About this file
This Request for Proposal (RFP) Amendment One issued by the State of Idaho Division of Purchasing on behalf of the Idaho State Historical Society (ISHS) solicits qualified firms to pack, crate, care for, and move approximately 50,000 historical artifact objects from two separate warehouses located at 805 and 877 North Whitewater Park Boulevard in Boise, Idaho to a consolidated new 50,000-square-foot facility at the Idaho History Center on Old Penitentiary Road in Boise. The project scope includes complete packing, packaging, transportation, delivery, unpacking, and proper storage of the artifact collections, with some items requiring specialized crating, cribbing, and rigging. The non-mandatory site visit is scheduled for June 9, 2026 at 2:00 p.m. MT, the pre-proposal meeting for June 12, 2026 at 11:00 a.m. MT, the question deadline for 10:30 a.m. MT the business day following the closing date, and the proposal closing date for July 8, 2026. Interviews are tentatively scheduled for the week of July 13–27, 2026, with an anticipated award date during the week of August 3–17, 2026. The contract is anticipated to start August 15, 2026 for an initial one-year term, with an option for one additional one-year renewal for a total anticipated contract term of two years.
The State has established a budgetary constraint of approximately $700,000 with no allowance for budget or time overruns. Payments follow a milestone-based schedule: 5% upon Relocation Plan approval, 25% upon completion of 25% of artifacts, 35% upon completion of 50% of remaining artifacts, and 35% upon final project completion and ISHS written acceptance. Evaluation criteria total 1,200 points and include mandatory submission requirements (pass/fail), Submittal A Background, Declarations, and Certifications (pass/fail), Submittal B Part One Qualifications and Experience (250 points), Submittal B Part Two Approach (250 points), Submittal B Part Three Obstacles, Challenges, and Risks (150 points), Submittal C Pricing Schedule (350 points), and Key Personnel Interview (200 points). Offerors must affirm a minimum of five years' experience in the packaging and moving industry and experience with specialized heritage pieces or irreplaceable items and collections. The contract budget is funded by Idaho legislature-appropriated funds.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF IDAHO
DIVISION OF PURCHASING
FOR
THE IDAHO STATE HISTORICAL SOCIETY
Request For Proposal
Artifact Collections & Active Records Pack and Moving
RFP Number: 1126 Amendment One (1)
Table of Contents
| RFP Section 1 - Administrative Information & Overview |
| Page 3 |
| RFP Section 2 - Format & Submission Requirements |
| Page 5 |
| RFP Section 3 - Proposal Contents |
| Page 8 |
| RFP Section 4 - Evaluation & Award Procedures |
| Page 10 |
| Exhibit 1 - Background Information |
| Page 13 |
| Exhibit 2 - General Requirements |
| Page 14 |
| Exhibit 3 - Scope of Work (SOW) |
| Page 17 |
| Exhibit 4 - On-Site Visit Registration Form |
| Page 21 |
| Exhibit 5 - Questions |
| Page 22 |
| Exhibit 6 - Contract Modifications and Exceptions |
| Page 24 |
| Exhibit 7 - Collections Access Policy |
| Page 28 |
| Exhibit 8 – New Facility Floor Plans |
| Page 29 |
| Submittal Form A - Background, Declarations, and Certifications |
| Page 30 |
| Submittal Form B - Technical Proposal |
| Page 33 |
| Submittal Form C - Cost Proposal |
| Page 36 |
Section 1 Administrative Information and Overview
1.1 Purpose
The State of Idaho’s (“State”) Division of Purchasing (“DOP”), on behalf of the Idaho State Historical Society (“ISHS”) is issuing this Request For Proposal (“RFP”) to solicit Proposals from qualified and experienced firms (“Offerors”), that can pack, crate, care for, and move artifact collections from two (2) separate warehouses in Boise, Idaho to one consolidated new facility in Boise, Idaho. Background information is provided in Exhibit 1. The complete scope of work is provided in Exhibit 3.
1.2 Procurement Schedule
Non-Mandatory Site Visit:
Pre-Proposal Meeting:
Pre-Proposal Meeting LINK:
Deadline to submit questions:
Closing Date (deadline to submit Proposal):
Public Opening Date:
Interviews:
Anticipated Award Date:
The State will make every effort to adhere to the schedule below, but reserves the right, at its sole discretion, to adjust the schedule.
Tuesday, June 9, 2026 at 2:00 pm MT Friday, June 12, 2026 at 11:00 am MT TEAMS link: Pre-Proposal Conference See IPRO Event Page See IPRO Event Page 10:30 am MT the following business day after closing Tentatively Week of July 13 27, 2026 Week of August 3 17, 2026
1.3 RFP Lead
Name Title & Agency Email The individual listed below (referred to as “RFP Lead”) is responsible for the conduct of this procurement. From the issue date of this RFP, until a contract is awarded, or the RFP is cancelled, Offerors are prohibited from communicating with any State employee, Official, or Evaluators regarding this RFP or procurement.
Mack DeYoung Buyer, Division of Purchasing Mack.DeYoung@adm.Idaho.gov
| 1.4 Non-Mandatory Site Visit |
| A non-mandatory site visit will be held on 6/9/2026 at 2:00 pm MT. While attendance is highly encouraged, it is not mandatory. To obtain additional information regarding this site visit, Offerors must complete and submit Exhibit 4, which informs the State of your planned interest and attendance. |
1.5 Public Bid Opening
Link:
A public bid opening will be held at 11:30 am MT on the next business day following the closing date. The bid opening will be conducted virtually, with the access link provided below.
Public Bid Opening Link
| 1.6 IPRO eProcurement System |
| This Solicitation is issued by the State via the State’s eProcurement system, IPRO. It is the Offeror’s responsibility to monitor IPRO for any updates or amendments. |
| 1.7 Initial Term of Contract and Renewals |
| The anticipated start date of this contract is August 15, 2026 with the contract term for one (1) year. Upon mutual, written agreement, the Contract may be renewed, extended or amended for an additional one (1) years. The anticipated total Contract term is two (2) years. |
1.8 Questions
The Offeror must review this entire RFP solicitation, including associated documents. All questions, requests for clarification, or other correspondence must be submitted in writing via email to the RFP Lead. See Exhibit 5 for additional instructions. Questions must be submitted using the table provided within Exhibit 5.
1.9 Modifications and Exceptions to Requirements, Terms, and Conditions The Offeror must review the Contract requirements, terms, and conditions. The Offeror is strongly encouraged to submit any proposed modifications, or exceptions to the Contract requirements, terms, or conditions to the RFP Lead prior to the deadline for submitting questions. See Exhibit 6 for additional instructions. Modifications and exceptions must be submitted using the table provided within Exhibit 6. The Contract requirements, terms, and conditions are provided in the Attachments tab in IPRO as stated in Exhibit 7.
Any modifications or exceptions that are brought up after the Proposal has been submitted may be rejected by the State. Therefore, the Offeror is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period. Proposals which condition the Proposal based upon the State accepting other terms and conditions not found in the RFP, may be found non-responsive, and no further consideration of the Proposal may be given.
1.10 Amendments
The State may issue amendments to make changes to the RFP, or to respond to any questions. Amendments will be posted on IPRO. Offerors are responsible for monitoring IPRO for updates and amendments. All published amendments must become part of this RFP, and must be considered by the Offeror in its Proposal. Oral interpretations or clarifications of this RFP are not binding and should not be relied upon. Any verbal responses provided by the State during the pre-proposal conference are considered unofficial, and will not be binding.
1.11 Authority
This procurement is conducted in accordance with IDAPA 38.05.01 and pursuant to Title 67, Chapter 92 of the Idaho Code.
Section 2 Format & Submission Requirements
2.1 Adherence to Requirements
The Proposal must be submitted in accordance with the requirements set forth in this document. Any Proposal that does not adhere to the requirements may be deemed non-responsive and rejected. The State reserves the right, in its sole discretion, to overlook any minor informalities that may be non-compliant.
2.2 Deadline to Submit
All Proposals are due at the date and time specified in the Procurement Schedule (Section 1.2). Late Proposals must not be accepted or considered. The State will not be responsible for any technical issues, difficulties, or delays. Offerors are strongly encouraged to begin the process of submitting the Proposal response far enough in advance of the Closing Date/Time to allow for resolution of any technical difficulties.
2.3 Submittal Form Templates
The Offeror must ensure that their response meets all requirements detailed within this RFP. This RFP contains Submittal Forms, which must be used by the Offeror to submit their Proposal. Offerors must not re-create these Submittal Forms, create their own Submittal Forms, or edit the format structure of the Submittal Forms. An electronic copy of each Submittal Form is posted along with this RFP. The Offeror must download, complete, and submit each Submittal Form in their response.
2.4 General Format Requirements
The Proposal response must meet the following requirements:
| 2.4.1 | The Offeror must not embed information, embed files, or embed any links within the Submittals; |
| 2.4.2 | The Offeror must not attach additional information to any Submittal Form (unless it has been explicitly requested). Any additional attachments submitted will not be considered in the evaluation process, and; |
| 2.4.3 | Cost information must only be contained within the Pricing Schedule Submittal Form. No other document or Submittal Form may contain cost or pricing information. |
2.5 Page Limits
The Submittal Forms have maximum page limit requirements, as shown in the table below. The Offeror must ensure that their Proposal meets these page limit requirements. Offerors must not exceed the maximum page limits. Please note that the page limit applies exclusively to the front side of a page only (i.e. a ‘1 Page’ implies that the Offeror can only provide a response on one side of a piece of paper). Any Submittal Form that does not follow these instructions may receive a ‘0’ score for the evaluated Submittal Form, or the additional text will be removed or redacted before being provided to evaluators; only the text within the page limit will be evaluated.
| Submittal Form |
| Maximum Page Limits |
| Submittal A |
| Background, Declarations, & Certifications |
| N/A |
| Submittal B |
| Qualifications & Experience |
| 6-Pages |
| Approach |
| 10-Pages |
| Obstacles, Challenges, & Risks |
| 6-Pages |
| Submittal C |
| Pricing Schedule |
| N/A |
2.6 Electronic Submission Instructions
The Offeror must submit the Proposal as follows:
2.6.1 The Proposal must be submitted electronically through IPRO powered by LUMA. The State will not accept Proposals in any other manner (i.e. facsimile, email, or hardcopy submissions). All Offerors participating in this Solicitation must establish an account in the IPRO system, as it is necessary in order to process and/or award the resulting Contract(s). Establishing an account is free.
Link: Luma IPRO Supplier Portal Registration link
Please make sure that the entity profile under which the Proposal is submitted in IPRO, is the same legal entity presented in the uploaded response materials. If there are any discrepancies, the entity information provided within Submittal Form A prevails.
The Proposal must be submitted in the following packages:
| Pkg No |
| Contents |
| File Format |
| How To Name The Files |
| 1 |
| Submittal Form A |
| MS Word |
| 1 <Insert Offeror Name> |
| 2 |
| Submittal Form B |
| MS Word |
| 2 <Insert Offeror Name> |
| 3 |
| Submittal Form C |
| MS Word |
| 3 <Insert Offeror Name> |
| 4* |
| Redacted Submittal Forms* |
| 4 <Insert Offeror Name> REDACTED |
* If applicable. Applies to Proposals with trade secrets as discussed below.
2.6.2 Package 2 may include a cover page and a table of contents.
2.6.3 All electronic files must be in Adobe PDF, Microsoft Word, or Microsoft Excel format as noted in the table above.
2.6.4 The Proposal file(s) must not be password protected or locked in any way.
2.6.5 All submission materials must be submitted at the same time. If multiple submissions are received, only the latest timely submission will be considered.
2.6.6 Alternate Proposals are not allowed.
2.6.7 Note: When submitting through IPRO, enter your Cost in IPRO as “$0.01,”
2.6.8 Package 4: If your Proposal contains trade secrets (see next Section), submit an additional redacted version. This should be labeled as Package 4 and include 'Redacted' in the file name.
2.7 Trade Secrets and Non-Public Information
The Idaho Public Records Act, Idaho Code title 74, chapter 1 (the “Act”) defines trade secrets to “include a formula, pattern, compilation, program, computer program, device, method, technique or process that derives economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by other persons and is subject to the efforts that are reasonable under the circumstances to maintain its secrecy.” The Act also defines other records that may be exempt from public disclosure.
In addition to marking each page of the document with a trade secret or other exemption notation (as applicable; and as provided in Paragraph 28 of the Solicitation Instructions to Vendors), Offerors must also:
2.7.1 Identify with particularity the precise text, illustration, or other information contained within each page marked “trade secret” or “exempt from disclosure” (it is not sufficient to simply mark the entire page). The specific information you deem “trade secret” or “exempt” within each noted page must be highlighted, italicized, identified by asterisks, contained within a text border, or otherwise clearly delineated from other text/information and specifically identified as a “trade secret” or “exempt from disclosure.”
2.7.2 Provide a separate document entitled “List of Redacted Trade Secret and Exempt Information” which provides a succinct list of all trade secret and exempt information noted in your Proposal; listed in the order it appears in your submittal documents, identified by Page #, Section #/Paragraph #, Title of Section/Paragraph, specific portions of text/illustrations; or in a manner otherwise sufficient to allow the State’s procurement personnel to determine the precise text/material subject to the notation. Additionally, this list must identify with each notation the specific basis for your position that the material be treated as exempt from disclosure and how the exempting the material complies with the Act.
2.7.3 Submit a redacted copy of any Proposal response document (e.g. Scope of Work Response) with all trade secret and exempt information removed or blacked out. The redacted copy must be submitted electronically in the Supplier Attachments section of IPRO, with the word “redacted” in the file name.
Section 3 Proposal Contents
3.1 Background, Declarations, and Certifications (Submittal Form A) The Offeror must complete and submit all information requested in this Submittal Form. An Offerors failure to complete and submit Submittal Form A may be found non-responsive and given no further consideration.
3.2 Technical Proposal (Submittal Form B)
The Offeror must complete and submit all information requested in Submittal Form B. An Offerors failure to complete and submit Submittal Form B may be found non-responsive and given no further consideration. The Technical Proposal consists of three (3) parts, as described below:
3.2.1 Qualifications and Experience: The Offeror should summarize their experience and qualifications as it relates to the scope of work being requested in this RFP. The Offeror should also outline the experience and qualification of the key personnel that will be assigned to this Contract. The Offeror should highlight any unique attributes that make the team especially qualified for the scope of services. Resumes are not required, and should not be provided.
3.2.2 Approach: For this section, the Offeror must address each of the following eight (8) components. These components represent the minimum content that will be required in the Contractor’s Relocation Plan (mandatory after award). The Offeror’s proposal must describe how these requirements will be met.
3.2.2.1 Identify the equipment, vehicles, trucks, trailers, and related resources the Offeror anticipates using for the relocation, including distinctions between the transporting equipment used for boxed items versus large, unboxed items.
3.2.2.2 Describe the Offeror’s loading and unloading procedures, including methods, sequencing, and handling practices for different categories of items.
3.2.2.3 Explain the Offeror’s approach to this work during inclement weather, including contingency plans, and risk‑mitigation strategies.
3.2.2.4 Describe how the Offeror will collaborate with ISHS to ensure that all equipment, packing techniques, and handling procedures for artifacts meet accepted museum‑industry standards and best practices.
3.2.2.5 Detail the labeling, tracking, and accountability processes the Offeror will use for items as they are packed, transported, and unloaded.
3.2.2.6 Explain how all labeling, tracking, and inventory information will be transferred to ISHS.
3.2.2.7 Provide a personnel plan for the relocation, including staffing structure, roles, and responsibilities.
3.2.2.8 The Offeror must state whether staffing levels and assigned personnel will remain consistent for the duration of the contract, and describe how continuity will be maintained if changes become necessary.
3.2.3 Obstacles, Challenges, & Risks: The Offeror should identify and address issues, concerns, challenges, obstacles, or risks that may impact the successful delivery of this project or service. This includes areas that may cause the project to not be completed on time, not finished within budget, generate any change orders, or may be a source of dissatisfaction for the Agency. The Offeror should rely on and use their past experience and knowledge of completing similar projects to identify these potential risks, issues, or challenges.
Each item should be described in non-technical terms and should contain enough information to describe to a reader why the item is a valid risk/concern. The Offeror should also explain how it will avoid or minimize the risks from occurring. The Offeror should consider:
3.2.3.1 Controllable Items: This includes risks, activities, or tasks that are controllable by the Offeror, or by entities/individuals that are contracted to by the Offeror. This includes things that are part of the technical scope of what the Offeror is being hired to do. This may also include risks that have already been minimized before the project begins due to the Offeror’s expertise (i.e. risks that are no longer risks due to the Offeror’s expertise in delivering this type of project). All controllable risks and strategies to mitigate them MUST be included in the Offeror’s base Proposal cost and schedule (if there are any impacts at all).
3.2.3.2 Non-Controllable Items: This includes risks, activities, or tasks that are not controllable by the Offeror. This may include risks, issues, challenges, or obstacles attributed by the Agency, Agency personnel, parties hired by Agency, risks that are caused by other agencies, or completely uncontrollable risks. These can also be areas/risks that can contribute to contingency. Although these risks may not be controlled by the Offeror, the Offeror should identify a strategy that can be followed or used to mitigate these risks. All non-controllable risks and strategies to mitigate them must not be included in the Offeror’s base Proposal cost or schedule.
Provide a brief description of each item (background of how the concern/issue may impact the project or service if it occurs), and a strategy to prevent/minimize the issue/concern from occurring, or strategy to minimize the impact of the risk if it does occur.
3.3 Cost Proposal (Submittal Form C)
The Offeror must complete and submit all information requested in Submittal Form C. The Offeror is not permitted to adjust or modify this form, and may not include additional rates, amounts, costs, information, exceptions, or limitations to their cost proposal. An Offeror’s failure to meet these requirements may be found non-responsive and given no further consideration.
Section 4 Evaluation & Award Procedures
4.1 Mandatory Submission Requirements
All Proposals will be reviewed on a "pass" or "fail" basis to ensure compliance with all mandatory submission requirements. Proposals determined by the State, at its sole discretion, to be responsive in this regard will proceed to the evaluation process outlined in this Section. Proposals that do not meet the mandatory submission requirements may be deemed non-responsive. Mandatory submission requirements include, but are not limited to, the following:
| 4.1.1 | The Proposal was submitted prior to the specified Closing Date and Time. | |
| 4.1.2 | The Proposal complies with the submission instructions detailed in Section 2.6. | |
| 4.1.3 | The Proposal includes a fully completed and signed Submittal Form A. | |
| 4.1.4 | The Proposal includes all required Submittal Forms listed in Section 3. |
4.2 Evaluation Criteria
The objective of the State in soliciting and evaluating Proposals is to ensure the selection of a firm or individual that will produce the best possible results for the funds expended. Responsive Proposals will be evaluated as described in the table below.
| Criteria |
| Weight |
| Mandatory Submission Requirements |
| Pass/Fail |
| Submittal A - Background, Declarations, & Certifications |
| Pass/Fail |
| Submittal B – Part One, Qualifications & Experience |
| 250 |
| Submittal B – Part Two, Approach |
| 250 |
| Submittal B – Part Three, Obstacles, Challenges, & Risks |
| 150 |
| Submittal C - Pricing Schedule |
| 350 |
| Key Personnel Interview |
| 200 |
| Total Points: |
| 1,200 |
4.3 Evaluation Committee
The Technical Proposal will be evaluated and scored utilizing one (1) or more Technical Proposal Evaluation Committee(s). The scores for the Technical Proposal will be normalized as described in Section 4.4.
4.4 Calculations
The following approach will be used to normalize and calculate scores:
Written Proposal Calculations For each document that is evaluated and scored by the evaluation committee, the RFP Lead will:
4.4.1 Average evaluator scores for each Proposal.
4.4.2 Identify the highest raw average score among all Proposals.
4.4.3 Assign normalized points as follows:
4.4.3.1 The Proposal with the highest raw score will receive the maximum available points for Submittal B.
4.4.3.2 All other Proposals will receive a proportional share of the available points using the formula:
650 X Raw Score of Submittal B Being Evaluated Highest Raw Submittal Form B Score
Interviews, and Presentations The RFP Lead will average all evaluator scores for each Interview, Presentation, or Demonstration element. The averaged score will then be normalized as follows:
4.4.4 The Offeror receiving the highest raw average score for an element will be awarded the maximum available points for that element.
4.4.5 All remaining Offerors will receive a proportional share of the available points using the following formula:
200 X Raw Score of Interviews, Presentations, Being Evaluated Highest Raw Interviews, Presentations Score
Cost Calculations Points for the Cost Proposal will be normalized as follows:
4.4.6 The Proposal with the lowest total evaluated cost will receive the maximum available points.
4.4.7 All remaining Proposals will receive a proportional share of the available points using the following formula:
350 X Lowest Overall Total Cost Overall Total Cost Being Evaluated
4.5 Candidate Selection
The RFP Lead may select Offerors to be invited to participate in presentations, interviews, and demonstrations. The State intends to only open Cost Proposals for the selected Offerors.
4.6 Key Personnel Interviews
The shortlisted Offerors may be asked to participate in key personnel interviews, which will be scored by an evaluation committee.
The Offeror is responsible for assigning key personnel (individuals) to this Contract. These individuals must be assigned to this role for the duration of the contract and must not be permitted to be removed or replaced during the first twelve (12) months of this Contract, unless requested and approved by the State (with the exception of uncontrollable events such as: retirement, medical emergency/injury/sickness, or resignation). Any changes made after the first twelve months must be approved by the State.
The following key personnel may be interviewed (a single individual is allowed to perform both positions):
| 4.7.1 | Project Manager: Individual that will serve as the daily point of contact for this contract and responsible for managing this overall effort. |
| 4.7.2 | Project Supervisor: Individual responsible for managing the Contractor’s work site during all working hours. |
Interviews are expected to last approximately 30 minutes per individual. The State will interview individuals separately (not as a team). Interviewees may be asked questions regarding their experience, knowledge and understanding of the scope of work, obstacles and challenges, strategies, and their plan/approach.
The State anticipates that the interviews will be performed in-person. No other individuals from the Offeror’s organization can attend, participate, or observe the interview. Interviewees may not bring notes or handouts. Interviewees will be prohibited from making any reference to their submitted cost or fee Proposal. No substitutes or proxies will be allowed. Individuals who fail to attend the interview will be given a “1” score, which may jeopardize the Offerors competitiveness.
4.7 Clarification Discussions
The RFP Lead may, in the State’s sole discretion, perform clarification discussions with the Offeror(s) to verify and validate that the Proposal will meet the needs of the Agency. At any time during this period, if it is discovered that the Offeror has not met a mandatory requirement, or has failed to adequately respond to an item below, the State may find the Offeror non-responsive, and disqualify the Proposal.
4.8.1 The Offeror may be required to provide documentation to demonstrate its responsibility. Failure to provide the requested documentation may result in the Offeror being deemed non-responsible. IDAPA 38.05.01.81
The clarification discussion cannot materially alter the Proposal. The State does not expect to negotiate any terms or conditions requested by the Offeror, unless they were submitted by the Offeror prior to the deadline for submitting questions (see Section 1.2), or they provide the State an opportunity to secure more advantageous terms or pricing.
4.8 Best-And-Final-Offer (BAFO)
The RFP Lead, in the State’s sole discretion, may conduct discussions and negotiations with multiple Offerors. The RFP Lead may request that these Offerors provide a Best-And-Final-Offer (BAFO) cost proposal. The State reserves the right to conduct one (1) or more rounds of a BAFO with these Offerors. The revised BAFO cost proposals, along with the additional evaluation criteria and weighting outlined in Section 4.2, will be utilized to prioritize and rank the Offerors. If the State anticipates the possibility of awarding multiple contracts from this RFP, the State may engage in concurrent negotiations with apparently successful Offerors as deemed appropriate.
4.9 Award
Award of Contract will be made to the responsive, responsible Offeror whose Proposal receives the highest number of total normalized points.
4.10 Resulting Contract
If the State awards Contract(s) from this solicitation, it will do so by issuing Contract Purchase Order (CPO) document(s) from Luma, the State’s ERP system. The State anticipates issuing a single contract document for each awarded Contractor, incorporating the Terms and Conditions, Scope of Work, Appendices, and some or all of the Offeror’s Technical Proposal; however, the State reserves the right to determine the form of the resulting Contract(s). At its option, the State may memorialize the agreement between the State and each Contractor in one (1) or more final Contract documents.
Important Note: Any modifications or exceptions to the Contract may be rejected by the State. Therefore, the Offeror is strongly encouraged to submit any proposed modifications or exceptions during the Q&A period.
EXHIBIT 1
Background Information
1. About The Agency The Idaho State Historical Society (ISHS or AGENCY) is a system of cultural and historic resources comprised of the Idaho State Museum, Idaho State Archives, State Historic Preservation Office, and Historic Sites Program. The ISHS agency was established by statute in 1907. The ISHS is organized within the Department of Self-Governing Agencies and is overseen by a board of trustees appointed by the Governor.
2. Background Information The State of Idaho is creating a fifty thousand (50,000) square foot addition to the consolidated collections and archives facility at the Idaho History Center located at 2205 Old Penitentiary Road in Boise. The purpose of this initiative is to unite state-owned historic artifacts and Capitol artifacts from two off-site warehouse facilities located at 805 & 877 North Whitewater Park Boulevard, Boise, to the new facility. The outcomes of this project include collections management efficiency, proper environmental controls, enhanced security, maintenance of museum accreditation, and ensuring the State is fulfilling its stewardship responsibilities for its collections. The building will be outfitted with an integrated compact mobile shelving system. Further information on ISHS management of collections and dispositions may be found at the following link:
https://history.idaho.gov/wp-content/uploads/2017_2018-ISHS-Collections-Management-Policy.pdf
3. Synopsis of collections Since 1881, the ISHS has preserved the state’s historical legacy through collecting its story. The Idaho State Museum manages the State of Idaho’s three-dimensional collections, including managing private donations, cataloging, photo documentation, preservation, and facilitating incoming and outgoing loans to organizations for exhibiting artifacts throughout the state. These fifty thousand (50,000) objects chronicle the state’s history and broad categories include historic clothing and costume, agriculture, business, industry and trade, home goods, works of art, photography, military, etc. Additionally, the Capitol Building Collections include one thousand two hundred (1,200) artifacts and furniture specifically related to the history of the Capitol, with approximately fifty (50) works of art and sculptures located within the Capitol Building and on its grounds. In addition to being displayed at the Capitol Building and grounds, these collections are used for public research and for exhibition at the State Museum and the Old Penitentiary.
4. Existing Data The ISHS staff have begun the work of packaging various artifacts located in the off-site storage facility. It is anticipated that at least two-thirds (2/3) of the collection will need to be packed.
The Contractor must assist ISHS staff with the packing, boxing, palletizing and readying for transport and transporting the remainder of the collection.
5. Current Challenges The artifact packaging and transporting project timeline may be spread out due to weather events and construction timelines. Additionally, the variety of shape, size and weight of artifacts to be packaged and moved could pose significant challenges due to unique handling and transportation needs.
6. Definitions In this document, artifact(s), object(s), item(s), and collection(s) are used interchangeably to mean the artifact collection.
EXHIBIT 2
General Requirements
The following provisions establish the contractual performance requirements applicable to the resulting contract. These requirements are mandatory and will be incorporated into the contract upon award. Offerors should carefully review each provision and ensure their Offer reflects the ability to comply.
Note: In the event of a conflict between the provisions below and the State’s Standard Terms and Conditions, the Standard Terms and Conditions will govern unless a specific exception has been approved in writing by the Division of Purchasing.
1. Objectives and Expectations It is the desire of the State to partner with a qualified Contractor to perform all services necessary to safely and effectively pack, transport, unpack, and properly store an estimated fifty thousand (50,000) historical artifacts. The Contractor will be solely responsible for carrying out all required activities in a manner that ensures the security, accountability, and appropriate handling of all objects. All work must be performed in full compliance with the requirements established by the State and in accordance with the Contractor’s State‑approved Relocation Plan.
2. Budgetary Expectations The ISHS will fund this work with legislature appropriated funds of approximately seven-hundred thousand dollars ($700,000.00). This budget is constrained to the Contractor having no budget or time overruns.
3. Unique Considerations
3.1. The State’s large artifact collection is diverse in many ways, including age, material types, size and stability. Additionally, the collection is being stored in multiple locations, adding planning and logistics challenges.
3.2. The new facility’s aisle ways between artifact storage shelving will be narrower than the Whitewater Blvd location, requiring the use of a narrower than normal size forklift to aid in the movement of artifacts; and
3.2.1. Layout dimensions can be found in the floor plans attached in Exhibit 8.
3.3. Overhead and man door dimensions at the new facility are as follows (door locations are shown in Exhibit 8):
3.3.1. Overhead Door #102C is ten feet tall and ten feet wide (10’-0”H x 10’-0”W); and
3.3.2. Man Door #103A is seven feet tall and 3 feet wide (7’-0”H x 3’-0”W).
4. Use of State-Owned Forklift The State may, at its sole discretion, permit the Contractor to use the State‑owned forklift located at the Whitewater Blvd. location for performance of the work under this Contract. As a condition of such use, the Contractor must provide:
4.1 Proof of Training and Qualification;
4.1.1 Written documentation demonstrating successful completion of forklift operator training conducted by an accredited industry trainer that meets all applicable industry standards; and
4.1.2 A physical copy of this certificate must be provided to the Agency for record keeping.
4.2 Demonstrated Operational Competency;
4.2.1 Evidence of the operator’s ability to safely and effectively operate the forklift, subject to review and approval by designated ISHS staff.
4.3 Execution of State Liability Release;
4.3.1 A signed release of liability form, provided by the State, which must be fully executed prior to any use of the forklift.
4.4 The State reserves the right to deny or revoke forklift access at any time if the Contractor fails to meet these requirements or if safety concerns arise.
5. Milestone-based Payment Schedule Payments to the Contractor will follow the four (4) phase milestone-based payment schedule shown here:
Phase 1: Relocation Plan Phase Completion - 5% Payment Upon the Contractor’s submission of the required Relocation Plan noted in Exhibit 3, Section 7.1 and written approval by ISHS, the Contractor will be entitled to payment equal to five percent (5%) of the Total Contract Sum.
Phase 2: Packaging and Delivery Progress – Twenty‑Five Percent (25%) Completion – 25% Payment Upon written confirmation by ISHS that twenty‑five percent (25%), ±5%, of the artifacts included in the Scope of Work have been fully packaged, labeled, documented, and transported in accordance with the approved Relocation Plan and handling specifications, the Contractor will be entitled to payment equal to twenty-five percent (25%) of the Total Contract Sum.
Phase 3: Packaging and Delivery Progress – Fifty Percent (50% of remaining artifacts) Completion - 35% Payment Upon written confirmation by ISHS that fifty percent (50%). ±5%, of the remaining artifacts included in the Scope of Work have been fully packaged, labeled, documented, and transported in accordance with the approved Relocation Plan and handling specifications, the Contractor will be entitled to payment equal to thirty-five percent (35%) of the Total Contract Sum.
Phase 4 – Project Completion – Final (including all remaining artifacts) Completion - 35% (and Final) Payment Upon final inspection and written acceptance by ISHS confirming that all remaining packaging activities, documentation, transportation, and all other contractual obligations, including site cleanup, have been fully and satisfactorily completed, the Contractor shall be entitled to payment equal to the final thirty-five percent (35%) of the Total Contract Sum. Final payment will not be due until all deliverables have been submitted, all deficiencies corrected, and ISHS has issued written acceptance of full compliance by the Contractor.
5.1 Each phase in the milestone schedule is tied to a clearly defined deliverable (or set of deliverables) that demonstrate measurable progress toward project completion. Payments will only be made upon the successful completion and written acceptance of these deliverables by ISHS;
5.2 The total of all milestone payments must not exceed the total contracted amount for the project listed in the winning vendor’s cost proposal. Advance payments and payments for incomplete work will not be authorized. Invoices submitted without the required documentation as shown in Section 5 will be returned to the Contractor for resubmission;
5.3 All milestone payments described in this section are contingent upon approval by ISHS. ISHS staff will retain final authority to determine whether any milestone, project phase, packaging activity, truckload, delivery or portion thereof has been satisfactorily completed in accordance with the Contract; and
5.4 In the event that circumstances beyond the State’s or Contractor’s reasonable control impede the timely completion of a phase associated with a milestone payment, the State may, at its sole discretion, consider alternative payment arrangements for work satisfactorily performed to date. Such circumstances may include, but are not limited to, extensive construction impacts, severe weather conditions, or other unforeseen external events that materially affect the Contractor’s ability to perform. Under no circumstances shall the State authorize or issue payment for work not performed.
6. Billing Procedure Invoices must be submitted immediately following the approved completion of each phase for work performed;
6.1 The Contractor must provide the following information with each invoice:
6.1.1 Agency PO/Contract number;
6.1.2 Identification of billing period;
6.1.3 Total amount billed for the billing period;
6.1.4 Detailed description of services (must include labor hours, supplies & equipment) provided;
6.1.5 Contact information for Contractor; and
6.1.6 Invoices must be submitted to: shsfiscal@ishs.idaho.gov
EXHIBIT 3
Scope of Work
1. Summary of Scope The Contractor must move the artifact collection, which consists of more than fifty thousand (50,000) items currently stored in two warehouses on Whitewater Park Boulevard in Boise, Idaho. The scope of this project includes complete packing and packaging, transportation, delivery, and unpacking of those artifacts. Artifacts are to be moved to a new facility being constructed at the Idaho History Center on Old Penitentiary Road in Boise, Idaho. Some items will need specialized crating, cribbing, and/or rigging which must be provided in full by the Contractor.
2. Requirements The requirements listed in the Scope of Work (SOW) are the minimum mandatory specifications the Contractor must adhere to throughout the duration of the Contract.
2.1 Relocation Plan
The Contractor must develop and submit to ISHS a comprehensive phased Relocation Plan for ISHS’s review and approval within thirty (30) days of execution of the contract.
2.1.1 The Relocation Plan must detail the Contractor’s phased approach (packaging, labeling, transporting, etc.) to complete the project as required in the SOW.
2.1.2 The Relocation Plan must address (but not be limited to) the following components:
2.1.2.1 Identify the equipment, vehicles, trucks, trailers, and related resources the Offeror anticipates using for the relocation; and
2.1.2.1.1 Contractor must use vehicles that are weather tight and secure while in transport and while stationary at the delivery/pick up sites, able to be equipped with liftgates designed for the transportation of various containers, pallets, miscellaneous sized artifacts.
2.1.2.2 Describe the loading and unloading procedures, including methods, sequencing, and handling practices for different categories of items.
2.1.2.3 Detail the labeling, tracking, and accountability processes the Offeror will use for items as they are packed, transported, and unloaded; and
2.1.2.3.1 Describe how all labeling, tracking, and inventory information will be transferred to ISHS.
2.1.2.4 Provide a personnel plan for the relocation, including staffing structure, roles, and responsibilities, and how personnel continuity will be maintained if changes become necessary.
3. Monitoring
3.1 The Contractor must ensure the sequence of pallets/containers/large artifacts are maintained as specified by ISHS staff;
3.2 The Contractor must provide in-person monitoring so that no objects are lost or damaged during the entire moving operation;
3.2.1 The Contractor must ensure that their designated Project Manager is successfully coordinating all phases of the work being performed.
3.2.2 The Contractor must ensure contracted staff will be observed at all times; and
3.2.3 Contract staff must not work unattended in any of the facilities.
3.3 ISHS reserves the right to reject any Project Manager that does not comply with all requirements as listed in the SOW by requesting the Contractor replace their Project Manager for the remainder of the contract; and
3.3.1 In the event a Project Manager replacement is requested by ISHS, the Contractor must make this replacement within thirty (30) to forty-five (45) calendar days.
3.4 The Agency’s designated staff will be familiar with the plans, layouts, schedules, and procedures and will work closely with the Contractor’s staff.
3.5 The Contractor must perform the work at each location between the hours of 8:00 am through 5:00 pm, Monday through Friday, excluding state and federal holidays, unless otherwise agreed upon in writing by ISHS and Contractor.
3.6 The Contractor must ensure the Contractor’s Project Supervisor is at the work site during all working hours to ensure that work is done in accordance with the terms of the contract.
3.7 At all times during the project, the Contractor’s staff must wear uniforms or clothing that identifies them as an employee of the Contractor.
3.8 The Contractor must provide employees with adequate and appropriate personal protection safety equipment (PPE) and gear.
3.9 The Contractor must ensure that Contractor staff refrain from eating, drinking (including water) or smoking/vaping except in ISHS designated areas.
3.10 The Contractor must make every effort to prevent damage to the floors, wall surfaces, corners, door frames, light fixtures, and shelving. Should damage occur, the Contractor must notify ISHS staff immediately. All repairs must be performed by Agency approved vendors that are qualified, insured, and licensed contractors; or ISHS may elect to execute the repair and deduct the amount of the repair from the Contractor’s payments due.
3.11 The Contractor must maintain a safe and clean working environment by keeping all isles clear and ensuring staging, packing, and work areas remain neat and tidy.
3.12 The Contractor must participate in coordination meetings and progress reviews as scheduled by ISHS.
4. Packaging and Transportation
4.1 The Contractor must ensure containers are stacked properly to prevent any damage to the contents.
4.2 At no time may the Contractor leave materials in unsecure areas unattended, or inside vehicles overnight.
4.3 Due to high damage potential, the Contractor must protect all items from inclement weather. For these purposes, inclement weather includes: rain, hail, snow, high wind, excessive dust, and extreme high or low temperature;
4.3.1 Objects must not be exposed to any forms of precipitation during this move. If, within forty-eight (48) hours of a scheduled move, there is a forecast of any severe weather system, the move must be rescheduled for transportation during periods of non-inclement weather;
4.3.1.1 In the event that inclement weather or forecasts prohibit moving activity, the Contractor must resume moving activities as soon as possible; and
4.3.1.2 ISHS will make the final determination on all activities involving inclement weather, including suspensions and resumptions of work.
4.4 Required packing material must be approved by ISHS and will include, but not be limited to:
4.4.1 Acid-free tissue paper;
4.4.2 Closed cell polyethylene foams in roll or plank form;
4.4.3 Clear polyethylene plastic sheeting; and
4.4.4 Polyethylene bubble wrap.
4.5 Packaging material may be reused for this project only.
4.6 Collections objects must be wrapped/packed/crated/palletized using the method most appropriate to the object type in consultation with the appropriate ISHS staff; and
4.6.1 All packaging and loading methods must be approved by ISHS staff prior to application and transport.
4.7 Artifacts and materials must be handled with clean hands and/or gloves.
4.8 The Contractor must relocate all exhibit furniture (pedestals, cases, plinths, vitrines, etc.) and other collection supplies (archival boxes, sheets of Ethafoam, archival tissue, and other similar items) as specified by ISHS staff. These items must be blanket-wrapped (or protected as appropriate) and transported separately from the artifacts.
4.9 Once loaded on vehicles for transport, the Contractor must proceed with the load to the warehouse within 30 minutes with no stops enroute to ensure there is no delay of transportation and delivery of artifacts.
4.10 Objects that are too large for enclosed vehicles must be protected in a manner that is pre-approved by the appropriate ISHS staff.
4.11 Contractor must dispose of all Contractor generated waste off site on a daily basis, excepting where:
4.11.1 The Contractor may provide their own on-site waste dumpster.
4.11.2 ISHS waste dumpsters must not be used by the Contractor.
4.11.3 Materials must be handled in accordance to training as noted in Section 6 of this Exhibit.
4.12 All work sites, including outdoor areas, must be kept free from food wrappers, drink containers and remains of cigarettes; and
4.12.1 Within twenty four (24) hours of completion of the Contract, the Contractor must remove from state property all equipment and other property belonging to the Contractor.
5. Tracking and Labeling Collection objects must be documented and tracked, primarily via use of ISHS accession/catalog numbers, box inventory and pallet inventory to ensure they are identifiable while in transit and in the new facility. As part of the Relocation Plan, Contractors must identify the tracking methodology they will employ. All tracking methodology and processes must be approved by ISHS staff.
6. Training Prior to the commencement of any packing, transport, or object movement activities, ISHS’s staff will provide a mandatory training session for all Contractor personnel assigned to this project. The purpose of this training is to ensure compliance with ISHS’s standards for artifact care, handling, and documentation.
The training will take approximately four (4) hours and will include, but is not limited to, the following topics:
6.1 Basic artifact handling principles and object care standards;
6.2 Appropriate packing methods and materials for various object types;
6.3 Site-specific procedures for movement, staging, documentation, materials disposal; and
6.4 Health, safety, and environmental considerations related to artifact handling.
7. Attendance and Verification All Contractor personnel (including any new personnel that may be added to the project after work has begun) who will handle, pack, or move collection items must attend a scheduled training session led by ISHS staff and demonstrate an understanding of the requirements prior to performing any work. The Contractor must maintain a list (and provide said list to ISHS when requested) of all personnel participating in the training, including their roles and responsibilities.
8. Compliance The Contractor must ensure that only trained personnel participate in any collections-related activities throughout the duration of the project.
8.1 ISHS reserves the right to require retraining if Contractor personnel are observed handling collection materials contrary to expectations.
8.2 The Contractor must ensure compliance with ISHS policies related to confidentiality, photography, and security as referred to in Exhibit 7 – Collections Access Policy.
9. Agency Responsibilities ISHS will be responsible for project oversight and coordination. ISHS will designate a Project Manager to serve as the primary point of contact with the Contractor to provide overall direction, coordination, and decision-making authority for the project. ISHS will review and approve the Contractor’s move plan, schedule, and staffing assignments prior to the start of work.
10. Access and Work Environment ISHS will provide the Contractor with reasonable access to collections storage facilities, including loading areas, collection storage, and staging spaces, during work hours. ISHS will communicate all relevant building restrictions, security procedures, and safety requirements prior to project commencement.
11. Collections Authority and Handling Requirements ISHS will retain final authority over all collections-related activities. The Project Manager or their designee will determine object handling priorities, packing standards, and approved materials in consultation with the Contractor. Prior to the commencement of packing or movement activities, the appropriate ISHS staff will provide mandatory training for all Contractor personnel on artifact handling and packing requirements.
12. Documentation and Approvals ISHS will provide access to relevant records, object lists, pallet inventories, and other inventories necessary for the Contractor’s performance of work. The Project Manager or their designee must review and approve all documentation related to packing, transport, unpacking, and condition reporting. ISHS will verify inventory and object reconciliation at each project phase.
13. Security ISHS will establish and communicate all security and access control requirements applicable to the Contractor prior to the commencement of any work.
14. Communication and Scheduling ISHS will provide timely review and feedback on Contractor submittals, reports, and deliverables, and will notify the Contractor promptly of any changes in project timelines, facility access, or conditions affecting performance. ISHS will participate in regular coordination meetings and progress reviews as scheduled.
EXHIBIT 4
Site Visit Registration Form
| RFP Number: |
| 1126 |
| RFP Title: |
| Artifact Collections & Active Records Pack and Moving |
Instructions: While not mandatory, potential Offerors choosing to participate in this Procurement Event are encouraged participate in the site visit. Offerors must pre-register by submitting this completed form, via e-mail, to the RFP Lead. Offeror attendees will be limited to no more than three (3) representatives from each company. Attendees are asked to submit this registration at least 3 days prior to the optional Site Visit.
As a reminder, Offerors are cautioned against relying on any verbal information shared during the site visit. The RFP may only be amended by written documentation, posted to the state’s eProcurement System, IPRO POWERED BY LUMA.
Location:
805 & 877 North Whitewater Park Boulevard Boise, ID 83703
Tuesday, June 9, 2026 @ 2:00 pm MT
| Individual’s Name |
| Company |
| Email Address |
| Phone Number |
EXHIBIT 5
Questions
Gener…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .