This is a Request for Bidding Interpretation (RFBI) document for the California Department of General Services (DGS) regarding Project Number 000000000013151 for DOT D6 Electric Vehicle Supply Equipment installation in Madera and Fresno counties. The project involves installing electrical conduits and equipment at two Department of Transportation facilities: 1635 W Pine Ave in Fresno and 125 W Almond Ave in Madera. The RFBI response deadline was December 11, 2024, at 5:00 p.m., with responses to be published on caleprocure.ca.gov.
The RFBI addresses two specific questions from MM Energy and Lighting regarding bush removal permissions and conduit installation routing at the Fresno location. The project lead designer responded that bushes/shrubs may be removed as needed for electrical conduit and equipment installation, though trees must be protected. For the conduit routing issue, contractors are instructed to preferably run conduit along the wall using junction boxes and conduit bodies for bends, or alternatively use underground PVC trenching to reach the new distribution panel. The contractor is responsible for repairing any damage to existing infrastructure at their own expense. The attached site plan and photograph show the building corner in question where the conduit routing needs to be addressed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Madera_Plans.pdf | ||
| Bid_Package_Documents.pdf | ||
| Fresno_Plans.pdf | ||
| Project_Manual.pdf | ||
| Pre-Bid_Sign-In_Sheet.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RESDMSTR: REV. 6.3.2021 Appendix 00 21 00.1 Project Number: 000000000013151
REQUEST FOR BIDDING INTERPRETATION (RFBI)
(Email no later than December 11, 2024, 5:00 p.m.)
OS RFBI No.: _______________ Requestor RFBI No.: ___________ Request Date:
To: Sina Roudbari, Project Director From (Bidder):
Executive Office of Sustainability Transportation Phone: (279) 799-4343 Contact: __________________________
Phone: ___________________________ Fax: _____________________________
Email: sina.roudbari@dgs.ca.gov Email: ___________________________
All RFBIs received prior to deadline identified above, and responses from the State will be published on http://www.caleprocure.ca.gov. Click on “Start Search.” In the event name field, enter the project number and click search. While viewing the Event Details, click on “View Event Package” to view RFBI responses.
Project No.: 000000000013151 Project Name: DOT D6 - Electric Vehicle Supply Equipment - Madera and Fresno Location: Madera and Fresno County, CA
Drawing Reference: ____________________ Project Manual Reference: ___________________________
Question:
Bidder’s Authorized Signature: ______________________________________________________ [ ] Check here if additional pages attached Page 1 of ____
12/5/24 MM Energy and Lighting
Are bushes allowed to be removed for both Fresno and Madera locations?
In Fresno location, during virtual bid walk we noticed the corner of the building has no room for the conduit to be ran on the wall please see image.
Please clarify how the facility would like this to be ran?
C2.1
Manuel Martinez Rodriguez 818 - 691 - 4290 mmartinez@mmeandl.com
REQUEST FOR BID INFORMATION
BC&F Project Number: 220-0212
Response Date: 12/10/2024
Project Name:
DOT – District 6 Fresno & Madera
RFBI Number: DGS Number: Project Address:
1 000000000013151
Fresno:
1635 W Pine Ave, Fresno, CA 93728
Madera:
125 W Almond Ave, Madera, CA
93637
Subject / Title of RFBI: Shrubs and Conduit Run
RFBI Question:
1. Are bushes allowed to be removed for both Fresno and Madera locations?
2. In Fresno location, during virtual bid walk we noticed the corner of the building has no room for the conduit to be ran on the wall please see image.
Please clarify how the facility would like this to be ran? (Drawing Reference C2.1)
RFBI Received From: Manuel Martinez Rodriguez
Responsible Contractor: MM Energy and Lighting Due Date: 12/10/2024
DGS Project Director/Manager: Sina Roudbari
RFI Response:
1. Bushes/shrubs are allowed to be removed as needed to install the electrical conduits and equipment, but trees are to be protected and not be damaged during construction.
2. It would be preferred to run the conduit along the wall, if needed junction boxes and conduit bodies may be used to make the bends. If this is not viable then going underground with PVC and trenching to the new distribution panel is acceptable. The reasoning for running the conduit along the wall was to avoid what seems to be a large amount of existing underground utilities and tree/roots. It will be the Contractors responsibility to repair and/or replace any damages to the existing infrastructure at the expense of the Contractor.
Blair, Church & Flynn Responder: Daniel Hernandez | Lead Project Designer
| RFI Form.pdf |
| Drawing C2.1.pdf |
| Screenshot_6 |
| REQUEST FOR BID INFORMATION_RFBI-01_Fresno and Madera.pdf |
File details come from the government source that posted it. Updated .