RFP 240021.pdf

PDF 219 KB Posted

Attached to
Repair Roof AS4085
Solicitation number
N4008526R9004
Issued by

About this file

This document is a federal solicitation for roof repair at MCB Camp Lejeune, North Carolina. The project (No. 24-0021) is limited to six pre-selected contractors: Achuti LLC, Apex Business Solutions LLC, Quality Roofers and Guttering Inc., Riza Construction Inc., Seashore Builders Inc., and Yerkes South Inc. The contract has an estimated cost range between $1,000,000 and $5,000,000, with a 450-day completion timeline and $800 daily liquidated damages. Proposals are due by 1/15/2026 at 2:00 pm, to be submitted via email to jessica.r.huebner.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil.

Key requirements include a site visit to be scheduled by amendment, compliance with Davis-Bacon wage rates for building construction in Onslow County, North Carolina, and potential bond requirements based on proposal value. The building will remain occupied during construction, and one person may fill multiple roles of Superintendent, Quality Control Manager, and Safety and Health Officer if qualified. The contract will be awarded on a lowest-price basis, with a 60-day proposal acceptance period. The solicitation notes that funding may not become available, and offerors will not be reimbursed for proposal costs.

View the file

Other files

File Type Posted
Amend 0004.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
N4008524B0021 Dwgs.pdf PDF
24-0021 APPXD.pdf PDF
N4008524B0021 Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR ROOF AS4085 Solicitation No. N4008526R9004

MCB Camp Lejeune, NC Project No. 24-0021

12/16/2025

ROICC CAMP LEJEUNE

POC: Jessica Huebner jessica.r.huebner.civ@us.navy.mil

ONLY THE FOLLOWING LIST OF CONTRACTORS MAY SUBMIT A

PROPOSAL FOR THIS PROJECT:

N40085-24-D-0100

Achuti, LLC

1122 Oberlin Road, STE 220

Raleigh, NC 27606

(919) 219-7351

POC: Dan Patrick dpatrick@achuti.com

N40085-24-D-0101

Apex Business Solutions, LLC

12650 Sunset Avenue, STE 7

Ocean City, MD 21842

(240) 793-5867

POC: Juan Franzetti jjfranzetti@gmail.com

N40085-24-D-0102

Quality Roofers and Guttering, Inc.

100 Church Street

Jacksonville, NC 28540

(910) 346-8378

POC: Jared Lanier contact@qualityroofersinc.com

N40085-24-D-0103

Riza Construction, Inc.

228 Chaparral Trail

Jacksonville, NC 28546

(910) 577-5284

POC: Corey Avens coreyavens@rizaconstruction.com

N40085-24-D-0104

Seashore Builders, Inc.

266 Nelson Park Road

Maple Hill, NC 28454

(910) 259-3404

POC: Elizabeth Raynor elizabeth@seashorebuilders.net

N40085-24-D-0105

Yerkes South, Inc.

4799 Hinote Road

Crestview, FL 32539

(850) 424-6069 Ext 2

POC: DeAnna Loftis dloftis@yerkessouth.com mailto:dpatrick@achuti.com mailto:jjfranzetti@gmail.com mailto:contact@qualityroofersinc.com mailto:coreyavens@rizaconstruction.com mailto:elizabeth@seashorebuilders.net mailto:dloftis@yerkessouth.com

GENERAL REQUIREMENTS

NAVFAC Solicitation No.: N40085-26-R-9004

Public Works Project No.: 24-0021

Title: REPAIR ROOF AS4085

Contract Completion Date: 450 days after award

Estimated Cost Range: Between $1,000,000 and $5,000,000

Wage Determination: General Decision Number: NC20250010 12/12/2025 Building

Liquidated Damages: $800 per Calendar Day

Notes: One person may fill the roles of Superintendent, Quality Control Manager, and Safety and

Health Officer, if duly qualified for all three positions as defined in the project specification.

Special Scheduling: Building will remain occupied during construction.

Hazardous Materials Present: N/A

Basis for Award: Lowest Price

Proposal Acceptance Period: 60 days from receipt of offers

Site Visit: A site visit will be scheduled via amendment.

Bond Requirements: Bid bonds are required based on the dollar values listed below. An electronic copy of your bid bond may be submitted with your proposal. Failure to submit a required bid bond by the deadline will result in your proposal being removed from consideration. Utilize the bond formats at FAR 53.300.

Payment and/or performance bond(s) will be requested at the time of award per the current process.

• No bonds are required for proposals less than $35K.

• Proposals valued at $35K and greater will require a payment bond only.

• Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond.

Proposal Due Date: 1/15/2026 by 2:00 pm

E-Mail Address for Proposals: jessica.r.huebner.civ@us.navy.mil and lauren.f.loconto.civ@us.navy.mil

Requests for Information (RFIs): RFIs must be submitted by the prime contractor to jessica.r.huebner.civ@us.navy.mil. The cut off for RFIs is 1/2/2026 by 2:00 PM EST in order to process all inquiries by the proposal due date.

The specifications and drawings are posted as attachments on https://www.sam.gov/.

OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS

ARE NOT AVILABLE, NO AWARD WILL BE MADE AS RESULT OF THIS SOLICITATION.

OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS

RESULTING FROM THIS SOLICITATION.

General Decision Number: NC20250010 12/12/2025

Superseded General Decision Number: NC20240010

State: North Carolina

Construction Type: Building

County: Onslow County in North Carolina.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Modification Number Publication Date

0 01/03/2025

1 11/21/2025

2 12/12/2025

IRON0848-003 07/01/2025

Rates Fringes

IRONWORKER.......................$ 29.75 18.00

PLUM0421-006 07/01/2023

PIPEFITTER.......................$ 33.96 13.48

SUNC2018-010 08/08/2023

BRICKLAYER.......................$ 19.13 0.00

CARPENTER, Excludes Form Work....$ 18.11 2.63

CEMENT MASON/CONCRETE FINISHER...$ 16.72 0.00

ELECTRICIAN......................$ 22.15 5.93

FORM WORKER......................$ 14.51 1.88

LABORER: Common or General......$ 11.98 0.81

LABORER: Mason Tender - Brick...$ 13.17 0.00

LABORER: Mason Tender -

Cement/Concrete..................$ 15.26 0.00

LABORER: Pipelayer..............$ 16.33 3.11

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 21.00 2.89

OPERATOR: Bulldozer.............$ 17.54 2.63

OPERATOR: Forklift..............$ 16.75 0.00

OPERATOR: Grader/Blade..........$ 22.68 3.27

OPERATOR: Roller................$ 15.31 1.46

PAINTER..........................$ 15.55 1.05

PLUMBER..........................$ 23.11 0.00

ROOFER...........................$ 18.26 4.38

SHEET METAL WORKER...............$ 19.67 13.27

TRUCK DRIVER: Dump Truck........$ 15.98 2.93

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between

January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive

Order 13658 does not apply to contracts subject only to the

Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007

6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007

01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

Washington, DC 20210.

END OF GENERAL DECISION

52.225-10 Notice of Buy American Requirement-Construction Materials.

As prescribed in 25.1102(b)(1), insert the following provision:

Notice of Buy American Requirement-Construction Materials (May 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"

"domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal

Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR

52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy

American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

File details come from the government source that posted it. Updated .