This request for proposal solicits construction services for slope stabilization work in Hyalite Canyon, Montana. The selected contractor will drill horizontal drains into two locations along an unstable slope to dewater and relieve pore water pressure. Drain lengths will range from 600 to 1,000 feet at varying depths. The contractor must furnish all labor, equipment, transportation, supplies, and incidentals. The project is located approximately six miles southwest of Bozeman on Custer Gallatin National Forest land. The solicitation is open only to certified small businesses with a size standard of $39.5 million. Questions must be submitted to the contracting officer by email. Interested vendors should register at SAM.gov to receive notifications and download solicitation documents only available there. The response deadline is not provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFEROR'S COPY
NOTE: Attached forms must be completed and submitted intact.
Solicitation No. 12034320R0015 HELP PREVENT FOREST FIRES
IMPORTANT - NOTICE TO OFFEROR
1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.
2. Note: An offer guarantee (Bid Bond) IS NOT REQUIRED. If applicable, Performance and Payment Bonds will be required as necessary based upon the collective award price and any options awarded during the life of the contract. (See Section I, FAR Clause 52.228-15.)
NOTE: Please EMAIL all proposals to Jeff Gardner at jeffrey.gardner@usda.gov rather than mailing hard copy proposals if possible. If it is not possible to email your proposal, please contact Jeff Gardner by email or phone at 406-329-3779 to ensure that mailed proposals are received and properly accounted for.
FS-6300-45 (11/79)
Issuing Office:
USDA – Forest Service Region 1, Acquisition Management 24 Fort Missoula Road Missoula, MT 59803
Offers Are Solicited For:
Hyalite Canyon Slope Stabilization Project
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
USDA FOREST SERVICE
R1 REGIONAL OFFICE
26 FORT MISSOULA ROAD
MISSOULA MT 59804
USDA Forest Service, Region 1
Acquisition Management 24 Fort Missoula Road Missoula, MT 59803
JEFFREY GARDNER 406-329-3779
1x 07/21/2020
12034320R0015
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Hyalite Canyon Slope Stabilization Project
The purpose of this contract is to stabilize an unstable slope in Hyalite Canyon by means of dewatering and relieving excess pore water pressures in the slope. This work will accomplish this through deeply drilled horizontal drains in two different locations along the face of the slope (one midway up the slope and one at the base).
Drain lengths will range from 600 to 1000 feet and vary from 2 to 5 degrees.
Estimated Period of Performance: 10/1/2020 to 9/30/2021
NOTE: Please EMAIL all proposals to Jeff Gardner at jeffrey.gardner@usda.gov rather than mailing hard copy proposals if possible. If it is not possible to email your proposal, please contact Jeff Gardner by email or phone at 406-329-3779 to ensure that mailed proposals are received and properly accounted for.
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 365 calendar days and complete it within ________________ ________________ calendar days after receiving
08/19/2020
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
USDA FOREST SERVICE
R1 REGIONAL OFFICE
26 FORT MISSOULA ROAD
MISSOULA MT 59804
JEFFREY B. GARDNER
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
HYALITE CANYON SLOPE STABALIZATION
CUSTER GALLATIN NATIONAL FOREST
GALLATIN COUNTY, MONTANA
PART I – THE SCHEDULE
B – SUPPLIES OR SERVICES AND PRICES
B-1 SCHEDULE OF ITEMS
BASE ITEMS
PAY
ITEM
DESCRIPTION METHOD
OF
MEASURE
UNIT EST.
QTY
UNIT
PRICE
TOTAL PRICE
15101 Mobilization/Demobilization LSQ LS 1 $
15713 Soil Erosion and Sediment Control LSQ LS 1 $
63501 Temporary Traffic Control CQ DY 6* $ $
61003 Horizontal Drain Collection system LSQ LS 1 $
61001 Installation of a Minimum of Five (5) Horizontal Drains; Each Drain drilled approximately 800 Linear Feet into the slope
CQ LF 4,000* $ $
TOTAL BASE $
OPTIONAL ITEM NO. 1
PAY
ITEM
DESCRIPTION METHOD OF
MEASURE
UNIT EST.
QTY
UNIT
PRICE
TOTAL PRICE
OI1-61001
Installation of Fifteen (15) Additional Drains (each drilled approximately 800 linear feet)
CQ LF 12,000* $ $
TOTAL OPTIONAL ITEM NO. 1 $
NOTE: Installation of an additional 15 horizontal drains (each drilled approximately 800 linear feet) into the slope along the same bench of the base project. If remobilization is required to exercise Option 1, see mobilization costs identified in Base Items Line Item 15101. If additional traffic control and/or erosion control is required as part of Option 1, see traffic/erosion control costs identified in Base Items Line Item 63501/15713 respectively. If a separate drain collection system is required as part of Option 1, see drain collection costs identified in Base Items Line Item 61003.
OPTIONAL ITEM NO. 2
PAY
ITEM
DESCRIPTION METHOD OF
MEASURE
UNIT EST.
QTY
UNIT
PRICE
TOTAL PRICE
OI2-61001
Installation of Twenty (20) Additional Drains (each drilled approximately 800 linear feet)
CQ LF 16,000* $ $
Hyalite Canyon Slope Stabilization
RFP: 12034320R0015
NA
NA
NA
TOTAL OPTIONAL ITEM NO. 2 $
TOTAL BASE ITEMS, OPTIONAL ITEM NO. 1 AND OPTIONAL ITEM NO. 2 $
NOTE: Installation of an additional 20 horizontal drains (each drilled approximately 800 linear feet) into the slope along a bench at a different location from the base project. If remobilization is required to exercise Option 2, see mobilization costs identified in Base Items Line Item 15101. If additional traffic control and/or erosion control is required as part of Option 2, see traffic/erosion control costs identified in Base Items Line Item 63501/15713 respectively. If a separate drain collection system is required as part of Option 2, see drain collection costs identified in Base Items Line Item 61003.
*Schedule quantities are based on the Government’s estimated need. Actual quantities may vary based on results observed in the field after work commences (see Clause 52.211-18 Variation in Estimated Quantity).
**Designated Method of Measurement: CQ= Contract Quantity; LSQ=Lump Sum Quantity; LS=Lump Sum; DY=Day (24 hour period starting and ending at midnight)
B-2 NOTES
2.1 All items shall be priced. Round to the nearest cent (do NOT use fractions).
2.2 Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitations, either before or after the solicitation’s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.
2.3 Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under
151.01 Mobilization.
2.4 An offer guarantee (Bid Bond) IS NOT REQUIRED. If applicable, Performance and Payment Bonds will be required as necessary based upon the collective award price and any options awarded during the life of the contract. (See Section I, FAR Clause 52.228-15.)
2.5 Contract will be awarded as:
Base Items only; or Base Items + Optional Item No. 1; or Base Item + Optional Item No. 1 + Optional Item No. 2
The government may require the performance of the numbered line item, identified in the Schedule as an Optional Item, at the price stated in the Schedule. The Contracting Officer may exercise any Optional Item by written notice to the Contractor at the time of award. Performance of added items shall follow the period of performance outlined in Section C.17 of this solicitation. It is the unilateral right of the Government to exercise optional items at the price agreed upon in the contract. Optional items will be exercised contingent upon availability of funds and the best interest of the government.
2.6 Contractor must be registered in the System for Award Management (SAM) data base (reference Section I, FAR 52.204-7) at time of offer to be considered for award.
RFP: 12034320R0015
C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C-1 - PROJECT DESCRIPTION AND LOCATION
1.1 Scope of Contract. The purpose of this contract is to stabilize an unstable slope in Hyalite Canyon by means of dewatering and relieving excess pore water pressures in the slope. The landslide originally triggered in the Spring of 2007 depositing large amounts of debris on the roadway surface, which blocked traffic. The slide subsequently re-triggered every spring. Work was done in 2010 through 2012 to stabilize the site with a soil nail wall with micropiles.
Continuous monitoring of the site indicates the slope is still moving and movement has been accelerating over the last few years. It has been determined that draining the slope is the most cost effective means of stabilizing the slope. This work will be accomplished by installing extreme distance horizontal drains at two different locations along the face of the slope (one midway up the slope and one at the base). Drain lengths will range from 600 to 1000 feet and vary from 2 to 5 degrees. The work will require the installation of drain collection systems to capture and redirect flow to the adjacent creek (Hyalite Canyon Creek), an erosion control plan, and traffic control. Piezometers will be installed prior to this work to assess the performance and efficacy of the horizontal drains and to allow for future monitoring of water levels in the slope. Slope inclinometers will also be installed prior to the start of this work to log soil strata, confirm orientation of bedding plan, and to provide long term monitoring of the slope after horizontal drains are installed. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown. Erosion control will be used to protect the watershed.
Contractor shall furnish all labor, equipment, supervision, transportation, operating supplies, and incidentals.
1.2 Description of Work. The purpose of this contract is to stabilize an unstable slope in Hyalite Canyon by means of dewatering and relieving excess pore water pressures in the slope. This work will accomplish this through deeply drilled horizontal drains in two different locations along the face of the slope (one midway up the slope and one at the base). Drain lengths will range from 600 to 1000 feet and vary from 2 to 5 degrees.
The on-site soils are colluvium and decomposed bedrock. The site receives a large amount of recreation traffic and will require traffic control for the duration of the project. The Contractor shall submit a traffic control plan for approval by the Government. The Contractor shall also submit a sediment and erosion control plan to protect Hyalite Canyon creek during construction activities.
The Contractor shall submit a recommended construction sequence to the USFS for consideration prior to commencement of work. This works shall include a proposed plan for pumping water from Hyalite Canyon creek during drilling operations. A qualified USFS representative shall be onsite to inspect and evaluate progress during the work and to approve work prior to contractor proceeding to next phase of project.
1.3 Project Location. The project is located in the Bozeman Ranger District of the Custer Gallatin National Forest, approximately 6 miles southwest of Bozeman in Gallatin County, Montana at 45.560333°, -111.067703° latitude & longitude, respectively.
1.4 Price Range. Magnitude of Construction Project for the base and all options (per FAR 36.204(c)) - Between $500,000 and $1,000,000.
1.5 Pre-Bid Tour. No site visit is planned for this project, but it is highly encouraged that the contractor visit the site. For further information, please contact Teresa Morales at 406-329-3293, Regional Geotechnical Engineer for the USDA Forest Service Northern Region.
1.6 Start Work. It is estimated that work can begin on or around October 1, 2020. The contractor shall give 14 days notice prior to starting any ground disturbing activities.
1.7 Period of Performance. All work must be between October 1, 2020 and September 30, 2021. All work must be completed by September 30, 2021. See Part I, Section F, Clause 52.211-10.
1.8 Government Furnished Material. The contractor may use water from Hyalite creek for drilling operations.
C-2 GENERAL SPECIFICATIONS
2.1 Existing Utilities. The Contractor is responsible for identification and protection of all underground utilities within the project area.
2.2 Pollution and Erosion Control. During all operations under this contract, the Contractor shall exercise reasonable measures to prevent or minimize soil erosion and pollution of water and other resources. All refuse, including garbage, rubbish, and solid or liquid wastes, from the Contractor's operations, including camps, parking areas, and equipment maintenance areas shall be stored, collected, and disposed of in a sanitary and nuisance-free manner. Refuse shall be disposed of in State-approved dumps as approved by the CO.
2.3 Noxious Weed Control. In order to prevent the potential spread of noxious weeds the Contractor shall clean roadway equipment.
2.4 Submittals. The contractor will need to submit a traffic control plan, Erosion and Sediment Control Plan, and recommended construction sequence to the Government for approval no later than 7 days prior to the commencement of work.
2.5 Public use of facilities. The Traffic Control requirements are a part of Technical Specifications.
2.6 Storage and Stockpiling of Equipment and Materials. Storage and stockpiling shall take place only within areas approved by the CO.
2.7 Maintenance of Clean Worksite Conditions. Maintain the project work area in a clean and orderly condition throughout the progress of work under this contract.
C-3 - STANDARD SPECIFICATIONS
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, U.S.
Customary Units are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. Copies of these Specifications are available on the internet at http://www.wfl.fha.dot.gov/design/specs/fp14.htm
C-4 - FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS
Forest Service supplementary specifications incorporated into this solicitation and any resultant contract are included as a separate APPENDIX of this solicitation. The supplementary specifications applicable to this project are listed in Appendix A.
NOTE THAT THE SUPPLEMENTAL SPECIFICATION LIST INCLUDES THE MAJOR
SPECIFICATIONS APPLICABLE TO THIS PROJECT. OTHER SPECIFICATIONS REFERRED TO
WITHIN THESE SPECIFICATIONS (EVEN THOUGH NOT SPECIFICALLY LISTED HEREIN)
ARE ALSO FULLY APPLICABLE TO THIS REQUEST FOR PROPOSALS AND ANY RESULTANT
CONTRACT.
C-5 – DRAWINGS
The following drawings are a part of this solicitation and any resulting contract:
Sheet Number Sheet Title
G-01 Cover Sheet C-01 Site Plan
C- 6 Biobased Product Utilization
The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C.
8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.
The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).
The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.
Hydraulic Fluids Penetrating Lubricants Concrete & Asphalt Release Fluids Absorbents Diesel Fuel Additives Greases Dust Suppressants 2-Cycle Engine Oil Wood and Concrete Sealers Fertilizers Roof Coatings Water Tank Coatings Adhesive and Mastic Removers Cleaners Sorbents Floor Finish Floor Stripper Composite Panels Insulating Foam Sealers Carpet Metalworking Fluids Graffiti and Grease Removers Stain Removers Degreasers De-icers
Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.
In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.
The winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).
Concurrent with the prework meeting, the Contractor shall submit a Biobased Product Utilization Plan.
This submittal will be approved by the COR in writing. The Plan must contain and define the following elements:
• Proposed biobased construction products planned for utilization in accordance with the criteria included above. At a minimum, the Plan must identify products by brand name for each of the product types.
NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.
A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.
D - PACKAGING AND MARKING
{For this solicitation there are NO Clauses.}
E - INSPECTION AND ACCEPTANCE
52.246-12 Inspection of Construction. (AUG 1996)
F - DELIVERIES OR PERFORMANCE
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) Alternative I The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 31, 2021. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by October 1, 2020. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
Hyalite Canyon Slope Stabilization http://www.biopreferred.gov/
52.242-14 Suspension of Work. (APR 1984)
G - CONTRACT ADMINISTRATION DATA
452.215-73 Postaward Conference. (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled after the date of contract award. The conference will be held at a date and time to be determined later.
H - SPECIAL CONTRACT REQUIREMENTS
H- 1 Key Personnel
The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract.
No diversion shall be made by the Contractor without the written consent of the Contracting Officer:
Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.
H-2 Barricades, Warning Signs, and Other Devices
The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.
The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.
Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.
H-3 Weed-Free Equipment
In order to prevent the potential spread of noxious weeds into the project area, the Contractor shall be required to furnish the Contracting Officer with proof of weed-free equipment.
The following is considered proof of weed-free equipment:
The Contractor will be required to clean all construction equipment (equipment that operates off existing roads) prior to entry on the project area. This cleaning shall remove all dirt and plant parts and material that may carry noxious weed seeds into the project area. Only construction equipment inspected by the Contracting Officer will be allowed to operate within the project area.
All subsequent move-ins of construction equipment shall be treated the same as the initial move-in.
Prior to initial move-in of all construction equipment, and all subsequent move-ins, the Contractor shall make equipment available for inspection at an agreed location. The Contractor shall give the Forest Service at least two business day advance notification when equipment is ready for inspection.
H-4 Contractor Performance Assessment Reporting System (FEB 2011)
(a) General. This contract is subject to Federal Acquisition Regulations (FAR), Agriculture Acquisition Regulations (AGAR), and Forest Service Acquisition Regulations (FSAR) that require past performance evaluations to be completed and entered into the Contractor Performance Assessment Reporting System
(CPARS).
(b) Contact Information. At the Prework Meeting, the name and email address of the Contractor Representative will be required.
(c) Assessment. Upon completion of the work associated with the contract/delivery orders, an evaluation will be initiated by the Contracting Officer in the CPARS system and the Contractor Representative will receive an auto-email from CPARS with instructions for completion of the evaluation.
H-5 Environmental Protection
Prevention of Oil Spills.
The contractor is required to have a spill plan. The plan will contain a description of the specific hazardous materials, procedures, and spill containment that will be used, including inventory, storage, and handling.
All vehicles carrying fuel will have specific equipment and materials needed to contain or clean up any incidental spills at the project site.
All pumps and generators used in or near streams will have appropriate spill containment structures and/or absorbent pads in place during use.
When storage facilities for oil or oil products are on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or any other body of water. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer and appropriate state agencies.
Fuel and service all equipment only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Meet all applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.
Contractor shall ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120). Notify the Forest Service of all hazardous material that may be brought onto the National Forest.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. The contractor must clean up spills or leaks in a manner that complies with Federal, state, and local laws and regulations and to the satisfaction of the CO. Any spills resulting in a detectable sheen on water shall be reported to the EPA National Response Center (1-800-424-8802). Any spills over 25 gallons will be reported to the Montana Department of Environmental Quality and cleanup will be initiated within 24 hours of the spill. When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
Equipment, Fuel/Oil Leakage
All equipment used for instream work will be cleaned of external oil, grease, dirt and mud; and leaks repaired; prior to arriving at the project site. All equipment will be inspected by the Contracting Officer’s Representative before unloading at site. Any leaks or accumulations of grease will be corrected before entering streams or areas that drain directly to streams or wetlands.
Equipment used for in-stream or riparian work (including chainsaws and other hand power tools) will be fueled and serviced in an area approved by the CO. When not in use, vehicles will be stored in the designated staging area. The staging area should be in an area that will not deliver fuel, oil, etc. to streams.
Contractor is required to have a Spill Kit or equivalent that contains oil-absorbing floating booms, and other equipment such as pads and absorbent “peanuts” appropriate for the size of the stream, available on-site during all phases of construction. For small streams with few pools or slack water, booms may not be effective. Use pads and straw bales to anchor booms if necessary. Booms will be placed in a location that facilitates an immediate response to potential petroleum leakage.
H-6 Loss, Damage, or Destruction
(a) Equipment furnished with operator. The Government shall not be liable for loss, damage, or destruction of equipment furnished under this contract except for such loss, damage, or destruction resulting from the negligent or wrongful act(s) of Government employee(s) while acting within the scope of their employment.
All claims arising under this clause will be submitted to the Contracting Officer.
H- 7 Local Material Sources
(a) Designated Sources--Sources of local materials will be designated on the drawings. The Government assumes responsibility for the quality and quantity of material in the source. The Contractor shall determine the equipment and work required to produce the specified product.
The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.
When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.
Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.
(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.
H- 8 Landscape Preservation
(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.
H- 9 Incidental Payment Items
The intent of the contract is to provide for the complete construction of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.
H- 10 Conformity with Drawings and Specifications
Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
FAR 52.236-4 Physical Data (APR 1984)
Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the plans and in the specifications are the result of site investigations by Forest Service specialists making physical determination based on surface observations.
(b) Weather Conditions. Normal snow conditions indicate a work season from approximately August 1, 2020 to October 30, 2020.
(c) Transportation Facilities. The project is located on FS Road 62 in the Bozman Ranger District of the Custer Gallatin National Forests, approximately 6 miles southwest of Bozeman in Gallatin County, Montana.
(d) Material Sources. N/A
452.236-72 Use of Premises. (NOV 1996)
(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.
(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.
AGAR 452.236-77 Emergency Response (NOV 1996)
(a) Contractor’s Responsibility for Fire Fighting.
(1) The Contractor, under the provisions of FAR clause 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work.
(2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor’s agents or employees.
(b) Contractor’s Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor’s Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the Changes Clause, FAR 52.243-4.
PART II – CONTRACT CLAUSES
I - CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://acquisition.gov/
52.202-1 Definitions. (NOV 2013) 52.203-3 Gratuities. (APR 1984) 52.203-5 Covenant Against Contingent Fees. (MAY 2014) 52.203-6 Restrictions on Subcontractor Sales to the Government. (SEPT 2006) 52.203-7 Anti-Kickback Procedures. (MAY 2014) 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014) 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014) 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010) 52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights. (APR 2014) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
(JAN 2017)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper. (MAY 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (OCT 2018) 52.204-13 System for Award Management Maintenance. (OCT 2018) 52.204-14 Service Contract Reporting Requirements (OCT 2016) 52.204-18 Commercial and Government Entity Code Maintenance. (JUL 2016) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (AUG 2019) 52.209-6 Protecting the Governments Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015) 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (OCT 2018) 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (NOV 2015) 52.211-18 Variation in Estimated Quantity (Apr 1984) 52.215-2 Audit and Records-Negotiation. (OCT 2010) 52.215-8 Order of Precedence-Uniform Contract Format. (OCT 1997) 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-8 Utilization of Small Business Concerns. (OCT 2018) 52.219-14 Limitations on Subcontracting. (JAN 2017) 52.219-28 Post Award Small Business Program Rerepresentation. (JUL 2013) 52.222-3 Convict Labor. (JUN 2003) 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation. (MAY 2018) 52.222-6 Construction Wage Rate Requirements. (AUG 2018) 52.222-7 Withholding of Funds. (MAY 2014) 52.222-8 Payrolls and Basic Records. (AUG 2018) 52.222-9 Apprentices and Trainees. (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements. (FEB 1988) 52.222-11 Subcontracts (Labor Standards). (MAY 2014)
Hyalite Canyon Slope Stabilization https://acquisition.gov/
52.222-12 Contract Termination - Debarment. (MAY 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
(MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988) 52.222-15 Certification of Eligibility. (MAY 2014) 52.222-21 Prohibition of Segregated Facilities. (APR 2015) 52.222-26 Equal Opportunity. (SEP 2016) 52.222-27 Affirmative Action Compliance Requirement for Construction. (APR 2015) 52.222-35 Equal Opportunity for Veterans (OCT 2015) 52.222-37 Employment Reports on Veterans (FEB 2016) 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) 52.222-50 Combating Trafficking in Persons. (JAN 2019) 52.222-54 Employment Eligibility Verification (OCT 2015) 52.222-55 Minimum Wages Under Executive Order 13658. (DEC 2015) 52.222-62 Paid Sick Leave Under Executive Order 13706. (JAN 2017) 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts. (SEP 2013) 52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011) 52.223-6 Drug-Free Workplace. (MAY 2001) 52.223-15 Energy Efficiency in Energy-Consuming Products (DEC 2007) 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts (AUG 2018) 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving. (AUG 2011) 52.223-21 Foams (JUN 2016) 52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008) 52.227-1 Authorization and Consent (DEC 2007) 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (DEC 2007) 52.227-4 Patent Indemnity--Construction Contracts (DEC 2007) 52.228-2 Additional Bond Security. (OCT 1997) 52.228-5 Insurance-Work on a Government Installation. (JAN 1997) 52.228-11 Pledges of Assets. (AUG 2018) 52.228-12 Prospective Subcontractor Requests for Bonds. (MAY 2014) 52.228-14 Irrevocable Letter of Credit (NOV 2014) 52.228-15 Performance and Payment Bonds – Construction (OCT 2010) 52.229-3 Federal, State, and Local Taxes. (FEB 2013) 52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014) 52.232-17 Interest. (MAY 2014) 52.232-23 Assignment of Claims. (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts. (JAN 2017) 52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018) 52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013) 52.233-1 Disputes. (MAY 2014) Alternate I (DEC 1991) 52.233-3 Protest after Award. (AUG 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004) 52.236-2 Differing Site Conditions. (APR 1984) 52.236-5 Material and Workmanship. (APR 1984) 52.236-6 Superintendence by the Contractor. (APR 1984) 52.236-7 Permits and Responsibilities. (NOV 1991) 52.236-8 Other Contracts. (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
(APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984) 52.236-11 Use and Possession Prior to Completion. (APR 1984) 52.236-12 Cleaning Up. (APR 1984) 52.236-13 Accident Prevention. (NOV 1991) 52.236-14 Availability and Use of Utility Services. (APR 1984) 52.236-15 Schedules. (APR 1984) 52.236-17 Layout of Work. (APR 1984) 52.236-21 Specifications and Drawings for Construction. (FEB 1997) 52.236-26 Preconstruction Conference. (FEB 1995) 52.242-13 Bankruptcy. (JUL 1995) 52.243-4 Changes. (JUN 2007) 52.244-6 Subcontracts for Commercial Items. (AUG 2019) 52.246-12 Inspection of Construction. (AUG 1996) 52.246-21 Warranty of Construction. (MAR 1994) 52.249-2 Termination for Convenience of the Government (Fixed-Price). Alternative I (SEP 1996) 52.249-10 Default (Fixed-Price Construction). (APR 1984) 52.253-1 Computer Generated Forms. (JAN 1991) 452.232-70 Reimbursement for Bond Premiums – Fixed Price Construction Contracts. (NOV 1996) 452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996) 452.236-73 Archaeological or Historic Sites. (FEB 1988) 452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996) 452.236-76 Samples and Certificates. (FEB 1988) 452.236-77 Emergency Response (NOV 1996)
52.222-36 Equal Opportunity for Workers With Disabilities. (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60.741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
52.225-9 Buy American - Construction Materials. (MAY 2014)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if-
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a
COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
NONE
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government…