RFP_1100_MMH3044_BID_DOC_v1.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Insulation and Heat Trace Services
- Solicitation number
- RFP 1100 MMH3044
- Issued by
- Texas
About this file
This is a pricing proposal submittal sheet for RFP 1100 MMH3044, issued by a Texas city with Melita Harden serving as the Procurement Specialist. The solicitation requests insulation and heat trace services for two primary process areas: Sand Hill Energy Center (Category 1) with seven line items ranging from 3/4-inch to 24-inch pipe sizes and lengths from 3 to 25 feet, and Decker (Category 2) with four line items ranging from 1.5-inch to 24-inch pipe sizes and lengths from 5 to 15 feet. All work involves removing and replacing calcium silicate insulation on various piping systems with operating temperatures between 224°F and 863°F, with several items requiring heat trace installation or replacement using either Self-Regulating Medium Temperature cable or Mineral Insulated Heating Cable. The total contract value across both categories is currently listed as zero, indicating that pricing has not yet been submitted by bidders. The city reserves the right to make multiple awards based on individual line items, groups of items, cost, or any combination deemed advantageous.
Pricing submissions must include all discounts, handling, shipping charges, and be FOB Destination, with costs including insulation where applicable. Bidders may submit pricing for all items or only specific items as desired. A bid of zero will be interpreted as a no-charge item, while "no bid" indicates the responder declines to bid on that item. The city does not guarantee purchase of the listed quantities, which are provided as annual estimates based on historical usage. Additionally, contractors must establish markup percentages for tool and equipment rental based on the Rental Rate Blue Book and for materials, supplies, and parts based on actual invoices from suppliers or subcontractors. Failure to respond to each section of the bid sheet may result in disqualification.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_1100_MMH3044_ROCIP_v1.pdf | ||
| IFB_6100_CLMC1165_TECH_DOC_v1.pdf | ||
| RFP_1100_MMH3044_TECH_DOC_v1.docx | DOCX document | |
| RFP_1100_MMH3044_0600_v1.pdf | ||
| RFP_1100_MMH3044_PAC2_v1.docx | DOCX document | |
| RFP_1100_MMH3044_PLANS_v1.pdf | ||
| RFP_1100_MMH3044_MWDBE_PAC_v1.pdf | ||
| RFP_1100_MMH3044_PAC1_v1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Solicitation
PRICING PROPOSAL
| SOLITATION NO.: | RFP 1100 MMH3044 |
| PROCUREMENT SPECIALIST: | MELITA HARDEN |
| SPECIAL INSTRUCTIONS: Offerors must use this Pricing Submittal Sheet to submit pricing. |
The City reserves the right to make multiple awards based on individual or groups of specific line items, cost, or any criteria or any combination deemed most advantageous to the City. The Vendor may choose to submit pricing for all items listed on the bid sheet or only specific items on the bid sheet in consideration of this solicitation
Be advised altering the Pricing Submittal Sheet, making additions to the Pricing Submittal Sheet or taking exceptions or qualifying statements made to any portion of the solicitations may jeopardize acceptance of the bid and may result in disqualification of the bid.
Prices being submitted shall include ALL discounts, handling and shipping charges, FOB Destination.
A bid of '0' (zero) will be interpreted by the City as a no-charge (free) item and the City will not expect to pay for that item. A bid of 'no bid' will be interpreted by the City that the responder does not wish to bid on that item.
The quantities noted below are annual estimates and not a guarantee of actual volume. The City does not guarantee the purchase of the quantities listed. Quantities are provided as a guide based on historical usage. Actual purchases may be more or less.
Failure to respond to each section of this bid sheet may result in disqualification of your bid.
| CATEGORY 1 – SAND HILL ENERGY CENTER SAMPLE PROCESS | |||||||||||||
| Item | |||||||||||||
| No. | SHEC Process | Line Size | Total Pipe Length Feet | Insulation Thickness | Insulation Type | Labor | Operating Temp | Heat Trace | Self-Regulating Medium Temperature (SRMT) | Mineral Insulated Heating Cable (MIHC) | Cost | Cost includes Insulation | |
| (Y/N) | |||||||||||||
| 1.1 | Dilution Air Piping | 10-inch | 20-feet | 3-inches | Calcium Silicate | Remove and replace insulation | N/A | N/A | N/A | N/A | $ - 0 | ||
| 1.2 | Main Steam Line | 24-inch | 25-feet | 6-inches | Calcium Silicate | Remove and replace insulation | N/A | N/A | N/A | N/A | $ - 0 | ||
| 1.3 | BFW Suction Line | 3/4-inch | 15feet | 1.5-inches | Calcium Silicate | Remove and replace insulation | 224F | Y | 208V, 10W/ft | N/A | $ - 0 | ||
| 1.4 | MSCV # 1 Drain | 1-inch | 20-feet | 1-inches | Calcium Silicate | Remove and replace insulation, remove and replace heat trace | 863F | Y | N/A | 300V, UP TO 80W/ft | $ - 0 | ||
| 1.5 | RFV Line | 6-inch | 17-feet | 1.5 inches | Calcium Silicate | Remove and replace insulation | N/A | N/A | N/A | N/A | $ - 0 | ||
| 1.6 | Reheat Attemp Water supply line | 2-inch | 17-feet | 1.5 inches | Calcium Silicate | Remove and replace insulation, remove and replace heat trace | 268F | Y | 208V, 15W/ft | N/A | $ - 0 | ||
| 1.7 | Maintain Steam to CRH Water supply | 4-inch | 3-feet | 1.5 inches | Calcium Silicate | Remove and replace insulation, remove and replace heat trace | 268F | Y | 208V, 15W/ft | N/A | $ - 0 | ||
| SUBTOTAL FOR CATEGORY 1= | $ - 0 |
| CATEGORY 2 - DECKER SAMPLE PROCESS | |||||||||||||
| Item | |||||||||||||
| No. | SHEC Process | Line Size | Total Pipe Length Feet | Insulation Thickness | Insulation Type | Labor | Operating Temp | Heat Trace | Self-Regulating Medium Temperature (SRMT) | Mineral Insulated Heating Cable (MIHC) | Cost | Cost includes Insulation | |
| (Y/N) | |||||||||||||
| 2.1 | North downcomer (ground floor) | 24-inch | 15-feet | 7-inches | Calcium Silicate | Remove and replace insulation | N/A | N/A | N/A | N/A | $ - 0 | ||
| 2.2 | #5 Downcomer (ground floor) | 24-inch | 12-feet | 7-inches | Calcium Silicate | Remove and replace insulation | N/A | N/A | N/A | N/A | $ - 0 | ||
| 2.3 | Superheat Spray Valve piping | 4-inch | 5-feet | 3-inches | Calcium Silicate | Remove and replace insulation, remove and replace heat trace | 297 F | Y | 280V, 15W/ft | N/A | $ - 0 | ||
| 2.4 | Blowdown lines | 1.5-inch | 8-feet | 1.2-inches | Calcium Silicate | Remove and replace insulation, remove and replace heat trace | 633F | Y | N/A | 300V, UP TO 80W/ft | $ - 0 | ||
| SUBTOTAL FOR CATEGORY 2= | $ - 0 | ||||||||||||
| TOTAL OF CATEGORIES 1& 2 = | $ - 0 | ||||||||||||
| Contractor Markup for Tool and Equipment Rental: Pricing for equipment rental shall be based on the latest edition of the "Rental Rate Blue Book" for each hour that said equipment is in use on such work (as published by EquipmentWatch: http://www.equipmentwatch.com or 1-200-669-3282) | |||||||||||||
| CONTRACTOR MARKUP FOR TOOLS AND EQUIPMENT RENTAL | %MARKUP | ||||||||||||
| 1 | Cost for Equipment and Tool Rental shall be % markup of actual invoice from supplier or subcontractor. |
| CONTRACTOR MARKUP FOR MATERIALS, SUPPLIES AND PARTS | %MARKUP | |
| 1 | Cost for Materials, Supplies and Parts shall be % markup of actual invoice from supplier or subcontractor. |
| COMPANY NAME |
| EMAIL ADDRESS |
image1.png