This document is a Statement of Work (SOW) for repurposing a fountain at the main entrance of Building No. 1 at the VA Engineering facility located at 2300 Ramsey Street in Fayetteville, North Carolina. The scope of work involves transforming the existing fountain into a planter by removing current plumbing, water pump, electrical components, and top-interior tile veneer. Specific tasks include drilling drainage holes in the basin, adding planting soil, replacing the existing tile with a natural earth-tone stone tile, and soft washing the fountain's exterior siding.

The project is part of Solicitation Number 36C24625B0022_2 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The SOW includes seven reference photos documenting the current fountain condition, including images of the water pump, damaged tiles, and fountain sprinkler head. The document provides detailed instructions for contractors on the precise modifications required to repurpose the historical entrance fountain into a landscaped feature.

View the file

Other files for this federal contract opportunity

Other files attached to Repurpose Fountain Main Entrance, newest first.
File Type Posted
Site Visit Sign in.pdf PDF
Fountain dimensions.jpg JPG image
36C24625B0022_2.pdf PDF
Basement floor plan B16.png PNG image
RFI Responses.pdf PDF
01 33 23 Shop Drawings Product Data and Samples.docx DOCX document
01 00 00 General Requirements.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Engineering 2300 Ramsey Street Building #45 Fayetteville, N.C. 28301

Scope of Work for: Repurpose Fountain at Main Entrance

Description Repurpose the fountain at the Building no. 1 historical entrance by turning it into a planter. Remove current plumbing, top-interior layer of tile veneer, bump-out for plumbing located in the northeast corner of the fountain (see Photo no. 4), water and debris inside the fountain, and electrical back to the source. Relabel the circuit breaker to be a spare. Once all piping, plumbing, and ancillary items are removed; drill holes at the bottom of the basin. Place planting soil inside the basin to a later determined height. Remove and replace the tile on the top of the fountain with a natural earth-tone stone tile. Soft wash the outside siding of the fountain when finished.

Reference Drawing(s):

Photo 1: Facing east at the main entrance of Building no. 1.

Photo 2: Inside of existing fountain facing east.

Photo 3: Facing west at the main entrance of Building no. 1.

Photo 4: Water pump that will be removed.

Photo 5: Damage tile and side view of water pump.

Photo 6: Fountain Sprinkler Head.

Photo 7: Damaged Tile image6.jpeg image7.jpeg image8.jpeg image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg