This document is a Request for Proposals (RFP) issued by the Fairfax County Public Schools (FCPS) for schematic design services for the retrofit of Patrick ES. The scope of work includes providing design services for the replacement of existing mechanical, electrical, and plumbing systems, as well as architectural improvements. The project is expected to have a construction budget of approximately $15 million. Proposals are due on March 24, 2023, and a pre-proposal conference will be held on March 10, 2023. The contract will be awarded in April 2023, and the term of the contract will be one year with the option to renew for an additional year.
The RFP outlines pricing requirements, including the use of a standard FCPS contract and payment terms. No set-asides or incumbent information is provided. The project is funded through FCPS capital improvement funds, but the specific funding source and amount is not disclosed. The RFP also includes detailed submittal requirements, evaluation criteria, and general terms and conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OWNER:
OWNER CONTACT: SPENCER DAVENPORT
PATRICK ELEMENTARY SCHOOL DISTRICT 6
1500 2ND AVENUE,
GOLD HILL, OR 97525
ARCHITECTURE:
STAMPING REGISTRANT: ZACH STOKES, P.E.
CONTACT: JESSI RUSSELL, AIA
ZCS ENGINEERING & ARCHITECTURE
524 MAIN ST., STE. 2
OREGON CITY, OR 97045
T 503.659.2205
STRUCTURAL ENGINEERING:
ENGINEER OF RECORD: MATT SMITH, P.E., S.E.
CONTACT: KEVIN HASSETT
ZCS ENGINEERING & ARCHITECTURE
524 MAIN ST., STE. 2
OREGON CITY, OR 97045
T 503.659.2205
CMGC:
TBD
PROJECT SCOPE
THE PURPOSE OF THIS PROJECT IS THE SEISMIC REHABILITATION OF PATRICK
ELEMENTARY SCHOOL CLASSROOMS AND GYMNASIUM. THE REHABILITATION
WILL BE ACCOMPLISHED BY MEANS OF ADDING LATERAL FORCE RESISTING
ELEMENTS WHERE NECESSARY, BY ENSURING PROPER LOAD PATH TO THE
FOUNDATION ELEMENTS. IN CONJUNCTION WITH THE LATERAL SYSTEM, SOME
DIAPHRAGMS WILL BE STRENGTHENED AND NEW STEEL POSTS WILL BE ADDED
TO ACCOMMODATE A SEISMIC ISOLATION GAP TO PREVENT POUNDING OF
NEARBY BUILDINGS. LIGHTING, HVAC AND INTEGRATED CEILINGS ARE TO BE
SEISMICALLY BRACED AND ANCHORED TO THE STRUCTURE.
SEISMIC REHABILITATION SCOPE
THE SEISMIC REHABILITATION PORTION OF THIS PROJECT IS FUNDED BY A GRANT
AWARDED TO CENTRAL POINT SCHOOL DISTRICT BY THE INFRASTRUCTURE
FINANCE AUTHORITY OREGON BUSINESS DEVELOPMENT DEPARTMENT TO MEET
THE BASIC PERFORMANCE OBJECTIVE FOR EXISTING BUILDING (BPOE) AS
OUTLINED IN THE AMERICAN SOCIETY OF CIVIL ENGINEERS "SEISMIC
REHABILITATION OF EXISTING BUILDINGS" (ASCE 41-17). THE REHABILITATION
OBJECTIVE IS DEFINED AS STRUCTURAL PERFORMANCE LEVEL, IMMEDIATE
OCCUPANCY, MEANS THE POST-EARTHQUAKE DAMAGE STATE IN WHICH ONLY
VERY LIMITED STRUCTURAL DAMAGE HAS OCCURRED. THE BASIC VERTICAL-,
AND LATERAL-FORCE-RESISTING SYSTEMS OF THE BUILDING RETAIN NEARLY ALL
OF THEIR PRE-EARTHQUAKE STRENGTH AND STIFFNESS. THE RISK OF LIFE
THREATENING INJURY AS A RESULT OF STRUCTURAL DAMAGE IS VERY LOW, AND
ALTHOUGH SOME MINOR STRUCTURAL PREPARES MAY BE APPROPRIATE, THESE
WOULD GENERALLY NOT BE REQUIRED PRIOR TO REOCCUPANCY.
HE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF CONSTRUCTION
NECESSARY FOR THE COMPLETION OF ALL WORK INCIDENTAL TO THE WORK
ILLUSTRATED IN THIS PLAN SET.
PROJECT COMPONENTS
THE FOLLOWING LIST IS A BRIEF GENERAL DESCRIPTION OF WHAT THIS PROJECT
ENTAILS:
1. NEW CMU WALL INFILL.
2. IN-PLANE AND OUT-OF-PLANE CONNECTIONS FROM DIAPHRAGMS
TO LATERAL FORCE RESISTING SYSTEM.
3. NEW ROOF SHEATHING ON GYMNASIUM BUILDING AND CANOPIES.
4. EXISTING WOOD SHEAR WALLS TO RECEIVE NEW PLYWOOD
SHEATHING.
5. SEISMIC BRACING OF NON-STRUCTURAL SCOPE ITEMS.
INCIDENTAL TO SEISMIC REHABILITATION
1. REMOVAL AND REPLACEMENT OF CEILING
2. REMOVAL AND REPLACEMENT OF ROOFING
3. REMOVAL AND REPLACEMENT OF FASCIAS, GUTTERS, AND DOWNSPOUTS
4. REMOVAL AND REINSTALLATION OF ROOF-MOUNTED EQUIPMENT
5. REMOVAL AND REPLACEMENT OF CASEWORK
6. REMOVAL AND REPLACEMENT OF LIGHTING
G.C. AND SUBCONTRACTORS TO REVIEW PLANS AND PROVIDE CODE REQUIRED
MEP DESIGN IN COORDINATION WITH THE ARCHITECTURE PLANS. FURTHER
MODIFICATION MAY BE REQUIRED.
MECHANICAL:
1. REMOVE AND REINSTALL (E) DUCTWORK AS REQUIRED FOR
STRUCTURAL MODIFICATIONS
ELECTRICAL:
1. REMOVE (E) LIGHTS AS REQUIRED FOR STRUCTURAL MODIFICATIONS
AND REPLACE WITH (N)
PLUMBING:
1. TBD
A.B. ANCHOR BOLT
ACI AMERICAN CONCRETE
INSTITUTE
A.C.T. ACOUSTICAL CEILING
TILE
A.F.F. ABOVE FINISHED FLOOR
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
ARCH. ARCHITECT
ASCE AMERICAN SOCIETY OF
CIVIL ENGINEERS
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
AWS AMERICAN WELDING
SOCIETY
BD. BOARD
BITUM. BITUMINOUS
BOT./B.O. BOTTOM/BOTTOM OF
B.O.D. BASIS OF DESIGN
CER. CERAMIC
C.G. CORNER GUARD
C.I. CONTINUOUS INSULATION
C.J. CONTROL JOINT
CJP COMPLETE JOINT
PENETRATION
CL CENTERLINE
CLR. CLEAR
CMU CONCRETE MASONRY
UNIT
C.O. CASED OPENING
CONC. CONCRETE
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
CORR. CORRIDOR
CPT. CARPET
C.T. CERAMIC TILE
DBA DEFORMED BAR
ANCHOR
D.F. DRINKING FOUNTAIN
DIA., ⌀ DIAMETER
DR. DOOR
D.S. DOWNSPOUT
(E) EXISTING
ELEC. ELECTRICAL
EQ. EQUAL
EXT. EXTERIOR
F.A. FIRE ALARM
F.D. FLOOR DRAIN
FDN. FOUNDATION
F.O.F FACE OF FINISH
F.O.S. FACE OF STUDS
F.S.D. FIRE SEPARATION DISTANCE
FTG. FOOTING
Ga. GAUGE
GALV. GALVANIZED
GL GRID LINE
GLB GLULAM BEAM
G.B. GRAB BAR
GND. GROUND
GSM GALVANIZED SHEET METAL
GYP. GYPSUM
H.B. HOSE BIBB
H.C. HOLLOW CORE
H.M. HOLLOW METAL
HORIZ. HORIZONTAL
HPC HIGH PERFORMANCE
COATING
HSS HOLLOW STRUCTURAL
STEEL
IBC INTERNATIONAL
BUILDING CODE
IN. INCH
INT. INTERIOR
K KIPS
KSF KIPS PER SQUARE FOOT
KSI KIPS PER SQUARE INCH
LAM. LAMINATE
LB. POUND
L.L. LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC. LOCATION
LONG. LONGITUDINAL
L.P. LOW POINT
LVF LOW VELOCITY FASTENER
MAX. MAXIMUM
MBMA METAL BUILDING
MANUFACTURERS
ASSOCIATION
M.E. MATCH EXISTING
MECH. MECHANICAL
MFR. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
MTD. MOUNTED
MUL. MULLION
(N) NEW
N.I.C. NOT IN CONTRACT
NOM. NOMINAL
N.T.S. NOT TO SCALE
OBS. OBSCURE
o.c. ON CENTER
O.F.C.I. OWNER FURNISHED
CONTRACTOR
INSTALLED
O.F.D. OVERFLOW DRAIN
O.F.O.I. OWNER FURNISHED
OWNER INSTALLED
OH. OPPOSITE HAND
OHD OVERHEAD DOOR
OPP. OPPOSITE
OWJ OPEN WEB JOIST
PAF POWDER ACTUATED
FASTENER
P/C PRECAST (CONCRETE)
PCF POUNDS PER CUBIC
FOOT
PL PLATE
P.LAM. PLASTIC LAMINATE
PLAS. PLASTER
PLY PLYWOOD
PJP PARTIAL JOINT
PENETRATION
PSF POUNDS PER FOOT
PSI POUNDS PER INCH
P/T POST-TENSIONED
P.T. PRESSURE TREATED
R.C.P. REFLECTED CEILING
PLAN
R.D. ROOF DRAIN
REF. REFERENCE
REINF. REINFORCING
REQ'D. REQUIRED
RL. RELOCATE
R.O. ROUGH OPENING
RWD. REDWOOD
REV. REVERSED
S.A.M. SELF-ADHERED MEMBRANE
S.C. SOLID CORE
SCHED. SCHEDULE
SIM. SIMILAR
SLRS SEISMIC LOAD RESISTING
SYSTEM
S.O.G. SLAB ON GRADE
SPEC. SPECIFICATION
SQ. SQUARE
S.S.D. SEE STRUCTURAL
DRAWINGS
S.S. STAINLESS STEEL
SSMA STEEL STUD
MANUFACTURERS
ASSOCIATION
STD. STANDARD
STRUCT. STRUCTURAL
S.T.S. SELF TAPPING SCREW
SYM. SYMMETRICAL
THRU THROUGH
TYP. TYPICAL
T & G TONGUE AND GROOVE
THK. THICK
TJ TRUSS JOIST
TRANS. TRANSVERSE
T.W. TOP OF WALL
U.N.O. UNLESS NOTED
OTHERWISE
U.T. ULTRASONIC TESTING
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
w/ WITH w/o WITHOUT
WF WIDE FLANGE
W.P. WORK POINT
1. ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS SHALL BE
FIELD VERIFIED. THE CONTRACTOR SHALL NOTIFY THE PROJECT
TEAM OF ANY SIGNIFICANT DISCREPANCIES FROM CONDITIONS
SHOWN ON THE DRAWINGS.
2. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL
CONSTRUCTION MEANS AND METHODS. RESPONSIBILITY SHALL
INCLUDE BUT NOT LIMITED TO DEMOLITION AND CONSTRUCTION
MEANS AND METHODS, TECHNIQUES, SEQUENCING, AND SAFETY
REQUIRED TO COMPLETE CONSTRUCTION.
3. BEFORE STARTING A SECTION OF WORK THE CONTRACTOR SHALL
CAREFULLY EXAMINE PREPARATORY WORK THAT HAS BEEN
EXECUTED. ENSURE THAT WORK AND ADJACENT RELATED WORK
WILL FINISH TO PROPER PLANES AND LEVELS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL
MATERIALS AND WORKMANSHIP IN ACCORDANCE WITH ALL
APPLICABLE FEDERAL, STATE, AND LOCAL CODES.
5. CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL CONTRACT
DOCUMENTS, FIELD CONDITIONS, AND DIMENSIONS FOR ACCURACY
AND CONFIRMING THAT WORK IS BUILDABLE AS SHOWN BEFORE
PROCEEDING WITH THE CONSTRUCTION. IF THERE ARE ANY
QUESTIONS, THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING A
CLARIFICATION FROM THE PROJECT TEAM BEFORE PROCEEDING
WITH THE WORK IN QUESTION OR RELATE WORK.
6. THE CONTRACTOR SHALL NOT SCALE DRAWINGS. WRITTEN
DIMENSIONS SHALL ALWAYS GOVERN. CONTRACTOR REQUIRING
DIMENSIONS NOT NOTED SHALL ALWAYS CONTACT THE PROJECT
TEAM FOR SUCH INFORMATION PRIOR TO PRECEDING WITH WORK
RELATED TO THOSE DIMENSIONS
7. THE CONTRACTOR SHALL PROTECT, PATCH, AND REPAIR TO MATCH
ANY WALLS, FLOORS, CEILINGS, AND/OR OTHER SURFACES WHICH
MAY BE DISTURBED DURING THE INSTALLATION OF MECHANICAL,
ELECTRICAL, PLUMBING OR OTHER OWNER WORK.
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR PROPER INSTALLATION OF MATERIAL AND
EQUIPMENT. PROVIDE DEMOLITION AND PATCH/REPAIR IN ALL
AREAS (WHETHER SPECIFICALLY SHOWN OR NOT) TO
ACCOMMODATE ALL WORK.
9. IF THE CONTRACTOR ENCOUNTERS A CONDITION NOT COVERED IN
THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR SHALL
NOTIFY AND RESOLVE THE ISSUE WITH THE PROJECT TEAM BEFORE
COMMENCING ANY WORK.
10. ALL PERMITS ASSOCIATED WITH THE PROJECT SHALL BE PAID AND
OBTAINED BY THE CONTRACTOR.
11. GENERAL CONTRACTOR SHALL BE SOLELY AND COMPLETELY
RESPONSIBLE FOR JOB CONDITIONS OF THE JOB SITE, INCLUDING
SAFETY OF PERSONS AND PROPERTY AND COMPLIANCE WITH OSHA
SAFETY STANDARDS.
12. WHEN PORTIONS OF THE WORK ARE PERFORMED BY THE
CONTRACTOR ON A DESIGN-BUILD BASIS, THE CONTRACTOR SHALL
BE SOLELY RESPONSIBLE FOR THE DESIGN OF SUCH SYSTEMS AND
FOR THE SECURING OF ALL ASSOCIATED PERMITS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF
ALL DESIGN BUILD SUB CONTRACTORS .
13. CONTRACTOR SHALL AVOID INTERFERENCE AND CONFLICT WITH
THE BUILDING'S NORMAL OPERATION. CONTRACTOR TO COMPLY
WITH THE BUILDING RULES AND REGULATIONS REGARDING
SCHEDULING AND USE OF ELEVATORS AND LOADING DOCKS FOR
DELIVERY AND HANDLING OF MATERIALS, EQUIPMENT, AND DEBRIS.
14. ALL KEY NOTES INDICATE NEW ITEMS TYPICALLY UNLESS NOTED
OTHERWISE
15. CONTRACTOR SHALL BE RESPONSIBLE FOR ASHRAE COMPLIANCE
IN SCHOOL, RETAIL, AND OFFICE SPACES
Room name
150 SF
ROOM NUMBER
ROOM AREA
PROJECT NORTH
TRUE NORTH
101 DOOR NUMBER TAG
X WINDOW TAG
A101
1 Ref
R e f
1 Ref
R e f
ELEVATION TAG
VIEW REFERENCE
SHEET REFERENCE
ROOM TAG
A101
SIM
A101
SIM
SECTION TAG
DRAWING REFERENCE
SHEET REFERENCE
A101
SIM
DETAIL REFERENCE
DRAWING REFERENCE
SHEET REFERENCE
A101
SIM
ENLARGED PLAN
DRAWING REFERENCE
SHEET REFERENCE
REFERENCE AREA
Name Elevation
DETAIL CUT DIRECTION
LEVEL REFERENCE
View Name A1.1
1/4" = 1'-0"
VIEW TITLE
VIEW SCALE
VIEW REFERENCE
ACT
8'-0"
CEILING TAG
CEILING MATERIAL
CEILING HEIGHT
ADDITIONAL NOTES
? KEYNOTE TAG
W1 WALL/ROOF TAG
TR# FLOORING TRANSITION
TAG
CENTERLINE
REVISION CLOUD
AREA OF REVISION
REVISION DELTA TAG
FINISH TAG
WALL FINISH
A101
Ref
R e f
R e f
Ref
PHOTO REFERENCE
VIEW REFERENCE
SHEET REFERENCE
X FINISH TAG
X EQUIPMENT TAG
Remarks
EX#
EX#
ME#
ME#
XX#
XX#
Room name
BASE FINISH
FLOOR FINISH
ADDITIONAL NOTES
NORTH ARROW
Room name
OccType
# occs.
150 sf OLF /sf
# Exit(s)
ROOM OCCUPANCY TAG
ROOM NAME
ROOM NUMBER
OCC. TYPE
OCC. LOAD
REQ'D EXITS
ROOM AREA
# OF OCCS.
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
DESCRIPTION DATE:
/2
/2
:1
:3
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
G0.00
COVER SHEET
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
PATRICK ELEMENTRY SCHOOL SEISMIC RETROFIT
CENTRAL POINT SCHOOL DISTRICT 6
1500 2ND AVE. GOLD HILL, OR 97525
100% SCHEMATIC DESIGN | NOT FOR CONSTRUCTION
HATCH INDICATES
AREA OF WORK
N
-GENERAL-
G0.00 COVER SHEET
G1.00 CODE PLAN
-ARCHITECTURAL-
A1.10 FLOOR PLAN - AREA A
A1.11 FLOOR PLAN - AREA B
A1.20 ROOF PLAN - AREA A
A1.21 ROOF PLAN - AREA B
A2.10 REFLECTED CEILING PLAN - AREA A
A2.11 REFLECTED CEILING PLAN - AREA B
-STRUCTURAL-
S0.01 STRUCTURAL GENERAL NOTES
S0.02 SPECIAL INSPECTIONS AND TESTING
S1.10 FOUNDATION PLAN - AREA A
S1.11 FOUNDATION PLAN - AREA B
S2.10 ROOF FRAMING PLAN - AREA A
S2.11 ROOF FRAMING PLAN - AREA B
PROJECT ADDRESS:
1500 2ND AVE.
GOLD HILL, OR 97525
SHEET INDEXPROJECT TEAMPROJECT NARRATIVEABBREVIATIONSPROJECT NOTES
VICINITY MAP
DESIGN BUILD SCOPE
AERIAL PHOTO
SYMBOL LEGEND
DEFERRED SUBMITTALS
ZCS SHALL PERFORM GENERAL REVIEW OF ANY DEFERRED SUBMITTAL DESIGNS
PRIOR TO SUBMITTING TO THE AHJ AND PRIOR TO CONSTRUCTION
IMPLEMENTATION FOR GENERAL CONFORMANCE TO THE DESIGN INTENT.
DEFERRED SUBMITTAL ITEMS SHALL NOT BE SPECIALLY FABRICATED OR
INSTALLED UNTIL APPROVED BY THE AHJ AND ZCS.
1. NONE
N
UP
(E) WALL MOUNTED ILLUMINATED EXIT SIGN
FIRE LIFE SAFETY LEGEND
FE
FE
(E) EXIT SIGN PLACARD
(E) EMERGENCY EXIT ROUTE
(E) FIRE EXTINGUISHER & CABINET
(E) WALL MOUNTED FIRE EXTINGUISHER
LIFE SAFTEY CODE SUMMARY
APPLICABLE CODES
BUILDING CODE 2022 OSSC
PLUMBING CODE 2023 OPSC
MECHANICAL CODE 2022 OMSC
ELECTRICAL CODE 2023 OESC
ENERGY CODE 2021 OEESC
FIRE CODE 2022 OFC
ACCESSIBILITY CODE ICC A117.1-2017
BUILDING DATA
ORIGINAL CONSTRUCTION DATE: AREA 'A' - 1955 ESTIMATED
AREA 'B' - 1960 ESTIMATED
OCCUPANCIES (NONSEPARATED): E
CONSTRUCTION TYPE: IIIB
(E) FIRE SPRINKLER: NO
(E) FIRE ALARM: YES
(E) BUILDING AREA (UNCHANGED): 33,962 ± SF
(E) BUILDING HEIGHT (UNCHANGED): 21'-7"±
(E) # OF STORIES (UNCHANGED): 1
INTERIOR FINISHES
TABLE 803.13 INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY OCCUPANCY
ROOMS AND ENCLOSED SPACES
GROUP E: C
CLASS C = FLAME SPREAD INDEX 76-200;
SMOKE DEVELOPED INDEX 0-450
MEANS OF EGRESS
TABLE 1006.2.1 MAXIMUM COMMON PATH OF EGRESS TRAVEL DISTANCE:
WITH LONGEST CONTROLLING
OCCUPANCY SPRINKLER SYSTEM DISTANCE PROPOSED EXIT PATH
E 75' MAX. TBD
TABLE 1017.2 EXIT ACCESS TRAVEL DISTANCE:
WITH LONGEST CONTROLLING
OCCUPANCY SPRINKLER SYSTEM DISTANCE PROPOSED EXIT PATH
E 250' MAX. TBD
EXISTING BUILDINGS
3406.3 LEVEL 2 ALTERATIONS APPLY WHERE THE WORK AREA IS EQUAL TO OR LESS THAN
50% OF THE BUILDING AREA.
PROPOSED WORK AREA OF ALTERATION IS < 50% OF THE (E) BUILDING AREA
LIFE SAFETY NARRATIVE
THE SCOPE OF THIS PROJECT CONSISTS OF VOLUNTARY SEISMIC
REHABILITATION OF PATRICK ELEMENTARY SCHOOL. NO CHANGES TO
(E) OCCUPANCIES OR EGRESSING ARE PROPOSED.
HATCH INDICATES AREA
OUT OF SCOPE OF WORK
HATCH INDICATES AREA
OUT OF SCOPE OF WORK
HATCH INDICATES AREA
OUT OF SCOPE OF WORK
CLASSROOM
CLASSROOM
CLASSROOM
STORAGE
MAIN OFFICE
PRINCIPALS
OFFICE
BOILER ROOM
OFFICE
OFFICE
HEALTH
CENTER
COLD
STORAGE
GIRLS
RESTROOM
COLD
STORAGE
DRY
STORAGE
KITCHEN
BOYS
RESTROOM
MULTI-PURPOSE
PLATFORM
STORAGE
STORAGE
STORAGE
HALL
STORAGE
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
DESCRIPTION DATE:
/2
/2
:1
:3
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
G1.00
CODE PLAN
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
G1.00 1/16" = 1'-0"
CODE PLAN1
A. VERIFY ALL DIMENSIONS AND NOTIFY PROJECT TEAM IF
DISCREPANCIES OCCUR.
B. G.C. TO PROVIDE FIRE BLOCKING AS REQUIRED PER
CODE.
C. G.C. SHALL PROVIDE ALL APPROPRIATE BACKING AS
REQUIRED FOR ACCESSORIES AND OTHER
MISCELLANEOUS ITEMS.
D. G.C. TO COORDINATE INSTALLATION OF ALL UTILITIES w/
RESPECTIVE SUPPLIERS/SUBCONTRACTORS PRIOR TO
CONSTRUCTION, TYPICAL.
E. ALL ELECTRICAL, MECHANICAL, PLUMBING, FIRE
SUPPRESSION AND LANDSCAPE TO BE DESIGN BUILD PER
APPLICABLE CODES.
F. ALL DIMENSION LINES TO THE FACE OF FRAMING, U.N.O.
FLOOR PLAN GENERAL NOTES
FLOOR PLAN LEGEND
(N) CMU WALL
(E) WALL TO REMAIN
(N) CONCRETE FOOTING AND SLAB SEE
STRUCTURAL
1 2 3 4 5 6 7 84.9
A
B
C
D
E
BOYS
RESTROOM
STORAGE
CLASSROOM
CLASSROOM
CLASSROOM
RESTROOM
4-A
RESTROOM
2-A
PRINCIPALS
OFFICE
MAIN OFFICE
RESTROOM
3-A
RESTROOM
1-A
BOILER ROOM
OFFICE
OFFICE
HEALTH
CENTER
KITCHEN
14 DRY
STORAGE
CUSTODIAN
/SEE 1 A1.11 /SEE 1 A1.11
1 1 1 1
3 3 3 3
MATCH LINE MATCH LINE
1. (N) COLUMN, SEE STRUCTURAL
2. (N) INFILL WALL
3. INSTALL (N) CASEWORK
# PLAN KEYNOTES
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
KEY PLAN
AREA A
AREA B
DESCRIPTION DATE:
OUT OF SCOPE
OUT OF SCOPE
/2
/2
:1
:3
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
A1.10
FLOOR PLAN -
AREA A
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
A1.10 1/8" = 1'-0"
FLOOR PLAN - AREA A1
A. VERIFY ALL DIMENSIONS AND NOTIFY PROJECT TEAM IF
DISCREPANCIES OCCUR.
B. G.C. TO PROVIDE FIRE BLOCKING AS REQUIRED PER
CODE.
C. G.C. SHALL PROVIDE ALL APPROPRIATE BACKING AS
REQUIRED FOR ACCESSORIES AND OTHER
MISCELLANEOUS ITEMS.
D. G.C. TO COORDINATE INSTALLATION OF ALL UTILITIES w/
RESPECTIVE SUPPLIERS/SUBCONTRACTORS PRIOR TO
CONSTRUCTION, TYPICAL.
E. ALL ELECTRICAL, MECHANICAL, PLUMBING, FIRE
SUPPRESSION AND LANDSCAPE TO BE DESIGN BUILD PER
APPLICABLE CODES.
F. ALL DIMENSION LINES TO THE FACE OF FRAMING, U.N.O.
FLOOR PLAN GENERAL NOTES
FLOOR PLAN LEGEND
(N) CMU WALL
(E) WALL TO REMAIN
(N) CONCRETE FOOTING AND SLAB SEE
STRUCTURAL
84.9
E
F
G
H
I
HATCH INDICATES AREA
OUT OF SCOPE OF WORK
H A
T C
H I N
D
IC
A T
E S
A R
E A
O
U T
O F
S C
O P
E O
F W
O R
K
MULTI-PURPOSE
STORAGE
PLATFORM
STORAGE
20-A
STORAGE
21-A
STORAGE
STORAGE
S T
O R
A G
E
/SEE 1 A1.10 /SEE 1 A1.10
MATCH LINE MATCH LINE
OUT DOOR PLAY
AREA
1. (N) COLUMN, SEE STRUCTURAL
# PLAN KEYNOTES
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
KEY PLAN
AREA A
AREA B
DESCRIPTION DATE:
OUT OF SCOPE
OUT OF SCOPE
/2
/2
:1
:3
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
A1.11
FLOOR PLAN -
AREA B
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
A1.11 1/8" = 1'-0"
FLOOR PLAN - AREA B1
A. ALL WORK AND MATERIALS SHALL CONFORM TO ALL
APPLICABLE STATE AND LOCAL REGULATIONS,
STANDARDS AND MFR. SPECIFICATIONS AND THE OSSC.
CONTACT PROJECT TEAM FOR DIRECTIVE IN THE EVENT
OF CONFLICTING STANDARDS AND SPECS.
B. VERIFY ALL DIMENSIONS, ELEVATIONS AND LOCATIONS
PRIOR TO CONSTRUCTION. NOTIFY PROJECT TEAM OF ANY
DISCREPANCIES. DIMENSIONS ON THIS PLAN ARE NOT
SUITABLE FOR MATERIAL ORDERING USE. CONTRACTOR
MUST FIELD VERIFY ALL DIMENSIONS PRIOR TO BIDDING
AND ORDERING.
C. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN,
INSTALLATION, AND MAINTENANCE OF ALL TEMPORARY
ROOF ACCESS SYSTEMS. ALL SYSTEMS MUST COMPLY
WITH OSHA.
D. COORDINATE STAGING AND MATERIALS STORAGE AREA
WITH ANY APPLICABLE PARTIES.
E. SECURITY OF STORED MATERIAL IS THE RESPONSIBILITY
OF THE CONTRACTOR.
F. NO PORTION OF THE ROOF SHALL BE LEFT UNPROTECTED
AGAINST THE ELEMENTS BETWEEN CONTRACTOR SHIFTS.
G. SEE PLAN SET AND/OR SPECIFICATIONS FOR MORE
INFORMATION.
ROOF PLAN GENERAL NOTES
ROOF PLAN LEGEND
DS
(E) ROOFING TO REMAIN
(N) ROOFING ON (N) SHEATHING OVER (E)
DECKING
INDICATES ROOF STEP
DOWN SPOUT
ROOF SLOPE (ALWAYS INDICATES DOWN)
(N) SEISMIC JOINT
1 2 3 4 5 6 7 8
A
B
C
D
E
RIDGE
(E
S L O
P E
(E
S L O
P E
TYP
TYP
MATCH LINE MATCH LINE
/SEE 1 A1.21 /SEE 1 A1.21
1. REINSTALL (E) EXHAUST FAN
2. REINSTALL (E) CONDENSING UNIT
# ROOF KEYNOTES
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
KEY PLAN
AREA A
AREA B
DESCRIPTION DATE:
OUT OF SCOPE
OUT OF SCOPE
/2
/2
:1
:3
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
A1.20
ROOF PLAN - AREA
A
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
A1.20 1/8" = 1'-0"
ROOF PLAN - AREA A1
A. ALL WORK AND MATERIALS SHALL CONFORM TO ALL
APPLICABLE STATE AND LOCAL REGULATIONS,
STANDARDS AND MFR. SPECIFICATIONS AND THE OSSC.
CONTACT PROJECT TEAM FOR DIRECTIVE IN THE EVENT
OF CONFLICTING STANDARDS AND SPECS.
B. VERIFY ALL DIMENSIONS, ELEVATIONS AND LOCATIONS
PRIOR TO CONSTRUCTION. NOTIFY PROJECT TEAM OF ANY
DISCREPANCIES. DIMENSIONS ON THIS PLAN ARE NOT
SUITABLE FOR MATERIAL ORDERING USE. CONTRACTOR
MUST FIELD VERIFY ALL DIMENSIONS PRIOR TO BIDDING
AND ORDERING.
C. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN,
INSTALLATION, AND MAINTENANCE OF ALL TEMPORARY
ROOF ACCESS SYSTEMS. ALL SYSTEMS MUST COMPLY
WITH OSHA.
D. COORDINATE STAGING AND MATERIALS STORAGE AREA
WITH ANY APPLICABLE PARTIES.
E. SECURITY OF STORED MATERIAL IS THE RESPONSIBILITY
OF THE CONTRACTOR.
F. NO PORTION OF THE ROOF SHALL BE LEFT UNPROTECTED
AGAINST THE ELEMENTS BETWEEN CONTRACTOR SHIFTS.
G. SEE PLAN SET AND/OR SPECIFICATIONS FOR MORE
INFORMATION.
ROOF PLAN GENERAL NOTES
ROOF PLAN LEGEND
DS
(E) ROOFING TO REMAIN
(N) ROOFING ON (N) SHEATHING OVER (E)
DECKING
INDICATES ROOF STEP
DOWN SPOUT
ROOF SLOPE (ALWAYS INDICATES DOWN)
(N) SEISMIC JOINT
84.9
E
F
G
H
I
(E) SLOPE
H
IP
H A
T C
H I N
D
IC
A T
E S
A R
T
O F
S C
O P
E O
F W
O R
K H
A T
C H
I N
D
IC
A T
E S
A R
T
O F
S C
O P
E O
F W
O R
K
MATCH LINE MATCH LINE
/SEE 1 A1.20 /SEE 1 A1.20
1. REINSTALL (E) EXHAUST FAN
2. REINSTALL (E) CONDENSING UNIT
3. (N) SEISMIC SEPARATION, B.O.D. CONSTRUCTION
SPECIALITIES EXPANSION JOINT COVER
# ROOF KEYNOTES
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
KEY PLAN
AREA A
AREA B
DESCRIPTION DATE:
OUT OF SCOPE
OUT OF SCOPE
/2
/2
:1
:3
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
A1.21
ROOF PLAN - AREA
B
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
A1.21 1/8" = 1'-0"
ROOF PLAN - AREA B1
RCP GENERAL NOTES
A. REFER TO ARCHITECTURAL FLOOR PLAN FOR ADDITIONAL
DIMENSIONS.
B. ALL DIMENSIONS ARE REFERENCED TO FACE OF FRAMING
U.N.O.
C. ALL HEIGHT REFERENCES ARE TAKEN FROM DATUM-T.O.S.
FOR AREA INDICATED.
D. PROVIDE WALL BACKING FOR REINFORCEMENT AS
REQUIRED.
E. PROVIDE SOLID BLOCKING FOR ALL 'J' BOXES SUSPENDED
LIGHT AND CEILING FAN FIXTURES, TELEVISION SUPPORT,
ARTIFACT SHELVES AND ANY OTHER CEILING MOUNTED
EQUIPMENT.
F. ANY LIGHT NOT DIMENSIONALLY LOCATED TO BE
CENTERED IN THE CEILING AREA OR ROOM AS
APPLICABLE. ALL "CAN" TYPE FIXTURES TO BE MOUNTED
IN THE CENTER OF THE CEILING TILES U.N.O.
G. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL BE
NOT LESS THAN 1 FOOT CANDLE AT THE WALKING
SURFACE. ALONG EXIT ACCESS STAIRWAYS, EXIT
STAIRWAYS AND AT THEIR REQUIRED LANDINGS, THE
ILLUMINATION LEVEL SHALL NOT BE LESS THAN 10 FOOT
CANDLES AT THE WALKING SURFACE WHEN THE
STAIRWAY IS IN USE.
H. PROVIDE OCCUPANCY SENSORS AND EMERGENCY
BATTERY BACKUP IN ALL SPACES RECEIVING NEW
LIGHTING.
I. ALL EXPOSED CONDUITS AND 'J' BOXES SHALL BE PAINTED
TO MATCH THE ADJACENT FINISH U.N.O.
J. ALL ROOMS THAT ARE TO RECEIVE A CEILING PATCH
SHALL BE PAINTED PTX IN ITS ENTIRETY U.N.O.
RCP LEGEND
(E) GYP CEILING
CEILING FINISHES
GYP GYPSUM WALL BOARD
ACT 2X4 ACOUSTICAL LAY-IN PANEL
ACT2 12X12 ACOUSTICAL DIRECT ATTACHED
CEILING HEIGHT
VAR VARIES
M.E. MATCH EXISTING
ADDITIONAL NOTES
1. NONE
(E) ACT CEILING
(N) CEILING PER PLAN
(N) LIGHTING
LUMINAIRE LEGEND :
(N) RETURN AND SUPPLY REGISTER
MECHANICAL LEGEND :
(N) SOFFIT / DECKING
(E) SOFFIT / DECKING
(N) ACT CEILING
(E) CONDUIT
(N) SEISMIC JOINT
(N) 12X12 ACT CEILING
ACT
8'-0"
CEILING TAG CEILING MATERIAL
CEILING HEIGHT
ADDITIONAL NOTES
(E) 12X12 ACT CEILING
1 2 3 4 5 6 7 84.9
A
B
C
D
E
CLASSROOM
CLASSROOM
CLASSROOM
STORAGE
MAIN OFFICE
PRINCIPALS
OFFICE
BOILER ROOM
OFFICE
CUSTODIAN
OFFICE
GIRLS
RESTROOM
BOYS
RESTROOM
KITCHEN
COLD
STORAGE
DRY
STORAGE
/SEE 1 A2.11 /SEE 1 A2.11
MATCH LINE MATCH LINE
TYP
TYP
TYP
HEALTH
CENTER
ACT2
7' - 9"
ACT2
8' - 0"
ACT2
8' - 0"
ACT2
8' - 0"
ACT2
12' - 7"
ACT2
12' - 7"
ACT2
12' - 7"
ACT2
12' - 7"
1. REINSTALL (E) DUCTWORK
2. INSTALL (N) LIGHT FIXTURE
3. INSTALL (N) ATTIC ACCESS HATCH
# RCP KEYNOTES
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
KEY PLAN
AREA A
AREA B
DESCRIPTION DATE:
OUT OF SCOPE
OUT OF SCOPE
/2
/2
:1
:4
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
A2.10
REFLECTED
CEILING PLAN -
AREA A
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
A2.10 1/8" = 1'-0"
REFLECTED CEILING PLAN - AREA A1
RCP GENERAL NOTES
A. REFER TO ARCHITECTURAL FLOOR PLAN FOR ADDITIONAL
DIMENSIONS.
B. ALL DIMENSIONS ARE REFERENCED TO FACE OF FRAMING
U.N.O.
C. ALL HEIGHT REFERENCES ARE TAKEN FROM DATUM-T.O.S.
FOR AREA INDICATED.
D. PROVIDE WALL BACKING FOR REINFORCEMENT AS
REQUIRED.
E. PROVIDE SOLID BLOCKING FOR ALL 'J' BOXES SUSPENDED
LIGHT AND CEILING FAN FIXTURES, TELEVISION SUPPORT,
ARTIFACT SHELVES AND ANY OTHER CEILING MOUNTED
EQUIPMENT.
F. ANY LIGHT NOT DIMENSIONALLY LOCATED TO BE
CENTERED IN THE CEILING AREA OR ROOM AS
APPLICABLE. ALL "CAN" TYPE FIXTURES TO BE MOUNTED
IN THE CENTER OF THE CEILING TILES U.N.O.
G. THE MEANS OF EGRESS ILLUMINATION LEVEL SHALL BE
NOT LESS THAN 1 FOOT CANDLE AT THE WALKING
SURFACE. ALONG EXIT ACCESS STAIRWAYS, EXIT
STAIRWAYS AND AT THEIR REQUIRED LANDINGS, THE
ILLUMINATION LEVEL SHALL NOT BE LESS THAN 10 FOOT
CANDLES AT THE WALKING SURFACE WHEN THE
STAIRWAY IS IN USE.
H. PROVIDE OCCUPANCY SENSORS AND EMERGENCY
BATTERY BACKUP IN ALL SPACES RECEIVING NEW
LIGHTING.
I. ALL EXPOSED CONDUITS AND 'J' BOXES SHALL BE PAINTED
TO MATCH THE ADJACENT FINISH U.N.O.
J. ALL ROOMS THAT ARE TO RECEIVE A CEILING PATCH
SHALL BE PAINTED PTX IN ITS ENTIRETY U.N.O.
RCP LEGEND
(E) GYP CEILING
CEILING FINISHES
GYP GYPSUM WALL BOARD
ACT 2X4 ACOUSTICAL LAY-IN PANEL
ACT2 12X12 ACOUSTICAL DIRECT ATTACHED
CEILING HEIGHT
VAR VARIES
M.E. MATCH EXISTING
ADDITIONAL NOTES
1. NONE
(E) ACT CEILING
(N) CEILING PER PLAN
(N) LIGHTING
LUMINAIRE LEGEND :
(N) RETURN AND SUPPLY REGISTER
MECHANICAL LEGEND :
(N) SOFFIT / DECKING
(E) SOFFIT / DECKING
(N) ACT CEILING
(E) CONDUIT
(N) SEISMIC JOINT
(N) 12X12 ACT CEILING
ACT
8'-0"
CEILING TAG CEILING MATERIAL
CEILING HEIGHT
ADDITIONAL NOTES
(E) 12X12 ACT CEILING
84.9
E
F
G
H
I
HATCH INDICATES AREA
OUT OF SCOPE OF WORK
H A
T C
H I N
D
IC
A T
E S
A R
T
O F
S C
O P
E O
F W
O R
K
MULTI-PURPOSE
PLATFORM
STORAGE
STORAGE
20-A
STORAGE
STORAGE
STORAGE
21-A
STORAGE
/SEE 1 A2.10 /SEE 1 A2.10
HALL
MATCH LINE MATCH LINE
STORAGE
OUT DOOR PLAY
AREA
1. REINSTALL (E) DUCT WORK
# RCP KEYNOTES
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESSIONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 201
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E I N
C H
E Q
U A
L S
F U
L L S
C A
L E
KEY PLAN
AREA A
AREA B
DESCRIPTION DATE:
OUT OF SCOPE
OUT OF SCOPE
/2
/2
:1
:4
P
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
A
R C
H R
.r v t
A2.11
REFLECTED
CEILING PLAN -
AREA B
M-0379-24
PATRICK
ELEMENTRY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
1500 2ND AVE. GOLD HILL,
OR 97525
09-27-2024
TLB
JRR
S C
H E
M A
T
IC
D E
S
IG
N N
O T
F O
R C
O N
S T
R U
C T
IO
N
A2.11 1/8" = 1'-0"
REFLECTED CEILING PLAN - AREA B1
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESS IONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 20
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E
IN
C H
E Q
U A
L S
F U
L L S
C A
L E
DESCRIPTION DATE:
/1
/2
:3
:2
A
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
S
T R
U C
T R
.r v t
S0.01
STRUCTURAL
GENERAL NOTES
M-0379-24
PATRICK
ELEMENTARY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
300 ASH STREET, CENTRAL
POINT, OR
9-27-2024
MEG
SKN
S C
H E
M A
IC
D
E S
IG
N
GENERAL INFORMATION:
1. STRUCTURAL DRAWINGS ARE A PORTION OF THE CONTRACT DOCUMENTS AND ARE INTENDED TO BE USED WITH ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS. THE CONTRACTOR IS
RESPONSIBLE FOR COORDINATING THE REQUIREMENTS FROM THESE DRAWINGS INTO THEIR
SHOP DRAWINGS AND WORK. THESE GENERAL NOTES SUPPLEMENT THE PROJECT
SPECIFICATIONS. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
NOTES AND DETAILS ON THE STRUCTURAL DRAWINGS SHALL TAKE PRECEDENCE OVER THE
GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL
BE AS SHOWN FOR SIMILAR WORK.
2. THE STRUCTURE IS DESIGNED TO FUNCTION AS A UNIT UPON COMPLETION. THE CONTRACTOR IS
RESPONSIBLE FOR FURNISHING ALL TEMPORARY BRACING AND/OR SUPPORT THAT MAY BE
REQUIRED AS THE RESULT OF THE CONTRACTOR'S CONSTRUCTION METHODS AND/OR
SEQUENCES.
3. ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS SHALL BE FIELD VERIFIED. THE
CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY SIGNIFICANT DISCREPANCIES FROM
CONDITIONS SHOWN ON THE DRAWINGS.
4. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION MEANS AND
METHODS. RESPONSIBILITY SHALL INCLUDE BUT NOT LIMITED TO DEMOLITION AND
CONSTRUCTION MEANS AND METHODS, TECHNIQUES, SEQUENCING, AND SAFETY REQUIRED TO
COMPLETE CONSTRUCTION.
5. UNLESS OTHERWISE NOTED, MATERIAL AND DESIGN SPECIFICATIONS CITED HEREIN SHALL BE
THOSE CONFORMING WITH THE VERSION OF THE APPLICABLE SPECIFICATIONS OR CODE MOST
RECENTLY ADOPTED BY THE PERMITTING AUTHORITY. THESE STRUCTURAL NOTES ARE TO BE
USED AS A SUPPLEMENT TO THE SPECIFICATIONS.
6. THIS STRUCTURE AND ALL OF ITS PARTS MUST BE ADEQUATELY BRACED AGAINST WIND, LATERAL EARTH AND SEISMIC FORCES UNTIL THE PERMANENT LATERAL-FORCE RESISTING SYSTEMS HAVE
BEEN CONSTRUCTED AND ALL ATTACHMENTS AND CONNECTIONS NECESSARY FOR THE
STABILITY OF THE STRUCTURE AND ITS PARTS HAVE BEEN MADE.
7. ALL FEATURES OF CONSTRUCTION NOT FULLY SHOWN SHALL BE OF THE SAME TYPE AND
CHARACTER AS SHOWN FOR SIMILAR CONDITIONS, SUBJECT TO REVIEW BY THE ARCHITECT AND
STRUCTURAL ENGINEER OF RECORD.
8. ALL PRODUCTS AND MATERIALS USED BY THE CONTRACTOR SHALL BE APPLIED, PLACED,
ERECTED OR INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS.
9. ALL KEYNOTES INDICATE NEW ITEMS TYPICALLY UNLESS NOTED OTHERWISE.
CODE REQUIREMENT:
1. CONFORM TO THE 2022 OREGON STRUCTURAL SPECIALTY CODE, BASED ON THE 2021
INTERNATIONAL BUILDING CODE (IBC). NOTE: THIS APPLIES TO ALL REFERENCES TO OSSC.
DESIGN CRITERIA:
1. THE WORK UNDER THE FOLLOWING SPECIFICATION SECTIONS IS SUBJECT TO SPECIAL
INSPECTIONS AS DESCRIBED IN SECTION 1704 OF THE OSSC.
2. DESIGN IS BASED ON THE STRENGTH AND DEFLECTION CRITERIA OF THE OSSC. IN ADDITION TO
THE DEAD LOADS, THE FOLLOWING LOADING AND ALLOWABLE LOAD IS USED FOR DESIGN:
A. LIVE LOADS:
ASSEMBLY 100 PSF
ROOF 20 PSF
CLASSROOM 40 PSF
OFFICE SPACE 50 PSF
B. GROUND SNOW LOAD: 22 PSF
EXPOSURE FACTOR 1.0
THERMAL FACTOR 1.0
FLAT ROOF SNOW LOAD 22 PSF
C. WIND LOAD:
BASIC WIND SPEED (3-SECOND GUST) 100 MPH
WIND EXPOSURE B
WIND IMPORTANCE FACTOR 1.0
INTERNAL PRESSURE COEFFICIENT 0.18
TOPOGRAPHIC FACTOR 1.0
D. EARTHQUAKE DESIGN DATA:
BSE-1E
SS 0.137g S1 0.072g SXS 0.178g
BSE-2E
SS 0.48g S1 0.271g SXS 0.624g
SITE CLASS C
SEISMIC DESIGN CATEGORY D
STRUCTURAL OBSERVATION:
THE STRUCTURAL ENGINEER OF RECORD (SER) WILL PERFORM STRUCTURAL OBSERVATION BASED ON THE REQUIREMENTS OF THE OSSC AT THE STAGES OF CONSTRUCTION LISTED BELOW. CONTRACTOR SHALL PROVIDE SUFFICIENT NOTICE AND ACCESS FOR THE SER TO PERFORM THESE OBSERVATIONS.
FOOTNOTES:
1. CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE SER IN ADVANCE.
2. AOR - ARCHITECT OF RECORD
SER - STRUCTURAL ENGINEER OF RECORD.
3. A FIELD REPORT WILL BE SUBMITTED TO THE BUILDING DEPARTMENT FOLLOWING EACH SITE
VISIT.
4. STRUCTURAL OBSERVATION IS FOR THE GENERAL CONFORMANCE OF THE STRUCTURAL
DRAWINGS, SPECIAL INSPECTION IS STILL REQUIRED.
5. AFTER REINFORCING STEEL HAS BEEN INSTALLED.
SPECIAL INSPECTION:
1. SEE SHEETS S0.02 FOR SPECIAL INSPECTION REQUIREMENTS.
SUBMITTALS:
1. SHOP DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO FABRICATION AND
CONSTRUCTION REGARDING ALL STRUCTURAL ITEMS, INCLUDING THE FOLLOWING:
A. CONCRETE MIX DESIGNS, CONCRETE AND MASONRY REINFORCEMENT (INCLUDING MILL
TEST REPORTS), STRUCTURAL STEEL (INCLUDING MILL TEST REPORTS)
B. ANY CHANGES TO THE STRUCTURAL DRAWINGS SHALL BE SUBMITTED TO THE ARCHITECT
AND ARE SUBJECT TO REVIEW AND ACCEPTANCE OF THE STRUCTURAL ENGINEER OF
RECORD.
C. THE CONTRACTOR SHALL COORDINATE SEISMIC RESTRAINTS OF MECHANICAL, PLUMBING,
AND ELECTRICAL EQUIPMENT, MACHINERY, AND ASSOCIATED PIPING WITH THE
STRUCTURE. ANY CONNECTIONS TO THE STRUCTURE SHALL CONFORM TO OSSC AND
SHALL BE SUBMITTED TO THE ARCHITECT PRIOR TO FABRICATION.
PROJECT STRUCTURAL NOTES (GOLD HILL, JACKSON COUNTY, OR 97525) DIVISION 03 - CONCRETE
CONCRETE:
1. CONCRETE WORK SHALL CONFORM TO CHAPTER 19 OF THE OSSC. CONCRETE STRENGTHS SHALL BE VERIFIED BY STANDARD 28 DAY CYLINDER TESTS PER ASTM C39, AND SHALL BE AS FOLLOWS:
2. VERIFY WATER/CEMENT RATIO WITH FLOOR COVERING MANUFACTURER FOR CONCRETE FLOORS
WITH MOISTURE SENSITIVE FLOOR COVERINGS, AND VERIFY COORDINATE WITH PROJECT
SPECIFICATIONS.
3. MINIMUM CEMENT CONTENT PER CUBIC YARD SHALL BE AS FOLLOWS:
• f'c=4,000 psi: 550 lbs.
4. FLY ASH CONFORMING TO ASTM C618 (INCLUDING TABLE 2A) TYPE F, MAY BE USED TO REPLACE UP TO 20% OF THE CEMENT CONTENT, PROVIDED THAT THE MIX STRENGTH IS SUBSTANTIATED BY TEST
DATA.
5. THE CONTRACTOR SHALL SUBMIT CONCRETE MIX DESIGNS, ALONG WITH TEST DATA COMPLIANT WITH OSSC SECTION 1905, A MINIMUM OF TWO WEEKS PRIOR TO PLACING CONCRETE. NO WATER MAY BE ADDED TO CONCRETE IN THE FIELD UNLESS SPECIFICALLY APPROVED IN WRITING BY THE
CONCRETE SUPPLIER IN CONJUNCTION WITH THE CONCRETE MIX DESIGN.
6. A WATER-REDUCING ADMIXTURE CONFORMING TO ASTM C494, USED IN STRICT ACCORDANCE WITH
THE MANUFACTURER'S RECOMMENDATIONS, SHALL BE INCORPORATED IN CONCRETE DESIGN
MIXES. A HIGH-RANGE WATER-REDUCING (HRWR) ADMIXTURE CONFORMING TO ASTM C494, TYPE F OR G, MAY BE USED IN CONCRETE MIXES PROVIDING THAT THE SLUMP DOES NOT EXCEED 8". AN
AIR-ENTRAINING AGENT CONFORMING TO ASTM C260 SHALL BE USED IN CONCRETE MIXES FOR
EXTERIOR HORIZONTAL SURFACES EXPOSED TO WEATHER. THE AMOUNT OF ENTRAINED AIR SHALL
BE 5% +/- 1% BY VOLUME.
CONCRETE CAST IN PLACE:
1. STRUCTURAL CALCULATIONS ARE BASED ON 2,500 psi CONCRETE STRENGTH, THEREFORE SPECIAL
INSPECTION IS NOT REQUIRED PER OSSC 1705.3.
2. CONCRETE SHALL HAVE A MAXIMUM SLUMP OF 4" WITHOUT THE USE OF ADMIXTURES AS NOTED.
3. A MINIMUM OF THREE (3) CONCRETE TEST CYLINDERS SHALL BE PROVIDED FOR EACH ONE
HUNDRED (100) CU. YARDS, OR EACH DAY OF POUR, FOR EACH CONCRETE STRENGTH. CYLINDERS
SHALL BE TESTED AS FOLLOWS:
A. ONE (1) AT SEVEN (7) DAYS, AND
B. TWO (2) AT TWENTY-EIGHT (28) DAYS
4. CONCRETE CYLINDER SAMPLING AND TESTING SHALL CONFORM WITH ASTM SPECIFICATIONS.
ACCEPTANCE OF CONCRETE SHALL BE GOVERNED BY THE PROVISIONS OF ACI 318-19 "BUILDING
CODE REQUIREMENTS FOR REINFORCED CONCRETE". TWO (2) SETS OF MIX DESIGNS, WITH
COMPLETE STATISTICAL BACKUP, SHALL BE SUBMITTED FOR REVIEW.
5. CONCRETE MATERIALS, FORM WORK, MIXING, PLACING AND CURING SHALL CONFORM WITH THE
SPECIFICATIONS CONTAINED IN THE ACI "MANUAL OF CONCRETE PRACTICE".
6. CONCRETE SHALL NOT BE PLACED ON FROZEN GROUND.
7. BOND NEW CONCRETE TO EXISTING CONCRETE WITH "WELD-CRETE", AS MANUFACTURED BY
LARSON PRODUCTS CORPORATION, OR APPROVED. AS A MINIMUM, EXISTING CONCRETE SURFACES
SHALL BE ROUGHENED BY CHIPPING TO A MINIMUM 1/4" AMPLITUDE TO EXPOSE COARSE
AGGREGATE. PREPARATION AND APPLICATION IS TO BE IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
8. ALL EXPOSED CORNERS SHALL HAVE 3/4" CHAMFER, UNLESS NOTES OTHERWISE.
CONCRETE REINFORCING STEEL:
1. REINFORCING STEEL SHALL CONFORM TO ASTM A615, GRADE 60. FOR DEFORMED BARS AND ASTM A185 FOR SMOOTH WELDED WIRE FABRIC (WWF), UNLESS OTHERWISE NOTED. REINFORCING STEEL TO BE WELDED SHALL CONFORM TO ASTM A706. REINFORCING STEEL SHALL BE SECURELY TIED IN
PLACE WITH #16 ANNEALED IRON WIRE.
2. BARS IN SLABS SHALL BE SUPPORTED ON WELL CURED CONCRETE BLOCKS OR APPROVED METAL CHAIRS, AS SPECIFIED BY THE CRSI MANUAL OF STRANDED PRACTICE, MSP-1. REINFORCING STEEL
SHALL BE DETAINED IN ACCORDANCE WITH THE "ACI MANUAL OF STANDARD PRACTICE, MSP-1
REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH THE "ACI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES", ACI 315. LAP ALL REINFORCING BARS PER THE TYPICAL LAP SPLICE LENGTH SCHEDULE, EXCEPT AS NOTED. MECHANICAL SPLICES NOTED ON THE PLANS SHALL BE DAYTON BAR-GRIP SPLICES OR APPROVED WITH A CURRENT ICC
APPROVAL REPORT.
NOTES:
A. DIMENSIONS ARE IN INCHES.
B. CASES 1 AND 2 ARE DEFINED AS FOLLOWS: (db = BAR DIAMETER)
a. BEAMS OR COLUMNS:
• CASE 1: COVER ≥ db AND c-c SPACING ≥ 2db
• CASE 2: COVER < db OR c-c SPACING < 2db
b. ALL OTHERS:
• CASE 1: COVER ≥ db AND c-c SPACING ≥ 3db
• CASE 2: COVER < db OR c-c SPACING < 3db
C. FOR TOP BARS, MULTIPLY LAP LENGTH ABOVE BY 1.3. TOP BARS ARE HORIZONTAL BARS
WITH MORE THAN 12" OF CONCRETE CAST BELOW THE BARS.
3. REINFORCEMENT SHALL BE SECURED IN FORMS WITH TIES AND ANCHORAGE TO PREVENT
DISPLACEMENT. ALL TIE WIRE SHALL BE MIN. #16 ANNEALED STEEL.
4. ALL REINFORCING STEEL SHALL BE TIED 100% ALONG ALL PERIMETER EDGES AND 50%FIELD.
5. REINFORCING (MINIMUM UNLESS NOTED OTHERWISE ON PLANS)
A. PLACE TWO (2) NO. 4 CONTINUOUS AT BOTTOM, TOP AND AT DISCONTINUOUS ENDS OF ALL
FOUNDATIONS.
B. PLACE BARS AT CORNERS AND INTERSECTIONS FOR WALLS AND FOUNDATIONS EQUAL IN
SIZE AND NUMBER TO HORIZONTAL REINFORCING WITH LEGS THAT SATISFY THE REQUIRED
LAP SPLICE LENGTH PER SCHEDULE ABOVE.
C. PLACE TWO (2) NO. 4x OPENING DIMENSIONS PLUS 4'-0" EACH SIDE OF ALL OPENINGS AND TWO (2) NO. 4x4'-0" DIAGONAL BARS AT EACH CORNER OF ALL SLAB OPENINGS GREATER
THAN 1'-6" IN DIMENSION.
6. ALL WELDED WIRE FABRIC SHALL CONFORM WITH ASTM A 185. ALL WIRE FABRIC SHALL BE SUPPLIED, LAID IN FLAT SHEETS AND CHAIRED TO PROPER POSITION IN SLABS. LAP ONE (1) FULL
MESH PLUS 2" ON SIDES AND ENDS.
7. ALL REINFORCING STEEL SHALL BE DETAILED, FABRICATED AND PLACED IN ACCORDANCE WITH ACI
DETAILING MANUAL 315.
A. ALL REINFORCING STEEL SHALL BE ACCURATELY AND SECURELY PLACED.
B. REINFORCING SHALL NOT BE BENT OR DISPLACED FOR THE CONVENIENCE OF OTHER
TRADES, UNLESS APPROVED BY THE STRUCTURAL ENGINEER.
C. SPLAY REINFORCING STEEL AROUND OPENINGS WITH 1" IN 10" SPLAY, UNLESS NOTED
OTHERWISE.
D. MINIMUM COVER FROM CONCRETE SURFACES TO REINFORCING STEEL SHALL BE:
• 3" TO BOTTOM OF FOOTING
• 2" TO EARTH FACE OF WALL
• 3/4" TO INSIDE FACE OF WALL
• 1 1/2" TO MAIN STEEL BEAMS AND COLUMNS
• 3/4" SLAB TO TOP AND BOTTOM SURFACES, CENTER OF SLAB ON GRADE
8. REINFORCEMENT BARS SHALL NOT BE TACK WELDED, WELDED, HEATED OR CUT, UNLESS INDICATED
ON THE CONTRACT DOCUMENTS OR APPROVED BY THE STRUCTURAL ENGINEER OF RECORD.
9. REINFORCEMENT COUPLERS SHALL BE LENTON, FOX-HOWLETT OR APPROVED, CAPABLE OF
DEVELOPING ONE HUNDRED TWENTY-FIVE PERCENT (125%) OF THE SPECIFIED YIELD STRENGTH OF
THE REINFORCEMENT.
CONCRETE ACCESSORIES:
1. EPOXY ADHESIVE SHALL BE SIMPSON SET-3G OR APPROVED WITH EQUIVALENT ICC ALLOWABLE
TENSION AND SHEAR VALUES. EPOXY ANCHORS SHALL BE INSTALLED IN STRICT CONFORMANCE
WITH MANUFACTURER'S RECOMMENDATIONS. DO NOT CUT REINFORCING IN NEW OR EXISTING
CONCRETE DURING INSTALLATION.
2. PERMANENTLY EXPOSED EMBEDDED PLATES AND ANGLES SHALL BE HOT-DIPPED, GALVANIZED
AFTER FABRICATION, UNLESS OTHERWISE NOTED. NO LOADS OR WELDS SHALL BE PLACED ON
EMBEDDED PLATES OR ANGLES FOR A MINIMUM OF 7 DAYS AFTER CASTING.
3. ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR UPWARDLY INCLINED ORIENTATIONS TO RESIST SUSTAINED TENSION LOADS SHALL BE DONE BY A CERTIFIED ADHESIVE ANCHOR INSTALLER
(AAI) AS CERTIFIED THROUGH ACI/CRSI, OR AN APPROVED ALTERNATE WHEN SUBMITTED AND
APPROVED BY THE EOR (ACI 318-19 D.9.2.2)/(ACI 318-19 17.8.2.2). PROOF OF CURRENT CERTIFICATION
SHALL BE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO COMMENCEMENT OF
INSTALLATION.
4. ADHESIVE ANCHORS MUST BE INSTALLED IN CONCRETE AGED A MINIMUM OF 21 DAYS (ACI 318-19 17.2.2).
DIVISION 04 - MASONRY
CONCRETE MASONRY:
1. CONCRETE MASONRY UNITS SHALL COMPLY WITH ASTM C90, SAMPLED AND TESTED IN
ACCORDANCE WITH ASTM C140 WITH A MINIMUM NET AREA COMPRESSIVE STRENGTH OF 2,800 psi.
LINEAR SHRINKAGE FOR UNITS SHALL NOT EXCEED 0.065%. ASSEMBLIES SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF f'm = 2,000 psi AS VERIFIED BY PRISM TESTS BEFORE AND DURING
CONSTRUCTION. CONCRETE MASONRY WALLS SHALL BE REINFORCED AS SHOWN ON THE PLANS
AND DETAILS AND, IF NOT SHOWN, SHALL BE AS NOTED UNDER "MASONRY REINFORCING STEEL".
MORTAR:
1. MORTAR SHALL BE TYPE S, WITH A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 1,800 psi, AND
SHALL CONFORM TO OSSC SECTION 2103.
MASONRY GROUT:
1. GROUT SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 2,000 psi AT 28 DAYS AND SHALL
CONFORM TO OSSC SECTION 2103. GROUT SHALL CONSIST OF A MIXTURE OF CEMENTITIOUS
MATERIALS AND AGGREGATE TO WHICH SUFFICIENT WATER HAS BEEN ADDED TO CAUSE THE
MIXTURE TO FLOW WITHOUT SEGREGATION OF THE CONSTITUENTS. ALL CELLS CONTAINING
VERTICAL BARS AND ALL BOND BEAMS SHALL BE FILLED WITH GROUT. FULLY GROUT WALLS WHERE
INDICATED.
MASONRY REINFORCING STEEL:
1. REINFORCING SHALL CONFORM TO OSSC SECTION 2103. DEFORMED BARS SHALL BE ASTM A615 GRADE 60, AND SHALL BE SECURELY PLACED IN ACCORDANCE WITH TMS 602 SECTION 3.4. UNLESS OTHERWISE NOTED ON THE PLANS, THE MINIMUM WALL REINFORCEMENT SHALL BE AS FOLLOWS:
2. BOND BEAMS WITH TWO #5 BARS HORIZONTALLY SHALL BE PROVIDED AT ALL FLOOR AND ROOF LINES AND AT THE TOP OF THE WALLS. STEP BOND BEAMS AS REQUIRED TO MATCH ROOF SLOPES.
PROVIDE A BOND BEAM WITH TWO #5 BARS HORIZONTALLY ABOVE AND BELOW ALL OPENINGS, AND
EXTEND THESE BARS 2'-0" PAST THE OPENING AT EACH SIDE. PROVIDE ONE BAR, MATCHING
VERTICAL BAR SIZE, FOR THE FULL HEIGHT OF THE WALL AT EACH SIDE OF OPENINGS, WALL ENDS, AND INTERSECTIONS. DOWELS TO MASONRY WALLS SHALL BE EMBEDDED A MINIMUM OF 1'-6" OR
HOOKED INTO THE SUPPORTING STRUCTURE AND BE OF THE SAME SIZE AND SPACING AS WALL
INTERSECTIONS. LAP ALL BARS AT SPLICES 48 DIAMETERS, WITH A MINIMUM LAP OF 18", EXCEPT AS
NOTED.
DIVISION 05 - METALS
STRUCTURAL STEEL AND MISCELLANEOUS IRON:
STRUCTURAL STEEL SHALL BE:
1. DESIGN, FABRICATION, AND ERECTION SHALL BE IN ACCORDANCE WITH THE "AISC SPECIFICATION FOR THE DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS" WITH
"COMMENTARY" AND THE "CODE OF STANDARD PRACTICE", WITH EXCEPTIONS NOTED IN
SPECIFICATIONS.
2. DRAWINGS ARE DIMENSIONED FOR LAYOUT AND NOT DIMENSIONED PER AISC STANDARDS. IT IS THE
RESPONSIBILITY OF THE GENERAL CONTRACTOR TO COORDINATE BETWEEN ALL DRAWINGS AND
DEVELOP SHOP DRAWINGS WITH DETAIL AND DIMENSIONING PER AISC.
3. ALL FABRICATION, ERECTION, IDENTIFICATION, AND PAINTING SHALL CONFORM TO AISC
SPECIFICATIONS.
4. ALL STEEL EXPOSED TO WEATHER, SOIL, MOISTURE, OR AS DENOTED ON PLANS SHALL BE HOT DIP
GALVANIZED PER ASTM A-123, OR OTHER APPROVED PROTECTIVE COATING.
5. ALL WELDING SHALL CONFORM TO AWS (LATES EDITION) SPECIFICATIONS.
A. ALL WELDERS TO BE QUALIFIED UNDER AWS SPECIFICATIONS WITHIN THE PAST TWO YEARS
FOR THE TYPE OF WELDING PERFORMED.
B. ALL WELDS SHALL BE PERFORMED USING PRE-QUALIFIED WELDING PROCEDURES.
C. WELDS FILLER METAL SHALL BE AWS A5.1 OR A5.5 E70XX ELECTRODES OR AWS A5.18 ER70S-X
OR A5.2 E7XT-X.
D. AFTER FABRICATION, BUT BEFORE INSTALLATION, REMOVE RUST, SCALE, GREASE, AND OIL
BY WIRE BRUSHING AND CHEMICAL TREATMENT.
E. WELDING OF REINFORCING STEEL SHALL BE AS SPECIFIED IN THESE STRUCTURAL NOTES
UNDER "CONCRETE REINFORCING STEEL".
F. WELDS TO METAL DECK, METAL STUDS OR OTHER LIGHT GAUGE METALS SHALL CONFORM
WITH AWS D1.3.
6. ALL MEMBERS SHALL BE CONNECTED WITH SEMI-FINISHED MACHINE BOLTS, UNLESS NOTED
OTHERWISE ON PLANS. MACHINE BOLTS SHALL CONFORM TO ASTM A 307, GRADE A.
7. STRUCTURAL STEEL AND MISCELLANEOUS IRON:
A. ADHESIVE ANCHORS SHALL BE I.C.B.O. APPROVED AND SHALL CONSIST OF ALL-THREAD
ANCHOR ROD, NUT, WASHER AND EPOXY INJECTION GEL SYSTEM. ANCHOR RODS SHALL BE
MANUFACTURED FROM:
a. A-36 MATERIAL (ZINC PLATED IN ACCORDANCE WITH ASTM B 633, HOT-DIPPED
GALVANIZED IN ACCORDANCE WITH ASTM A 153).
b. ASTM A 193, GRADE B-7 MATERIAL (ZINC PLATED IN ACCORDANCE WITH ASTM B 633, HOT-DIPPED GALVANIZED IN ACCORDANCE WITH ASTM A 153).
c. A.I.S.I. 304 OR 316 STAINLESS STEEL, IN ACCORDANCE WITH ASTM F 593. ANCHOR
RODS SHALL HAVE ROLLED THREADS. NUTS SHALL CONFORM WITH ASTM A 194.
ACCEPTABLE ADHESIVE INJECTION GEL SYSTEMS ARE THE SIMPSON SET-3G.
ANCHORS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
8. ANCHOR BOLT SHALL CONFORM WITH ASTM A 307, GRADE A, AND SHALL BE PROVIDED WITH
STANDARD WASHERS AND NUTS. GALVANIZE EXTERIOR BOLTS. GALVANIZING SHALL BE IN
ACCORDANCE WITH ASTM A 153, CLASS C. NUTS SHALL BE OVER-TAPPED TO CLASS 2A FIT BEFORE
GALVANIZING, IN ACCORDANCE WITH ASTM A 563.
9. ERECTION AIDS (SUCH AS BOLTS, CLIPS, SHIMS, SEATS OR ANY OTHERS REQUIRED TO FACILITATE
CONSTRUCTION) ARE THE RESPONSIBILITY OF THE CONTRACTOR TO DESIGN AND PROVIDE.
10. ALL BRACING SHALL HAVE TWO (2) BOLT CONNECTIONS, UNLESS NOTED OTHERWISE. ALL CROSS BRACING SHALL BE BOLTED AT INTERSECTIONS WITH TWO (2) BOLT MINIMUM FOR ST AND ONE (1)
BOLT FOR ANGLES. PROVIDE FILLER PLATE BETWEEN CROSS BRACES, AS REQUIRED.
11. ALL FIELD WELDS TO GALVANIZED STEEL AND AREAS DAMAGED BY WELDING, FLAME CUTTING OR
HANDLING, SHALL BE REPAIRED WITH AN ORGANIC COLD GALVANIZING COMPOUND HAVING A
MINIMUM OF NINETY-FOUR PERCENT (94%) ZINC DUST IN THE DRY FILM. APPLY IN MULTIPLE COATS, UNTIL AN 8 MIL THICKNESS HAS BEEN ACHIEVED. SURFACES TO RECEIVE ZINC-RICH PAINT SHALL BE
CLEAN, DRY AND FREE OF OIL, GREASE, SALT AND CORROSION PRODUCTS.
12. ALL EMBEDDED STEEL SHALL BE FABRICATED FROM MATERIAL CONFORMING WITH THE
REQUIREMENTS OF ASTM A 36. HOT-DIP GALVANIZE IN ACCORDANCE WITH ASTM A 123, UNLESS
NOTED OTHERWISE.
4,000 0.45 N/A SPREAD FOOTINGS
4,000 0.50 N/A INTERIOR SLABS ON GRADE
3,500 0.42 N/A
EXPOSED SLABS ON GRADE OR METAL
DECK
f'c (PSI) NON AIR-ENTRAINED AIR-ENTRAINED USE
ABSOLUTE WATER-CEMENT RATIO BY WEIGHT
#6 43 64 37 56 33 50 31 46
#5 36 54 31 47 28 42 25 38
#4 29 43 25 37 22 33 20 31
#3 22 32 19 28 17 25 16 23
CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2 CASE 1 CASE 2
BAR SIZE
3,000 psi 4,000 psi 5,000 psi 6,000 psi
TYPICAL LAP SPLICE LENGTH SCHEDULE
8" #5 @ 24" o.c. (2) #5 @ 24" o.c.
STACK BOND
WALL THICKNESS VERTICAL BARS
HORIZONTAL BARS
TYPICAL MASONRY WALL REINFORCING
ASTM A53, GRADE B (Fy = 35 KSI) PIPES
ASTM A500, GRADE B (Fy = 46 KSI) HOLLOW STRUCTURAL SECTIONS (TUBES)
ASTM A36 CHANNELS, PLATES, AND ANGLES, U.N.O.
ASTM A572, GRADE 50 PLATES WHERE NOTED
STRUCTURAL STEEL
AS REQUIRED TO ADDRESS STRUCTURAL ISSUES X REF. NOTES 1, 3, 4
DURING INITIAL STEEL ERECTION X REF. NOTES 1, 3, 4
PRIOR TO FIRST CONCRETE POUR X REF. NOTES 1, 3, 4, 5
AOR SER
ITEM
OBSERVED BY (2)
COMMENTS
STRUCTURAL OBSERVATION
DIVISION 06 - WOOD, PLASTICS AND COMPOSITES
FRAMING LUMBER:
1. ALL FRAMING LUMBER SHALL BE DOUGLAS FIR-LARCH AND SHALL BE GRADED UNDER THE MOST
RECENTLY ADOPTED RULES OF THE WEST COAST LUMBER INSPECTION BUREAU (WCLIB).
2. ALL BEAMS AND JOISTS SHALL BE NO. 2 MINIMUM, UNLESS INDICATED OTHERWISE ON THE PLANS.
3. ALL STUDS AND BLOCKING SHALL BE NO. 2.
4. ALL LUMBER IN CONTACT WITH CONCRETE OR EXPOSED SHALL BE PRESSURE TREATED IN
ACCORDANCE WITH AWPA STANDARD C-2 AND SHALL BEAR THE AWPA QUALITY MARK.
5. DOUBLE ALL JOISTS UNDER WALL PARTITIONS, AND PROVIDE BLOCKING BETWEEN JOISTS WHERE
BEARING WALLS ARE PERPENDICULAR TO JOISTS.
6. ALL GLULAM BEAMS TO BE 24F-V4 TYPICAL. 24F-V8 FOR CANTILEVERED OR CONTINUOUS SPAN.
7. ALL LVL LUMBER TO BE MICROLAM LVL OR APPROVED EQUAL.
PLYWOOD SHEATHING:
1. ALL PLYWOOD SHALL BE C-D GRADE WITH EXTERIOR GLUE MANUFACTURED IN ACCORDANCE WITH
THE UNITED STATES PRODUCT STANDARDS PS 1-83/ANSI A199.1 "FOR CONSTRUCTION AND
INDUSTRIAL PLYWOOD" AND SHALL CONFORM TO OSSC SECTION 2303 AND SHALL BEAR THE APA
TRADEMARK OF THE APA.
2. PLYWOOD SHALL BE LAID WITH END JOINTS STAGGERED.
3. BLOCK ALL SHEAR WALL SHEATHING WITH 2x BLOCKING AT ALL EDGES.
4. ROOF SHEATHING TO BE UNBLOCKED 5/8" C-D 24/0 PLY, UNLESS NOTED OTHERWISE ON PLANS.
5. EXTERIOR WALLS TO BE 7/16" EXPOSURE I, C-D PLY. OR OSB SHEATHING U.N.O. SEE PLANS FOR
SHEAR WALL TYPE AND CORRESPONDENCE SHEAR WALL SCHEDULE FOR REQUIREMENTS.
6. OSB MAY BE SUBSTITUTED FOR PLYWOOD WITH SAME SPAN RATING.
NAILING AND FASTENERS:
1. NAILING INDICATED ON PLANS AND DETAILS ARE "COMMON" NAILS. MINIMUM FRAMING NAILING SHALL CONFORM TO OSSC TABLE 2304.10.1. SEE DETAILS FOR ADDITIONAL TYPICAL NAILING REQUIREMENTS.
SUBSTITUTION OF NAILS OTHER THAN "COMMON" IS NOT PERMITTED WITHOUT PRIOR APPROVAL.
2. POWER DRIVEN NAILS OTHER THAN "COMMON" NAILS MAY BE USED IF DATA IS SUBMITTED AND
APPROVED PRIOR TO USE.
3. ALL BOLTED CONNECTIONS SHALL BE MADE WITH MACHINE BOLTS (M.B.) CONFORMING TO ASTM A307.
ALL BOLTS AND LAGS SHALL BE INSTALLED WITH STANDARD WASHERS, UNLESS NOTED.
4. JOIST HANGERS, HOLDOWNS AND OTHER FRAMING ACCESSORIES ARE REFERRED TO ON PLANS BY PARTICULAR TYPE AS MANUFACTURED BY SIMPSON COMPANY, SAN LEANDRO, CA. ALL HARDWARE IS
TO BE FASTENED PER MANUFACTURER'S SPECIFICATIONS, U.N.O.
5. ALL PLATES AND LEDGERS SHALL BE ANCHORED WITH A MINIMUM OF THREE FASTENERS PER PIECE.
6. PRE-DRILL HOLES FOR LAG BOLTS. SOAP THREADS OF LAGS IMMEDIATELY PRIOR TO INSTALLATION.
7. EPOXY ANCHOR BOLTS AND ADHESIVE INDICATED ON DRAWINGS MAY BE SUBSTITUTED UPON
CONTRACTORS REQUEST WITH E.O.R. APPROVED EQUAL. DEPTH OF EMBEDMENT SHALL BE AS PER MANUFACTURER SPECIFICATIONS, UNLESS NOTED OTHERWISE. INSTALL ALL EPOXY FASTENERS IN
STRICT ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS.
8. SILL AT WALLS SHALL BE BOLTED TO CONCRETE WITH 5/8" DIAMETER x 10" LONG ANCHOR BOLTS AT 4'-0" o.c. MAXIMUM AND WITHIN 1'-0" OF SILL PLATE ENDS, CORNERS OR SPLICES, UNLESS DETAILED OTHERWISE. STEEL PLATE WASHERS SHALL BE INSTALLED AT ALL ANCHOR BOLTS IN SHEAR WALLS, WITH MINIMUM DIMENSIONS OF 3" x 3" x 3/16" THICK, AND SHALL BE INSTALLED WITHIN 1/2" OF
SHEATHING FACE. SIMPSON BPS BEARING PLATE OR APPROVED EQUAL MAY BE USED.
EQ. EQ.
SHEAR PARALLEL TO WALL
TOP OF MASONRY WALL FACE OF MASONRY WALL
VERTICAL SHEAR
SHEAR PARALLEL TO WALL
FACE OF MASONRY WALL
M
IN
TENSION
POST INSTALLED ANCHOR TESTING FIGURES
4"
S
EXPIRES: 06-30-26
LT R
U C T U R A
R
D
EG
IS
TE
RE
P
L
ROFESS IONA
J
70888
OREGON
E RNG
I NE E
4u l y 08, 20
M
HA
T
THEW R .
SM
I T-P R E L
IM
IN
A R Y
N O
T F
O R C
O N S T R U C T
IO
N
45 Hawthorne Street Medford, OR 97504
541.500.8588
PROJECT NO.
DATE:
DRAWN:
CHECKED:
O N
E
IN
C H
E Q
U A
L S
F U
L L S
C A
L E
DESCRIPTION DATE:
/1
/2
:3
:2
A
M A u to d e s k D o c s /M
.P a tr ic k E le m e n ta ry
S c h o o l R e tr o fi t/ M
S
T R
U C
T R
.r v t
S0.02
SPECIAL
INSPECTIONS AND
TESTING
M-0379-24
PATRICK
ELEMENTARY
SCHOOL SEISMIC
RETROFIT
CENTRAL POINT SCHOOL
DISTRICT 6
300 ASH STREET, CENTRAL
POINT, OR
9-27-2024
MEG
SKN
S C
H E
M A
IC
D
E S
IG
N
SEISMIC ISOLATION SYSTEMS IN
SEISMICALLY ISOLATED STRUCTURES
1705.13.8 X
REQUIRED DURING FABRICATION AND
INSTALLATION OF ISOLATOR UNITS AND
ENERGY DISSIPATING DEVICES.
SEISMIC ISOLATION SYSTEMS
DESIGNATED SEISMIC SYSTEM
VERIFICATION
1705.13.4 X
VERIFY THAT THE LABEL, ANCHORAGE OR
MOUNTING CONFORMS TO THE CERTIFICATE
OF COMPLIANCE. DESIGNATED SEISMIC
SYSTEMS SHALL BE QUALIFIED IN
ACCORDANCE WITH ASCE 7-16 13.2.2
DESIGNATED…