2025 05 29 Addendum No. 1.pdf

PDF 14 MB Posted

Attached to
GRCC LRC Trades (Repost) - WC 09C, 14A, and 28B
Solicitation number
RFP #2425-6162
Issued by
Kent County, Michigan

About this file

This document is an Addendum No. 1 for the Grand Rapids Community College (GRCC) Learning Resource Center Renovation and Addition project, issued by Progressive Companies on May 29, 2025. The addendum comprehensively updates multiple specification sections, drawings, and project details for a major renovation of the college's learning resource center. Key changes include modifications to civil work, landscape work, structural elements, architectural components, interior finishes, mechanical systems, electrical systems, and various building accessories. The addendum provides detailed revisions to piping specifications, locker types, wall coverings, visual display units, projection screens, window shades, and numerous other building systems and components.

The addendum accompanies the original bid documents and provides clarifications and updates to assist bidders in preparing their proposals. Significant changes include specifying exact locker types for different building areas, updating mechanical piping sizes and specifications, clarifying finish material installations, and providing additional details on window treatments and visual display boards. The document includes technical specifications for various building systems, performance requirements, and installation guidelines. The project appears to be funded through the college and involves comprehensive renovation of an existing learning resource center, with work categories spanning multiple trades and building systems.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Progressive Companies | weareprogressive.com

Addendum No. 1 Project: Grand Rapids Community College Learning Resource Center Renovation & Addition

Date: May 29, 2025

Project No: 58136042

To: GRCC – Abbot Kastanek, Jim Van Dokkumburg

Pioneer – Ross Geurink, Brandon Rhodes Progressive Companies – Chris Sholl, Lisa Warren All Plan Holders

AD1-1 NOTICE

A. This Addendum to the specifications and drawings for the above-captioned project adds to or supersedes all contrary or conflicting information in specifications and drawings which is amended in the following paragraphs. This Addendum is to become part of bidding documents as originally issued.

B. Each trade shall review the entire Addendum, including work of other trades, for revisions or clarifications regarding their own work.

C. This Addendum includes drawings herein numbered G100, C102, C201, C301, C401, L201, L202, L203, L501, S101, S102, S103, S302, AD101, AD102, A100, A101, A102, A110, A111, A113, A121, A122, A123, A131, A132, A133, A201, A202, A310, A311, A312, A320, A401, A402, A403, A411, A412, A413, A414, A501, A503, A601, A602, A801, PD100, P099, P100, P101, P102, P401, P501, P601, MH100, MH101, MH102, MH103, MP100, MP101, MP102, M403, M601, M602, E001, EP100, EP101, EP102, EL100, EL101, EL102, EC100, EC101, E401, E503, and E603, revised and dated May 29, 2025; new issue; Specification Sections 00 3100, 03 3000, 06 2000, 07 0150.74, 07 4213.19, 08 1117, 09 3000, 09 6723, 09 9123, 10 1100, 10 2600, 10 2800, 10 5113, 12 2216, 12 2400, 23 2113, 32 3313, revised and reissued; and 07 1800, 09 9300, 10 5126, 11 5213, new issue.

AD1-2 CIVIL WORK (ST)

A. DRAWING ITEMS

1. Drawing C102 (Reissued): Revise limits of removal along Ransom Avenue per City of Grand

Rapids requirements for the drop off zone.

2. Drawing C201 (Reissued):

a. Revise drop off zone per City of Grand Rapids.

b. Revise bike rack layout and sizing.

c. Revise the public sidewalk along Ransom Avenue to be 6’ wide per City of Grand Rapids.

d. Add bike rack on east side of the building.

e. Add handrail to top of wall along sidewalk on east side of the building.

3. Drawing C301 (Reissued):

a. Revise grading at drop off zone along Ransom Avenue.

b. Revise grading at new bike rack on east side of the building.

4. Drawing C401 (Reissued):

a. Revise storm sewer structures and piping on east and west sides of the building.

b. Add note to adjust steam manhole rim in planter area at main entry stairs.

AD1-3 LANDSCAPE WORK (NM)

A. SPECIFICATION ITEM

1. Section 32 3313 Site Bicycle Racks (Reissued): Substitute bike rack manufacturer and type.

B. DRAWING ITEMS

1. Drawing L201 (Reissued):

a. Add note for 2 existing trees to be removed and transplanted.

b. Add bike racks to east side.

c. Add Zoning Ordinance Requirements Table.

2. Drawing L202 (Reissued): Revise area for bike racks.

3. Drawing L203 (Reissued): Revise area for bike racks.

4. Drawing L501 (Reissued):

a. Detail A1: Substitute bike rack.

b. Detail B1: Revise structural reinforcement.

c. Detail B5: Revise structural reinforcement and labels.

d. Detail B7: Revise structural reinforcement and labels.

e. Details C1-C4: Clean up detail labels.

f. Details D2-D5: Revise structural reinforcement and add labels.

g. Details E2-E7: Revise structural reinforcement and add labels.

AD1-4 STRUCTURAL WORK (EF)

1. Drawing S101 (Reissued):

a. Add base plate callouts.

b. Update site wall and keynote.

c. Add steel framing for vertical shaft enclosure.

2. Drawing S102 (Reissued):

a. Add steel support for toilet partitions.

b. Add vertical angles in low wall below glass.

c. Add framing for vertical shaft enclosure.

3. Drawing S103 (Reissued): Add steel beam for glass support.

4. Drawing S302 (Reissued):

a. Omit Detail C3.

b. Update Detail E4.

AD1-5 ARCHITECTURAL WORK (JFC/JB)

A. SPECIFICATION ITEMS

1. Section 00 2113 Instructions to Bidders (Not Reissued): Refer to attached PDF for revisions.

2. Section 00 3100 Available Project Information (Reissued):

a. Add Preliminary Construction Schedule.

b. Add Preliminary Wage Rates.

3. Section 03 3000 Cast-in-Place Concrete (Reissued): Add light sandblast finish requirements including mock-ups.

4. Section 06 2000 Finish Carpentry (Reissued): Delete 1.01B Stair Handrail.

5. Section 07 0150.74 Rehabilitation of Single Ply Roofing (Reissued): Delete GACO as an approved manufacturer (2.01.C).

6. Section 07 1800 Traffic Coatings (New Issue): Add new section.

7. Section 07 4213.19 Insulated Metal Wall Panels (Reissued): Revise 2.03.A.4 from (R-21, U-.047) to (R-25.1, U-0.042).

8. Section 07 7273 Vegetated Roof Systems (Deleted) Delete section in entirety.

9. Section 08 1117 Aluminum Doors and Frames-Interior (Reissued):

a. Add interior barn door slider.

b. Add finish color selection “custom color to match approved Architect sample”.

10. Section 10 1400 Signage (Deleted) Delete section in entirety.

1. Drawing G100 (Reissued): Energy Compliance – Add thermal assembly values at building envelope.

2. Drawing AD101 (Reissued):

a. Remove fire extinguishers as indicated.

b. Add key note at exterior steps and retaining wall.

c. Remove exterior building signage as noted on West Elevation.

3. Drawing AD102 (Reissued): Remove fire extinguishers as indicated.

4. Drawing A100 (Reissued):

a. Add fire extinguishers as indicated.

b. Revise Office, Storage, and Break Room layout.

5. Drawing A101 (Reissued):

a. Add fire extinguishers and fire extinguisher cabinets as indicated.

b. Add wall types, dimensions, and key notes as indicated.

c. Add traffic coating waterproofing full area of basement outline.

d. Revise Keynote A51 to include Basis of Design for Lockers.

e. Add accessories and tags for Storage Room 104.

6. Drawing A102 (Reissued):

a. Add fire extinguishers and fire extinguisher cabinets as indicated.

b. Add wall types, dimensions, and key notes as indicated.

c. Delete interior planter drainage and vegetative roof assembly.

d. Add note at interior planter to indicate vegetation provided and installed by Owner.

e. Revise exterior planter drainage system from interior roof drains to through wall scupper drains.

f. Delete two wood roof pavers at Outdoor Terrace 243.

g. Add call box Key Note at Outdoor Terrace 243.

h. Delete Key Note 53.

i. Add exterior building signage at West Elevation.

7. Drawing A110 (Reissued): Revise Office, Storage, and Break Room layout.

8. Drawing A111 (Reissued):

a. Add suspended grid elevation note at Experimental Classroom 198.

b. Add Keynote A93 for recessed electric screen at Experimental Classroom 198.

9. Drawing A113 (Reissued): Add building outline for clarity.

10. Drawing A201 (Reissued):

a. Exterior Materials Legend: Add storefront shadowbox designation.

b. Elevation E2: Add note at exterior duct enclosure for clarification.

c. Elevation E2: Add exterior building signage above vestibules.

11. Drawing A202 (Reissued):

a. Elevations C2 and E2: Add finish note at Penthouse vertical metal panels.

b. Elevation C2: Add Section Cut at exterior exhaust enclosure.

c. Elevations C3, C4, and C6: Add detail cuts for clarification.

d. Elevations C3 and C6: Revise door graphics.

e. Elevation C6: Add shadowbox graphics at storefront assembly and related dimensions.

f. Exterior Materials Legend: Add storefront shadowbox designation.

g. Elevation A2: Add existing building signage to remain.

12. Drawing A310 (Reissued):

a. Keynote 07 2100.06: Revise perimeter foundation wall insulation from 2” to 3”.

b. Detail E2: Add key note at ceiling metal closure.

c. Detail E2: Delete elevation tag at wind girt for clarification.

d. Detail E3: Delete vegetative roof at planter box.

e. Detail E3: Revise planter box configuration from tapered to flat.

f. Detail E2: Revise perimeter foundation wall rigid insulation from 2” to 3”.

13. Drawing A311 (Reissued):

a. Keynote 07 2100.06: Revise perimeter foundation wall insulation from 2” to 3

b. Detail E2: Revise perimeter foundation wall rigid insulation from 2” to 3”.

c. Detail E2: Add window shade. Revise perimeter bulkhead depth as indicated on drawing.

d. Detail E4: Add note to remove portion of spray fiber insulation at (2) duct penetrations for clearance.

e. Detail E4: Revise planter configuration to accept scupper drain.

14. Drawing A312 (Reissued):

a. Detail B2: Add new detail.

b. Detail E2: Add planter with waterproofing membrane.

15. Drawing A320 (Reissued):

a. Detail A3: Delete vegetative roof assembly. Modify planter insulation configuration.

b. Detail A4: Delete vegetative roof assembly. Modify planter insulation configuration.

c. Detail E7: Add new detail.

16. Drawing A402 (Reissued):

a. Detail E3: Add ceiling mounted toilet partition key note at Women 150 and Men 149.

b. Detail E3: Add interior elevation tag at Wellness 144.

c. Detail E3: Add fire extinguisher cabinet at Corridor 148.

17. Drawing A414 (Reissued): Detail C7: Add key notes and cased aluminum jamb frame at barn door sliders.

18. Drawing A601 (Reissued):

a. Door Schedule: Revise Doors 113, 114, 115, 116, 120, 122, 124, 125,126, 129, 130, 131, 132, 162A, 162B, 162C, 162D, 162E, 162F, 162G, 162H, 162J, 162K, 168, 191, 194 to include perimeter seals and acoustic glazing at door lite and sidelite where occurs.

b. Doors 193 and 265: Delete “Alum.” frame material. Revise Door Type from FG to FG2.

c. Door Schedule Notes: Revise Key Note 7 to include specification reference. Add Note 14.

d. Detail A8: Delete surface mounted insulating glass.

e. Detail B7: Add new detail.

19. Drawing A801 (Reissued):

a. Details B2, B4, B5, C2, C3, and C4: Add sprayed-on-fireproofing at structural steel framing.

b. Add horizontal cap rail at glass guardrail.

c. Add glass guardrail key notes for clarification.

AD1-6 INTERIORS WORK (JB)

1. Section 09 3000 Tiling (Reissued):

a. Revise finish for non-tile trim and add Laticrete on list for acceptable products. (2.02)

b. Modify grout product to epoxy per GRCC standard. (2.04)

c. List Epoxy Grout as standard for all applications per GRCC standard. (3.03)

2. Section 09 6723 Resinous Flooring (Reissued):

a. Add required mockup and preinstallation meeting. (1.04)

b. Modify note to include 4” base where indicated on drawings. (3.01)

3. Section 09 9123 Interior Painting (Reissued):

a. Remove scope for painting wood (General)

b. Revise Basis of Design manufacturer to Benjamin Moore with Repcolite as approved alternate. (2.01)

4. Section 09 9300 Staining and Transparent Finishes (New Issue): Add new section.

5. Section 10 1100 Visual Display Units (Reissued): Revise note to indicate mechanically fastened mounting (2.01 A.4)

6. Section 10 2600 Wall and Corner Protection (Reissued): Add protective wall panels. (FRP) (2.03)

7. Section 10 2800 Toilet and Bath Accessories (Reissued):

a. Add Folding Shower seat. (2.05)

b. Modify mounting for both surface and recessed mounting for baby changing color as selected by Architect. (2.07)

8. Section 10 5113 Metal Lockers (Reissued):

a. Remove Locker Benches. (General)

b. Modify Basis of Design for backpack laptop lockers, remove hooks and add laptop shelf, update locking mechanism for digital keypad locks. (2.02)

9. Section 10 5126 Plastic Lockers (New Issue): Add new section.

10. Section 10 5129 Phenolic Lockers (Deleted): Delete section in entirety.

11. Section 11 5213 Projection Screens (New Issue): Add new section.

12. Section 12 2216 Drapery Track and Accessories (Reissued):

a. Add Basis of Design manufacturer. (2.01)

b. Modify finish to black. (2.04)

13. Section 12 2400 Window Shades (Reissued): Add mockup. (1.07)

1. Drawing A121 (Reissued):

a. Revise finish plan with new layout.

b. Add note for refinishing existing wood handrails in stairwell.

2. Drawing A122 (Reissued):

a. Revise carpet tags for Testing Rooms to include CPT-5 as transition tile as shown in carpet diagrams.

b. Add note for refinishing existing wood handrails in stairwell.

c. Add location and finish tags for CPT-13 area rug in wellbeing commons.

d. Revise glass film type to be installed outside Reception 127.

3. Drawing A123 (Reissued):

a. Revise tag for MB installed in Archives 258 to align with size and align with finish material list.

b. Add note for refinishing existing wood handrails in stairwell.

4. Drawing A131 (Reissued):

a. Revise furniture with updated layout.

b. Add note for display case location as required by Owner.

5. Drawing A132 (Reissued):

a. Add self-checkout station as provided by owner to Circulation Desk 154.

b. Add tables to Control Room 193 as required by Owner.

6. Drawing A133 (Reissued): Add self-checkout station as provided by Owner to Student Group

Study 222A.

7. Drawing A401 (Reissued):

a. Enlarge floor plans C2, C3, C4, and E2: Revise toilet accessories as approved by Owner.

b. Elevations D6, E6, E7: Revise to show updated toilet accessories as approved by Owner.

c. Elevation D7: Add note to include one locker to be ADA accessible.

d. Restroom Accessories Schedule: Update to include toilet accessories as approved by Owner.

8. Drawing A402 (Reissued):

a. Enlarge floor plan E3: Revise toilet accessories as approved by Owner.

b. Enlarge floor plan E7: Revise extents of T-4 with relocation of M2 mirror to north wall.

c. Elevations A3, A6, A7, and C5: Revise to show updated toilet accessories as approved by

Owner.

d. Restroom Accessories Schedule: Update to include toilet accessories as approved by Owner.

e. Revise Keynote A33 to list accurate model number for one station sink.

9. Drawing A403 (Reissued):

a. Enlarge floor plan E3: Revise toilet accessories as approved by Owner.

b. Elevations B5, C6, and C7: Revise to show updated toilet accessories as approved by

Owner.

c. Restroom Accessories Schedule: Update to include toilet accessories as approved by Owner.

d. Revise Keynote A33 to list accurate model number for one station sink.

10. Drawing A411 (Reissued):

a. Elevation B5: Revise casework to remove mini refrigerator, tagged revised accessories.

b. Elevation C5: Add note for metal floating shelves to align with detail.

c. Elevation D7: Revise to include additional accessories.

d. Elevation E4: Revise elevation with redesign of basement layout.

e. Elevation E7: Revise casework to remove mini refrigerator, tagged revised accessories.

f. Restroom Accessories Schedule: Update to include toilet accessories as approved by Owner.

g. Revise Keynote A51 to include the Basis of Design for lockers, revise note to clarify metal lockers are to be provided.

11. Drawing A412 (Reissued): Elevation E3: Revise note for seating niche to include UPH-2 as wall upholstery.

12. Drawing A413 (Reissued): Elevation D2: Revise to show location for self-checkout station provided by Owner.

13. Drawing A414 (Reissued): Elevation A2: Add note for metal floating shelves to align with detail.

14. Drawing A501 (Reissued): Details B5, and E7: Add note to include Basis of design information for floating shelves.

15. Drawing A503 (Reissued):

a. Elevation C7: Revise note to clarify finish for counter.

b. Elevation D2: Revise note to clarify finish for counter.

c. Details E2, E4, E6, and E7: Revise note to clarify finish for counter.

16. Drawing A602 (Reissued):

a. Revise Finish Material list:

1) Add CPT-13.

2) Revise Note for RST-1 and RST-2 for clarity that they were integral risers and treads.

3) Add color selection for WP-9.

4) Revise representative contact for all Turf products listed.

5) Revise SC-5 information for custom designed felt inserts for existing coffers.

6) Revise note for MB1-7 to include clarifications on height and width.

7) Revise selection for UPH-2.

8) Revise notes for WT-1 and WT-2 to list openness desired.

AD1-7 PLUMBING WORK (JG)

1. Drawing PD100 (Reissued): Revise existing wall cleanout to be demolished and add keynote as indicated.

1. Drawing P099 (Reissued):

a. Add sanitary piping to break room sink.

b. Add keynote for connection to existing piping.

c. Revise sump pump pipe size.

2. Drawing P100 (Reissued):

a. Add venting and domestic water piping to relocated break room sink.

b. Add keynote for relocation of existing wall cleanout.

c. Remove waste piping to planter box drains PD-1.

d. Revise sump pump pipe size.

3. Drawing P101 (Reissued):

a. Remove waste piping to planter box drains PD-1.

b. Add floor sink to JC 139.

4. Drawing P102 (Reissued):

a. Remove planter box drains PD-1.

b. Revise vent piping to S-1.

5. Drawing P401 (Reissued):

a. Add relief vent note to enlarged plan.

b. Add hose bib HB-2 in the Mechanical Room.

c. Add Keynote 18.

6. Drawing P501 (Reissued): Revise Detail C1.

7. Drawing P601 (Reissued): Revise Plumbing Fixture Schedule.

AD1-8 MECHANICAL WORK (JG)

1. Section 23 2113 Hydronic Piping (Reissued): Reissue per RFI 002.

1. Drawing MH100 (Reissued):

a. Revise ductwork layout for revised basement layout.

b. Add dimensions and notes for Mechanical Room ductwork.

c. Add refrigerant monitor and keynote as indicated.

d. Add keynote for service dock exhaust ductwork for clarification.

2. Drawing MH101 (Reissued):

a. Revise CUH-137 and CUH-165 to be recessed ceiling mounted type.

b. Add return grilles throughout the spaces as indicated.

c. Add wall openings through testing rooms 162E and 162K for return air path.

d. Add transfer grilles in rooms with exposed ceilings for return air path.

3. Drawing MH102 (Reissued):

a. Add return grilles as indicated.

b. Revise CUH-225 to be recessed ceiling mounted type.

c. Revise TU-3-150A and TU-3-150B inlet size.

4. Drawing MH103 (Reissued): Revise L-2 tag and airflow.

5. Drawing MP100 (Reissued):

a. Revise fin tube hydronic pipe size.

b. Revise BCU-1 hydronic pipe to show existing to remain.

6. Drawing MP101 (Reissued):

a. Revise CUH-137 and CUH-165 piping for new mounting type.

b. Revise hydronic pipe sizing based on M001 pipe size schedule.

c. Revise CO2 sensor symbol.

7. Drawing MP102 (Reissued):

a. Revise CUH-225 piping for new mounting type.

b. Revise hydronic pipe sizing based on M001 pipe size schedule.

c. Revise CO2 sensor symbol.

8. Drawing M403 (Reissued):

a. Revise location of UH-1.

b. Add hydronic piping to UH-1.

c. Revise TU-3-150A and TU-3-150B inlet duct size.

9. Drawing M601 (Reissued): Revise TU-3-150A and TU-3-150B inlet duct size.

10. Drawing M602 (Reissued):

a. Diffuser, Register, & Grille Schedule: Add RG-13, SD-10, TG-2,3, and 4. Revise model of RD-6 and 8. Revise model of SD-6, 8, 9, 11, and 12.

b. Hydronic Cabinet Heater Schedule: Revise CUH-137, 65, and 225 model and mounting type.

c. Add Louver, Intake Hood, and Steam Humidifier Schedule.

AD1-9 ELECTRICAL WORK (GG)

1. Drawing E001 (Reissued): Add wall mounted speaker to Data Symbol Legend.

2. Drawing EP100 (Reissued): Update power to match new room layouts in 010, 009, 008, 007, 012.

3. Drawing EP101 (Reissued):

a. Add dimensioning for projector power/data location in 156 Classroom.

b. Add Keynote 44 for IT Rack.

c. Update hand dryer power locations in 150 Women and 149 Men.

4. Drawing EP102 (Reissued):

a. Add dimensioning for projector power/data location in 238 Classroom.

b. Update hand dryer power locations in 218 GN Toilet Room.

5. Drawing EL100 (Reissued): Adjust lighting in 010, 008, 011, and 006 to match architectural changes.

6. Drawing EL101 (Reissued):

a. Add emergency lighting in Men 149, Women 150, Inclusion & Multicultural Affairs Support

142, Circulation 155, Primary Production Studio 191, Lightboard 194, Control 193, Equip Storage 187, Media Staging 186, Vestibule 159, Vestibule 101, Experimental Classroom 198.

b. Made visible select ceiling mounted devices on reflected ceiling plan in 156 Classroom for coordination purposes.

c. Add General Lighting Note E.

7. Drawing EL102 (Reissued):

a. Add emergency lighting in Library Stacks 207, GN Toilet Room 218, Quiet Study 223, Active

Student Study 201, Student Group Study 222B, Corridor 202, Reference Center 237, Archives 258.

b. Made visible select ceiling mounted devices on reflected ceiling plan in 238 Classroom for coordination purposes.

8. Drawing EC100 (Reissued): Update systems to match new room layouts in 010, 009, 008, 007, 012.

9. Drawing EC101 (Reissued): Update/add Keynotes 11, 16, 19.

10. Drawing E401 (Reissued):

a. Update/add Keynotes 1, 4, 5, 6, 7, 8.

b. Show speaker locations in 198 Experimental Classroom.

c. Show conduit runs for speakers in hard lid ceiling in 198 Experimental Classroom.

11. Drawing E503 (Reissued):

a. Add Detail B7.

b. Update Detail E6 to show single gang recessed box for speaker location.

12. Drawing E603 (Reissued): Update circuit names in Panel P.

SDT/NM/EF/JFC/JLB/JGGG/pny P:\58136042\05 CA\E1 BIDDING NEGOTIATION\d Addenda\2025 05 29 Addendum No. 1.docx

00 2113 Instructions to Bidders Revisions - Addendum #1

GRCC Learning Resource Center

Renovation & Addition GRCC Bid RFP No. 2425-5129

Owner: Grand Rapids Community College

Architect: Progressive Companies

Construction Manager/Constructor: Pioneer Construction

Date: Thursday, 5/29/25

Changes to 00 2113 Instructions to Bidders:

WORK CATEGORY 03A - Concrete

• 07 2100 Thermal Insulation – include all insulation at foundations & under slab.

• A letter of intent will be issued immediately following successful post-bid interview. All submittals for the work category are required within 2 weeks following LOI (prior to contract award). Anchor bolts & rebar for foundations at the addition and new elevator pit will be required on site by 7/28/25.

• Coordinate concrete washout with WC 31A Sitework contractor.

WORK CATEGORY 04A - Masonry

• 04 7200 Cast Stone Masonry

• Install only all lintels (steel lintels supplied by WC 05A)

• Install joint sealants required at cast stone cap.

WORK CATEGORY 05A - Metals

• 05 5100 Metal Stairs

• 05 5133 Metal Ladders

• 05 5213 Pipe & Tube Railings

• 05 7300 Decorative Metal Railings

• Include all non-shrink grout at steel column base plates, top of steam beam to existing slabs.

• Supply only all steel lintels required at CMU openings (to be installed by WC 04A Masonry)

• Submittals & Procurement:

o A letter of intent will be issued immediately following successful post-bid interview, during the week of 6/9/25.

o Detailing / Shop Drawings shall begin upon issuance of LOI.

o Virtual meetings / calls will be held with Pioneer, the detailer, and the structural engineer twice weekly, to ensure RFI’s/questions are answered quickly and expedite shop drawing progress.

o Sequencing and schedule for shop drawings, fabrication, and delivery are as follows:

▪ Sequence #1 (Interior structural steel at elevator shaft & 2nd floor opening area)

• Shop drawings complete by 6/27/25

• Contract issued by 7/4/25

• Review complete by 7/7/25

• Fabrication & Delivery to site by 8/15/25 (8 weeks after LOI)

▪ Sequence #2 (New Addition, excluding canopy)

• Shop drawings complete by 7/11/25

• Review complete by 7/18/25

• Fabrication & Delivery to site by 9/05/25 (12 weeks after LOI)

▪ Sequence #3 (Roof Penthouse & Canopy)

• Shop drawings complete by 7/25/25

• Review complete by 8/1/25

• Fabrication & Delivery to site by 10/10/25 or sooner (16 weeks after LOI)

• Structural steel framing for solar control sunshade system.

• Exclude high performance coating per spec section 09 9600 by WC 09D Painting & Wallcovering. WC 05A

Metals must apply a primer compatible with the compatible high performance coating.

WORK CATEGORY 06A – General Trades

• All scope items indicated in scope are to be furnished & installed by this work category

• 07 9513 – Expansion Joint Cover Assemblies

• 08 0671 – Door Hardware Schedule

• 08 1113 – Hollow Metal Doors & Frames

• 08 1416 – Flush Wood Doors

• 08 3100 – Access Doors & Panels

• 08 7100 – Door Hardware

• 10 4400 Fire Protection Specialties

• 10 5113 Metal Lockers

• 10 5129 Phenolic Lockers

• 10 2216 Drapery Track & Accessories

• 32 3300 Site Furnishings – included in this work category

• 32 3313 Site Bicycle Racks – included in this work category

• All site furnishings & bike racks (including top of wall mounted benches shown on landscape plans)

• Recessed projection screens (A112, for example)

• Temporary plywood wrap of existing exposed concrete columns for protection during construction.

• Signage, spec section 10 4000 – Signage is eliminated from this work scope and bid package. Signage will be procured by owner.

• Temporary fencing is eliminated from this work scope.

• Relocation of existing lockers is eliminated from this work scope.

• Include powdercoat tech column wrap metal case work (A7, C7, D7 on sheet A502). Monitors by others.

• Furnish & install new lockers.

• Furnish & install new wood handrails

WORK CATEGORY 07A – Roofing

• 07 5400 Thermoplastic Membrane Roofing

• 07 5563 Vegetated Roof Systems

• 07 6200 Sheet Metal Flashings & Trim

• 07 7100 Roof Specialties

• 07 7600 Roof Pavers

• Temporary roofing & roof flashing at locations where old penetrations are removed and/or new penetrations are created (to unsure no leaks during construction, prior to fluid applied membrane installation in 2026.

• Note roofing areas shown on sheet A102

• At existing roof, remove/replace of insulation and membrane areas will be done in summer/fall of 2025 to prevent spread of saturated areas. In spring/summer of 2026, any additional wet insulation will need to be replace, prior to application of fluid applied membrane.

• Specifically Excluded – Rooftop Irrigation (by WC 32A – Landscape)

WORK CATEGORY 07B – Metal Siding & Trellis

• 07 2100 Thermal Insulation – Include insulation behind metal panels as detailed.

• 07 4213 Metal Wall Panels

• 07 4213.19 Insulated Metal Wall Panels

WORK CATEGORY 07C – Joint Sealants

• 07 1800 Traffic Coatings – See Addendum 1 writeup, added spec section, and drawing revisions. Include this work in 07C – Joint Sealants scope of work.

• 07 9100 – Expansion Joint Seals

• 07 9200 – Joint Sealants

WORK CATEGORY 08A – Curtainwall, storefronts, glazing

• 08 0671 Door Hardware schedule (for aluminum openings)

• 08 4313 Aluminum Framed Storefronts

• 08 7100 Door Hardware (for aluminum openings)

• 08 8813 Fire-Rated Glazing

• 10 2239.13 Folding Glass Panel Partitions

• Include all mirrors, except for lighted mirrors (by WC 26A – Electrical)

• Include all insulation as required at perimeter of curtainwall system?

• Include sawcutting for recessed sliding glass wall track (if required)

WORK CATEGORY 09A – Metal Stud Framing, Drywall, Acoustical Ceilings & Walls

• 06 8316 Fiberglass Reinforced Paneling

• 07 2100 Thermal Insulation – include all interior batt insulation & insulation at metal framing.

• 07 2700 Air Barriers

• 07 8400 Firestopping (at wall assemblies. Fire stopping for penetrations will be completed by MEP trades)

• 09 5400 Specialty Ceiling & Feature Wall Systems

• 09 5423 Metal Blades Ceiling System

• For the metal baffle system (SC-4), include all Unistrut support (Keynote A87 on sheet A112, for example).

• Engineered CFMF jamb, headers, & posts Material Keynotes 05 4000.28 & .29 note on A414 for example)

WORK CATEGORY 09B – Flooring

• 09 6900 Access Flooring

• 09 8400 Sound Absorbing Wall & Ceiling Units

• For the large format porcelain tile panels/slabs (T-3 on finish schedule, for example), all installers must have completed the NTCA Gauged Porcelain Tile Panels/Slabs training (or equivalent training program) prior to installation. all installers must have completed The Flooring Contractor is responsible for all final wall prep to ensure proper installation of panels.

• Specifically excluded: 06 6723 – Resinous Flooring

WORK CATEGORY 09C – Specialty Flooring

• 09 6723 – Resinous Flooring included in this work category

WORK CATEGORY 09D - Painting

• 07 0553 Fire & Smoke Assembly Identification included in the work category

• 09 7200 Wall Coverings included in this work category

• Specifically excluded: Primer for High Performance Coating at steel canopy structure by steel fabricator.

• Refinishing of existing wood handrails

WORK CATEGORY 14A - Elevators

• 14 2123 Electric Traction Passenger Elevators

• 14 2400 Hydraulic Elevators

• Maintain existing Elevator #1 for temporary use during construction.

• Coordinate with the Access Controls (WC 28A) and Fire Alarm (WC 28B) contractor to make accommodations for installation and integration of card reader & fire alarm systems. See spec sections 28 1500 & 28 4600.

WORK CATEGORY 21A – Fire Protection

• 07 8400 Firestopping

WORK CATEGORY 22A - Plumbing

• 08 3100 – Access Doors & Panels – As required to access valves, controls, etc for this trade.

• 22 0548 Vibration & Seismic Controls For Plumbing Piping & Equipment

• Include all roof drains, overflow drains, drain pans, & piping.

• All trades responsible for covering and maintaining covers at their own holes/cores/openings.

• Include oil separator for elevator and associated sawcutting, trenching, piping, backfill, & new concrete.

• Specifically excluded: new sump pit enclosure by WC 31A Sitework

• Supply & install backflow preventers for irrigation system (See sheet IR 200)

WORK CATEGORY 23A - HVAC

• 08 3100 – Access Doors & Panels – As required to access valves, controls, dampers etc for this trade.

• 23 0993 Sequence of Operations for HVAC Controls

• 23 2300 Refrigerant Piping

• 23 8125 Computer Room Air Conditioners

• GRCC exclusively uses Trane Controls (other controls contractors to be removed from spec via addendum)

• Hoisting & handling of all HVAC equipment for install. Verify equipment will fit in all available openings. Cost to modify openings will be by the HVAC contractor if CM is not notified prior to bid.

• All trades responsible for covering and maintaining covers at their own holes/cores/openings.

• Warranties start at the date of substantial completion. Startups will be required to this date to allow for TAB & commissioning, so the contractor is required to carry any costs associated with additional months of warranty if required.

WORK CATEGORY 26A - Electrical

• 08 3100 – Access Doors & Panels – As required to access controls, power supplies, other service components for this trade.

• 26 0529 Hangers & Supports for Electrical Systems

• 26 0548 Vibration & Seismic Controls for Electrical Systems

• 26 0573 Power System Studies

• 26 2816.16 Enclosed Switches

• 26 2923 Variable Frequence Motor Contrrollers

• 26 3213 Engine Generators

• Review all other trades drawings for complete electrical connections of all equipment & electrically powered devices.

• Remove fire alarm and access controls from this scope.

• Include backfill and concrete replacement for any sawcutting/trenching required for electrical.

• Furnish & install all conduit/sleeves under hardscape areas for site lighting/fixtures.

WORK CATEGORY 31A - Sitework

• 31 2323.43 GeoFoam

• Include all earth retention required at new interior elevator pit. Including permanent earth retention as shown on drawings, and temporary (not shown) required to keep from undermining existing slab surrounding elevator pit.

• Include all footing drains, peastone, geotextile fabric.

• Provide voluntary alternate price to remove fire lane running from Lyon Street to the project site at the end of construction and replace with new (in lieu of temporary protection)

• Remove concrete washout (coordinate with Concrete contractor)

• Include protection of existing structures including steam vault.

• Include compacted granular base at new elevator pit.

• Furnish and install new sump pit enclosure.

• Furnish & install all sleeves for underground irrigation system.

WORK CATEGORY 32A – Landscaping

• Include transplanting of trees as noted on plan.

• 32 8423 – Underground Sprinklers – Include all underground sprinklers.

• 32 9223 Sodding

• Include all rooftop irrigation.

• Specifically Excluded: backflow preventers for irrigation system by WC 22A - Plumbing

• Specifically Excluded: 32 3300 Site Furnishings

• Specifically Excluded: 32 3313 Site Bicycle Racks

This concludes Addendum 1 revisions to 00 2113 Instructions to Bidders.

SECTION 00 3100 AVAILABLE PROJECT INFORMATION

Grand Rapids Community College Learning Resource Center Renovation and Addition 00 3100 - 1 58136042

Issued for Addendum 1

PART 1 GENERAL

1.01 EXISTING CONDITIONS

A. Certain information relating to existing surface and subsurface conditions and structures is available to bidders but will not be part of Contract Documents, as follows:

B. Roof Analysis: Entitled - Roof Diagnostic Moisture Survey, Dated - September 26, 2024.

C. Hazardous Material Survey: Entitled NESHAP Hazardous Building Materials Inspection Report , dated December 10, 2022 .

D. Hazardous Materials - Supplemental Specification E. Grand Rapids Community College Asbestos & Lead-Based Paint Operations & Maintenance

Program F. Preliminary Project Schedule: Entitled [Grand Rapids Community College Learning Resource

Center Renovation and Addition], G. Prevailing Wage Rates Entitled: State of Michigan Department of Labor and Economic

Opportunity Wage and Hour Division Dated: 04/18/2025.

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION (NOT USED)

This page intentionally left blank

Task Name Duration Start Finish

GRCC Learning Resource Center 435 days Mon 3/31/25 Fri 11/27/26

Preconstruction 41 days Fri 5/9/25 Fri 7/4/25

Bidding 20 days Fri 5/9/25 Thu 6/5/25

Post Bid / Award Contracts 21 days Fri 6/6/25 Fri 7/4/25

Start Construction 0 days Fri 7/4/25 Fri 7/4/25

Procurement 100 days Mon 7/7/25 Fri 11/21/25

Construction 435 days Mon 3/31/25 Fri 11/27/26

Addition Core & Shell 220 days Mon 7/28/25 Fri 5/29/26

Foundations 20 days Mon 7/28/25 Fri 8/22/25

Steel 20 days Mon 9/1/25 Fri 9/26/25

Slab on Metal Deck 5 days Mon 9/29/25 Fri 10/3/25

Metal Framing 15 days Mon 10/6/25 Fri 10/24/25

Underground MEP 10 days Mon 10/27/25 Fri 11/7/25

Roofing 20 days Mon 10/27/25 Fri 11/21/25

Concrete SOG 5 days Mon 11/10/25 Fri 11/14/25

Curtainwall 25 days Mon 11/17/25 Fri 12/19/25

Metal Panels 15 days Mon 12/22/25 Fri 1/9/26

Metal Sunshades 20 days Mon 1/12/26 Fri 2/6/26

Fluid-Applied Roof Membrane 20 days Mon 5/4/26 Fri 5/29/26

Interior Buildout 435 days Mon 3/31/25 Fri 11/27/26

Asbestos Abatement 5 days Mon 3/31/25 Fri 4/4/25

Demolition 40 days Mon 4/7/25 Fri 5/30/25

Elevator Foundation 15 days Mon 7/14/25 Fri 8/1/25

Elevator Shaft 20 days Mon 8/11/25 Fri 9/5/25

Structural Steel 15 days Mon 9/8/25 Fri 9/26/25

Slab on Metal Deck 5 days Mon 9/29/25 Fri 10/3/25

Elevator Install 25 days Mon 11/24/25 Fri 12/26/25

Interior Studs 30 days Mon 7/14/25 Fri 8/22/25

Electrical Rough-in 55 days Mon 8/4/25 Fri 10/17/25

Plumbing Rough-in 20 days Mon 8/18/25 Fri 9/12/25

Mechanical Rough-in 60 days Mon 7/28/25 Fri 10/17/25

Fire Suppression Rough-in 40 days Mon 9/8/25 Fri 10/31/25

Door Frames 20 days Mon 8/25/25 Fri 9/19/25

Drywall 60 days Mon 10/6/25 Fri 12/26/25

Prime & 1st Coat Paint 20 days Mon 12/29/25 Fri 1/23/26

Tile 40 days Mon 1/26/26 Fri 3/20/26

Millwork 30 days Mon 1/26/26 Fri 3/6/26

Ceiling Grid & Cuts 30 days Mon 1/26/26 Fri 3/6/26

Specialty Ceilings & Walls 50 days Mon 1/26/26 Fri 4/3/26

Final Coat Paint 45 days Mon 4/6/26 Fri 6/5/26

Doors & Hadware 30 days Mon 4/6/26 Fri 5/15/26

Bath Accessories & Wall Mounted Items

25 days Mon 6/8/26 Fri 7/10/26

Electrical Finishes 40 days Mon 6/8/26 Fri 7/31/26

Plumbing Finishes 30 days Mon 6/8/26 Fri 7/17/26

Mechanical Finishes 40 days Mon 6/8/26 Fri 7/31/26

Fire Suppression Finishes 15 days Mon 6/8/26 Fri 6/26/26

Flooring 45 days Mon 6/8/26 Fri 8/7/26

Drop Ceiling Pads 15 days Mon 8/10/26 Fri 8/28/26

Inspections 15 days Mon 8/31/26 Fri 9/18/26

Punchlist 15 days Mon 8/31/26 Fri 9/18/26

Construction Cleaning 15 days Mon 8/31/26 Fri 9/18/26

Commissioning 20 days Mon 8/31/26 Fri 9/25/26

Furniture 20 days Mon 9/28/26 Fri 10/23/26

IT Install 15 days Mon 10/26/26 Fri 11/13/26

Move In 10 days Mon 11/16/26 Fri 11/27/26

Sitework 265 days Mon 7/7/25 Fri 7/10/26

Site Demolition 15 days Mon 7/7/25 Fri 7/25/25

Remove / Relocate Utilities 10 days Mon 7/28/25 Fri 8/8/25

Rough Grading 10 days Mon 8/25/25 Fri 9/5/25

Site Lighting 10 days Mon 5/4/26 Fri 5/15/26

Snowmelt 20 days Mon 5/4/26 Fri 5/29/26

Concrete Paving 15 days Mon 6/1/26 Fri 6/19/26

Landscaping 15 days Mon 6/22/26 Fri 7/10/26

0% Bidding

0% Post Bid / Award Contracts

7/4

0% Foundations

0% Steel

0% Slab on Metal Deck

0% Metal Framing

0% Underground MEP

0% Roofing

0% Concrete SOG

0% Curtainwall

0% Metal Panels

0% Metal Sunshades

0% Fluid-Applied Roof Membrane

Asbestos Abatement

Demolition

0% Elevator Foundation

0% Elevator Shaft

0% Structural Steel

0% Slab on Metal Deck

0% Elevator Install

0% Interior Studs

0% Electrical Rough-in

0% Plumbing Rough-in

0% Mechanical Rough-in

0% Fire Suppression Rough-in

0% Door Frames

0% Drywall

0% Prime & 1st Coat Paint

0% Tile

0% Millwork

0% Ceiling Grid & Cuts

0% Specialty Ceilings & Walls

0% Final Coat Paint

0% Doors & Hadware

0% Bath Accessories & Wall Mounted Items

0% Electrical Finishes

0% Plumbing Finishes

0% Mechanical Finishes

0% Fire Suppression Finishes

0% Flooring

0% Drop Ceiling Pads

0% Inspections

0% Punchlist

0% Construction Cleaning

0% Commissioning

0% Furniture

0% IT Install

0% Move In

0% Site Demolition

0% Remove / Relocate Utilities

0% Rough Grading

0% Site Lighting

0% Snowmelt

0% Concrete Paving

0% Landscaping

May '25 Jun '25 Jul '25 Aug '25 Sep '25 Oct '25 Nov '25 Dec '25 Jan '26 Feb '26 Mar '26 Apr '26 May '26 Jun '26 Jul '26 Aug '26 Sep '26 Oct '26 Nov '26 Dec '26

Grand Rapids Community College Learning Resource Center

Preliminary Construction Schedule

Task Name Duration Start Finish Asphalt 5 days Mon 6/22/26 Fri 6/26/26 0% Asphalt

May '25 Jun '25 Jul '25 Aug '25 Sep '25 Oct '25 Nov '25 Dec '25 Jan '26 Feb '26 Mar '26 Apr '26 May '26 Jun '26 Jul '26 Aug '26 Sep '26 Oct '26 Nov '26 Dec '26

Grand Rapids Community College Learning Resource Center

Preliminary Construction Schedule

SUSAN CORBIN

DIRECTOR

STATE OF MICHIGAN

DEPARTMENT OF LABOR AND ECONOMIC OPPORTUNITY

WAGE AND HOUR DIVISION

Prevailing Wage Rates for State Funded Projects Official Rate Schedule

GRETCHEN WHITMER

GOVERNOR

ORS#: ORS-002470

Date Issued: 04/18/2025 Contract Award By Date: 07/17/2025 Contracting Agency: Grand Rapids Community College (CA-0225) Contracting Agency Representative: Abbot Kastanek (akastanek@grcc.edu) Project Number: 366/24118.KSZ Project Name: Learning Resource Center Renovation & Expansion Project Description: The existing Learning Resource Center serves as one of the main hubs on campus, with open-access 74-hours per week, and contains research materials, study tables, computer lab, an information literacy classroom, presentation spaces, laptop and hotspot checkouts, textbook and reserves, and houses

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 1 of 155

FOR ALL AWARDED CONTRACTS ONLY

• Every Contractor and Subcontractors shall keep Posted on the Construction Site, in a conspicuous place, a copy of all applicable prevailing wage rate schedules contained in a contract.

• The Prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated classifications.

• Please refer to WHD-9917 & WHD 9918 for any additional information.

Official Rate Schedule

Kent

Classification Name Category Last Updated

Tile Setter & Terrazzo Worker (Do Not Use) Tile, Marble and Terrazzo 04/04/2025

Classification Description: Work: Installing and finishing mosaic and terrazzo materials, including precision tasks like grinding and polishing.

Materials: Marble, mosaic, Venetian enamel, terrazzo, granules of marble, granite, bluestone, enamel, mother of pearl, quartz, ceramic-colored quartz, rubber, neoprene, vinyl, magnesium chloride, and resinous or chemical substances.

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $52.89 $67.19 $81.47 Apprentice: Apprentice Level 1 $40.51 $49.49 $58.46 Apprentice: Apprentice Level 2 $42.12 $52.03 $61.93 Apprentice: Apprentice Level 3 $43.73 $54.32 $64.90 Apprentice: Apprentice Level 4 $45.34 $56.73 $68.12 Apprentice: Apprentice Level 5 $46.95 $59.15 $71.34 Apprentice: Apprentice Level 6 $48.56 $61.56 $74.56 Apprentice: Apprentice Level 7 & 8 $50.17 $63.98 $77.78

Overtime Provisions Over 8-hour day/40-hour week

9th hour $67.06 10th hour $67.06 Beyond 10 hours $67.06

Saturday First 8 hours $67.06 9th hour $67.06 10th hour $67.06 Beyond 10 hours $67.06

Sunday/Holiday $81.22

Four 10-hour days allowed? - Yes Make Up Day Allowed? - No

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 2 of 155

Kent

Classification Name Category Last Updated

Asbestos & Lead Abatement Laborer Asbestos Abatement Worker or Environmental Remediation Worker

04/04/2025

Classification Description: Asbestos & Lead Abatement Laborer 4 ten hour days @ straight time allowed Monday-Saturday, must be consecutive calendar days

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $50.60 $65.37 $80.13 Apprentice: Trainee 600 hours +1 year $34.07 $18.89 $20.54

Overtime Provisions Over 8-hour day/40-hour week

9th hour $65.37 10th hour $65.37 Beyond 10 hours $65.37

Saturday First 8 hours $65.37 9th hour $65.37 10th hour $65.37 Beyond 10 hours $65.37

Sunday/Holiday $80.13

Four 10-hour days allowed? - Yes

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 3 of 155

Kent

Classification Name Category Last Updated

Boilermaker Boilermaker 04/04/2025 Classification Description: Boilermaker

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $72.47 $107.55 $142.63 Apprentice: 1st Period $53.53 $79.15 $104.75 Apprentice: 2nd Period $55.14 $81.56 $107.97 Apprentice: 3rd Period $56.73 $83.94 $111.15 Apprentice: 4th Period $58.31 $86.31 $114.31 Apprentice: 5th Period $59.85 $88.62 $117.39 Apprentice: 6th Period $63.03 $93.39 $123.75 Apprentice: 7th Period $66.17 $98.10 $130.03 Apprentice: 8th Period $69.32 $102.83 $136.33

Overtime Provisions Over 8-hour day/40-hour week

9th hour $90.82 10th hour $90.82 Beyond 10 hours $90.82

Saturday First 8 hours $90.82 9th hour $90.82 10th hour $90.82 Beyond 10 hours $90.82

Sunday/Holiday $109.17

Four 10-hour days allowed? - Yes

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 4 of 155

Kent

Classification Name Category Last Updated

Bricklayers, Stone Mason, Pointer, Cleaner & Caulker - BAC 2 - GR & Northern

Bricklayer 04/04/2025

Classification Description: Bricklayers, Stone Mason, Pointer, Cleaner & Caulker

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $55.28 $71.33 $87.38 Apprentice: Bricklayer Apprentice Level 5 $48.63 $62.36 $76.08

Apprentice: Bricklayer Apprentice Level 6 $51.66 $66.35 $81.04

Apprentice: Bricklayers Apprentice 2nd Level $44.36 $55.40 $66.44

Apprentice: Bricklayers Apprentice 4th Level $48.18 $61.13 $74.08

Apprentice: Bricklayers Apprentice Level 1 $41.47 $51.62 $61.76

Apprentice: Bricklayers Apprentice Level 3 $45.05 $56.99 $68.92

Apprentice: Bricklayers Apprentice Level 7& 8 $52.22 $67.74 $83.26

Overtime Provisions Over 8-hour day/40-hour week

9th hour $71.33 10th hour $71.33 Beyond 10 hours $71.33

Saturday First 8 hours $71.33 9th hour $71.33 10th hour $71.33 Beyond 10 hours $71.33

Sunday/Holiday $87.38

Four 10-hour days allowed? - Yes

Between Nov. 1 and Apr 30, if inclement weather, or other conditions beyond the Employer’s control, Saturdays may be worked as make-up days. Make-up time shall be paid at the straight time rate until forty hrs are worked unless the standard workweek included a holiday, then 32 hrs straight time

Make Up Day Allowed? - Yes

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 5 of 155

Kent

Classification Name Category Last Updated

Bricklayers, Stone Mason, Pointer, Cleaner & Caulker - BAC 2 - Lansing Bricklayer 04/04/2025

Classification Description: Bricklayers, Stone Mason, Pointer, Cleaner & Caulker

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $59.46 $75.04 $90.62 Apprentice: Bricklayer Apprentice 5th Level $52.80 $66.05 $79.30

Apprentice: Bricklayer Apprentice Level 6 $54.61 $68.77 $82.92

Apprentice: Bricklayers Apprentice 1st Level $45.58 $55.22 $64.86

Apprentice: Bricklayers Apprentice 2nd Level $47.39 $57.94 $68.48

Apprentice: Bricklayers Apprentice 3rd level $49.19 $60.64 $72.08

Apprentice: Bricklayers Apprentice 4th level $51.00 $63.35 $75.70

Apprentice: Bricklayers Apprentice 7th & 8th Levels $56.41 $71.47 $86.52

Overtime Provisions Over 8-hour day/40-hour week

9th hour $59.46 10th hour $59.46 Beyond 10 hours $59.46

Saturday First 8 hours $59.46 9th hour $59.46 10th hour $59.46 Beyond 10 hours $59.46

Sunday/Holiday $90.62

Four 10-hour days allowed? - Yes

Between Nov. 1 and Apr 30, if inclement weather, or other conditions beyond the Employer’s control, Saturdays may be worked as make-up days. Make-up time shall be paid at the straight time rate until forty hrs are worked unless the standard workweek included a holiday, then 32 hrs straight time

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 6 of 155

Kent

Classification Name Category Last Updated

Journeyman Carpenter Carpenter 04/04/2025 Classification Description: Journeyman Carpenter Base Foreman wage with 3-7 employees = $2.50 above Base Rate Foreman with 8 + employees = $3.50 above base rate General Foreman = $4.00 above base rate

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $50.20 $65.26 $80.31 Apprentice: 1st year $42.17 $52.71 $63.25 Apprentice: 2nd year $43.67 $54.96 $66.25 Apprentice: 3rd year $46.68 $59.48 $72.27 Apprentice: 4th year $49.69 $63.99 $78.29

Overtime Provisions Over 8-hour day/40-hour week

9th hour $65.25 10th hour $65.25 Beyond 10 hours $65.25

Saturday First 8 hours $65.25 9th hour $65.25 10th hour $65.25 Beyond 10 hours $65.25

Sunday/Holiday $80.31

Four 10-hour days allowed? - No

Base Rate Comment: Foreman wage with 3-7 employees = $2.50 above Base Rate Foreman with 8 + employees = $3.50 above base rate General Foreman = $4.00 above base rate

Saturday

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 7 of 155

Kent

Classification Name Category Last Updated

Cement Mason Cement Mason 04/04/2025 Classification Description: • Work: Laying cement, casting concrete, polishing, sealing, and operating cement-related tools and machines

• Materials: cement concrete, brownstone composition, mastic and gypsum material, black top or composition flooring, waterproofing, and epoxy

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $51.20 $65.33 $79.46 Apprentice: Apprentice Level 1 $40.55 $50.36 $60.16 Apprentice: Apprentice Level 2 $42.14 $52.74 $63.34 Apprentice: Apprentice Level 3 $43.73 $55.13 $66.52 Apprentice: Apprentice Level 4 $45.32 $57.51 $69.70 Apprentice: Apprentice Level 5 $46.91 $59.90 $72.88 Apprentice: Apprentice Level 6 $48.50 $62.28 $76.06

Overtime Provisions Over 8-hour day/40-hour week

9th hour $65.33 10th hour $65.33 Beyond 10 hours $65.33

Saturday First 8 hours $65.33 9th hour $65.33 10th hour $65.33 Beyond 10 hours $65.33

Sunday/Holiday $79.46

Four 10-hour days allowed? - Yes

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 8 of 155

Kent

Classification Name Category Last Updated

Class I Diver 04/04/2025 Classification Description: Class I - diver/wet tender, engineer, blaster, leverman

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $82.82 $107.82 $132.82

Overtime Provisions Over 8-hour day/40-hour week

9th hour $32.82 10th hour $107.82 Beyond 10 hours $107.82

Saturday First 8 hours $107.82 9th hour $107.82 10th hour $107.82 Beyond 10 hours $107.82

Sunday/Holiday $132.82

Four 10-hour days allowed? - No

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 9 of 155

Kent

Classification Name Category Last Updated

Drywall Taper & Finisher Drywaller 04/04/2025 Classification Description: Drywall Taper and Finisher

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $44.64 $58.17 $71.75 Apprentice: 1st level $31.06 $37.80 $44.59 Apprentice: 2nd level $36.49 $45.95 $55.45 Apprentice: 3rd level $41.92 $54.09 $66.31

Overtime Provisions Over 8-hour day/40-hour week

9th hour $58.22 10th hour $58.22 Beyond 10 hours $58.22

Saturday First 8 hours $58.22 9th hour $58.22 10th hour $58.22 Beyond 10 hours $58.22

Sunday/Holiday $71.80

Four 10-hour days allowed? - No

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 10 of 155

Kent

Classification Name Category Last Updated

Communication Technician Electrician 04/04/2025 Classification Description: Communication Technician

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $67.89 $98.24 $128.58

Overtime Provisions Over 8-hour day/40-hour week

9th hour $98.24 10th hour $98.24 Beyond 10 hours $98.24

Saturday First 8 hours $98.24 9th hour $98.24 10th hour $98.24 Beyond 10 hours $98.24

Sunday/Holiday $128.58

Four 10-hour days allowed? - Yes

Base Rate Comment: Foreman (112.5% above JL Rate)

ONLY due to inclement weather or customer requirements may Friday be used as a make up day if the normal scheduled work week was interrupted and time lost of five (5) hours or more was incurred by workmen covered under the terms of the 6-17-C/6-876-T agreement.

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 11 of 155

Kent

Classification Name Category Last Updated

Electrician - IW Electrician 04/04/2025 Classification Description: Inside Wireman

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $59.04 $76.88 $94.72 Apprentice: 1st period 0-1,000 hrs $26.89 $35.69 $44.48 Apprentice: 2nd period 1,001-2,000 hrs $28.82 $38.59 $48.34

Apprentice: 3rd period 2,001-3,500 hrs $31.08 $41.98 $52.86

Apprentice: 4th period 3,501-5,000 hours $33.06 $44.95 $56.82

Apprentice: 5th or 6th period with license $45.91 $64.22 $82.52

Apprentice: 5th period 5,001-6,500 hrs (no license) $37.78 $52.02 $66.26

Apprentice: 6th period 6,501-8,000 hrs (no license) $41.84 $55.61 $68.73

Overtime Provisions Over 8-hour day/40-hour week

9th hour $76.88 10th hour $76.88 Beyond 10 hours $76.88

Saturday First 8 hours $76.88 9th hour $76.88 10th hour $76.88 Beyond 10 hours $76.88

Sunday/Holiday $94.72

Four 10-hour days allowed? - Yes

4 consecutive 10s allowed M-Th Friday may be used as a make-up day

ORS#: ORS-002470 | CA#: CA-0225 | Date Issued: 04/18/2025 | Contract Award By Date: 07/17/2025 Page 12 of 155

Kent

Classification Name Category Last Updated

Fiber Optic Splicer Electrician 04/04/2025 Classification Description: Fiber Optic Splicer

Wage Rates Straight Time

Time and a Half

Double Time

Total Hourly Wage $67.89 $98.24 $128.58

Overtime Provisions Over 8-hour day/40-hour week

9th hour $98.24 10th hour $98.24 Beyond 10 hours $98.24

Saturday First 8 hours $98.24 9th hour $98.24 10th hour $98.24 Beyond 10 hours $98.24

Sunday/Holi…