About this file
This document is an Addendum 1 for RFP #2425-6162 issued by the Purchasing Department for the Grand Rapids Community College (GRCC) Learning Resource Center (LRC) Renovation project in Michigan. The addendum addresses a bidder's inquiry about flooring specifications, specifically clarifying that the only flooring package being bid is for 09C Specialty Flooring (epoxy/resinous flooring). The document indicates that contractors are required to complete their own quantitative takeoffs based on the drawings included in the RFP, with no pre-specified quantities provided.
The addendum is part of a reposted RFP (#2425-6162) that originally was numbered #2425-5129, covering work categories including Specialty Flooring (09C), Elevators (14A), and Fire Alarm (28B). Bidders are instructed to acknowledge receipt of the addendum with their bid submission. No specific pricing details, funding sources, or contract term information is provided in this document. The primary focus appears to be providing clarification for potential bidders about the scope and measurement requirements for the specialty flooring component of the renovation project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Department
June 13, 2025
GRCC LRC Renovation
RFP # 2425-6162
Addendum 1
A. SPECIFICATION CLARIFICATIONS / REVISION
B. REQUESTS FOR INFORMATION
1. I was curious as to how I would place a bid on the flooring aspect when it’s not even specifying the square footage or anything of that nature. Can you help me in the right direction?
The only flooring package that is being bid is for 09C Specialty Flooring which is the epoxy/resinous flooring. Quantities are not specified; contractors are required to complete their own quantitative takeoffs based on the drawings included in the RFP.
Please acknowledge receipt of this addendum with your bid submission.