Offeror Questions with Agency Responses
| RFP Number: | | 1126 |
| RFP Title: | ISHS Artifact Collections Packing and Moving | |
| No |
| RFP Section |
| RFP Page |
| Question |
| Response |
| 1 |
| Exhibit 3 Section 10 |
| 19 |
| Facility Access: What is the anticipated date of availability for move-in at the new facility? |
| The anticipated date for access to the new facility is: December 1, 2026 |
| 2 |
| Exhibit 4 |
| 20 |
| Is it possible to get more time on the 9th for the site visit, I feel that the size of this project will need more that few hours to do a comprehensive assessment of the entire collection in both buildings .. a full day seems more in line with this sort of scope |
| Beyond the original site visit on June 9, 2026, there will not be any additional time allowed for an optional walk through of the facilities. |
| Timeline: Could you confirm the project’s hard deadline? Additionally, please clarify if the timeline is fixed or if you welcome a proposed schedule from the vendor. |
| While we welcome a proposed schedule from the Offerors as part of the requirements of the RFP, the project completion must be no later than December 31, 2027. |
| Harvester: Please clarify if the harvester is required as part of the proposal and bid scope, or if it should be listed as optional pricing. Additionally, if it is included, is there dedicated storage space for it at the new facility? |
| The harvester (thresher) is not a required item for relocation under the scope of this RFP. Offerors are not expected to include it in their base proposal or pricing. |
However, an Offeror may submit optional pricing for the relocation of the thresher to a yet to be determined area of the new warehouse facility. Any such pricing will be treated strictly as optional and will not be evaluated as part of the RFP’s Cost Proposal.
| Logistics & Site Access: Could you provide floorplans for the new facility, including detailed dimensions for the freight elevator and dock doors, to assist with our logistical planning? |
| The RFP Administrative Document has been amended with the addition of floor plans and dimensions in Exhibit #8 |
| On-site Materials: Is existing on-site packing material available for use by the selected vendor? If so, could you provide an inventory estimate? |
| No existing packing material is available for use by the Contractor. |
| Staff Involvement: What is the expected level of involvement from the collections staff during the project phases? |
| The ISHS museum staff will have a high level of involvement during packing and unloading. |
| Site Equipment: Will a forklift be available on-site for vendor use, or should we factor the rental of such equipment in our proposal? |
| The RFP Administrative Document has been amended in Exhibit 2, Section 4 to allow the use of the State Owned forklift at the Whitewater location. It is expected that the Contractor will provide the proper forklift(s) needed for use at the new facility and consider the access dimensions shown in Exhibit 2, Section 3 when selecting equipment. |