This document is an amendment to RFP 1126 issued by the Idaho State Historical Society (ISHS) containing offeror questions and official agency responses regarding artifact collections packing and moving services. The project requires professional moving services to relocate historical artifact collections from two separate warehouses in Boise to a consolidated facility, with project completion required no later than December 31, 2027. The new facility is anticipated to be available for move-in on December 1, 2026. A site visit was conducted on June 9, 2026, with no additional optional facility walkthroughs permitted beyond the originally scheduled time. While offerors are welcome to submit proposed schedules as part of their proposals, the hard deadline for project completion is December 31, 2027. The RFP administrative documents have been amended to include floor plans and dimensions for the new facility (Exhibit #8) and access information for equipment (Exhibit 2, Section 3).

Key logistical and operational clarifications provided in the amendment address contractor responsibilities and available resources. No existing on-site packing materials are available for contractor use. The State-owned forklift at the Whitewater location is available for vendor use, but contractors must provide their own forklifts for the new facility and ensure equipment compatibility with specified access dimensions. The thresher (harvester) is not required for relocation under the RFP scope; however, offerors may submit optional pricing for its relocation to a yet-to-be-determined area, which will not be evaluated as part of the cost proposal. ISHS museum staff will maintain high-level involvement during packing and unloading phases.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offeror Questions with Agency Responses

RFP Number:1126
RFP Title:ISHS Artifact Collections Packing and Moving
No
RFP Section
RFP Page
Question
Response
1
Exhibit 3 Section 10
19
Facility Access: What is the anticipated date of availability for move-in at the new facility?
The anticipated date for access to the new facility is: December 1, 2026
2
Exhibit 4
20
Is it possible to get more time on the 9th for the site visit, I feel that the size of this project will need more that few hours to do a comprehensive assessment of the entire collection in both buildings .. a full day seems more in line with this sort of scope
Beyond the original site visit on June 9, 2026, there will not be any additional time allowed for an optional walk through of the facilities.
3
General
Timeline: Could you confirm the project’s hard deadline? Additionally, please clarify if the timeline is fixed or if you welcome a proposed schedule from the vendor.
While we welcome a proposed schedule from the Offerors as part of the requirements of the RFP, the project completion must be no later than December 31, 2027.
4
General
Harvester: Please clarify if the harvester is required as part of the proposal and bid scope, or if it should be listed as optional pricing. Additionally, if it is included, is there dedicated storage space for it at the new facility?
The harvester (thresher) is not a required item for relocation under the scope of this RFP. Offerors are not expected to include it in their base proposal or pricing.

However, an Offeror may submit optional pricing for the relocation of the thresher to a yet to be determined area of the new warehouse facility. Any such pricing will be treated strictly as optional and will not be evaluated as part of the RFP’s Cost Proposal.

5
General
Logistics & Site Access: Could you provide floorplans for the new facility, including detailed dimensions for the freight elevator and dock doors, to assist with our logistical planning?
The RFP Administrative Document has been amended with the addition of floor plans and dimensions in Exhibit #8
6
General
On-site Materials: Is existing on-site packing material available for use by the selected vendor? If so, could you provide an inventory estimate?
No existing packing material is available for use by the Contractor.
7
General
Staff Involvement: What is the expected level of involvement from the collections staff during the project phases?
The ISHS museum staff will have a high level of involvement during packing and unloading.
8
General
Site Equipment: Will a forklift be available on-site for vendor use, or should we factor the rental of such equipment in our proposal?
The RFP Administrative Document has been amended in Exhibit 2, Section 4 to allow the use of the State Owned forklift at the Whitewater location. It is expected that the Contractor will provide the proper forklift(s) needed for use at the new facility and consider the access dimensions shown in Exhibit 2, Section 3 when selecting equipment.