This is a Schedule B pricing document for RFP 210000000908, a three-year contract for mattress and bedding component materials. The procurement covers three primary product categories: mattress ticking fabrics, mattress cores, and mattress batting. The mattress ticking section includes seven line items for various fabric specifications, ranging from 3-ply vinyl/polyester laminates to nylon with waterproof or fire barrier backings, with estimated usage of 180,000 linear yards over the three-year contract period. The mattress cores section specifies six items with varying dimensions and weights, with total estimated quantities of 22,200 units across the three-year term. The mattress batting section requests 180,000 pounds of batting material to be distributed equally across the contract years at 60,000 pounds annually. All line items break down usage into year-by-year quantities, with year one and years two and three typically showing equal quarterly or annual distributions.
The pricing structure requires bidders to submit unit costs per linear yard for ticking materials, per each for mattress cores, and per pound for batting materials, with costs to be provided separately for each contract year and a combined total reflecting any applicable tariffs. The document indicates that current tariff costs are applicable and should be included in bid pricing. The file provides a template for bidders to complete with their proposed unit costs across all three contract years, allowing for year-to-year price adjustments. No information regarding set-asides, incumbent vendors, award dates, or funding sources is included in this pricing schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 210000000908 Amendment No. 1.docx | DOCX document | |
| RFP 210000000908 - Mattress Comoponents 2-8-21.docx | DOCX document | |
| RFP 210000000908 Questions and Answers - 2-19-21 final.pdf | ||
| RFP 210000000908 - Attachment A - SLA Template.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Matress Ticking ITEM # DESCRIPTION U/M ESTIMATED 3 YEAR USAGE CURRENT TARIFF COST (if applicable) UNIT COST YEAR 1 UNIT COST YEAR 2 UNIT COST YEAR 3 TOTAL 3 YEAR COST Including tariffs
| 1 | Mattress ticking; fabric 3-ply vinyl/polyester laminate per item 1 of Schedule A 1.1 B | Linear Yard (LY) | 75,000 / 25,000 per year | 75,000 | 25,000 | 25,000 | 25,000 | 75,000 including tariffs |
| Bid Price Line per linear yard | $ | $ | $ | $ | $ | |||
| 2 | Mattress ticking; Phthalate Free and PVC Free Halogen Free per item 2 of Schedule A 1.1 B | Linear Yard (LY) | 6,000 / 2,000 per year | 6,000 | 2,000 | 2,000 | 2,000 | 6000 including tariffs |
| Bid Price Line per linear yard | $ | $ | $ | $ | $ | |||
| 3 | Mattress ticking; fabric 3-ply vinyl/polyester laminate per item 3 of Schedule A 1.1 B | Linear Yard (LY) | 6,000 / 2,000 per year | 6,000 | 2,000 | 2,000 | 2,000 | 6,000 including tariffs |
| Bid Price Line per linear yard | $ | $ | $ | $ | $ | |||
| 4 | Mattress ticking; fabric 210 Denier Nylon with waterproof backing that is Phthalate Free and Halogen Free per item 4 of Schedule A 1.1 B | Linear Yard (LY) | 21,000 / 7,000 per year | 21,000 | 7,000 | 7,000 | 7,000 | 21,000 including tariffs |
| Bid Price Line per linear yard | $ | $ | $ | $ | $ | |||
| 5 | Mattress ticking; fabric vinyl/woven backing as fire barrier per item 5 of Schedule A 1.1 B | Linear Yard (LY) | 6,000 / 2,000 per year | 6,000 | 2,000 | 2,000 | 2,000 | 6,000 including tariffs |
| Bid Price Line per linear yard | $ | $ | $ | $ | $ | |||
| 6 | Pillow ticking; fabric PVC/ polyester laminate material; micro vent per item line 6 of Schedule A 1.1 B | Linear Yard (LY) | 60,000 / per year | 60,000 | 20,000 | 20,000 | 20,000 | 60,000 including tariffs |
| Bid Price Line per linear yard | $ | $ | $ | $ | $ | |||
| 7 | Mattress ticking; Fabric nylon/woven backing as fire barrier per item 7 of Schedule A 1.1 B | Linear Yard (LY) | 6,000 / 2,000 per year | 6,000 | 2,000 | 2,000 | 2,000 | 6,000 including tariffs |
| Bid Price Line per linear yard | $ | $ | $ | $ | $ | |||
| $ | ||||||||
| TOTAL COST MATTRESS TICKING MATERIALS | $ | $ | $ | $ | $ |
Mattress Cores ITEM # DESCRIPTION U/M CURRENT TARIFF COST (if applicable) ESTIMATED 3 YEAR USAGE UNIT COST YEAR 1 UNIT COST YEAR 1 UNIT COST YEAR 1 TOTAL 3 YEAR COST Including tariffs
| 1 | Mattress Cores: 13.0 oz. per square foot (2.17 PCF). Size 25”W (+2%/-0%) X 72”L (+2%/-0%) X 4.5”H. Weight: 10 lbs per item 1 of Schedule A 1.1 D | Each ( EA) | 9,000 / 3,000 per year | 9,000 | 3,000 | 3,000 | 3,000 | 9,000 including tariffs |
| Bid Price Line per each | $ | $ | $ | $ | $ | |||
| 2 | Mattress Cores: 13.0 oz. per square foot (2.17 PCF). Size 30”W (+2%/-0%) X 72”L (+2%/-0%) X 4.5”H. Weight: 12.2 lbs. per item 2 of Schedule A 1.1 D | Each ( EA) | 600 / 200 per year | 600 | 200 | 200 | 200 | 600 including tariffs |
| Bid Price Line per each | $ | $ | $ | $ | $ | |||
| 3 | Mattress Cores: 13.0 oz. per square foot (2.17 PCF). Size 30”W (+2%/-0%) X 76”L (+2%/-0%) X 4.5”H. Weight: 12.9 lbs. per item 3 of Schedule A 1.1 D | Each ( EA) | 6,000 / 2,000 per year | 6,000 | 2,000 | 2,000 | 2,000 | 6,000 including tariffs |
| Bid Price Line per each | $ | $ | $ | $ | $ | |||
| 4 | Mattress Cores: 13.0 oz. per square foot (2.17 PCF). Size 36”W (+2%/-0%) X 76”L (+2%/-0%) X 4.5”H. Weight: 15.5 lbs. per item 4 of Schedule A 1.1 D | Each ( EA) | 3,000 / 1,000 per year | 3,000 | 1,000 | 1,000 | 1,000 | 3,000 including tariffs |
| Bid Price Line per each | $ | $ | $ | $ | $ | |||
| 5 | Mattress Cores: 16.0 oz. per square foot (2.00 PCF). Size 36”W (+2%/-0%) X 80”L (+2%/-0%) X 6”H. Weight: 20 lbs. per item 5 of Schedule A 1.1 D. | Each ( EA) | 3,000 / 1,000 per year | 3,000 | 1,000 | 1,000 | 1,000 | 3,000 including tariffs |
| Bid Price Line per each | $ | $ | $ | $ | $ | |||
| 6 | Mattress Cores: 16.0 oz. per square foot (2.00 PCF). Size 39”W (+2%/-0%) X 75”L (+2%/-0%) X 6”H. Weight: 20.3 lbs. per item 6 of Schedule A 1.1. D | Each ( EA) | 600 / 200 per year | 600 | 200 | 200 | 200 | 600 including tariffs |
| Bid Price Line per each | $ | $ | $ | $ | $ | |||
| $ | ||||||||
| TOTAL COST MATTRESS CORES | $ | $ | $ | $ |
Mattress Batting ITEM # DESCRIPTION U/M ESTIMATED 3 YEAR USAGE CURRENT TARIFF COST (if applicable) UNIT COST YEAR 1 UNIT COST YEAR 2 UNIT COST YEAR 3 TOTAL 3 YEAR COST Including tariffs
| 1 | Mattress Batting per Schedule A 1.1 C | Pound (LB) | 180,000 | 180,000 | 60,000 | 60,000 | 60,000 | 180,000 including tariffs |
| Bid Price Line per pound | $ | $ | $ | $ | $ |
TOTAL COST BATTING MATERIALS $ $ $ $
File details come from the government source that posted it. Updated .