RFB952200-01 - Drawings (file size reduced).pdf
PDF 3 MB Posted
- Attached to
- DOC NCF Dietary and Laundry Hot Water Tank
- Solicitation number
- RFB952200-01
- Issued by
- Jasper County, Iowa
About this file
This is a technical drawing set for RFB952200-01 prepared by I & S Group, Inc. (ISG) for the Iowa Department of Corrections at Newton Correctional Facility in Newton, Iowa. The project involves replacement of domestic hot water storage tanks and associated mechanical and plumbing work at the facility's Dietary & Laundry building (Support Building "H"). The scope includes disconnection and removal of existing hot water storage tanks, removal of louvers and portions of the plenum to facilitate equipment movement, installation of new domestic hot water storage tanks (LAARS STHDI models with capacities of 1225 gallons for the 140-degree system and 580 gallons for the 160-degree system), replacement of louvers, and creation of removable panels in the plenum for future renovations. The project includes coordination with a crane contractor for equipment staging through the louver opening and reconnection to existing domestic water heating systems. Two expansion tanks (TACO PAX130-150 models, 34 gallons each) are scheduled for installation. The base bid requires utilization of existing plenum insulation with removal only where panels and doors are located, while Bid Alternate #1 provides for replacement of all plenum insulation (approximately 720 square feet). Bid Alternate #3 addresses coordination for relocation of an existing electrical transformer during construction.
The drawing package, prepared under ISG Project No. 26-34495 and Owner Project No. 9522.00, includes detailed mechanical and plumbing plans, demolition plans, schedules, isometric drawings, and reference photographs. The design was prepared by Adam Puls (License No. 23206, Iowa), with project management contact at adam.puls@isginc.com. The drawings emphasize coordination requirements between mechanical and plumbing contractors, field verification of existing conditions, adherence to manufacturer's instructions, and compliance with applicable codes and standards. All work must follow SMACNA HVAC duct construction standards, and the contractor is responsible for providing complete contract documents to all subcontractors. The project documentation includes specifications for new stainless steel piping materials, temperature and pressure relief valves, isolation valves, check valves, and butterfly valves. A phasing schedule must be provided to minimize HVAC system downtime during installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB952200-01 - Addendum 1.pdf | ||
| RFB952200-01 - Notice to Bidder.pdf | ||
| RFB952200-01 - Project Manual.pdf | ||
| RFB952200-01 - Bid Form.pdf | ||
| 1442883-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24/12
FIRE/SMOKE DAMPER
SMOKE DAMPER
FIRE DAMPER
MANUAL DAMPER
GRAVITY BACKDRAFT
DAMPER
MOTORIZED DAMPER
GALVANIZED
STEEL ELBOW
FLEX DUCT
(5'-0" MAX. LENGTH
OF ONE BRANCH) GALVANIZED STEEL
ELBOW AT DIFFUSER
CONNECTION
DIFFUSER
VOLUME
DAMPER
TAKE-OFF
CEILING
RADIATION
DAMPER
EXISTING
DUCTWORK
TO REMAIN
DEMOLISHED
DUCTWORK
BRANCH BALANCING DAMPER
DUCT SIZE
IN FREE
AREA
45 DEGREE
SHOE-TAP
TAKE-OFF
MITERED
ELBOWS
TURNING
VANES
EXHAUST OR
RETURN AIR
INLET
EXHAUST OR RETURN
AIR GRILLE
TYPICAL FLEXIBLE
DUCT CONNECTION
(BEFORE AND AFTER
EQUIPMENT)
NOTES:
• THIS DRAWING IS FOR INFORMATIONAL
PURPOSES ONLY. ITEMS SHOWN ARE NOT
NECESSARILY USED ON THIS PROJECT.
• DUCT SIZE: FIRST NUMBER INDICATES
DIMENSION OF SIDE SHOWN. THE SECOND
NUMBER INDICATES SIDE NOT SHOWN.
- RECTANGULAR DUCT SIZEXX/XX
- ROUND DUCT SIZEX"Ø
- FLAT OVAL DUCT SIZEXX/XX"Ø
- DISCONNECT FROM EXISTING
- THERMOSTAT
- TEMPERATURE SENSOR (DDC)
- HUMIDITY SENSOR
- DUCT SMOKE DETECTOR
- CARBON MONOXIDE SENSOR
- CARBON DIOXIDE SENSOR
- NITROGEN DIOXIDE SENSOR
- PRESSURE SENSOR
SYMBOL LEGEND
DUCTWORK LEGENDHVAC PIPING LEGEND
- HYDRONIC WATER SUPPLYHWS
- HYDRONIC WATER RETURNHWR
- LOW PRESSURE STEAMSTM-L#
- LOW PRESSURE CONDENSATE RETURNCD-L#
- CHILLED WATER SUPPLYCWS
- CHILLED WATER RETURNCWR
A-XX/XX
CFM
GRILLE, REGISTER, DIFFUSER TYPE.
DESIGN CFM
GRILLE, REGISTER, DIFFUSER TAG
A - Ø"
EXTERNAL
INSULATED
DUCT
LINED
DUCTWORK
UNLINED
DUCTWORK
EQUIPMENT
ROUND
SPIN-IN
TAKE-OFF
ACCESS PANEL
FOR TURNING VANES
DUCT INLET SIZE
- SUPPLY AIR DUCT UP / DOWN
- RETURN AIR DUCT UP / DOWN
- EXHAUST AIR DUCT UP / DOWN
EXISTING DUCTWORK SYMBOLS
- CONDENSER WATER SUPPLYCNDS
- CONDENSER WATER RETURNCNDR
FABRIC DUCT SPIRAL DUCT
- BALL VALVE
- BUTTERFLY VALVE
- GATE VALVE
- GAS COCK
- CHECK VALVE
- IN LINE PUMP
- STRAINER
- BALANCING VALVE
- UNION / FLANGE
- PIPING DROP
- INLINE PIPING DROP
- PIPING RISE
- PIPE CAP
- PIPE BREAK
- GLOBE VALVE (NORMALLY CLOSED)
- RELIEF VALVE
FOS
FOR
FUEL OIL SUPPLY
FUEL OIL RETURN
DOMESTIC HOT WATER
DOMESTIC COLD WATER
VENT
DOMESTIC HOT WATER
RECIRCULATION
NATURAL GAS
SANITARY WASTE
- METER
- WALL / END CLEANOUT
- THERMOMETER
- FLOOR DRAIN
- FLOOR SINK
- WALL HYDRANT/ HOSE BIBB
REDUCED PRESSURE PRINCIPLE
BACKFLOW PREVENTER
M
NG
W
V
DCW
DHW
DHWR
FP-W
LIQUID PROPANE
GREASE VENT
GREASE WASTE
FIRE PROTECTION - WET
CONDENSATE DRAIN
COMPRESSED AIR
CD
CA
GW
GV
LP
SANITARY ACID VENT
SANITARY ACID WASTEAW
AV
ST-O STORM OVERFLOW
ST-P STORM PRIMARY
- ISOLATION VALVE
PIPING SYMBOLS
- CLEAN OUT
PLUMBING PIPING LEGEND
IFS
IFR
- IN FLOOR HEATING SUPPLY
- IN FLOOR HEATING RETURN
- GLOBE VALVE
- GATE VALVE (NORMALLY CLOSED)
- NEEDLE VALVE (NORMALLY CLOSED)
- NEEDLE VALVE
- FLEXIBLE CONNECTOR
- 2 WAY CONTROL VALVE
- 3 WAY CONTROL VALVE
RS
RL
- REFRIGERATION SUCTION
- REFRIGERATION LIQUID
T
T S
H
P
NO2
CO2
CO
SD
- INLINE PIPING RISE
FP-D FIRE PROTECTION - DRY
FP-PA FIRE PROTECTION - PRE-ACTION
PIPING TAGS
##"-XXX
NOMINAL PIPE SIZE
PIPE SYSTEM ABBREVIATION
##"-XXX (##) FIXTURE UNITS / FLOW
SHEET ANNOTATION SYMBOLS
01 - KEYNOTE
01 - REVISION NUMBER
- DETAIL NUMBER ON SHEET
- SHEET NUMBER
TYPICAL ANNOTATIONS
A.F.F. - ABOVE FINISH FLOOR
EA - EXHAUST AIR
OA - OUTSIDE AIR (UNCONDITIONED)
RA - RETURN AIR
SA - SUPPLY AIR
N.I.C. - NOT IN CONTRACT
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOJ - BOTTOM OF JOIST
BOP - BOTTOM OF PIPE
BOS - BOTTOM OF STEEL
CL - CENTERLINE
DN - DOWN
DIA - DIAMETER
FT - FEET
HD - HEAD
HP - HORSEPOWER
KW - KILOWATT
PH. - PHASE
GC - GENERAL CONTRACTOR
MC - MECHANICAL CONTRACTOR
PC - PLUMBING CONTRACTOR
MFR - MANUFACTURER
NC - NORMALLY CLOSED
NO - NORMALLY OPEN
OFCI - OWNER FURNISHED,
CONTRACTOR INSTALLED
OFOI - OWNER FURNISHED,
OWNER INSTALLED
PD - PRESSURE DROP (FEET)
PSIA - POUNDS PER SQUARE INCH,
ATMOSPHERIC
RPM - REVOLUTIONS PER MINUTE
BTU/H - BRITISH THERMAL
UNITS PER HOUR
CFM - CUBIC FEET PER MINUTE
ACH - AIR CHANGES PER HOUR
GPM - GALLONS PER MINUTE
MBH - THOUSANDS OF BTUs PER HOUR
A - AMPS
MCA - MINIMUM CIRCUIT AMPACITY
MOCP - MAXIMUM OVER CURRENT PROTECTION
PSIG - POUNDS PER SQUARE INCH,
GAUGE
FPM - FEET PER MINUTE
DB - DECIBELS
DDC - DIRECT DIGITAL CONTROL
ESP - EXTERNAL STATIC PRESSURE
EAT - ENTERING AIR TEMPERATURE (°F)
LAT
EWT
LWT
- LEAVING AIR TEMPERATURE (°F)
- ENTERING WATER TEMPERATURE (°F)
- LEAVING WATER TEMPERATURE (°F)
NC - NOISE CRITERIA
RH - RELATIVE HUMIDITY
BMS - BUILDING MANAGEMENT SYSTEM
FDC - FIRE DEPARTMENT CONNECTION
FLA - FULL LOAD AMPS
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOP - TOP OF PIPE
TOS - TOP OF STEEL
UP - UP
V / VOLT. - VOLTAGE
TYP. - TYPICAL
TSP - TOTAL STATIC PRESSURE
VFD - VARIABLE FREQUENCY DRIVE
VTR - VENT THROUGH ROOF
TON - TON OF COOLING (12,000 BTU/H)
- PIPE ANCHOR
- PIPE GUIDE
- STEAM TRAP
##' - ##" - SPOT ELEVATION
(BOTTOM OF ELEMENT)
DEMOLISHED
EXISTING
NEW
PIPING / EQUIPMENT LINE STYLES
DUCT DN
DUCT UP
F/S
S
F
G
M
- SUPPLY AIR DUCT UP / DOWN
- RETURN AIR DUCT UP / DOWN
- EXHAUST AIR DUCT UP / DOWN
NEW DUCTWORK SYMBOLS
- OUTSIDE AIR DUCT UP / DOWN
- FLUE AIR DUCT UP / DOWN
- OUTSIDE AIR UP / DOWN
- FLUE AIR DUCT UP / DOWN
- CONNECT TO EXISTING
EXISTING PLUMBING PIPING LEGEND NEW PLUMBING PIPING LEGEND
FLAMMABLE VENT
FLAMMABLE WASTEFW
FV
PROCESS VENTPV
STORM OVERFLOWST-O
STORM PRIMARYST-P
VENTV
SANITARY WASTEW
PROCESS WASTEPW
FLAMMABLE VENT
FLAMMABLE WASTEFW
FV
PROCESS VENTPV
STORM OVERFLOWST-O
STORM PRIMARYST-P
VENTV
SANITARY WASTEW
PROCESS WASTEPW
GREASE WASTEGW
GREASE VENTGV
GREASE WASTEGW
GREASE VENTGV
ACID WASTEAW
ACID VENTAC
ACID WASTEAW
ACID VENTAC
/2
/4
R E
F E
R E
N C
E S
C A
L E
SHEET
PROJECT
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
REVIEWED BY
PROJECT INDEX:
OWNER: PROJECT ADDRESS: MANAGING OFFICE:
I & S GROUP, INC. (ISG)
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
9/8/2026 4:17:24 PM
GM0-00
DIV 22,23
SYMBOLS /
ABBREVIATIONS
N.C.F. DIETARY &
LAUNDRY
NEWTON IOWA
HP, ACH
ACH
09/09/26
AWP
9522.00
26-34495
HOT WATER TANK
REPLACEMENT
NEWTON CORRECTIONAL FACILITY
307 S 60th Ave W, Newton
NEWTON, IOWA 50208
PROJECT MANAGER: ADAM PULS
EMAIL: ADAM.PULS@ISGINC.COM
IOWA DEPARMENT OF CORRECTIONS
BRAD HIER
307 S 60th Ave W
NEWTON, IOWA 50208
641.791.1414
NEWTON, IOWA
GM0-00 DIV 22,23 SYMBOLS / ABBREVIATIONS
N.C.F. DIETARY & LAUNDRY HOT WATER TANK
REPLACEMENT
600 34495 GM0-00
ISG PROJECT # 26-34495
SHEET INDEX
SHEET # SHEET TITLE
GENERAL MECHANICAL
GM0-00 DIV 22,23 SYMBOLS / ABBREVIATIONS
MECHANICAL
M1-12 SECOND FLOOR HVAC PLANS
M1-22 SECOND FLOOR PLUMBING PLANS
M6-11 PLUMBING SCHEDULES, ISOMETRICS, AND DETAILS
M7-11 REFERENCE PHOTOS AND NOTES
GENERAL MECHANICAL / PLUMBING NOTES:
1. CONTRACT DOCUMENTS SHALL BE ISSUED TO ALL SUBCONTRACTORS BY THE PRIME CONTRACTOR IN COMPLETE SETS IN ORDER TO ACHIEVE THE FULL EXTENT AND COMPLETE COORDINATION OF ALL WORK.
2. DO NOT SCALE DRAWINGS TO OBTAIN DIMENSIONS. WRITTEN DIMENSIONS GOVERN. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
3. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE LOCAL, STATE, AND NATIONAL LAWS, CODES, ORDINANCES, AND REGULATIONS, AS WELL AS LOCAL UTILITY REQUIREMENTS. PROVIDE ALL ADDITIONAL ACCESSORIES EQUIPMENT AND OTHER WORK NECESSARY FOR A PROPER AND
OPERATIONAL INSTALLATION, TO SATISFY WARRANTY REQUIREMENTS, CODES OR STANDARDS. VERIFY THAT ALL EQUIPMENT PROVIDED IS SUITABLE FOR INTENDED USE. INSTALL ALL EQUIPMENT IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
4. MECHANICAL/PLUMBING DRAWINGS ARE DIAGRAMMATIC IN NATURE. ADDITIONAL OFFSETS, FITTINGS, AND ACCESSORIES MAY BE NEEDED FOR INSTALLATION OF NEW MECHANICAL ELEMENTS. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE WITH OTHER TRADES, ARCHITECTURAL DRAWINGS, AND
STRUCTURAL DRAWINGS.
5. WORK NOT SPECIFICALLY SHOWN IN DETAIL, INDICATED BY REFERENCE, OR OTHERWISE IMPLIED, SHALL BE PROVIDED IN ACCORDANCE WITH THE TRADE OR INDUSTRY BEST STANDARD PRACTICE TO PROVIDE A COMPLETE INSTALLATION.
6. COORDINATE CLOSELY BETWEEN MECHANICAL AND PLUMBING CONTRACTORS TO UTILIZE THE SAME SUPPORTS WHERE POSSIBLE.
7. ALL EQUIPMENT, PIPING, AND DUCTWORK SHALL BE ROUTED TO AVOID CONFLICTS WITH STRUCTURE, OTHER PIPING, ETC. UNLESS SPECIFICALLY DIMENSIONED, THE PIPE AND DUCTWORK SHOWN INDICATES GENERAL LOCATION ONLY, CONTRACTOR SHALL COORDINATE.
8. EXISTING CONDITIONS:
A. ALL ITEMS SHOWN ON THE DRAWINGS ARE AS ACCURATE AS COULD BE DETERMINED. THE CONTRACTOR SHALL OBTAIN EXACT LOCATIONS, SIZES, ELEVATIONS, ETC. AND SHALL SATISFACTORILY ADAPT THE NEW WORK TO THE EXISTING SITE CONDITIONS AS REQUIRED.
B. SINGLE LINE (LIGHT GRAY) LINEWORK AS SHOWN REPRESENTS EXISTING FROM PREVIOUS CONSTRUCTION PROJECTS.
C. REPAIR AND RESTORE EXISTING MECHANICAL ELEMENTS WHICH ARE AFFECTED AS PART OF THIS PROJECT. THIS INCLUDES BUT IS NOT LIMITED TOO, PIPING AND DUCTWORK INSULATION, CONTROLS OF EQUIPMENT TO REMAIN IN OPERATION, ETC.
D. ANY EXISTING CONSTRUCTION OR UTILITIES THAT ARE DAMAGED BY THE CONTRACTOR OR SUBCONTRACTORS SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR TO THE SATISFACTION OF THE OWNER AT NO ADDITIONAL COST. PATCH AND REPAIR CEILINGS, WALLS AND FLOORS TO MATCH
EXISTING ADJACENT SURFACES AFFECTED BY THE NEW WORK. UNLESS OTHERWISE INDICATED, ALL EXISTING UTILITIES TO REMAIN IN PLACE.
E. COORDINATE ALL FLOOR DRAIN LOCATIONS, ELEVATIONS AND FLOOR SLOPES WITH PRIME CONTRACTOR BEFORE BEGINNING WORK.
F. ALL EQUIPMENT AND MATERIALS MUST BE REMOVED FROM THE JOB SITE UNLESS WANTED FOR SALVAGE BY THE OWNER. OWNER RETAINS THE RIGHT TO KEEP ANY EQUIPMENT/MATERIALS UNTIL REMOVED FROM SITE WITH OWNER'S PERMISSION.
9. ANY PAINTED SURFACES AFFECTED BY NEW WORK THAT REQUIRES PATCHING OR REPAIR SHALL BE REPAINTED WITH A MINIMUM OF TWO COATS OF PAINT TO MATCH EXISTING ADJACENT COLOR. THIS WORK BY PRIME CONTRACTOR.
10. PIPING:
A. ROUTE PIPING IN ORDERLY MANNER AND MAINTAIN GRADIENT. ROUTE PARALLEL AND PERPENDICULAR TO WALLS. INSTALL PIPING TO ALLOW FOR EXPANSION AND CONTRACTION WITHOUT STRESSING PIPE, JOINTS, OR CONNECTED EQUIPMENT. PROVIDE ACCESS WHERE VALVES AND FITTINGS ARE NOT EXPOSED. INSULATED PIPES CONVEYING FLUIDS BELOW AMBIENT TEMPERATURE: INSULATE ENTIRE SYSTEM INCLUDING FITTINGS, VALVES, UNIONS, FLANGES, STRAINERS, FLEXIBLE CONNECTIONS, PUMP BODIES, AND EXPANSION JOINTS. CONTINUE INSULATION THROUGH WALLS, SLEEVES, PIPE
HANGERS, AND OTHER PIPE PENETRATIONS.
B. PIPING ABOVE SUSPENDED CEILINGS SHALL BE INSTALLED A MINIMUM OF 6" ABOVE THE CEILING LEVEL.
C. PIPING SIZES TO EQUIPMENT, AND EQUIPMENT SUPPORTS SHALL BE VERIFIED AND ADJUSTED TO MATCH THE ACTUAL EQUIPMENT PROVIDED.
D. ALL DISSIMILAR METALS SHALL BE EFFECTIVELY ISOLATED FROM EACH OTHER TO AVOID GALVANIC CORROSION.
11. DUCTWORK:
A. INSTALL, SUPPORT, AND SEAL DUCTS IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. FLEXIBLE DUCTS: CONNECT TO METAL DUCTS WITH LIQUID ADHESIVE PLUS TAPE. VERIFY THAT DUCTS HAVE BEEN TESTED BEFORE APPLYING INSULATION MATERIALS.
B. PROVIDE DUCT ACCESS DOORS FOR INSPECTION AND CLEANING BEFORE AND AFTER FILTERS, COILS, FANS, AUTOMATIC DAMPERS, AT FIRE DAMPERS, COMBINATION FIRE AND SMOKE DAMPERS, AND ELSEWHERE AS INDICATED.
C. AT FANS AND MOTORIZED EQUIPMENT ASSOCIATED WITH DUCTS, PROVIDE FLEXIBLE DUCT CONNECTIONS IMMEDIATELY ADJACENT TO THE EQUIPMENT.
D. PROVIDE BALANCING DAMPERS ON DUCT TAKE-OFF TO DIFFUSERS, GRILLES, AND REGISTERS, REGARDLESS OF WHETHER DAMPERS ARE SPECIFIED AS PART OF THE DIFFUSER, GRILLE, OR REGISTER ASSEMBLY. PROVIDE ADDITIONAL BALANCING DAMPERS WHERE NECESSARY TO BALANCE DIFFUSER AIR
FLOWS.
12. PROVIDE PHASING SCHEDULE TO OWNERS SHOWING AREAS OF WORK AND HVAC INTERRUPTIONS TO MINIMIZE DOWNTIME.
13. SEAL AND FIRE CAULK ALL PENETRATIONS AS NECESSARY TO MAINTAIN FIRE RATING.
14. ALL FIELD CHANGES ARE TO BE PRE-APPROVED.
15. ALL TRADES SHALL HAVE PRE-WORK CONFERENCE AND COORDINATION TO SCHEDULE WORK, PLAN WORK, DETAIL WORK TO PROVIDE CLEAN, COMPACT, AND THOUGHTFUL CONSIDERED LAYOUT OF EQUIPMENT, DUCT, CONDUIT, PIPE, ETC.
KEYPLAN
SUPPORT
BUILDING "H"
PRINTED SIGNATURE
SIGNATURE DATE
LICENSE RENEWAL DATELICENSE NUMBER
SEAL
S N
E C I
W
E
LANOISSEFORP
L D
IO A
N R
E E
NI
G
E
I HEREBY CERTIFY THAT THE PORTION OF THIS
TECHNICAL SUBMISSION DESCRIBED BELOW WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION
AND RESPONSIBLE CHARGE. I AM A DULY LICENSED
ENGINEER UNDER THE LAWS OF THE STATE OF IOWA.
SHEETS COVERED BY THIS SEAL:
GM0-00, M1-12, M1-22, M6-11, M7-11
ADAM
PULS
23206 23206
ADAM W. PULS
09/09/26
PROPOSED
CRANE STAGING
AREA AND PATH
TO WORK SITE.
OWNER PROJECT # 9522.00
REVISION SCHEDULE
DATE DESCRIPTION BY
EX 60/40
EX 60/40 EX 70/30
EX 70/30
EX 80/40
EX 70/30
EX 55/30
EX 60/30
E X
5/
E X
/2
EX 30/25
E X
/3
EX 50/30
EX 60/45
EX 35/30 DN
EX 35/30 DN
EX 30/25 DN
EX 25/30 DN
EX 14/14 DN
E X
/1
EX 45/40
EX 103/36
E X
/4
E X
/3
EX 40/30 DN
EX 30"ø DN
EX 84/48 UP E
X
/4
EX 38/22 DN
EX 26/22 DN
EX 38/22 DN
EX 26/22 DN
EX 38/22 DN
8' / 10'
LOUVERS
5' 4" WIDE / 28' LONG / 12' HIGH
EXHAUST PLENUM
EX 4"ø UP EX 4"ø UP
D1
EX 42/131 DN
EX 25/69 DN
D3
D6
EX AHU-H4EX AHU-H3
EX AHU-H2
EX AHU-H1
D16
EX 60/40
EX 80/40
EX 70/30
EX 60/30
EX 50/30
E X
/2
E X
/1
E X
/3
EX 14/14 DN
EX 25/30 DN
EX 38/22 DN
EX 26/22 DN
EX 38/22 DN
EX 26/22 DN
EX 38/22 DN
8' / 10'
LOUVERS
5' 4" WIDE / 28' LONG / 12' HIGH
EXHAUST PLENUM
EX 60/40 EX 70/30
EX 70/30
EX 55/30
E X
5/
EX 30/25
EX 35/30 DN
EX 35/30 DN
EX 30/25 DN
EX 45/40
EX 103/36
E X
/4
E X
/3
EX 40/30 DN
EX 30"ø DN
E X
/4
EX 4"ø UP EX 4"ø UP
EX 84/48 UP
EX 60/45
EX 42/131 DN
EX 25/69 DN
H2
H3
M1-12
M1-12
H4
EX AHU-H4EX AHU-H3
EX AHU-H2
EX AHU-H1
H1
ST-1
ST-2
M1-12
M1-12
M1-12
M1-22
M1-22
M1-22
M1-22
P8
REMOVE CURB UNDER
REMOVABLE PANELS
NOMINAL 7'-2" X 4'-0" INSULATED
METAL PANEL (TYP 4)
INSULATED 6'-0" X 3'-0" METAL PANEL
DOOR ON HINGE
LATCH (TYP)
REMOVABLE T-BAR TO
REINFORCE DUCT PLENUM AND
LATCH PANELS TO (TYP 3)
3" ANGLE IRON FRAME TO
REINFORCE PLENUM AND
REMOVABLE PANEL STRUCTURE
3" ANGLE IRON BOLTED TO
FLOOR TO SECURE PANEL
LATCHES TO AND REMOVE
DURING RENOVATIONS
BASE BID: UTILIZE AS MUCH EXISTING
INSULATION AS POSSIBLE AND ONLY
REMOVE AND DISPOSE OF INSULATION
WHERE PANELS AND DOOR IS LOCATED.
BID ALTERNATE #1: REPLACE ALL
INSULATION ON THE PLENUM.
APPROXIMATELY 720 SQFT.
PROVIDE SEALANT INSIDE PLENUM
ALONG THE BASE OF ANGLE IRON
AND REMAINING CURB
NOMINAL 7'-2" X 16'-0" OPENING
EXISTING CURB
EX 60/45
EX 40/30
EX 45/40
NOTE: PANEL FRAME CONSTRUCTED
OF GALVANIZED STEEL 3"X3"X1/4" ANGLE
IRON. GALVANIZED STEEL T-BARS ARE
1"X1"X 1/8".
ACCESS DOOR FRAME IS
CONSTRUCTED OF 1-1/2"X1-1/2"X1/4"
GALVANIZED STEEL ANGLE IRON WITH A
DOOR HINGE.
N
/2
/4
R E
F E
R E
N C
E S
C A
L E
SHEET
PROJECT
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
9/8/2026 4:17:35 PM
M1-12
SECOND FLOOR
HVAC PLANS
N.C.F. DIETARY &
LAUNDRY
NEWTON IOWA
HP, ACH
ACH
09/09/26
AWP
9522.00
26-34495
HOT WATER TANK
REPLACEMENT
M1-12 SECOND FLOOR HVAC PLANS
600 34495 M1-12
1/8" = 1'-0"2
SECOND FLOOR HVAC DEMOLITION PLAN
1/8" = 1'-0"4
SECOND FLOOR NEW HVAC PLAN
1/8" = 1'-0"1
SECOND FLOOR OVERALL MECHANICAL PLAN
KEYPLAN
SUPPORT
BUILDING "H"
KEYNOTE LEGEND
D1 REMOVE AND SALVAGE LOUVERS TO FACILITATE REMOVAL
AND INSTALLATION OF WATER TANKS.
D3 PORTION OF PLENUM TO BE DEMOLISHED. SEE SCHEMATIC
DETAIL 3 / M1-12.
D6 REMOVE AND SALVAGE EXISTING DUCT ELBOW AND ANGLE
IRON SUPPORTS FOR THE NEW EQUIPMENT PATH OF
TRAVEL.
D16 WHEN WORK WRAPS UP FOR THE DAY, LOUVER OPENING
NEEDS TO BE SEALED OR LOUVER REINSTALLED.
H1 PROJECT SCOPE: DISCONNECT AND REMOVE EXISTING
DOMESTIC HOT WATER STORAGE TANKS. REMOVE
LOUVERS AND INDICATED PORTIONS OF PLENUM TO
FACILITATE MOVING NEW DOMESTIC HOT WATER STORAGE
TANKS INTO MECHANICAL ROOM. INSTALL NEW DOMESTIC
HOT WATER STORAGE TANKS INTO EXISTING DOMESTIC
WATER HEATING SYSTEMS. COORDINATE WITH PRIME
CONTRACTOR TO CRANE EQUIPMENT THROUGH LOUVER
OPENING. REPLACE LOUVERS AND CREATE REMOVABLE
PANELS IN PLENUM FOR FUTURE RENOVATIONS. INSULATE
AS SPECIFIED. ALTERNATE #3: OWNER HAS EXISTING
STORED ELECTRICAL TRANSFORMER TO MOVE INTO
MECHANICAL ROOM DURING CONSTRUCTION, COORDINATE
CRANE LIFT WITH PRIME CONTRACTOR AND OWNER.
H2 SHEET METAL CONTRACTOR TO PROVIDE REMOVABLE
PANEL SYSTEM AND ACCESS DOOR FOR CURRENT AND
FUTURE RENOVATIONS. COORDINATE WITH PRIME
CONTRACTOR TO REMOVE CURB UNDER DEMOLISHED
PORTION OF PLENUM. SEE REMOVABLE PANEL SCHEMATIC
DETAIL 3 / M1-12.
H3 RE-INSTALL EXISTING LOUVERS.
H4 ELBOW SERVES EXHAUST AIR OF THE AIR HANDLER. CLOSE
OA/EA DAMPERS DURING WHILE ELBOW IS REMOVED.
REINSTALL SALVAGED DUCT ELBOW AND SUPPORTS AFTER
NEW EQUIPMENT HAS BEEN STAGED.
P8 EXISTING SPRINKLER HEAD LOCATED HERE. DISCONNECT
BACK TO EXISTING SHUT-OFF VALVE. REINSTALL SPRINKLER
AFTER DUCT ELBOW HAS BEEN REINSTALLED.
1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING
CONSTRUCTION.
2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC.
INDICATED ON PLANS ARE BASED ON INFORMATION
FROM CONSTRUCTION DOCUMENTS AND FIELD
VERIFICATION OF EXISTING BUILDING.
3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK,
PIPING, EQUIPMENT, ETC. WITH OTHER TRADES.
SHEET NOTES
3/8" = 1'-0"3
SECTION AT OUTSIDE AIR PLENUM - REMOVABLE PANEL SCHEMATIC
EX DHW - 140°
EX DCWS
EX DHWR - 160°
EX DHW - 140°
EX NG
EX DHW - 160°
EX DHWR - 160°
EX DCWS
EX DWH-H1
EX DWH-H2 EX DWH-H3
EX DWH-H4 EX DWH-H5
EX WSFT
D2
D2
EX STORAGE
TANK
EX STORAGE
TANK
EX
EXPANSION
TANK
EX DHW - 140°
EX DHW - 160°
EX DCWS
EX DHW - 160°
EX DHWR - 160°
EX DCWS
EX FP-W
EX DCW
EX FP-W
EX DHW
EX DCW
EX DHWR
EX DHW - 140°
D4
D4
M6-11
D7
D8
M6-11
ST-1
ST-2
ET-2
EX DHW - 140°
EX DCWS
EX DHWR - 160°
EX DHW - 140°
EX NG
EX DHW - 160°
EX DHWR - 160°
EX DHW - 140°
EX DHW - 160°
EX DCWS
EX DHW - 160°
EX DHWR - 160°
EX DCWS
EX FP-W
EX DCW
EX FP-W
EX DHW
EX DCW
EX DHWR
EX DHW - 140°
EX DWH-H1
EX DWH-H2 EX DWH-H3
EX DWH-H4 EX DWH-H5
ET-1
EX DHWR - 160°
EX DHW - 160°
EX DCWS
P1 P2 P4
P1
P2
P4
1" DCW
1" DCWS
EX DCWS
P5
P6
P6
P7
3/4" DHWR - 160°
2" DCWS
P11
P10
P10
P9
P10
P11
2" DCWS
P9 P10P10
P10
1/4" = 1'-0"2
SECOND FLOOR PLUMBING PLAN - MECHANICAL ROOM
N
/2
/4
R E
F E
R E
N C
E S
C A
L E
SHEET
PROJECT
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
9/8/2026 4:17:46 PM
M1-22
SECOND FLOOR
PLUMBING PLANS
N.C.F. DIETARY &
LAUNDRY
NEWTON IOWA
HP, ACH
ACH
09/09/26
AWP
9522.00
26-34495
HOT WATER TANK
REPLACEMENT
M1-22 SECOND FLOOR PLUMBING PLANS
600 34495 M1-22
1/4" = 1'-0"1
SECOND FLOOR PLUMBING DEMOLITION PLAN - MECHANICAL ROOM
KEYPLAN
SUPPORT
BUILDING "H"
KEYNOTE LEGEND
D2 REMOVE AND DISPOSE OF EXISTING STORAGE TANK AND
PIPING AS NOTED ON PLANS.
D4 PREPARE PORTION OF PIPE WITH TEE OR TAP FOR
CONNECTION NEW EXPANSION TANK.
D7 SEE DEMOLITION ISOMETRIC 2 / M6-11 FOR FURTHER
EXTENTS OF PIPE REMOVAL.
D8 SEE DEMOLITION ISOMETRIC 4 / M6-11 FOR FURTHER
EXTENTS OF PIPE REMOVAL.
P1 INSTALL NEW STORAGE TANK. INSTALL NEW PIPE TO TANK
AND MATCH EXISTING PIPE SIZES.
P2 PROVIDE NEW TEMPERATURE GUAGE.
P4 PROVIDE NEW T&P RELIEF VALVE AND DISHCARGE PIPE.
ROUTE PIPE TO NEAREST FLOOR DRAIN AND TERMINATE
WITH AIR GAP.
P5 CONNECT NEW EXPANSION TANK PIPE INTO DOMESTIC
WATER SUPPLY PIPE.
P6 COORDINATE WITH OWNER FOR SCHEDULING OF TANK
STAGING AND INSTALLATION TO MINIMIZE SYSTEM DOWN
TIME.
P7 UTILIZE AS MUCH EXISTING STAINLESS STEEL PIPING AS
POSSIBLE. SEE SPECIFICATIONS NEW PIPE MATERIAL
INSTALLATION.
P9 CHECK VALVE.
P10 ISOLATION VALVE.
P11 BUTTERFLY VALVE.
1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING
CONSTRUCTION.
2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC.
INDICATED ON PLANS ARE BASED ON INFORMATION
FROM CONSTRUCTION DOCUMENTS AND FIELD
VERIFICATION OF EXISTING BUILDING.
3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK,
PIPING, EQUIPMENT, ETC. WITH OTHER TRADES.
SHEET NOTES
DHW - 140°
DHW - 140°
DHW - 140°
DHWR - 140°
ST-1
ET-1
P1
P4
P2
D2
D5
ET-2
ST-2
P1
P4
P2
D2
FINISHED FLOOR
EXISTING HOT WATER
CIRCULATION PUMP
DCW
DHWR
ST-2
ET-1
160° DHW TO LAUNDRY ROOM
160° DHWR FROM LAUNDRY ROOM
SOFTENED WATER SUPPLY
COMBINATION TEMPERATURE AND PRESSURE RELIEF
PER LOCAL CODE
FLOOR DRAIN
TEMP SENSOR
TO BOILERS
FROM BOILERS
TEMPERATURE GAUGE
TEMPERATURE
GAUGE
ISOLATION VALVE (TYP)
STRAINER
CHECK VALVE (TYP)
FINISHED FLOOR
EXISTING HOT WATER
CIRCULATION PUMP
DCW
DHWR
ST-1
ET-1
140° DHW TO FIXTURES AND TMV
140° DHWR FROM SYSTEM
SOFTENED WATER SUPPLY
COMBINATION
TEMPERATURE AND
PRESSURE RELIEF PER
LOCAL CODE
FLOOR DRAIN
TEMP SENSOR
EXISTING CIRCULATION PUMP
BETWEEN TANK AND BOILERS
140° DHW FROM BOILERS
TO BOILERS
TO TMV
TEMPERATURE
GUAGE
TEMPERATURE GUAGE
/2
/4
R E
F E
R E
N C
E S
C A
L E
SHEET
PROJECT
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
9/8/2026 4:18:04 PM
M6-11
PLUMBING
SCHEDULES,
ISOMETRICS, AND
DETAILS
N.C.F. DIETARY &
LAUNDRY
NEWTON IOWA
HP, ACH
ACH
09/09/26
AWP
9522.00
26-34495
HOT WATER TANK
REPLACEMENT
M6-11 PLUMBING SCHEDULES, ISOMETRICS, AND DETAILS
600 34495 M6-11
NEW PIPING ISOMETRIC - 140° STORAGE TANK
DEMOLITION ISOMETRIC - 140° STORAGE TANK
NEW PIPING ISOMETRIC - 160° STORAGE TANK
DEMOLITION ISOMETRIC - 160° STORAGE TANK
NOTES:
1. INTALL PER MANUFACTURERS INSTRUCTIONS.
2. PROVIDE WITH ASME RATED TEMPERATURE AND PRESSURE RELIEF VALVE.
STORAGE TANK SCHEDULE
MARK MFG MODEL LOCATION SERVICE TANK VOL. FITTING SIZE DIAMETER LENGTH NOTES
ST-1 LAARS STHDI 48168 MECHANICAL ROOM 140° DOMESTIC HOT WATER 1225 3" 48" 168" 1,2
ST-2 LAARS STHDI 48084 MECHANICAL ROOM 160° DOMESTIC HOT WATER 580 3" 48" 84" 1,2
KEYPLAN
SUPPORT
BUILDING "H"
KEYNOTE LEGEND
D2 REMOVE AND DISPOSE OF EXISTING STORAGE TANK AND
PIPING AS NOTED ON PLANS.
D5 REMOVE AND DISPOSE OF EXISTING EXPANSION TANK.
P1 INSTALL NEW STORAGE TANK. INSTALL NEW PIPE TO TANK
AND MATCH EXISTING PIPE SIZES.
P2 PROVIDE NEW TEMPERATURE GUAGE.
P4 PROVIDE NEW T&P RELIEF VALVE AND DISHCARGE PIPE.
ROUTE PIPE TO NEAREST FLOOR DRAIN AND TERMINATE
WITH AIR GAP.
1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING
CONSTRUCTION.
2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC.
INDICATED ON PLANS ARE BASED ON INFORMATION
FROM CONSTRUCTION DOCUMENTS AND FIELD
VERIFICATION OF EXISTING BUILDING.
3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK,
PIPING, EQUIPMENT, ETC. WITH OTHER TRADES.
SHEET NOTES
NOTES:
1. INSTALL UNIT AS SHOWN AND AS PER MANUFACTURER'S INSTRUCTIONS.
2. ASME RATED.
EXPANSION TANK SCHEDULE
MARK MFG MODEL
TANK VOLUME
(GAL)
WEIGHT
(LBS)
MAX. OPERATING
TEMPERATURE
WORKING PRESSURE
(MAX. PSI)
DIAMETER
(IN) HEIGHT (IN) NOTES
ET-1 TACO PAX130-150 34 200 240 150 16 52.5 1,2
ET-2 TACO PAX130-150 34 200 240 150 16 52.5 1,2
NOT TO SCALE8
ST-2 DETAIL
NOT TO SCALE5
ST-1 DETAIL
/2
/4
R E
F E
R E
N C
E S
C A
L E
SHEET
PROJECT
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
9/8/2026 4:18:14 PM
M7-11
REFERENCE
PHOTOS AND
NOTES
N.C.F. DIETARY &
LAUNDRY
NEWTON IOWA
HP, ACH
ACH
09/09/26
AWP
9522.00
26-34495
HOT WATER TANK
REPLACEMENT
M7-11 REFERENCE PHOTOS AND NOTES
600 34495 M7-11
EXISTING LAUNDRY STORAGE TANK
PHOTO 1
FACING NORTH EAST
EXISTING DIETARY STORAGE TANK EXISTING PLENUM AND DUCT ELBOW
STAGING AREA
PHOTO 2
FACING EAST
PHOTO 3
FACING NORTH
PHOTO 4
FACING NORTH
PHOTO 5
FACING NORTH WEST
PHOTO 6
FACING NORTH AT STAGING AREA
PHOTO 7
FACING SOUTH TOWARDS STAIR ACCESS AND PLENUM
PHOTO 8
FACING WEST AT ELBOW TO REMOVED AND REINSTALLED
PHOTO 9
FACING WEST AT ELBOW TO REMOVED AND REINSTALLED
PHOTO 10
FACING SOUTH WEST AT PLENUM
LOUVER BEING REMOVED
AND REINSTALLED
LOUVER BEHIND THIS PLENUM
PATH OF TRAVEL TO BOILERS
FROM PLENUM
DOOR TO STRAIRS
PHOTO 11
FACING NORTH EAST INSIDE PLENUM
File details come from the government source that posted it. Updated .