RFI_IRV Exterior Paint_Vendor_Questionnaire.xlsx
XLSX spreadsheet 19 KB Posted
- Solicitation number
- OC-2026-131281
About this file
This file is a Request for Information (RFI) vendor questionnaire for the FDA Irvine Exterior Paint Repair project (OC-2026-131281). The questionnaire is designed to gather information from qualified contractors to assess capability and capacity for a building exterior repair and protective coating project at the FDA Pacific Southwest Laboratory in Irvine, California, located approximately 5 miles from the Pacific Ocean. The anticipated period of performance is approximately 180 calendar days from contract award.
The questionnaire collects business information including company legal name, address, point of contact details, SAM.gov UEI, CAGE code, and business size status (small business certifications). Vendors must provide relevant NAICS codes and detailed information on their experience with concrete crack repair and exterior steel coating repairs in coastal environments, particularly in Southern California. The questionnaire requests information on in-house expertise, relevant certifications (ACI, AMPP/SSPC), surface preparation methods, environmental condition management during coating application, and familiarity with California and local safety requirements. Additionally, vendors must address concerns regarding concrete crack repair methodology and materials specifications, coating system appropriateness for coastal exposure, typical project duration for similar work, approaches to minimizing disruption in occupied facilities, standard warranty periods, safety protocols for elevated exterior work, and past performance on two relevant projects including customer references, contract values, and periods of performance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| OC-2026-131281 Ext Repair PWS_Draft 26.01.30.pdf | ||
| IRV Exterior Paint_Seismic Design_IFC.pdf | ||
| IRV Exterior Paint_Site Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Vendor Questionnaire
| FDA Irvine Exterior Paint Repair RFI (OC-2026-131281) | ||
| Section | Question | Vendor Response |
| Business Information | Company Legal Name | |
| Business Information | Company Address (Street, City, State, ZIP) | |
| Business Information | Point of Contact – Name | |
| Business Information | Point of Contact – Title | |
| Business Information | Point of Contact – Email | |
| Business Information | Point of Contact – Phone Number | |
| Business Information | SAM.gov UEI | |
| Business Information | CAGE Code | |
| Business Information | Business Size Status (Include all that apply SB, 8(a), HUBZone, SDVOSB, WOSB, Other) | |
| Business Information | Primary NAICS Code for this Response | |
| Business Information | Additional NAICS Codes Relevant to this Work | |
| Contractor Qualifications & Experience | How many years of experience does your company have with concrete crack repair and exterior steel coating repairs? | |
| Contractor Qualifications & Experience | What similar projects have you completed in coastal environments within the past five years, particularly in Southern California? | |
| Contractor Qualifications & Experience | Do you have in-house expertise for both concrete repair and steel coating work? | |
| Contractor Qualifications & Experience | What relevant certifications does your company hold (e.g., ACI, AMPP/SSPC)? | |
| Technical Approach | What surface preparation methods do you typically use for exterior steel in coastal environments? | |
| Technical Approach | How do you ensure environmental conditions (temperature, humidity, dew point) are properly managed during coating application? | |
| Technical Approach | Do you have any comments or concerns with the concrete crack repair methodology outlined in the drawings and specifications? | |
| Materials | Do you have comments or concerns with the materials specified for concrete crack repair? | |
| Materials | Are the specified coating systems appropriate for coastal exposure in Southern California based on your experience? | |
| Project Execution | What is a typical duration for a project of this size and complexity? | |
| Project Execution | What is your approach to working in occupied facilities to minimize operational disruption? | |
| Project Execution | What is your standard warranty period for similar concrete and coating repairs? | |
| Safety & Compliance | Are you familiar with California and local (Irvine/Orange County) regulatory and safety requirements applicable to this type of work? | |
| Safety & Compliance | How do you manage safety when performing elevated exterior work? | |
| Relevant Past Performance | ||
| Project 1 – Customer Name, Address and Point of Contact Name and Email | ||
| Project 1 – Government or Commercial | ||
| Project 1 – Scope Description | ||
| Project 1 – Contract Value | ||
| Project 1 – Period of Performance | ||
| Project 2 – Customer Name, Address and Point of Contact Name and Email | ||
| Project 2 – Government or Commercial | ||
| Project 2 – Scope Description | ||
| Project 2 – Contract Value | ||
| Project 2 – Period of Performance |
File details come from the government source that posted it. Updated .