RFI_IRV Exterior Paint_Vendor_Questionnaire.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Building Exterior Repair Project – FDA Pacific Southwest Laboratory
Solicitation number
OC-2026-131281
Issued by

About this file

This file is a Request for Information (RFI) vendor questionnaire for the FDA Irvine Exterior Paint Repair project (OC-2026-131281). The questionnaire is designed to gather information from qualified contractors to assess capability and capacity for a building exterior repair and protective coating project at the FDA Pacific Southwest Laboratory in Irvine, California, located approximately 5 miles from the Pacific Ocean. The anticipated period of performance is approximately 180 calendar days from contract award.

The questionnaire collects business information including company legal name, address, point of contact details, SAM.gov UEI, CAGE code, and business size status (small business certifications). Vendors must provide relevant NAICS codes and detailed information on their experience with concrete crack repair and exterior steel coating repairs in coastal environments, particularly in Southern California. The questionnaire requests information on in-house expertise, relevant certifications (ACI, AMPP/SSPC), surface preparation methods, environmental condition management during coating application, and familiarity with California and local safety requirements. Additionally, vendors must address concerns regarding concrete crack repair methodology and materials specifications, coating system appropriateness for coastal exposure, typical project duration for similar work, approaches to minimizing disruption in occupied facilities, standard warranty periods, safety protocols for elevated exterior work, and past performance on two relevant projects including customer references, contract values, and periods of performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Vendor Questionnaire

FDA Irvine Exterior Paint Repair RFI (OC-2026-131281)
SectionQuestionVendor Response
Business InformationCompany Legal Name
Business InformationCompany Address (Street, City, State, ZIP)
Business InformationPoint of Contact – Name
Business InformationPoint of Contact – Title
Business InformationPoint of Contact – Email
Business InformationPoint of Contact – Phone Number
Business InformationSAM.gov UEI
Business InformationCAGE Code
Business InformationBusiness Size Status (Include all that apply SB, 8(a), HUBZone, SDVOSB, WOSB, Other)
Business InformationPrimary NAICS Code for this Response
Business InformationAdditional NAICS Codes Relevant to this Work
Contractor Qualifications & ExperienceHow many years of experience does your company have with concrete crack repair and exterior steel coating repairs?
Contractor Qualifications & ExperienceWhat similar projects have you completed in coastal environments within the past five years, particularly in Southern California?
Contractor Qualifications & ExperienceDo you have in-house expertise for both concrete repair and steel coating work?
Contractor Qualifications & ExperienceWhat relevant certifications does your company hold (e.g., ACI, AMPP/SSPC)?
Technical ApproachWhat surface preparation methods do you typically use for exterior steel in coastal environments?
Technical ApproachHow do you ensure environmental conditions (temperature, humidity, dew point) are properly managed during coating application?
Technical ApproachDo you have any comments or concerns with the concrete crack repair methodology outlined in the drawings and specifications?
MaterialsDo you have comments or concerns with the materials specified for concrete crack repair?
MaterialsAre the specified coating systems appropriate for coastal exposure in Southern California based on your experience?
Project ExecutionWhat is a typical duration for a project of this size and complexity?
Project ExecutionWhat is your approach to working in occupied facilities to minimize operational disruption?
Project ExecutionWhat is your standard warranty period for similar concrete and coating repairs?
Safety & ComplianceAre you familiar with California and local (Irvine/Orange County) regulatory and safety requirements applicable to this type of work?
Safety & ComplianceHow do you manage safety when performing elevated exterior work?
Relevant Past Performance
Project 1 – Customer Name, Address and Point of Contact Name and Email
Project 1 – Government or Commercial
Project 1 – Scope Description
Project 1 – Contract Value
Project 1 – Period of Performance
Project 2 – Customer Name, Address and Point of Contact Name and Email
Project 2 – Government or Commercial
Project 2 – Scope Description
Project 2 – Contract Value
Project 2 – Period of Performance

File details come from the government source that posted it. Updated .