This document is a Request for Information (RFI) with detailed responses from the Department of Veterans Affairs regarding the Repurpose Fountain project. The RFI covers 18 specific questions about project logistics, including drilling specifications (nine 2-inch diameter holes), electrical source location (room B16), debris removal (contractor responsible for daily removal), and work performance expectations (primarily on Saturdays during low occupancy). Key requirements include removing current fountain plumbing, interior tile veneer, plumbing bump-out, water, debris, and electrical components, then drilling holes in the basin and filling it with potting soil to a minimum 2-foot depth. The VA will handle plant selection and planting after soil placement. Additional project details specify no irrigation, no waterproofing of wall sides, and flexible work hours with potential coordination during normal business hours. Bonding requirements are minimal, with no payment bond necessary unless the bid exceeds $150,000.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24625B0022_2.pdf | ||
| Basement floor plan B16.png | PNG image | |
| Site Visit Sign in.pdf | ||
| Fountain dimensions.jpg | JPG image | |
| Repurpose Fountain at Main Entrance SOW.docx | DOCX document | |
| 01 33 23 Shop Drawings Product Data and Samples.docx | DOCX document | |
| 01 00 00 General Requirements.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repurpose Fountain RFI and Answer
1. General Length x Width x Height of Fountain for estimating of soil required.
• VA Response: See the attached dimensioned sheet.
2. Clarification on number, size and depth of holes to be drilled.
• VA Response: Nine (9) 2-inch diameter
3. Is there a general site map drawing to depict location of electrical source to be pulled back to and labeled spare?
• VA Response: See attached basement floorplan with room B16 circled where the electrical source is located.
4. The "Instructions To Offerors For Bid Preparation" stated offers over $30,000 would require a payment bond; but block 12a on the SF 1442 was checked "no". We're anticipating our offer exceeding $30,000. Would we need to provide a payment bond?
• VA Response: No payment bond necessary unless your bid exceeds $150,0000.
5. Are we able to get a copy of the sign-in Sheet for the Repurpose Fountain project?
• VA Response: Yes, attachment included within the amendment.
6. Photo 4 in solicitation is labeled as Water pump, upon site visit inspection, this is the skimmers/filter assembly for the fountain. The aforementioned pump is located to the left behind the main entrance steps. Are both the Skimmer/filter assembly, and Pump to be removed?
• VA Response: Yes, the skimmer/filter assembly in photo 4 and the pump shall be removed.
7. Will parking be available for equipment and ramp at front steps?
• VA Response: Contractor can request through VA Engineering to block off two parking spaces in front of the main building. This will be considered for necessary activities (loading/unloading equipment materials, tools, etc).
Contractor must request minimum three days in advance.
8. Debris, will there be a provided dumpster for the demolition debris provided by the VA, or will this be the responsibility of the contractor?
• VA Response: The contractor shall remove debris from the site daily. No dumpster will be allowed.
9. Does the VA wish to specify any plants/flowers to be planted or is the planter solely to be filled with fill dirt and topsoil?
• VA Response: Contractor to fill with “potting soil” to a minimum of 2-ft. VA will provide and plant the plants/flowers afterwards.
10. Will there be any landscaping going in fountain bed after soil backfill?
• VA Response: See response to previous question.
11. Are to waterproof wall sides?
• VA Response: No
12. Is irrigation included in the project? Is there a water supply line from the old fountain to use for supplemental irrigation?
• VA Response: No to both questions
13. How deep do we assume core drilling depth, are we assuming that it will drain once core drilled past concrete base?
• VA Response: Core drill depth not expected to exceed 8-inches. Yes, we are assuming it will drain once core drilled past concrete base.
Repurpose Fountain RFI and Answer
14. Will we have staging access for the renovation work and imported soil?
• VA Response: See response to question 7.
15. Can superintendent be a working superintendent?
• VA Response: Yes but must be capable of performing superintendent and SSHO duties.
16. Will a SSHO be required?
• VA Response: No, so long as superintendent is qualified and capable of performing SSHO responsibilities.
17. When can the work be performed?
• VA Response: Expect work to be performed on Saturdays during low occupancy time. Some work may be coordinated to be performed during normal business hours.
18. Is the government asking for a bid bond to accompany the offer or a payment bond after award?
• VA answer: Neither, unless your bid exceeds $150,000, you are required to submit a bid bond before with bid submission. See question/answer 4 above.