This document is a Post Bid Addendum No. 2 for the Grand Rapids Community College (GRCC) Learning Resource Center Renovation & Addition project, issued by Progressive Companies and Pioneer Construction. The addendum is for a re-bid of specific work categories (09C Specialty Flooring, 14A Elevators, and 28B Fire Alarm) originally part of RFP 2425-5129, now reissued as RFP 2425-6162. Bids are due on Wednesday, June 18th, 2025 at 2:30 PM EST, with electronic submissions required through the MITN Purchasing Group website or hard copies submitted to the college's purchasing department. The project involves a complete interior renovation of the existing GRCC Library & Learning Resource Center, including mechanical systems, structural modifications, wall and floor plan revisions, plumbing, electrical, and architectural finishes, as well as a building addition and site reconstruction.

The project is a prevailing wage project requiring contractors to include State of Michigan prevailing wage rates in their bids. Contractors must provide performance and labor & material bonds, with a bid security of 5% of the base bid required for submission. The project timeline indicates selective demolition is already underway and expected to be completed by the end of May 2025, with the remaining work to begin in early July 2025 and wrap up in September 2026. Pioneer Construction will be implementing a "boots on the ground" program to track women and minority participation throughout the trades, with monthly manpower studies and quarterly updates provided to the owner. Contractors are expected to provide comprehensive documentation, including labor agreements, submittals, and as-built drawings, and must adhere to strict safety, testing, and quality control requirements throughout the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Progressive Companies | weareprogressive.com

Post Bid Addendum No. 2 Project: Grand Rapids Community College Learning Resource Center Renovation & Addition

Date: June 11, 2025

Project No: 58136042

To: GRCC – Abbot Kastanek, Jim Van Dokkumburg

Pioneer – Ross Geurink, Brandon Rhodes Progressive Companies – Chris Sholl, Jim Cripps, Lisa Warren All Plan Holders

PBAD2-1 NOTICE

A. This Addendum to the specifications and drawings for the above-captioned project adds to or supersedes all contrary or conflicting information in specifications and drawings which is amended in the following paragraphs. This Addendum is to become part of bidding documents as originally issued.

B. Each trade shall review the entire Addendum, including work of other trades, for revisions or clarifications regarding their own work.

C. This Addendum includes Specification Sections 00 2113 and 00 4100 revised and dated

June 11, 2025.

PBAD2-2 PIONEER (BR)

A. SPECIFICATION ITEMS

1. Section 00 2113 Instructions to Bidders (Reissued): Reissue to rebid specific work categories.

2. Section 00 4100 Bid Form (Reissued): Reissue to rebid specific work categories.

BR/pny P:\58136042\05 CA\E1 BIDDING NEGOTIATION\d Addenda\2025 06 11 Post Bid Addendum No. 2.docx

SECTION 00 2113 INSTRUCTIONS TO BIDDERS

Grand Rapids Community College

Learning Resource Center Renovation and Addition 00 2113 - 1 58136042

Issued for Post Bid Addendum 2

GRCC Learning Resource Center

Renovation & Addition– Post Bid Addendum #2

GRCC Bid RFP No. 2425-6162

Owner: Grand Rapids Community College

Architect: Progressive Companies

Construction Manager/Constructor: Pioneer Construction

Date: Wednesday, 6/11/25

Post Bid Addendum 2 Summary:

This document reflects updated Instructions to Bidders and Bid Form as a formal reissuance and rebidding of Work Categories 09C, 14A, and 28B that were originally part of GRCC Bid RFP 2425-5129. Bids need to be reflective of the following documents included in the RFP:

• Bids and Permits Drawings Dated: 03/31/2025

• Bids and Permits Project Manual Dated: 03/31/2025

• Addendum 1 Dated: 05/29/2025

• Post Bid Addendum 1 Dated: 06/05/2025

• Post Bid Addendum 2 Dated: 06/11/2025

Invitation to Bid:

Pioneer will be receiving bids for the GRCC Learning Resource Center Renovation & Addition at 2:30 on

Wednesday, June 18th, according to the schedule in this document under Section IX: Work Category

Descriptions. This package is for Work Categories 09C, 14A, 28B ONLY. Please review the General Notes as well as the Specific Scope of Work for your bid category. Bids MUST be submitted on the Bid Form included with the construction documents and be inclusive of all work assigned to your work category.

Bids can be turned in by these methods:

Electronic copies to:

The official electronic copy of your proposal must be received via the MITN Purchasing Group

(https://www.bidnetdirect.com/mitn/grcc) by the time and date specified.

If you need help registering, please call the Vendor support dept (1-800-835-4603, option #2)

(Please register as a vendor prior to bid day and allow ample time for electronic submission of your bid, prior to due date/time)

Mailed hard copies to: Hand delivered hard copies to:

Grand Rapids Community College Grand Rapids Community College

143 Bostwick N.E. Administration Building – Room 100C

Grand Rapids, Michigan 49503 415 Fulton St. E.

Attn: Purchasing Grand Rapids, Michigan 49503.

Bids will be opened and read publicly at Sneden Hall Room 108, 415 Fulton St E, Grand Rapids, immediately following their scheduled bids-due time.

Pre-Bid Meeting: Not Applicable

The Project – Overview of scope, schedule, and existing conditions and Addition 00 2113 - 2 58136042

The project includes complete interior renovation of the existing GRCC Library & Learning Resource Center, including major mechanical systems, structural modifications, extensive wall / floor plan revisions, plumbing & electrical, and new architectural finishes, as well as a building addition and site reconstruction. Selective

Demolition is underway and is expected to be completed by the end of May, 2025. The balance of the work will begin immediately following award of contracts in early July 2025 and wrap up in September 2026.

This is a prevailing wage project. All bids must include State of Michigan prevailing wage rates according to the prevailing wage rate scheduled included with the bid documents.

Hazardous Materials Survey is provided as part of the bid documents.

Instructions to Bidders

The bid/work scope guide is provided to assist each contractor in gaining a thorough understanding of the requirements and scope of each work category. Contractors are expected to familiarize themselves with current work categories related to their trade to ensure that there are no omissions or duplications of work being bid. The narrative in the Instructions to Bidders is intended to assign work shown on the plans and specs to specific work categories.

Section I: General Notes to Contractors:

1. All subcontractors, material vendors, and their respective suppliers shall include in their bids the costs associated with any and all tariffs applicable to the materials they supply, which are in effect at the time of bidding or are anticipated to be in effect at the time of contract award, as per the schedule outlined in the bidding documents. Under no circumstances shall any adjustments to the bid or contract price be permitted after the submission of bids, with respect to tariffs that were known at the time of bidding.

Similarly, if any premiums are incurred as a result of buying approved products that are not subject to

Tariffs, these cost too shall be included as part of the bid and under no circumstances shall any adjustments to contract or bid price be permitted after submission of the bid.

2. All workers on site must have updated asbestos awareness training.

3. All sub-contractors that are providing on site labor shall also provide a dedicated Foreman that can plan and coordinate all scope included in their contract. This foreman shall be the singular point of contact for the Pioneer superintendent and shall attend all progress and coordination meetings.

4. When referring to the “contractor” or “supplier” in the bid and work scope categories the reference directly pertains to the contractor bidding that category. Unless specifically noted, the bidding contractor shall be responsible for all activities highlighted within the scope.

5. If compliance with two or more standards is specified and the standards established have differing requirements for minimum quantities or quality levels, comply with the most stringent requirement. If drawings and/or specifications established different or have conflicting requirements comply with the most stringent of the two. Refer all uncertainties and requirements that are different, but apparently equal, to the Architect through Pioneer Construction for a decision proceeding utilizing the Request For

Information (RFI) process.

6. Contractors must refer to the plans and specifications for a detailed scope of each work category. This document is designed as a guide for bidding and work scopes. All documents herein are considered part of the project. The contractor shall familiarize themselves with all parts of the construction documents

(specs, scope, and drawings) and be responsible for work required by the contractors discipline unless otherwise noted.

and Addition 00 2113 - 3 58136042

7. Contractors will be held accountable to scope which is to be executed by the contractor if indicated on all construction documents, not limited to discipline documents.

8. Contracts will be awarded on a lump sum basis. Pioneer Construction and the owner shall have the right to accept or reject any bid. All subcontracts will be held by Pioneer Construction. Mandatory alternates and/or voluntary alternates will be evaluated.

9. Unless specifically stated as being furnished only or install only, all contractors must include the cost of all labor, material, equipment, etc. to complete the work described. Sales tax shall be included on all items.

10. Contractors whose work require testing or inspections must coordinate in a timely manner as to not hold up progress with Pioneer to have the test / inspections completed. Any expense accrued because of retesting or re-inspection because of faulty work in place will be the responsibility of the contractor who did the work

11. Contractors are responsible for the repair of any damage their company did to the temporary protections

(fencing, soil erosion controls, temporary enclosures/entrances, hole covers, temporary protection placed by Pioneer or other responsible subcontractor) for the site and throughout construction.

12. Bidders in contention for contract awards will be asked to attend a post-bid interview and submit information such as project manager, engineer and field coordinator’s resumes.

Section II: Submittals and Document Management

1. A copy of current labor agreements will be requested from Pioneer upon final selection of the contractor.

This will be used as a tool to ensure minimal project schedule disruption due to strikes and/or labor grievances. It shall be noted that in the event of a labor strike, Pioneer holds the right to hire an outside contractor to execute the contracted work at the expense of the bidding contractor.

2. Pioneer uses Autodesk Construction Cloud - Build to update contract plans and documents and to communicate punch list items, etc. This tool is essential for project communication and document management.

3. All submittals, including shop drawings and calculations, must be sent to Pioneer Construction within six

(6) weeks from date of contract award. Submittals for long lead-time items will need to be forwarded to

Pioneer Construction within three (3) weeks. All submittals shall be executed electronically. When submittal has been prepared for fabrication (all approvals complete), Pioneer is requesting one hard copy to be delivered to the project site. Please refer to section 01-3300 Submittal Procedures for detailed requirements.

4. The Owner, Architect, and Contractor teams may choose to be utilizing an on-line planroom for submittal, and shop drawing review (Autodesk Construction Cloud Build). The contractor will familiarize themselves with Autodesk Build. The contractor will also be responsible for scanning and uploading their information accordingly in PDF format.

5. Submittals shall be provided in a clear and concise method of delivery. Inclusive of sequencing and scheduling of product to meet the construction schedule. The submitting contractor/supplier will be requested to include a list of all submittals and durations of procurement for each item.

6. Submittals shall be allowed one (1) revise and resubmit. Additional revisions required by Pioneer or the architect for non-compliance will result in consultant hourly rates for re-review of the submittal to be paid for by the submitting contractor/supplier.

and Addition 00 2113 - 4 58136042

7. The contractor/supplier shall allow a minimum of ten (10) working days for submittal approval or response from the time received by the architect. The intent will be to execute the approval process in a timely manner and in the case of critical path items, priority will be established.

8. Bid RFIs: All bidding requests for information during the bidding period shall be provided electronically to

GRCC Purchasing Director, Paula Gleason-Zeeff at (paulagleasonzeeff@grcc.edu) no later than Noon on

Friday, June 13th. The contractor/supplier shall be allowed to use their standard RFI form. Pioneer will develop a formal RFI, number, and submit to the Architect for response. The requesting contractor/supplier is encouraged to provide viable solutions to the problem.

9. Construction RFIs: All construction requests for information shall be provided electronically to Ross

Geurink, the project manager or uploaded to the project page on Autodesk Construction Cloud. The contractor/supplier shall be allowed to use their standard RFI form. Pioneer will develop a formal RFI, number, and upload to Submittal Exchange. The requesting contractor/supplier is encouraged to provide viable solutions to the problem. If there is a cost impact due to the request for information, the contractor must provide a cost order of magnitude.

10. The contractor is encouraged to take photographs of placed work when describing or developing requests for information (RFI).

11. Contractors shall not be allowed to use any building photos for corporate marketing without written consent from Pioneer and the owner.

12. It is requested that all as-built drawings be forwarded to the offices of Pioneer Construction upon completion and acceptance of the work. (2) copies of as-built drawings and warranties will be sent to

Pioneer for final close-out assembly. (1) electronic submittal will be required. This documentation will be requested and shall be provided immediately following the completion and acceptance of the work.

Section III: Safety and Jobsite Conduct Requirements:

1. All subcontractors will be required to follow state and federal safety regulations, including MIOSHA and

OSHA requirements. Safety will be strictly enforced. The Pioneer safety policy will also be implemented for the complete scope of work.

2. The following are requirements of the Pioneer Safety Accountability Program:

a. All tradespersons having 10-hour, 30-hour, and 40-hour OSHA certifications shall provide certifications to Pioneer at the time of site orientation.

b. All tradespersons having special certifications such as, but no limited to, aerial lift, material handling, first aid, specific trade certifications, AED training, shall provide certifications to

Pioneer at the time of site orientation.

c. Each trade contractor shall provide one lead contact for safety. The Lead contact will also be required to have “Field Tools” on their mobile device. Field Tools is an on-line application provided by Pioneer for tracking of all safety related items. As a feature of this application, both

Pioneer and the contractors Lead person can have direct and immediate documented communications for avoiding safety hazards. When a hazard or incident does happen, it also allows both Pioneer and the contractor direct lines of documented communication for hazard abatement.

d. All contractors shall be responsible for daily toolbox talks. Documentation of the toolbox talk, and daily plans will be housed on Field Tools. By using this application, all contractors can view other contractors’ daily plans for hazard abatement. Documentation of the daily safety huddle will be logged through the Pioneer Field Tools application. Additional information will be provided upon award of the contract.

and Addition 00 2113 - 5 58136042

e. All contractors shall execute Pre-Task Analysis (PTA’s). The PTA shall be provided, at minimum, weekly or at every major event executed by the installing contractor where there is direct impact on the installing contractor and contractors working within the same or adjacent work zones.

f. Critical lift plans shall be used for each critical lift on the project. Critical lifts are clearly described in Section 004200.

g. The contractor must attend a pre-construction/orientation meeting. The project manager and/or safety manager of each contractor in attendance will be provided with the guidelines of the safety program. It will be the responsibility of the contractor to disperse this information to the field staff.

h. Upon arrival onto the site, each tradesperson must check in with the Pioneer Field

Superintendent and sign-in.

i. By signing in under the check-in process, the tradesperson understands and agrees to all aspects of the safety accountability program. The first violation will constitute a removal of the tradesperson from the site for the duration of one (1) workday. The second written violation will result in the tradesperson being removed from the site for the duration of three (3) working days. Additional violations by the contractor will result in permanent removal of the tradesperson from the site and a complete performance evaluation of the company and could result in the permanent removal of the contractor from the site. In the event of contractor removal, Pioneer will hold the right to hire an outside contractor to execute the balance of the project at the installing contractor’s expense.

3. This will be 100% hard hat project site. There is no exception to this requirement.

4. This will be a 100% safety glasses site. Prescription glasses must be accommodated with side shields.

Basis of safety glasses shall be ANSI Z87. There is no exception to this requirement.

5. This will be a 100% fall protection project site for any work over 6’-0”, inclusive of all exposures.

Violations of this policy shall move immediately to violation 2 as described in 3.2.j.

6. This will be 100% high visibility project site.

7. This will be a 100% tobacco free project site, inclusive of smoking and chewing tobacco. It should be understood that this requirement is mandatory for ALL Pioneer projects.

8. Please contact the offices of Pioneer if the accountability policy is needed for review prior to bid.

9. Deliveries:

Each delivery made to the site must be coordinated and confirmed with the Pioneer Field Superintendent.

In addition, each driver must check-in (sign-in) at the Pioneer site entry point. Trucking companies are to be made aware of the Pioneer safety policies. All truckers must wear hard hats and protective eyewear when exiting the cab of the truck.

Guests:

All visitors and guests must check-in at the Pioneer field office prior to accessing the site. Guests will be required to sign-in, check personal safety gear (or acquire), and then required to sign-out upon exiting.

10. To ensure a safe and productive work environment, a clean job site will be emphasized. All contractors are required to provide continuous housekeeping and clean-up. Pioneer Construction will provide dumpsters for disposal and recycling of misc. construction debris. All contractors must plan for the clean-up of their debris, material handling, and placement of the debris in the job dumpsters. If contractors are not providing daily clean-up, Pioneer will execute this effort and bill the contractor accordingly, by method of deductive change order, for manpower time required for this effort. Periodic thorough cleaning will be required by Pioneer. Each contractor is to anticipate this work effort throughout the construction timeline.

and Addition 00 2113 - 6 58136042

11. On site staff shall wear appropriate work attire. Vulgar and inappropriate messages on clothing will cause the employee to be removed until clothing is changed. Shirts are to remain on at all times. Tradesmen are not allowed to wear shorts. Proper work footwear is required (work boots – steel toe not a requirement).

12. Workers with outstanding warrants and/or in the process of any criminal investigation or prosecution are not allowed on site.

13. Site employees having criminal sex crime backgrounds will not be allowed on site.

14. Contractors employing illegal immigrants will be held responsible in accordance with all State and Federal law for consequences. Pioneer and the owner will be held harmless in the event illegal employment is occurring on the project site.

Section IV: Schedule and Logistics:

1. The scope of work included in the Bids – Demolition is already underway and will be completed in May

2025. The Bids – All Remaining Trades contracts are scheduled to be awarded in early July and work will begin immediately following contract award. The overall project completion date is September 2026. All bidders must anticipate appropriate crews to complete their work within the scheduled timeframes. Refer to preliminary schedule for more information.

2. It shall be understood that each contractor is working in an operating campus-urban setting. The construction work zone, as indicated on the site plans, shall be concentrated to work effort only.

Immediately outside of the site fencing area, the campus of Grand Rapids Community College is in live operation, with student and faculty traffic. Each contractor shall be cognizant of their surroundings ensuring safety to the general public. Equally important is the respect and protection of GRCC property outside of the construction zone. Each contractor shall be responsible for protecting, restoring, and replacing any damage caused by that contractor to all above-mentioned properties. Additional logistical planning will be conducted post-bid with the awarded contractor.

3. Parking: GRCC will make available parking passes for Ramp A for $2 per entry/exit. Carpool commuting is encouraged.

4. The site does not have space for field offices or storage trailers. Pioneer may, on a case by case basis make accommodations in the existing space for a foreman desk and/or gang box.

5. All stored materials are to be warehoused by the contractor or supplier until needed for installation or coordinated for placement in on site staging zones thru the on-site superintendent. Off-site staging and warehousing needs shall be at the cost and risk of the contractor / supplier.

6. Contractors are instructed to include all necessary overtime to maintain the construction schedule. Work hours may vary; however, the construction start is to be no later than 7:00AM each morning. For major closures and utility work, off-hours, nights, and weekends must be considered in the bidding process.

7. Adequate manpower must be provided to the project to keep pace with the construction schedule.

8. Contractors will be required to attend all scheduled progress meetings when invited. Agendas will be sent one day prior to the scheduled meeting. If the contractor is invited, they are required to attend due to activity impact in that time duration by the contractor.

and Addition 00 2113 - 7 58136042

9. During the progress meeting, each contractor in attendance will be required to provide to the team the current status of their work and the activities planned for the up-incoming week. The contractor is also to provide the team with current lead time status of product and highlight critical deliveries.

10. Equipment and Hoisting: Any equipment and hoisting required for the installation of each contractors’ materials must be included in their bid.

11. Cranes, Rigging, and Equipment: Contractors will be required to execute the following for cranes and rigging safety:

- Critical lift plan for critical lifts (see MIOSHA standard for definition of critical lift) including type of material being hoisted, weight of material, rigging diagram.

- General lift plan for typical lifts.

- The contractor shall provide all necessary rigging equipment for their material.

- Contractor shall comply with most current MIOSHA operating and rigging requirements, November

2012.

- All employees on site, rigging materials, must be certified by a recognized certification process

- All crane operators must be certified by a recognized certification process

- All equipment must have been inspected prior to operation, all annual inspections must be provided to the on-site safety manager, and all equipment must undergo a daily inspection prior to use.

- All employees using tele-handlers must be certified for tele-handlers by a recognized certification agency.

- All employees using personnel and material boom lifts must be certified for boom lifts by a recognized agency.

Additional equipment operation and usage guidelines for the project are highlighted in the partnership document attached in section 00-4220.

12. Due to site conditions and restrictions, Pioneer is requiring minimum petibone/tractor traffic. All contractors will be responsible for their own off-loading on-site and/or at the adjacent staging area.

Material handling shall be executed by the contractor.

Section V: Quality Control, Testing, Training, and Warranties:

1. Material testing and special inspections (soils, bituminous paving, concrete, concrete re-steel, masonry, and mortar cubes will be conducted by an independent testing consultant provided by Pioneer

Construction. Soils testing shall be executed in specified lifts. Coordination by contractor, Pioneer, and soils testing agency must be conducted. The project geotechnical investigation is attached for reference.

Each subcontractor whose work category requires testing or special inspections will be required to notify

Pioneer Construction for scheduling the required tests. Failed tests and rejection of installed work by the testing consultant that result in additional testing and costs shall be borne by the installation contractor.

2. The contractor shall provide a written quality control plan to Pioneer at the time of SDS submittal. For critical installations, the contractor must plan on a minimum of three specific meetings (pre-installation, mock-up review, and post-installation). Each meeting must be attended by the installation contractor, Pioneer Construction, and the supplier/s of the product being installed. Pioneer will document each of these meetings accordingly.

3. In addition to the quality control plan, the contractor is obligated to review thoroughly the detailed installation requirements and methods. If at any time, the contractor views a possible delay to schedule, coordination potential error, or design concern, it shall be immediately addressed through special meeting or RFI.

and Addition 00 2113 - 8 58136042

4. Each contractor shall provide their employees with a minimum of one device for the use of AutoDesk

Build. AutoDesk Build will be the method of construction document control and updates to all contractors. The cost for this application and associated hardware shall be included in the base bid.

5. Quality fabrication and installation will be monitored through the Quality Control Report method produced by Pioneer. The report shall state the deficiency, give the proper solution to fix the opportunity, apply a deadline to execute the fix, and provide a follow-up report. Pioneer will not only be reporting on deficiencies, but also critical installations. If the contractor does not correct the deficiency within the timeline or to the acceptance of the CM, Owner, and/or Architect, Pioneer will hold the right to hire an outside contractor to execute the fix at the installing contractor’s expense.

6. The contractor will be responsible for all Owners training on each of the specified systems. This includes, but is not limited to: graphical read-out training, major equipment training and demonstrations, Owner maintenance, and general overviews.

7. The contractor is responsible for a maintenance walk-thru at the completion of the project. This walk-thru and demonstration shall be coordinated by Pioneer but lead by the contractor. The intent of this walk-thru is to show the janitorial and service staff the daily operations of the facility.

8. The contractor is responsible for all warranties for materials and labor as indicated within each division and section of the specification.

9. The contractor is responsible and shall submit proper as-builts at the time of project completion. As-builts are to accurately depict the built condition as executed by the contractor. As-builts are to be updated on a weekly basis at minimum. Dimensions and notes are to legible.

Section VI: Wage Rates, Change Order, and Billing Requirements:

1. This is a Prevailing Wage rate project. Contractors are required to:

a. include State of Michigan Prevailing Wage Rates as provided with the bid documents. Proposed

Worker Classifications, Wages, Fringes, and Labor hours included in bid are to be reported on the

Bid Form for informational purposes.

b. Register with the State of Michigan office of Labor and Economic Opportunity and pay the annual

$500 registration fee. Costs for registration must be included in bid. Link to Register:

https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage

2. Contractors are required to provide all required Department of Labor & State of Michigan Prevailing Wage payroll documentation upon execution of contract and along with monthly payment applications.

Payment applications will not be processed until Pioneer has received all compliant payroll documentation.

3. Pioneer Construction will be implementing the “boots on the ground” program for this project. This program is a method to encourage and track women and minority participation throughout the trades.

Manpower studies will be conducted monthly throughout the project using the Pioneer provided form.

Quarterly updates will be provided to the Owner. This document will be available to all awarded contractors electronically. In addition to tracking hours, each contractor must provide Pioneer with the wage and trade classification of the minority tradesmen for data tracking and trending.

4. Awarded contractors and suppliers shall agree to the following set percentages for changes in the work as well as meeting the required criteria for submitting a request for change:

a. For contractor self-performed labor and materials – 10% overhead and profit will be accepted

(limit).

b. For contractor – subcontracted work – 5% overhead and profit will be accepted (limit).

and Addition 00 2113 - 9 58136042

c. Contractor and suppliers must provide an itemized breakdown of all labor, material, equipment, tools, taxes, and overhead/profit on all requests for change. Material supplier breakdowns will also be requested at the time of change submittal. Failure to provide a clear form in regards to bulletin, CCD, and requested extra work will result in a mandatory revision of the change. Failure to produce the itemized breakdown within 15-days of the requested change will result in a “No

Change.” Equally, if the change is being requested by the Pioneer Superintendent, Project

Manager, immediate response will be required. There are to be no delays in work activity due to change order and change order back-up documentation.

d. Project management and estimating time is not allowed to be added to cost changes.

Administrative, engineering, and estimating services are to be included in the overhead portion of ‘overhead and profit’.

e. Additional funds will not be allowed for labor increases due to corporate internal agreements.

Labor rates, fringes, and benefit packages will be locked in at the time of contract execution between the contractor and Pioneer Construction.

5. Awarded contractors and suppliers must provide monthly billing using the criteria set forth below:

a. Provide all billing in AIA G702 billing format.

b. Billing must be received by Pioneer no later than the 25th of each month to invoices@pioneerinc.com . There are no exceptions to this date. In the event of a holiday, the contractor is required to submit billing applications by the following business day for process.

c. Billing applications must include PO #

d. Billing for stored materials will be accepted, however, billing statement must be accompanied with certificate of insurance for stored materials, pictures and address where the materials are being stored – failure to provide will result in a rejection of stored material.

e. 10% retainage shall be held on the project until acceptance of installed products by GRCC, Progressive Companies, and Pioneer Construction.

f. Sworn statements must accompany monthly billing – failure to provide will result in a rejection of the monthly billing.

Section VII: Insurance Requirements:

1. General Insurance Requirements: The general liability insurance policy shall include:

a. Issuance of a carrier accepted by Pioneer Construction

b. Shall be kept in force throughout the performance of the Contractor’s services and for one year after the end of such performance.

c. Shall name the owner, Pioneer, and architect as additional insured parties.

d. Shall be evidence by a certificate of insurance acceptable to Pioneer which provides coverage evidenced thereby shall not be substantially modified or cancelled without fifteen calendar days prior written notice to Pioneer.

2. Certificates of Insurance, prior to performance of contracted services:

a. Prior to work and during execution of contract, the contractor is required to have the coverage in effect.

b. The contractor shall confirm that all tiered subcontractors and suppliers have similar coverage in effect.

and Addition 00 2113 - 10 58136042

c. The contractor shall deliver to Pioneer certificates of insurance for all its required minimum insurance coverage.

3. The contractor is to provide workers compensation for all direct hired employees. The contractor shall be responsible to ensure all tiered trades, on-site, have minimum workers compensation insurance.

4. Upon the request of Pioneer, the contractor shall provide Pioneer with certificates of insurance acceptable to Pioneer and evidencing the required insurance coverage in the form of ISO CG2010 1185 and CG2037 0704 of equivalent forms.

5. Certificates for insurance for stored materials shall be inclusive of the actual purchase value of the material. Inclusive of taxes, delivery from point of fabrication to stored location, material handling and other such procurement. The certificate is to insure complete replacement of such stored material.

6. Minimum Required Insurance Limits – Coverage on an Occurrence Basis

COMMERCIAL GENERAL LIABILITY

General Aggregate $2,000,000

Products & Completed Ops Aggregate $2,000,000

Personal & Advertising Injury $1,000,000

Each Occurrence $1,000,000

1. If the CGL coverage contains a General Aggregate Limit, General Aggregate shall apply separately to each project.

2. Contractor, Owner and Architect and their agents, officers, directors and employees and all other parties required by contract shall be included as additional insured on the ISO Additional Insured Endorsement

CG2010 11/85 or CG2010 10/01 and CG 2037 10/01 or its equivalent.

3. Coverage shall apply as primary insurance on a non-contributing basis before any other insurance.

4. Waiver of Subrogation, Subcontractor waives all rights against Contractor, Owner and Architect and their agents, officers, directors and employees and all other parties required by contract.

5. Subcontractor shall maintain CGL coverage for itself and all additional insured’s for the duration of the project and maintain Completed Operations coverage for itself and each additional insured for at lease six years after completion of work.

6. The coverage shall provide notice of cancellation of not less than 30 days.

AUTOMOBILE LIABILITY

Combined Single Limit $1,000,000

1. Business auto coverage must include coverage for liability arising out of the use of all owned, leased, hired and non-owned automobiles.

2. Contractor, Owner and Architect and their agents, officers, directors and employees and all other parties required by contract shall be included as additional insured.

3. Coverage shall apply as primary insurance on a non-contributing basis before any other insurance.

4. Waiver of Subrogation, Subcontractor waives all rights against Contractor, Owner and Architect and their agents, officers, directors and employees and all other parties required by contract.

5. The coverage shall provide notice of cancellation of not less than 30 days.

COMMERCIAL UMBRELLA

General Aggregate $5,000,000

Each Occurrence $5,000,000 and Addition 00 2113 - 11 58136042

1. Contractor, Owner and Architect and their agents, officers, directors and employees and all other parties required by Contract shall be included as additional insured.

2. Coverage shall apply as primary insurance on a non-contributing basis before any other insurance.

3. Waiver of Subrogation, Subcontractor waives all rights against Contractor, Owner and Architect and their

4. The coverage shall provide notice of cancellation of not less than 30 days.

WORKERS COMPENSATION AND EMPLOYER’S LIABILITY

Each Accident $500,000

Disease Each Employee $500,000

Disease Policy Limit $500,000

1. Waiver of Subrogation, Subcontractor waives all rights against Contractor, Owner and Architect and their

2. Where applicable, The Maritime Coverage Endorsement shall be attached to the policy.

3. The coverage shall provide notice of cancellation of not less than 30 days.

Section IX - Work Category Descriptions

INDEX OF WORK CATEGORIES – GRCC Learning Resource Center Renovation and Addition

Re Bid Select Work Categories

WORK CATEGORY 09C – Specialty Flooring

Bid Due Date and Time: Wednesday, June 18th, 2025, 2:30pm EST

WORK CATEGORY 14A – Elevators

WORK CATEGORY 28B – Fire Alarm

WORK CATEGORY 02A – Hazardous Materials Abatement – Awarded – Quality Environmental

Included:

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Technical Specifications o NESHAP Hazardous Building Materials Inspection Report from MicroAir Consulting dated

12/10/22 o Hazardous Materials – Supplemental Specification, located in Available Project Information in the specifications.

o GRCC Asbestos and LBP OM Program – located in Available Project Information in the specifications.

and Addition 00 2113 - 12 58136042

• Contractor shall remove and properly dispose of all Asbestos Containing Materials identified in the report provided by MicroAir. (Note: MicroAir report mistakenly identifies “Window Caulk Around Green Window

Frame at West Entrance” as “15 Sinks”. The correct unit quantity is “15 Lineal Feet”

• Contractor to utilize all proper PPE, as well as proper isolation and negative air pressurization means and methods to protect GRCC and all other stakeholders during abatement. Reference Hazardous Materials

Supplemental Specification and GRCC Asbestos and LBP OM Program for specific requirements.

• Contractor shall provide all third party clearance reports at the conclusion of abatement activities, according to Hazardous Materials Supplemental Specification and GRCC Asbestos and LBP OM Program for specific requirements.

• Provide Unit Pricing for additional hazardous materials that may be discovered. See Bid Form.

• If the contractor discovers additional materials that are suspected to contain asbestos, the following procedure shall be conducted:

o Notify Pioneer Construction & GRCC within 24 hours.

o Pioneer Construction request sampling from MicroAir Consulting.

o If protective measures and enclosures are in place, contractor shall maintain in place until test results are returned (approximately 24 hours), while continuing abatement scope in the area.

o If the material is confirmed to be ACM, contractor shall properly remove and dispose of this material.

o Cost shall be based on the unit costs provided on the Bid Form. If materials were not previously identified on the Inspection Report, cost shall be tracked on a T&M basis (with signed daily field work orders).

o Contractor shall provide adequate labor to remove additional discovered ACM to maintain schedule.

• Include Pollution Coverage with Pioneer Construction & GRCC included as additional insured.

• The contractor is to review all bid documents, plans, and specifications to assure that the bidder understands all the coordination requirements between this trade and other related work and has included in the cost of work considerations for work sequence coordination with other trades on the project.

• Plumbing and electrical provisions for setting up decontamination areas.

Notes:

• This is a prevailing wage project. Provide wage rate information on Bid Form.

• This contract is to be held by GRCC

• Refer to Bid Form for specific Unit Cost & Alternate requests.

• Refer to Section1: General Notes to Contractors, Paragraph 1 in regards to Tariffs.

WORK CATEGORY 02B – Selective Demolition – Awarded Pro-Tech Environmental

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Technical Specifications o Section 02 4100 - Selective Demolition o Section 26 0505 – Selective Demolition for Electrical

• Provide demolition work in accordance with the construction documents, including all interior and exterior façade elements.

• The demolition contractor shall provide all dumpsters, chutes, equipment, and other means and methods for removing materials from the building and the site and properly disposing.

• Provisions for Cut and make safe for mechanical, plumbing, and electrical items will need to be included by demolition contractor

• Provide separate add alternate to remove all electrical items, plumbing items, HVAC items, and fire protection items – Indicate alternate cost on appropriate line on the bid form.

and Addition 00 2113 - 13 58136042

• Include all sawcutting required for complete demolition scope.

• Provide all engineered temporary shoring as needed to support existing remaining structure.

• Contractor performing demolition scope of work is responsible to provide protection of existing any existing finishes not noted to be demo’d or removed.

• The contractor is to review all bid documents, plans, and specifications to assure that the bidder understands all the coordination requirements between this trade and other related work and has included in the cost of work considerations for work sequence coordination with other trades on the project.

• Base bid scope of work is to include the removal of all ceilings assemblies inclusive of any item that is visibly attached to the ceiling assembly, this includes but is not limited to:

o Light fixtures o Hvac diffusers, registers, and grilles o Cover plates o Speakers o outlets

Notes:

• This is a prevailing wage project. Provide wage rate information on Bid Form.

• Refer to Bid Form for specific Unit Cost & Alternate Requests.

Specifically Excluded:

• Roof demolition by others.

• As part of base bid exclude the removal of ductwork, piping, hvac equipment, electrical equipment, wires, plumbing equipment or any other part of the MEP systems that has not specifically addressed in the included scope section above. See add alternates on bid form for the demolition of MEP systems.

WORK CATEGORY 03A – Concrete: Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications o 03 1000 - Concrete Forming and Accessories o 03 2000 - Concrete Reinforcing o 03 3000 - Cast in place concreteCast in place concrete stairs, footings, retaining walls, ramps, pavement, and slabs

• Vapor retarders

• Waterproofing and damp proofing integral to concrete assembly

• Sub slab insulation for snowmelt

• Finishing of exposed concrete slabs and walls

• Joint sealants and joint filling material at all new concrete.

and Addition 00 2113 - 14 58136042

WORK CATEGORY 04A – Masonry Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications o

• Cast stone parapet caps

• Concrete masonry unit assemblies

• Rebar integral to concrete masonry unit assemblies

• Grouting of concrete masonry unit cores

WORK CATEGORY 05A – Metals Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications o 05 1200 - Structural steel framing o 05 3100 - Steel Decking

• Hand Rails

• Overhead supports for ceiling mounted toilet partitions

• Structural steel

• Ornamental stair assemblies

• HSS for spigot support brackets. E2/A311

Notes:

• This is a prevailing wage project. Provide wage rate information on Bid Form.

WORK CATEGORY 06A – General Trades Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications o 06 2000 - Finish Carpentry o 06 4100 - Architectural Woodwork o 10 1100 - Visual Display Units o 10 1400 - Signage o 10 2113.19 - Plastic Toilet Compartments and Addition 00 2113 - 15 58136042 o 10 2600 - Wall and Corner Protection o 10 2800 - Toilet, Bath, and Laundry Accessories o 10 5126 - Plastic Lockers o 12 2400 - Window Shades o 12 3600 – Countertops

• Final Cleaning, which includes but is not limited to:

o Removal of all rubbish let behind by construction activities o Final Sweeping, vacuuming, and mopping of floors o Window cleaning o Wiping down of horizontal surfaces so to be free of dust and streaking o Final cleaning of all plumbing and light fixtures

• Project General Laborers to be used at the Discretion of Pioneer Superintendent and must be onsite within

24 hours of initial request by Pioneer Superintendent.

• Project general labor to be included must be equivalent to (2)-common laborers working 45 hours per week for a total of 16 months.

• Separate from Project General Labor. Furnish, installation and removal of temporary OSHA compliant railing at:

o All existing stairwells. (Railing will need to be extended for OSHA compliance) o Atrium perimeter o New concrete stairs o Tops of retaining walls

• All lumber, plywood, and osb

• Cabinets

• Counters

• Supports for counters mounted to walls

• Salvaging site furniture

• Salvage bike repair station

• New landscape furniture

• Relocation of existing lockers

• Toilet partitions

• RFID Security Gates

• Raised access flooring

• Wood doors

• Sliding door track for sliding wood doors

• Prefabricated aluminum stair/rail assembly at penthouse

• High impact wall protection

• Corner guards

• Marker boards

• Adjustable glass shelving

• Window sills

• Window treatments

• Access panels

• Wood and hollow metal doors

• HM door frames

• Hardware associated with wood and hollow metal doors in hollow metal frames

• Design, furnish, installation, and removal of temporary landing platform at new penthouse to receive new air handler.

• Signage

• Restroom accessories

• Expansion joint assemblies and covers and Addition 00 2113 - 16 58136042

• Furnish, installation, and/or rental fees for temporary chain-link fencing on stands and gates. Refer to logistics plan for locations and quantities. Rental for 14 months

• Aluminum door frames

• Electric mirrors

• Hand dryers

• Card readers

• Electronic locksets

• Integrating of access controls

WORK CATEGORY 07A – Roofing Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications o 07 0150.16 - Maintenance Cleaning of Membrane Roofing o 07 0150.19 - Preparation for Re-Roofing o 07 0150.74 - Rehabilitation of Single Ply Roofing o 07 7273 - Vegetated Roof Systems

• Modular wood raised floor assembly at terrace

• Pre-construction testing and reporting of existing roof system per specifications

• Maintenance cleaning of existing roof prior to re-roof process

• Interior and exterior vegetative roofing

• Prefabricated metal roof coping

• Stone over roofing membrane

• Fluid applied waterproofing membrane over existing roofing.

• Prepare existing membrane to receive new coating

• Remove and replace of existing roofing system down to deck.

• New tpo roofing systems

• Roof walkway pads

• Flashing around roof penetrations

• Roofing infills where equipment has been removed

• Vapor retarder under new roofing

• Flexible tubing under roof membrane

• Emseal joint filler material per A4/A320 and Addition 00 2113 - 17 58136042

WORK CATEGORY 07B – Metal Siding and Trellis Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications o 07 4213.23 - Metal Composite Material Wall Panels o 10 7113.43 - Fixed Sun Screens

• Metal Composite Panels with 3” insulation and z furring

• Metal wall panel and hat channel furring at new and existing penthouses

• Insulated metal back up panels

• Continuous 2-1/2” wide cold formed strap brackets

• Solar Control sunshades

• Vertical metal wall panels

• Metal fascia/closure piece at top of walls integral to metal panel system. Includes Z-Furring. Refer to detail A2/A320

• Joint sealants integral to metal panel systems

• All flashing and trims associated with metal panel systems

• Air barriers integral to metal panel systems

• Mineral wool stuffed around metal panel systems

• Cold form bent plate attached to insulated metal panels for mounting of metal panel end flashing

• Refer to Bid Form for specific Unit Cost & Alternate Requests.

• Refer to E2/A311 for metal panel system on inside face of roof tray “planters”.

WORK CATEGORY 07C – Joint Sealants Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications

• Sealants at the following locations o Window sills o Counter tops o Plumbing fixtures o Hollow metal door frames

Notes:

• Joint sealants at metal panel systems and Addition 00 2113 - 18 58136042

• Joint sealants at concrete work

• Joint sealants at interior or exterior of storefront or curtain wall framing

WORK CATEGORY 08A – Curtainwall, Storefronts, & Glazing Not subject to ReBid

• Division 00 – Procurement and Contracting Requirements as they apply to this work category.

• Division 01 – General Requirements are included as they apply to this work category.

• Scope and Materials Identified in Technical Specifications o 08 1117 - Aluminum Doors and Frames-Interior o 08 4413 - Glazed Aluminum Curtain Walls o 08 8000 - Glazing

• Curtain wall assemblies.