KCT Office Scope-MP(2025.06.30).pdf

PDF 58 KB Posted

Attached to
Design and Fabricate Mobile Office Building for Customs and Border Protection Officers at Kapalama Container Terminal in Honolulu, HI
Solicitation number
Not on record
Issued by

About this file

This document is a Scope of Work (SOW) for designing and fabricating a modular office building for U.S. Customs and Border Protection at the Kapalama Container Terminal in Honolulu, HI. The contractor will be responsible for designing a two-story, 150-square-foot supervisor office with six CBP officer work areas, a break area, unisex bathroom, storage room, and a covered deck with a bulletproof interaction window. The building must meet specific security requirements, including UL 752 level 3 bullet-resistant doors, windows, and exterior construction, with an intrusion detection system featuring access control, glass break sensors, and infrastructure for a Central Area Surveillance System.

Key project details include shipping the fabricated building to San Diego, CA, and providing installation drawings that comply with U.S. Customs and Border Protection Space Allocation Design Standard from September 2009. Additional requirements involve a hardened LAN room, central heat and air, a storage room with a cage for weapons and seized property, and future determination of office furniture, backup power, propane generator, key storage system, and electrical configurations. Interested parties are requested to submit documentation of qualifications, work examples, and warranty information by July 16, 2025, to Paula.Miller@pnnl.gov, with installation services noted as an optional offering.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The scope of work for this project is to design and fabricate an office building that will be used by Customs and Border Protection at the Kapalama Container Terminal in Honolulu, HI. It will be the responsibility of the contractor to ship the fabricated building to San Diego, CA. The contractor will be responsible to provide a final, installation drawing that meets local codes and standards as well as U.S. Customs and Border Protection Space Allocation Design Standard dated September 2009.

It is anticipated that the final product will be modular and may include on-site assembly. It is also anticipated that some aspects of the build will be ‘stick-built’ on site. This approach is acceptable, as the space availability is irregular and will not easily accommodate modular construction.

1. Space requirements are as follows:

a. Building must be designed to fit within the space allocated in attached drawing.

b. Building can be two stories

c. Supervisor office to be a minimum of 150SF

d. A minimum of (6) CBP Officer work areas with minimum 64SF each, must be on main level

e. Break area to include sink, counter, and refrigerator

f. Unisex Bathroom and locker room

g. Storage room

h. Exterior building to include eyewash station and safety shower

i. LAN room must be located on main level

j. Covered deck area with sliding/bulletproof access window for CBP interaction with the public.

2. Intrusion Detection System (IDS) and other security requirements are as follows:

a. Exterior:

i. Access control and IDS on exterior doors

ii. 3068 steel bullet resistant UL 752 level 3 doors & steel frames

iii. All exterior windows will be bullet resistant UL 752 level 3

iv. Glazing: B.R. UL 752 level 3 mirror pane insulated low E Glass Clad

Polycarbonate

v. Ability to accommodate IDS such as glass break, motion, balanced magnetic sensors

vi. Service/transaction window with awning

vii. Infrastructure for Central Area Surveillance System (CAVSS) w/camera locations TBD

viii. Exterior interaction points with mic

ix. Bullet resistant UL 752 level 3 construction on exterior of supervisor office, front of building, and break room

b. Interior:

i. Infrastructure for CAVSS w/camera locations TBD

ii. Interior interaction points with mic

iii. Access control and accommodation for IDS as required

iv. Central heat and air

v. Hardened LAN room w/enhanced HVAC

vi. Hardened storage room

1. Cage within storage room to separate weapons from seized property

3. Details to be determined during design development include (but not limited to):

Office furniture requirements, backup power, propane generator including propane storage, key storage system, data drop locations, electrical outlet locations

Interested parties shall provide documentation of qualifications, examples of work, and warranty information. The installation of the building at the Kapalama Container Terminal is not part of this scope. However, if interested parties provide installation services, please note that option.