This Request for Proposals (RFP) #2026-09 is issued by Clackamas County, through its Water Environment Services (WES) department, to solicit proposals for biosolids hauling services. The county seeks contractors to transport dewatered Class B biosolids with 18-23% total solids generated by the Tri-City and Kellogg Creek Wastewater Treatment Plants to agricultural application sites and landfills as needed. The service requires approximately seven truck and pup trailer trips per week to manage 2025 biosolids production of approximately 7,000 wet tons from the Tri-City plant and 5,000 wet tons from the Kellogg Creek plant, with an anticipated two percent annual increase in hauling volume. Biosolids are currently applied to fields in Sherman County, Oregon, with potential expansion to the Willamette Valley during summer and fall months. The deadline to submit clarifying questions is March 8, 2026 at 5:00 p.m. Pacific Time, with proposals due electronically via Bid Locker by March 25, 2026 at 2:00 p.m. Pacific Time. The contract term is five years from the effective date with an optional five-year renewal period at WES's discretion.

Contractors must supply all equipment and labor, including truck and pup dump trucks and front-end loaders for loading biosolids from the biosolids shed, and must develop and implement a comprehensive Spill Prevention and Response Plan approved by WES prior to commencing work. Fees should be submitted on a fixed fee basis with all estimated expenses, hourly rates, and reimbursable costs clearly outlined. The evaluation committee will score proposals based on proposer qualifications (0-30 points), scope of work approach (0-45 points), and fees (0-25 points), with the highest-scoring proposer recommended for award. Contractors must maintain applicable insurance including Commercial General Liability ($1,000,000 per occurrence), Professional Liability ($1,000,000 per occurrence), Automobile Liability ($1,000,000 per occurrence), and Pollution Liability ($1,000,000 per occurrence). Work hours are generally Monday through Friday between 6:00 a.m. and 3:30 p.m., with emergency availability required outside standard hours. Proposals are limited to 20 pages and must include references from at least three clients served within the past three years.

View the file

Other files

File Type Posted
RFP 2026-09 Addendum 1.pdf PDF
RFP 2026-09 Clarifying Questions 1.pdf PDF
RFP 2026-09 Clarifying Questions 2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSALS #2026-09

FOR

BIOSOLIDS HAULING SERVICES

BOARD OF COUNTY COMMISSIONERS

CRAIG ROBERTS, Chair

PAUL SAVAS, Commissioner MARTHA SCHRADER, Commissioner

BEN WEST, Commissioner DIANA HELM, Commissioner

Gary Schmidt

County Administrator

Thomas Candelario Contract Analyst

PROPOSAL CLOSING DATE, TIME AND LOCATION

DATE: March 25, 2026

TIME: 2:00 PM, Pacific Time

PLACE: Email: https://bidlocker.us/a/clackamascounty/BidLocker https://bidlocker.us/a/clackamascounty/BidLocker

2026-09 Page ii

SCHEDULE

Request for Proposals Issued…….................................................. February 19, 2026

Protest of Specifications Deadline.................................................. February 26, 2026, 5:00 PM, Pacific Time

Deadline to Submit Clarifying Questions....................................... March 8, 2026, 5:00 PM, Pacific Time

Request for Proposals Closing Date and Time……....................... March 25, 2026, 2:00 PM, Pacific Time

Deadline to Submit Protest of Award............................................. Seven (7) days from the Intent to Award

TABLE OF CONTENTS

Section 1 – Notice of Request for Proposals

Section 2 – Instructions to Proposers

Section 3 – Scope of Work

Section 4 – Evaluation and Selection Criteria

Section 5 – Proposal Content (Including Proposal Certification)

SECTION 1

NOTICE OF REQUEST FOR PROPOSALS

Notice is hereby given that Water Environment Services (“WES”), through its Board of County Commissioners, will receive sealed Proposals per specifications until 2:00 PM, March 25, 2026 (“Closing”), to provide Biosolids Hauling Services. No Proposals will be received or considered after that time.

RFP Documents can be downloaded from the state of Oregon procurement website (“OregonBuys”) at the following address https://oregonbuys.gov/bso/view/login/login.xhtml, Document No. S-C01010- 00016078.

Prospective Proposers will need to sign in to download the information and that information will be accumulated for a Plan Holder's List. Prospective Proposers are responsible for obtaining any Addenda, clarifying questions, and Notices of Award from OregonBuys. Sealed Proposals are to be emailed to https://bidlocker.us/a/clackamascounty/BidLocker.

Submitting Proposals: Bid Locker Proposals will only be accepted electronically thru a secure online bid submission service, Bid Locker.

Email submissions to Clackamas County email addresses will no longer be accepted.

A. Completed proposal documents must arrive electronically via Bid Locker located at https://bidlocker.us/a/clackamascounty/BidLocker.

B. Bid Locker will electronically document the date and time of all submissions. Completed documents must arrive by the deadline indicated in Section 1 or as modified by Addendum.

LATE PROPOSALS WILL NOT BE ACCEPTED.

C. Proposers must register and create a profile for their business with Bid Locker in order to submit for this project. It is free to register for Bid Locker.

D. Proposers with further questions concerning Bid Locker may review the Vendor’s Guide located at https://www.clackamas.us/how-to-bid-on-county-projects .

Contact Information Procurement Process and Technical Questions: Thomas Candelario, tcandelario@clackamas.us

The Board of County Commissioners reserves the right to reject any and all Proposals not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any and all Proposals upon the finding that it is in the public interest to do so and to waive any and all informalities in the public interest. In the award of the contract, the Board of County Commissioners will consider the element of time, will accept the Proposal or Proposals which in their estimation will best serve the interests of Clackamas County and will reserve the right to award the contract to the contractor whose Proposal shall be best for the public good.

Clackamas County encourages proposals from Minority, Women, and Emerging Small Businesses.

https://oregonbuys.gov/bso/view/login/login.xhtml https://bidlocker.us/a/clackamascounty/BidLocker https://www.clackamas.us/how-to-bid-on-county-projects mailto:tcandelario@clackamas.us

2026-09 Page 2

SECTION 2

INSTRUCTIONS TO PROPOSERS

Clackamas County (“County”) reserves the right to reject any and all Proposals received as a result of this RFP. County Local Contract Review Board Rules (“LCRB”) govern the procurement process for the County.

2.1 Modification or Withdrawal of Proposal: Any Proposal may be modified or withdrawn at any time prior to the Closing deadline, provided that a written request is received by the County Procurement Division Director, prior to the Closing. The withdrawal of a Proposal will not prejudice the right of a Proposer to submit a new Proposal.

2.2 Requests for Clarification and Requests for Change: Proposers may submit questions regarding the specifications of the RFP. Questions must be received in writing on or before 5:00 p.m. (Pacific Time), on the date indicated in the Schedule, at the Procurement Division address as listed in Section 1 of this RFP.

Requests for changes must include the reason for the change and any proposed changes to the requirements.

The purpose of this requirement is to permit County to correct, prior to the opening of Proposals, RFP terms or technical requirements that may be unlawful, improvident or which unjustifiably restrict competition.

County will consider all requested changes and, if appropriate, amend the RFP. No oral or written instructions or information concerning this RFP from County managers, employees or agents to prospective Proposers shall bind County unless included in an Addendum to the RFP.

2.3 Protests of the RFP/Specifications: Protests must be in accordance with LCRB C-047-0730.

Protests of Specifications must be received in writing on or before 5:00 p.m. (Pacific Time), on the date indicated in the Schedule, or within three (3) business days of issuance of any addendum, at the Procurement Division address listed in Section 1 of this RFP. Protests may not be faxed. Protests of the RFP specifications must include the reason for the protest and any proposed changes to the requirements.

2.4 Addenda: If any part of this RFP is changed, an addendum will be provided to Proposers that have provided an address to the Procurement Division for this procurement. It shall be Proposers responsibility to regularly check OregonBuys for any notices, published addenda, or response to clarifying questions.

2.5 Submission of Proposals: Proposals must be submitted in accordance with Section 5. All Proposals shall be legibly written in ink or typed and comply in all regards with the requirements of this RFP. Proposals that include orders or qualifications may be rejected as irregular. All Proposals must include a signature that affirms the Proposer’s intent to be bound by the Proposal (may be on cover letter, on the Proposal, or the Proposal Certification Form) shall be signed. If a Proposal is submitted by a firm or partnership, the name and address of the firm or partnership shall be shown, together with the names and addresses of the members. If the Proposal is submitted by a corporation, it shall be signed in the name of such corporation by an official who is authorized to bind the contractor. The Proposals will be considered by the County to be submitted in confidence and are not subject to public disclosure until the notice of intent to award has been issued.

No late Proposals will be accepted. Proposals submitted after the Closing will be considered late and will be returned unopened. Proposals may not be submitted by telephone or fax.

2.6 Post-Selection Review and Protest of Award: County will name the apparent successful Proposer in a Notice of Intent to Award published on OregonBuys. Identification of the apparent successful Proposer is procedural only and creates no right of the named Proposer to award of the contract. Competing Proposers shall be given seven (7) calendar days from the date on the Notice of Intent to Award to review the file at the Procurement Division office and file a written protest of award, pursuant to LCRB C-047-0740. Any award protest must be in writing and must be delivered by hand-delivery or mail to the address for the Procurement Division as listed in Section 1 of this RFP.

Only actual Proposers may protest if they believe they have been adversely affected because the Proposer would be eligible to be awarded the contract in the event the protest is successful. The basis of the written protest must

2026-09 Page 3 be in accordance with ORS 279B.410 and shall specify the grounds upon which the protest is based. In order to be an adversely affected Proposer with a right to submit a written protest, a Proposer must be next in line for award, i.e. the protester must claim that all higher rated Proposers are ineligible for award because they are non-responsive or non-responsible.

County will consider any protests received and:

a. reject all protests and proceed with final evaluation of, and any allowed contract language negotiation with, the apparent successful Proposer and, pending the satisfactory outcome of this final evaluation and negotiation, enter into a contract with the named Proposer; OR

b. sustain a meritorious protest(s) and reject the apparent successful Proposer as nonresponsive, if such Proposer is unable to demonstrate that its Proposal complied with all material requirements of the solicitation and Oregon public procurement law; thereafter, County may name a new apparent successful Proposer; OR

c. reject all Proposals and cancel the procurement.

2.7 Acceptance of Contractual Requirements: Failure of the selected Proposer to execute a contract and deliver required insurance certificates within ten (10) calendar days after notification of an award may result in cancellation of the award. This time period may be extended at the option of County.

2.8 Public Records: Proposals are deemed confidential until the “Notice of Intent to Award” letter is issued.

This RFP and one copy of each original Proposal received in response to it, together with copies of all documents pertaining to the award of a contract, will be kept and made a part of a file or record which will be open to public inspection. If a Proposal contains any information that is considered a TRADE SECRET under ORS 192.345(2), SUCH INFORMATION MUST BE LISTED ON A SEPARATE SHEET CAPABLE OF SEPARATION

FROM THE REMAINING PROPOSAL AND MUST BE CLEARLY MARKED WITH THE

FOLLOWING LEGEND:

“This information constitutes a trade secret under ORS 192.345(2), and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS Chapter 192.”

The Oregon Public Records Law exempts from disclosure only bona fide trade secrets, and the exemption from disclosure applies only “unless the public interest requires disclosure in the particular instance” (ORS 192.345).

Therefore, non-disclosure of documents, or any portion of a document submitted as part of a Proposal, may depend upon official or judicial determinations made pursuant to the Public Records Law.

2.9 Investigation of References: County reserves the right to investigate all references in addition to those supplied references and investigate past performance of any Proposer with respect to its successful performance of similar services, its compliance with specifications and contractual obligations, its completion or delivery of a project on schedule, its lawful payment of subcontractors and workers, and any other factor relevant to this RFP. County may postpone the award or the execution of the contract after the announcement of the apparent successful Proposer in order to complete its investigation.

2.10 RFP Proposal Preparation Costs and Other Costs: Proposer costs of developing the Proposal, cost of attendance at an interview (if requested by County), or any other costs are entirely the responsibility of the Proposer, and will not be reimbursed in any manner by County.

2.11 Clarification and Clarity: County reserves the right to seek clarification of each Proposal, or to make an award without further discussion of Proposals received. Therefore, it is important that each Proposal be submitted initially in the most complete, clear, and favorable manner possible.

2.12 Right to Reject Proposals: County reserves the right to reject any or all Proposals or to withdraw any item from the award, if such rejection or withdrawal would be in the public interest, as determined by County.

2026-09 Page 4

2.13 Cancellation: County reserves the right to cancel or postpone this RFP at any time or to award no contract.

2.14 Proposal Terms: All Proposals, including any price quotations, will be valid and firm through a period of one hundred and eighty (180) calendar days following the Closing date. County may require an extension of this firm offer period. Proposers will be required to agree to the longer time frame in order to be further considered in the procurement process.

2.15 Oral Presentations: At County’s sole option, Proposers may be required to give an oral presentation of their Proposals to County, a process which would provide an opportunity for the Proposer to clarify or elaborate on the Proposal but will in no material way change Proposer’s original Proposal. If the evaluating committee requests presentations, the Procurement Division will schedule the time and location for said presentation. Any costs of participating in such presentations will be borne solely by Proposer and will not be reimbursed by County. Note: Oral presentations are at the discretion of the evaluating committee and may not be conducted;

therefore, written Proposals should be complete.

2.16 Usage: It is the intention of County to utilize the services of the successful Proposer(s) to provide services as outlined in the below Scope of Work.

2.17 Review for Responsiveness: Upon receipt of all Proposals, the Procurement Division or designee will determine the responsiveness of all Proposals before submitting them to the evaluation committee. If a Proposal is incomplete or non-responsive in significant part or in whole, it will be rejected and will not be submitted to the evaluation committee. County reserves the right to determine if an inadvertent error is solely clerical or is a minor informality which may be waived, and then to determine if an error is grounds for disqualifying a Proposal. The Proposer’s contact person identified on the Proposal will be notified, identifying the reason(s) the Proposal is non-responsive. One copy of the Proposal will be archived and all others discarded.

2.18 RFP Incorporated into Contract: This RFP will become part of the Contract between County and the selected contractor(s). The contractor(s) will be bound to perform according to the terms of this RFP, their Proposal(s), and the terms of the Sample Contract.

2.19 Communication Blackout Period: Except as called for in this RFP, Proposers may not communicate with members of the Evaluation Committee or other County employees or representatives about the RFP during the procurement process until the apparent successful Proposer is selected, and all protests, if any, have been resolved. Communication in violation of this restriction may result in rejection of a Proposer.

2.20 Prohibition on Commissions and Subcontractors: County will contract directly with persons/entities capable of performing the requirements of this RFP. Contractors must be represented directly.

Participation by brokers or commissioned agents will not be allowed during the Proposal process. Contractor shall not use subcontractors to perform the Work unless specifically pre-authorized in writing to do so by the County. Contractor represents that any employees assigned to perform the Work, and any authorized subcontractors performing the Work, are fully qualified to perform the tasks assigned to them, and shall perform the Work in a competent and professional manner. Contractor shall not be permitted to add on any fee or charge for subcontractor Work. Contractor shall provide, if requested, any documents relating to subcontractor’s qualifications to perform required Work.

2.21 Ownership of Proposals: All Proposals in response to this RFP are the sole property of County, and subject to the provisions of ORS 192.410-192.505 (Public Records Act).

2.22 Clerical Errors in Awards: County reserves the right to correct inaccurate awards resulting from its clerical errors.

2026-09 Page 5

2.23 Rejection of Qualified Proposals: Proposals may be rejected in whole or in part if they attempt to limit or modify any of the terms, conditions, or specifications of the RFP or the Sample Contract.

2.24 Collusion: By responding, the Proposer states that the Proposal is not made in connection with any competing Proposer submitting a separate response to the RFP, and is in all aspects fair and without collusion or fraud. Proposer also certifies that no officer, agent, elected official, or employee of County has a pecuniary interest in this Proposal.

2.25 Evaluation Committee: Proposals will be evaluated by a committee consisting of representatives from County and potentially external representatives. County reserves the right to modify the Evaluation Committee make-up in its sole discretion.

2.26 Commencement of Work: The contractor shall commence no work until all insurance requirements have been met, the Protest of Awards deadline has been passed, any protest have been decided, a contract has been fully executed, and a Notice to Proceed has been issued by County.

2.27 Nondiscrimination: The successful Proposer agrees that, in performing the work called for by this RFP and in securing and supplying materials, contractor will not discriminate against any person on the basis of race, color, religious creed, political ideas, sex, age, marital status, sexual orientation, gender identity, veteran status, physical or mental handicap, national origin or ancestry, or any other class protected by applicable law.

2.28 Intergovernmental Cooperative Procurement Statement: Pursuant to ORS 279A and LCRB, other public agencies shall have the ability to purchase the awarded goods and services from the awarded contractor(s) under terms and conditions of the resultant contract. Any such purchases shall be between the contractor and the participating public agency and shall not impact the contactor’s obligation to the County.

Any estimated purchase volumes listed herein do not include other public agencies and County makes no guarantee as to their participation. Any Proposer, by written notification included with their Proposal, may decline to extend the prices and terms of this solicitation to any and/or all other public agencies. County grants to any and all public serving governmental agencies, authorization to purchase equivalent services or products described herein at the same submitted unit bid price, but only with the consent of the contractor awarded the contract by the County.

2026-09 Page 6

SECTION 3

SCOPE OF WORK

3.1. INTRODUCTION

Clackamas County is behalf of Clackamas Water Environment Services (“District”) is seeking Proposals from vendors to provide Biosolids Hauling Services.

Please direct all Technical/Specifications or Procurement Process Questions to the indicated representative referenced in the Notice of Request for Proposals and note the communication restriction outlined in Section 2.19.

3.2 BACKGROUND

Clackamas County Water Environment Service (“WES”) is seeking Proposals from experienced vendors for two contracts: one for Biosolids Hauling Services, and one for Biosolids Land Application Services.

This RFP is for Biosolids Hauling Services only. Biosolids are generated by the Kellogg Creek and Tri- City Wastewater Treatment Plants (“WWTP”) and applied to agricultural sites. Interested contractors may submit proposals to provide Biosolids Hauling Services only, Biosolids Land Application Services only, or both.

• Except as otherwise indicated in this contract, Contractor shall supply all equipment and labor necessary to perform the work.

• Clackamas Water Environment Services (“WES”), a Department of Clackamas County, manages and operates the Tri-City Wastewater Treatment Plant (“TC”) and the Kellogg Creek Wastewater Treatment Plant (“KC”). The TC and KC WWTPs produce a dewatered Class B biosolids product with 18-23% total solids.

• Biosolids are currently transported to Sherman County, Oregon, for land application on active agricultural fields. All WES sites are presently located in Sherman County;

however, WES may pursue land application at fields in other locations, including the Willamette Valley (“Valley”) during the dry months of summer and fall. While WES’s goal is to locate adequate acreage in the Valley to support summer and fall production within the contract period, this is not a guarantee. If WES achieves that goal, land application will occur only in the Valley during the dry months.

• Biosolids production in 2025 is shown in Table 1. Contractor shall be prepared to haul similar wet tonnage to 2025 totals, with an estimated two percent annual increase. It takes approximately seven trips (truck and pup configuration) per work week to keep up with biosolid production at TC.

• In 2025 WES applied biosolids to six fields. The number of fields required to meet the demands of production is not guaranteed. Some sites are smaller than others resulting in less time on that field.

• The TC and KC biosolids programs are regulated by each plant’s National Pollutant Discharge Elimination System (NPDES) permit. One Biosolids Management Plan covers both plants.

• The KC plant is unable to produce dewatered biosolids at the plant. The liquid biosolids generated at KC are transported by WES staff directly to a centrifuge at the TC plant.

This centrifuge is known as the back-up centrifuge or BUC. The BUC is on the TC campus, but is separate from the main solids building at the plant. The BUC discharges the dewatered product onto the cement floor of a covered biosolids shed. Trucks pull into

2026-09 Page 7 the shed and are filled using a front end loader. An axle scale is available at the plant to weigh trucks before exiting the plant.

• The Tri-City plant generally loads trucks via a newly installed elevated hopper in the newly constructed solids building. Pre-weighed biosolids are discharged directly into trucks from the hopper. At times, TC biosolids are also stored in the biosolids shed. TC may also use the BUC for dewatering during maintenance or repair of the primary centrifuges. WES will identify TC biosolids and KC biosolids when both are stored in the biosolids shed.

Table 1 2025 biosolids production

Plant

Approximate Production, Wet Tons

CY 2025

Address

Tri-City WWTP 7,000 15941 S. Agnes Ave, Oregon City, OR 97045 Kellogg Creek WWTP 5,000 Not relevant; no hauling shall be done from KC

3.3. SCOPE OF WORK

3.3.1. Scope:

Contractor shall provide all equipment and personnel to meet the requirements of the contract. Required heavy equipment includes truck and pup dump truck(s) and a front-end loader for the biosolids shed.

Contractor shall have an established maintenance program for equipment to minimize breakdowns.

Contractor shall not store any equipment at the TC plant without prior approval from the Contract Administrator. Contractor shall not use subcontractors for principal duties without prior disclosure and approval by WES.

LOADING AND TRANSPORTING

Kellogg Creek Biosolids Loading

• Contractor shall be fully trained by WES staff before performing duties in the biosolids shed.

• Noise and odor from this operation can disturb neighbors. Contractor will work with WES to modify operations at the biosolids shed if operations cause neighbor complaints.

• Contractor shall load biosolids from the floor of the biosolids shed into trucks using a front loader. If contractor is not able to provide a front loader and staff for loading trucks at the biosolids shed, WES may be able to perform this task. If contractor needs WES to supply a loader and staff to load trucks from the biosolids shed, this should be indicated in the proposal and reflected in the Fee Schedule.

• Contractor shall notify and reimburse WES for any damage to the shed from hauling or loader operation.

• WES shall clearly mark or identify any TC biosolids that may be produced at the BUC or stored in the biosolids shed alongside KC biosolids.

• Contractor shall weigh trucks before departure and is responsible for any fines associated with overweight trucks.

• Biosolids shall be properly loaded and secured to prevent the loss of material during transport. Spilled biosolids shall be properly cleaned up and disposed of in a timely manner. Refer to the Contractor’s Spill Plan for specific procedures.

2026-09 Page 8

Tri-City Biosolids Loading:

• WES staff will load contractor trucks from the elevated hopper unless otherwise authorized by the Contract Administrator.

• WES will provide a SOP for loading and scaling from the hopper. Contractor will abide by the SOP.

• When TC biosolids are stored in the biosolids shed or dewatered with the BUC, Contractor shall load TC biosolids from the floor of the biosolids shed. Conditions outlined in paragraph 4.1 apply when loading TC biosolids in the biosolids shed.

• Biosolids shall be properly loaded and secured to prevent the loss of material during transport. Spilled biosolids shall be properly cleaned up and disposed of in a timely manner. Refer to the Contractor’s Spill Plan for specific procedures.

General The inside of the hauling box must be empty of all material other than WES biosolids prior to loading.

WES reserves the right to inspect trucks prior to loading. Contractor shall not add any material to the load other than WES biosolids before off-loading at the application site.

Transport

• Contractor shall transport biosolids to WES determined fields for application. WES will coordinate with the Contractor on scheduling and hauling locations.

• Contractor shall transport biosolids to landfills when determined necessary by the Contractor and WES Contract Administrator. WES is responsible for maintaining landfill permits and will provide the drivers with the necessary paperwork. WES will pay all tipping fees directly to the landfill.

• Contractor and WES shall agree to the routes that may be used to transport biosolids. Any deviation from the established routes shall be approved by WES.

• Contractor shall not haul biosolids when, in the reasonable opinion of Contractor or WES, inclement weather prevents safe transport.

SCHEDULE

• WES shall determine the hauling schedule and what fields will receive biosolids based on WWTP production and calculated field application rates.

• WES shall provide the Contractor with the Land Application Authorization (LAA) for the fields. Contractor will meet the requirements of the LAA. Contractor shall notify WES Contract Administrator within 24 hours of discovery that any requirement cannot be met.

SPILL PLAN

• Contractor shall immediately respond to and clean up any spills that may occur during the loading, transportation, and unloading of biosolids.

• Contractor shall incur all costs associated with a spill clean-up.

• Contractor shall prepare a Spill Prevention and Response Plan and obtain WES’s approval of the plan prior to hauling WES’s biosolids. The Spill Prevention and Response Plan shall adhere to Section 6 & 7 of WES’s Biosolids Management Plan.

• WES may reasonably modify the plan in coordination with the Contractor. Contractor may request modifications to the plan at any time. Contractor’s requested modifications shall be subject to WES’s approval.

2026-09 Page 9

The spill response plan shall contain at least the following:

• A map of the approved route to the general area where material staging occurs.

• Spill prevention measures

• The call priority, names and telephone numbers of individuals or organizations that shall be notified in the event of a spill. WES shall be responsible for required agency notifications when a spill reaches or exceeds a reporting threshold.

• Night and emergency telephone numbers shall be listed for those individuals or organizations requiring immediate notification.

• Description of the types of communication equipment available for use by transport operators.

• The procedures to be taken in cleaning up a spill.

• The type, location, size and estimated response time for all major items of spill response equipment and any materials needed to mitigate a spill.

• A list of persons responsible for the execution of a spill response.

Contractor shall follow the plan at all times and shall ensure that Contractor’s staff have a thorough knowledge of the plan. Hard copy versions of the plan shall be placed in accessible locations for those that may respond to a spill. WES shall determine when response measures to a spill can be discontinued.

OFF-LOADING AT THE FIELD

Contractor will off-load the biosolids at the designated staging area at each land application site.

WES biosolids shall only be placed on or applied to fields that have received LAA approval from DEQ through WES applications.

• Contractor shall clean the outside of their trucks of all biosolids prior to leaving the staging area. Contractor shall be responsible for providing all cleaning equipment. Any biosolids removed from the Contractor’s trucks will be properly disposed of or added to the biosolids pile deposited at the staging area.

• Contractor shall use reasonable devices and equipment necessary for driving at the application site when road conditions are poor. Contractor shall not look to the owner of the application site or the biosolids application contractor for towing or other services, unless those services have been negotiated independently with each applicable party. Any agreement with the biosolids applicator or site contact must be included in the Contractor’s work plan.

• Contractor shall provide all measures necessary for traffic control, including flag persons, signs and detours.

• Contractor will coordinate with WES’s Contract Administrator when deciding if an application site is inaccessible due to weather, site conditions, or other relevant reasons.

When sites are determined to be inaccessible, the Contractor will dispose of hauled biosolids at the nearest approved landfill.

REGULATORY COMPLIANCE

Contractor shall comply with all applicable statutes, regulations and directives concerning the application and transportation of biosolids, including, but not limited to, the requirements in OAR 340, Division 50, 40 CFR 501 and 503 and WES’s Biosolids Management Plan. Contractor will ensure that each of Contractor’s employees, agents and subcontractors understand all such applicable statutes, regulations and directives.

• WES shall provide Contractor with copies of all relevant DEQ LAA’s and Contractor shall comply with the LAA requirements.

• Contractor shall comply with applicable health, safety and transportation regulations that pertain to this work.

2026-09 Page 10

• WES will provide Contractor a copy of the WES Biosolids Management Plan and contractor shall adhere to the conditions therein.

REPORTS

Contractor shall provide WES with daily copies of scale tickets, bill of lading, and any other receipts related to hauling activities.

WORK HOURS

The TC plant is open from 6:00 am – 3:30 pm seven days per week. Loading from the elevated hopper may be done between 6:00 am and 1:30 pm unless otherwise approved by the Contract Administrator.

• Contractor shall generally provide services Monday through Friday. If hauling is needed outside of noted hours due to emergency circumstances, Contractor will have staff and equipment available to perform those duties.

• Contractor shall load from the biosolids shed between 6:00 am and 3:30 pm unless otherwise approved by the Contract Administrator.

3.3.3. Term of Contract:

The term of this contract shall be five (5) years from the effective date. This contract may be renewed at WES option for an additional five (5) year period.

3.3.4 Sample Contract: Submission of a Proposal in response to this RFP indicates Proposer’s willingness to enter into a contract containing substantially the same terms (including insurance requirements) of the sample contract identified below. No action or response to the sample contract is required under this RFP. Any objections to the sample contract terms should be raised in accordance with Paragraphs 2.2 or 2.3 of this RFP, pertaining to requests for clarification or change or protest of the RFP/specifications, and as otherwise provided for in this RFP. This RFP and all supplemental information in response to this RFP will be a binding part of the final contract.

The applicable Sample Personal Services Contract, for this RFP can be found at https://www.clackamas.us/finance/terms.html.

Personal Services Contract (unless checked, item does not apply)

The following paragraphs of the Professional Services Contract will be applicable:

Article I, Paragraph 5 – Travel and Other Expense is Authorized Article II, Paragraph 27 – Confidentiality Article II, Paragraph 28 – Criminal Background Check Requirements Article II, Paragraph 29 – Key Persons Exhibit A – On-Call Provision

The following insurance requirements will be applicable:

Commercial General Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence, with an annual aggregate limit of $2,000,000 for Bodily Injury and Property Damage.

Professional Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence, with an annual aggregate limit of $2,000,000 for damages caused by error, omission or negligent acts.

Automobile Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence for Bodily Injury and Property Damage.

https://www.clackamas.us/finance/terms.html

2026-09 Page 11

☒ Pollution Liability: combined single limit, or the equivalent, of not less than $1,000,000 per occurrence.

2026-09 Page 12

SECTION 4

EVALUATION PROCEDURE

4.1 An evaluation committee will review all Proposals that are initially deemed responsive and they shall rank the Proposals in accordance with the below criteria. The evaluation committee may recommend an award based solely on the written responses or may request Proposal interviews/presentations.

Interviews/presentations, if deemed beneficial by the evaluation committee, will consist of the highest scoring Proposers. The invited Proposers will be notified of the time, place, and format of the interview/presentation. Based on the interview/presentation, the evaluation committee may revise their scoring.

Written Proposals must be complete and no additions, deletions, or substitutions will be permitted during the interview/presentation (if any). The evaluation committee will recommend award of a contract to the final County decision maker based on the highest scoring Proposal. The County decision maker reserves the right to accept the recommendation, award to a different Proposer, or reject all Proposals and cancel the RFP.

Proposers are not permitted to directly communicate with any member of the evaluation committee during the evaluation process. All communication will be facilitated through the Procurement representative.

4.2 Evaluation Criteria

Category Points available:

Proposer’s General Background and Qualifications 0-30 Scope of Work 0-45 Fees 0-25

Available points 0-100

4.3 Once a selection has been made, the County will enter into contract negotiations. During negotiation, the County may require any additional information it deems necessary to clarify the approach and understanding of the requested services. Any changes agreed upon during contract negotiations will become part of the final contract. The negotiations will identify a level of work and associated fee that best represents the efforts required. If the County is unable to come to terms with the highest scoring Proposer, discussions shall be terminated and negotiations will begin with the next highest scoring Proposer. If the resulting contract contemplates multiple phases and the County deems it is in its interest to not authorize any particular phase, it reserves the right to return to this solicitation and commence negotiations with the next highest ranked Proposer to complete the remaining phases.

2026-09 Page 13

SECTION 5

PROPOSAL CONTENTS

5.1. Vendors must observe submission instructions and be advised as follows:

5.1.1. Complete Proposals must be emailed to https://bidlocker.us/a/clackamascounty/BidLocker. The subject line of the email must identify the RFP title. Proposers are encouraged to contact Procurement to confirm receipt of the Proposal.

5.1.2. County reserves the right to solicit additional information or Proposal clarification from the vendors, or any one vendor, should the County deem such information necessary.

5.1.3. Proposal may not exceed a total of 20 pages (single-sided), inclusive of all exhibits, attachments, title pages, pages separations, table of contents, or other information. The Proposal Certification Page will NOT count towards the final page count. Pages shall be 8-1/2” x 11” standard sheet size, 11 point font, single-spaced.

Provide the following information in the order in which it appears below:

5.2. Proposer’s General Background and Qualifications:

• Description of the firm.

• Credentials/experience of key individuals that would be assigned to this project.

• Description of providing similar services to public entities of similar size within the past five (5) years.

• Description of the firm’s ability to meet the requirements in Section 3.

• Description of what distinguishes the firm from other firms performing a similar service.

5.3. Scope of Work

Please provide detailed responses to the following questions regarding your proposed approach to the Scope of Work:

• Equipment and Logistics o Please detail the specific heavy equipment—including truck and pup dump trucks and front-end loaders—that your firm will utilize for this contract.

o Will your firm provide the front-end loader and personnel to load biosolids from the floor of the biosolids shed, or will you require WES staff to perform this task?

o Please describe your established equipment maintenance program and how it will minimize breakdowns and operational delays.

o What equipment and procedures will you use to ensure the outside of your trucks are completely cleaned of all biosolids prior to leaving the staging areas?

• Operations and Scheduling o How will your firm manage operations and staffing to ensure you can maintain the estimated seven trips per week required to keep up with the Tri-City (TC) plant's biosolids production?

o Describe your protocol and staff availability for handling required hauling outside of standard work hours (Monday through Friday) in the event of emergency circumstances.

o How will you coordinate with the WES Contract Administrator to evaluate road and weather conditions when determining if safe transport is viable or if an application site is inaccessible?

• Safety and Environmental Controls o Describe your approach to developing and executing a comprehensive Spill Prevention and

Response Plan.

2026-09 Page 14 o What is your estimated response time for deploying major spill response equipment and materials in the event of an incident during loading, transport, or unloading?

o Operations at the biosolids shed can cause noise and odor disturbances; how will you work with WES to modify operations and mitigate neighbor complaints?

o

• Regulatory Compliance and Training o Detail your firm's experience and specific procedures for ensuring compliance with all applicable directives, including OAR 340, Division 50, 40 CFR 501 and 503, and DEQ Land Application Authorizations (LAA).

o How will you ensure that your employees, agents, and any approved subcontractors are fully trained by WES staff and maintain a thorough understanding of the Spill Plan and regulatory directives?

5.4. Fees

Fees should be on a fixed fee basis. Fees should be sufficiently descriptive to facilitate acceptance of a Proposal. List the not-to-exceed amount you propose for the service. Fees and fee schedules should outline all estimated expenses, hourly rates for all assigned individuals, anticipated travel, other reimbursable expenses.

5.5. References

Provide at least three (3) references from clients your firm has served similar to the County in the past three (3) years, including one client that has newly engaged the firm in the past thirty-six (36) months and one (1) long-term client. Provide the name, address, email, and phone number of the references. Please note the required three references may not be from County staff, but additional references may be supplied.

5.6. Completed Proposal Certification (see the below form)

2026-09 Page 15

PROPOSAL CERTIFICATION

RFP #2026-09

Submitted by:

(Must be entity’s full legal name, and State of Formation)

Each Proposer must read, complete and submit a copy of this Proposal Certification with their Proposal. Failure to do so may result in rejection of the Proposal. By signature on this Proposal Certification, the undersigned certifies that they are authorized to act on behalf of the Proposer and that under penalty of perjury, the undersigned will comply with the following:

SECTION I. OREGON TAX LAWS: As required in ORS 279B.110(2)(e), the undersigned hereby certifies that, to the best of the undersigned’s knowledge, the Proposer is not in violation of any Oregon Tax Laws. For purposes of this certification, “Oregon Tax Laws” means the tax laws of the state or a political subdivision of the state, including ORS 305.620 and ORS chapters 316, 317 and 318. If a contract is executed, this information will be reported to the Internal Revenue Service. Information not matching IRS records could subject Proposer to 24% backup withholding.

SECTION II. NON-DISCRIMINATION: That the Proposer has not and will not discriminate in its employment practices with regard to race, creed, age, religious affiliation, sex, disability, sexual orientation, gender identity, national origin, or any other protected class. Nor has Proposer or will Proposer discriminate against a subcontractor in the awarding of a subcontract because the subcontractor is a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a service-disabled veteran owns or an emerging small business that is certified under ORS 200.055.

SECTION III. CONFLICT OF INTEREST: The undersigned hereby certifies that no elected official, officer, agent or employee of Clackamas County is personally interested, directly or indirectly, in any resulting contract from this RFP, or the compensation to be paid under such contract, and that no representation, statements (oral or in writing), of the County, its elected officials, officers, agents, or employees had induced Proposer to submit this Proposal. In addition, the undersigned hereby certifies that this proposal is made without connection with any person, firm, or corporation submitting a proposal for the same material, and is in all respects fair and without collusion or fraud.

SECTION IV. COMPLIANCE WITH SOLICITATION: The undersigned further agrees and certifies that they:

1. Have read, understand and agree to be bound by and comply with all requirements, instructions, specifications, terms and conditions of the RFP (including any attachments); and

2. Are an authorized representative of the Proposer, that the information provided is true and accurate, and that providing incorrect or incomplete information may be cause for rejection of the Proposal or contract termination; and

3. Will furnish the designated item(s) and/or service(s) in accordance with the RFP and Proposal; and

4. Will use recyclable products to the maximum extend economically feasible in the performance of the contract work set forth in this RFP.

Name:_______________________________________ Date:______________________________________

Signature:____________________________________ Title:______________________________________

Email:_______________________________________ Telephone:_________________________________

Oregon Business Registry Number:________________ OR CCB # (if applicable):________________________

Business Designation (check one):

Corporation Partnership Sole Proprietorship Non-Profit Limited Liability Company

Resident Quoter, as defined in ORS 279A.120 Non-Resident Quote. Resident State:__________________________

PAUL SAVAS, Commissioner
MARTHA SCHRADER, Commissioner
BEN WEST, Commissioner
DIANA HELM, Commissioner
PROPOSAL CLOSING DATE, TIME AND LOCATION
TIME: 2:00 PM, Pacific Time
PLACE: Email: https://bidlocker.us/a/clackamascounty/BidLocker
Deadline to Submit Clarifying Questions....................................... March 8, 2026, 5:00 PM, Pacific Time
Request for Proposals Closing Date and Time……....................... March 25, 2026, 2:00 PM, Pacific Time
Deadline to Submit Protest of Award............................................. Seven (7) days from the Intent to Award
Category Points available: Proposer’s General Background and Qualifications 0-30