RFB952200-01 - Addendum 1.pdf
PDF 2 MB Posted
- Attached to
- DOC NCF Dietary and Laundry Hot Water Tank
- Solicitation number
- RFB952200-01
- Issued by
- Jasper County, Iowa
About this file
This addendum document issued by the Iowa Department of Administrative Services pertains to Request for Bid (RFB) 952200-01 for the replacement of dietary and laundry hot water storage tanks at Newton Correctional Facility in Newton, Iowa. Addendum #01, dated September 29, 2026, revises the original bidding and contract documents issued September 9, 2026, and supersedes conflicting provisions. The project scope includes removal and replacement of existing domestic hot water storage tanks and expansion tanks, installation of additional expansion tanks, temporary removal and reinstallation of louver and outdoor air intake plenum, revisions to plumbing piping, and related work. The addendum provides clarifications on revised plumbing plan sheets M1-22 and M6-11, specifying revised tank expansion tanks and the retention of the existing circulation pump between tanks and boilers until the boiler replacement project. Bidders are required to acknowledge receipt of the addendum on the bid form, with failure to do so potentially resulting in disqualification. A pre-bid meeting was held on September 22, 2026, at 11:00 a.m. with representatives from I&S Group Inc., Newton Correctional Facility, Samuels Group Inc., and the State of Iowa Department of Administrative Services. Bids were due October 6, 2026, by 2:00 p.m., with the bid opening scheduled for 3:00 p.m. the same day via conference call. Questions and substitution requests were due in writing by September 24, 2026, by 2:00 p.m.
The specifications identify approved manufacturers for domestic hot water storage tanks, including Laars, Lochinvar, Niles, PVI, and American Wheatley, with American Wheatley approved as a substitution. Expansion tank manufacturers include Amtrol Inc., Bell & Gossett, Taco Inc., and American Wheatley. Storage tanks must comply with ASME standards for pressure vessels, feature welded steel construction rated at 125 psig working pressure, include glass lining with 20 mil thickness, and be furnished with aquastat, drain valve, pressure-temperature relief valve, and magnesium anodes. Expansion tanks must be welded steel with ASME certification, rated at 125 psig, supplied with flexible rubber bladders that are removable and replaceable, pressure gauges, air-charging fittings, and precharge to 40 psig. The project requires a 10-year manufacturer warranty on water storage tanks, registered in the owner's name. Bid security of 5 percent of the total bid amount is required, and apparent low bidders must submit subcontractor and supplier lists within 48 hours of bid opening. Construction is scheduled from April 5 to April 30, 2027, with submittal periods from October 23 to November 25, 2026. Site work requires onsite supervision by the prime contractor, daily logs, background checks for all workers, work hours limited to 7:00 a.m. to 3:00 p.m. Monday through Friday, and compliance with facility rules including no smoking or vaping. The project includes accommodation for lifting an owner-furnished transformer weighing 3,960 pounds into the mechanical room using crane services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB952200-01 - Drawings (file size reduced).pdf | ||
| RFB952200-01 - Notice to Bidder.pdf | ||
| RFB952200-01 - Project Manual.pdf | ||
| RFB952200-01 - Bid Form.pdf | ||
| 1442883-event.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DOC NCF Dietary and Laundry Hot Water Tank Replacement Newton, Iowa
RFB952200-01
Addendum #01
ADDENDUM #01
Project Name: DOC NCF Dietary and Laundry Hot Water Tank Replacement
DAS# 9522.00
RFB 952200-01
Dated: September 29, 2026
This Addendum forms a part of the bidding and contract documents. This Addendum supersedes and supplements all portions of the original bidding and contract documents dated September 09, 2026 with which it conflicts.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE
BID FORM. FAILURE TO DO SO MAY SUBJECT THE BIDDER TO
DISQUALIFICATION.
1) CLARIFICATIONS
A. Refer to revised plan sheet M1-22 – Second Floor Plumbing Plans
1. Revised tank expansion tanks
2. Revised existing circulation pump between tanks and boilers to remain until boiler replacement project.
B. Refer to revised plan sheet M6-11 – Plumbing Schedules, Isometrics, and Details
1. Revised expansion tank schedule.
2. Revised existing circulation pump between tanks and boilers to remain until boiler replacement project on the isometric and detail.
2) SPECIFICATIONS
A. See attached Section 22 3000: Plumbing Equipment
1. Revised 2.02 Expansion Tanks. Replaced section in its entirety.
B. See attached Specifications cover sheet with revised Samuels Group address.
3) QUESTIONS
A. None
4) SUBSTITUTION REQUESTS
A. 22 3000: Domestic hot water storage tanks:
RFB952200-01
1. American Wheatley
B. 22 3000: Expansion tanks:
1. American Wheatley
5) ATTACHMENTS
A. Pre-Bid meeting agenda and sign in sheet
B. 22 3000: Plumbing Equipment
C. M1-22
D. M6-11
E. Prebid agenda and sign-in sheet
F. Specifications Cover Sheet
END OF ADDENDUM
RFB952200-01
PROJECT 9522.00 Plumbing Equipment 09-09-26 223000 - 1
SECTION 223000
PLUMBING EQUIPMENT
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Domestic hot water storage tanks.
B. Diaphragm-type compression tanks.
1.02 RELATED REQUIREMENTS
A. Section 260583 - Wiring Connections: Electrical characteristics and wiring connections.
1.03 REFERENCE STANDARDS
A. ASME BPVC-VIII-1 - Boiler and Pressure Vessel Code, Section VIII, Division 1: Rules for
Construction of Pressure Vessels; 2025, with Errata .
1.04 SUBMITTALS
A. See Section 013000 - Administrative Requirements for submittals procedures.
B. Product Data:
1. Provide dimension drawings of water heaters indicating components and connections to other equipment and piping.
C. Warranty Documentation: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.
1.05 DELIVERY, STORAGE, AND HANDLING
A. Provide temporary inlet and outlet caps. Maintain caps in place until installation.
1.06 WARRANTY
A. See Section 017800 - Closeout Submittals for additional warranty requirements.
B. Water Storage Tank Manufacturer Warranty: Provide minimum 10 years manufacturer warranty for water storage tanks. Complete forms in Owner's name and register with manufacturer.
PART 2 PRODUCTS
2.01 DOMESTIC HOT WATER STORAGE TANKS
A. Manufacturers:
1. Laars: www.laars.com/.
2. Lochinvar: www.lochinvar.com/.
3. Niles: www.nilesst.com/.
4. PVI: www.pvi.com/.
5. American Wheatley: www.americanwheatley.com/.
6. Substitutions: See Section 016000 - Product Requirements.
B. Tank: Welded steel, ASME labeled for working pressure of 125 psig, steel support saddles, tappings for accessories, threaded connections, access manhole.
C. Insulation:
1. BASE BID: Refer to Section 220716 - Plumbing Equipment Insulation.
2. ALTERNATE #2: Manufacturer applied, field repairable, spray polyurethane foam with a
100% acryilic topcoat.
a. Polyurethane Foam: >90% closed cell contect, minimum 0.17 K-factor, maximum 2.9 perms, ASTM E-84 compliant flame spread, minimum R-16.
b. Acrylic Coating: minimum 25 mils thick, smooth, 11 perms @ 20 mils.
D. Lining: 20 mil thick finished glass lining extended through connections. Minimum adheasion of Class 4. Minimum spot acid testing of Class A.
RFB952200-01
PROJECT 9522.00 Plumbing Equipment 09-09-26 223000 - 2
E. Openings and Connections:
1. Threaded top hot water outlet, bottom cold water inlet, 3 inch. Minimum two each.
2. Threaded openings for aquastat, drain, PT release valve, and thermometer.
F. Accessories: Provide aquastat, drain valve, and pressure-temperature (PT) relief valve ASME rated for maximum working pressure, and two magnesium anodes.
2.02 EXPANSION TANKS
A. Manufacturers:
1. Amtrol Inc: www.amtrol.com/#sle.
2. Bell & Gossett, a brand of Xylem, Inc: www.bellgossett.com/#sle.
3. Taco, Inc: www.taco-hvac.com/#sle.
4. American Wheatly: www.americanwheatley.com/.
5. Substitutions: See Section 016000 - Product Requirements.
B. Construction: Welded steel, tested and stamped in accordance with ASME BPVC-VIII-1;
supplied with National Board Form U-1, rated for working pressure of 125 psig, with flexible EPDMor seamless heavy duty butyl rubber bladder. All wetted components shall be fabricated of FDA approved materials. Bladder shall be able to accept the partial or full volume of the expansion tank and shall be removable and replaceable. The bladder shall be fabricated to allow the bag to more easily collapse and facilitate replacement. The bladder shall be connected to the top of the tank via a hose/tube that with distribution holes that facilitate even expansion of the bladder. Threaded water connection.
C. Accessories: Pressure gauge and air-charging fitting, tank drain, lifting lug; precharge to 40 psig.
PART 3 EXECUTION
3.01 INSTALLATION
A. Install plumbing equipment in accordance with manufacturer's instructions, as required by code, and complying with conditions required for applicable certifications.
B. Electrical Work: Provide automatic control and protective devices with associated wiring to interconnect related interfaced devices required for specified operation.
C. Coordinate system, equipment, and piping work with applicable electrical, fuel, gas, vent, drain, and waste support interconnections as included or provided by other trades.
D. Domestic Water Storage Tanks:
1. Provide factory installed support, independent of building structural framing members.
2. Clean and flush. Seal until pipe connections are made.
END OF SECTION 223000
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9522.00 DOC NCF Dietary and Laundry Hot Water Tank Replacement
307 S 60th Ave E W Newton, Iowa 50208
P: 641-792-7552
RFB Pre-Bid Agenda: Meeting #1
Meeting Date Sep 22, 2026 Meeting Time 11:00 am - 12:00 pm Central Time (US & Canada)
Meeting Location NCF Facility Video Conferencing Link
Join Meeting
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Attachments
Scheduled Attendees
Name Company Phone Number Email
Andy Hummel I&S Group Inc. P: (515) 243-9143 andy.hummel@isginc.com
Adam Puls I&S Group Inc. P: (515) 243-9143 adam.puls@isginc.com
Brad Heir Newton Correctional Facility P: (515) 314-8820 brad.hier@iowa.gov
Ryan Trease Newton Correctional Facility P: (641) 792-7552 ryan.trease@iowa.gov
Mike Brooks Samuels Group, Inc. P: (515) 288-0467 mbrooks@samuelsgroup.net
Jerry Dehnke Samuels Group, Inc. P: (515) 288-0467 jdehnke@samuelsgroup.net
Cody Lawrence Samuels Group, Inc. P: (515) 288-0467 clawrence@samuelsgroup.net
Mac McKeever Samuels Group, Inc. mmckeever@samuelsgroup.net
Brian Polzin Samuels Group, Inc. P: (715) 841-1982 bpolzin@samuelsgroup.net
Bill Reynolds Samuels Group, Inc. P: (515) 288-0467 breynolds@samuelsgroup.net
Chitrangi Shastri Samuels Group, Inc. P: (515) 518-6575 cshastri@samuelsgroup.net
Brad Tonyan State of Iowa - Department of Administrative Services
P: 515-360-7718 brad.tonyan@iowa.gov
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description Everyone please make sure to fill in the sign in sheet
Project Overview
State of Iowa - Department of Administrative Services Page 1 of 4 Printed On: Sep 29, 2026 11:18 AM CDT https://teams.microsoft.com/meet/273474402386623?p=EfSAa59AZCcFMMjRTh
2.1 1 Project Description Open
Description Replacement of dietary and laundry domestic hot water storage tanks, including removal and replacement of existing storage tanks and one expansion tank, installation of one additional expansion tank, temporary removal and reinstallation of the louver, outdoor air intake plenum, and exhaust ductwork, revisions to plumbing piping as required, and all related work indicated in the drawings and specifications
• Base Bid - BP 01 - Dietary and Laundry Hot Water Tank Replacement
• Alternates -o ALT 01 - Outdoor Air Insulation o ALT 02 - Manufacturer Applied Tank Insulation
• Unit prices - No unit prices
• The owner has an electrical transformer they would like lifted into the mechanical room at the same time the new water tanks are being lifted. This contractor is to include some crane time in this bid for this lift. The owner will be responsible for getting the transformer to the crane site and will move the equipment once its in the building. The transformer weighs 3960 LBS. (see pic in appendix)
2.2 1 Project Schedule Open
Description
• Contract(s) Issued: Oct. 7 - 23.
• Submittals: Oct. 23 to Nov. 25
• Construction: April 5 to April 30, 2027 (Depending on lead time for equipment)
• Closeout: May 2027
A pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
Contractors are to make sure the Appendix is reviewed for additional facility information.
Meeting #1 - RFB Pre-Bid Project: 9522.00 DOC NCF Dietary and Laundry Hot Water Tank Replacement
State of Iowa - Department of Administrative Services Page 2 of 4 Printed On: Sep 29, 2026 11:18 AM CDT
• Temporary facilities o Toilets - Contractor's use of owner's toilets in the building the work in being completed in is available. Unless the contractor wants to provide their own temporary toilet outside the prison fence.
o Owner will provide electrical power and water.
• Demolished equipment - To be removed from the facility by the contractor.
• Tool control
• Cell phones
• Background checks - Will need to be completed by all workers on site.
• Work hours: Work hours are from 07:00 AM to 03:00 PM, Monday through Friday, unless arrangements are made in advance. See the information in the appendix for added information on work hours.
• View Specification 01 1200 - Contract Summary for more information.
RFB Overview
3.1 1 Bid Submission Open
Description
• Bids are due: October 6, 2026 by 2:00 pm
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date. DO THIS DAYS BEFORE BID ARE DO.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call:
o Dial in by phone - 3:00 pm October 6, 2026 +1 469-998-6043,,30563855# United States, Dallas Phone conference ID: 305 638 55#
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount
• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening.
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@das.iowa.gov: September 24, 2026 by 2:00 pm
• Addendum Issued: September 29, 2026
• Bids Due: October 6, 2026 by 2:00 pm
State of Iowa - Department of Administrative Services Page 3 of 4 Printed On: Sep 29, 2026 11:18 AM CDT mailto:Construction.Procurement@das.iowa.gov:
• Tentative NOI Issued: October 7, 2026
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
• Contractors are to provide a site-specific safety plan before construction begins.
3.4 1 Pre-Bid Site Visits Open
Description No additional site visits are planed besides today for this project.
Questions
4.1 1 Questions Open
Description Submit all questions in writing to construction.procurement@iowa.gov.
Questions or substitution requests are due in writing by September 24, 2026 by 2:00 pm.
State of Iowa - Department of Administrative Services Page 4 of 4 Printed On: Sep 29, 2026 11:18 AM CDT mailto:construction.procurement@iowa.gov
PROJECT MANUAL
PROJECT NAME:
DOC NCF Dietary and Laundry Hot Water
Tank Replacement
PROJECT ADDRESS:
Newton Correctional Facility (NCF)
307 S 60th Ave. W, Newton, Iowa 50208
PROJECT DATE: September 9, 2026
OWNER:
Iowa Department of Administrative Services
109 Southeast 13th Street
Des Moines, Iowa 50319
OWNER PROJECT NUMBER: 9522.00
OWNER REQUEST FOR BID NUMBER: RFB 952200-01
CONSTRUCTION MANAGER:
Samuels Group
2929 Westown Parkway, Suite 200
West Des Moines, IA 50266
CONSTRUCTION MANAGER PROJECT NUMBER: 7926
ARCHITECT:
ISG
217 E 2nd Street, Suite 110
Des Moines, Iowa 50309
ARCHITECT PROJECT NUMBER: 26-34495
EX DHW - 140°
EX DCWS
EX DHWR - 160°
EX DHW - 140°
EX NG
EX DHW - 160°
EX DHWR - 160°
EX DCWS
EX DWH-H1
EX DWH-H2 EX DWH-H3
EX DWH-H4 EX DWH-H5
EX WSFT
D2
D2
EX STORAGE
TANK
EX STORAGE
TANK
EX
EXPANSION
TANK
EX DHW - 140°
EX DHW - 160°
EX DCWS
EX DHW - 160°
EX DHWR - 160°
EX DCWS
EX FP-W
EX DCW
EX FP-W
EX DHW
EX DCW
EX DHWR
EX DHW - 140°
D4
D4
M6-11
D7
D8
M6-11
ST-1
ST-2
ET-2
EX DHW - 140°
EX DCWS
EX DHWR - 160°
EX DHW - 140°
EX NG
EX DHW - 160°
EX DHWR - 160°
EX DHW - 140°
EX DHW - 160°
EX DCWS
EX DHW - 160°
EX DHWR - 160°
EX DCWS
EX FP-W
EX DCW
EX FP-W
EX DHW
EX DCW
EX DHWR
EX DHW - 140°
EX DWH-H1
EX DWH-H2 EX DWH-H3
EX DWH-H4 EX DWH-H5
ET-1
EX DHWR - 160°
EX DHW - 160°
EX DCWS
P1 P2 P4
P1
P2
P4
P3
1" DCWS
1" DCWS
EX DCWS
P5
P6
P6
P7
P7
3/4" DHWR - 160°
2" DCWS
P11
P10
P10
P9
P10
P11
2" DCWS
P9 P10P10
P10
1/4" = 1'-0"2
SECOND FLOOR PLUMBING PLAN - MECHANICAL ROOM
N
/2
/4
R E
F E
R E
N C
E S
C A
L E
SHEET
PROJECT
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
9/29/2026 8:42:26 AM
M1-22
SECOND FLOOR
PLUMBING PLANS
N.C.F. DIETARY &
LAUNDRY
NEWTON IOWA
HP, ACH
ACH
09/09/26
AWP
9522.00
26-34495
HOT WATER TANK
REPLACEMENT
M1-22 SECOND FLOOR PLUMBING PLANS
600 34495 M1-22
1/4" = 1'-0"1
SECOND FLOOR PLUMBING DEMOLITION PLAN - MECHANICAL ROOM
KEYPLAN
SUPPORT
BUILDING "H"
KEYNOTE LEGEND
D2 REMOVE AND DISPOSE OF EXISTING STORAGE TANK AND
PIPING AS NOTED ON PLANS.
D4 PREPARE PORTION OF PIPE WITH TEE OR TAP FOR
CONNECTION NEW EXPANSION TANK.
D7 SEE DEMOLITION ISOMETRIC 2 / M6-11 FOR FURTHER
EXTENTS OF PIPE REMOVAL.
D8 SEE DEMOLITION ISOMETRIC 4 / M6-11 FOR FURTHER
EXTENTS OF PIPE REMOVAL.
P1 INSTALL NEW STORAGE TANK. INSTALL NEW PIPE TO TANK
AND MATCH EXISTING PIPE SIZES.
P2 PROVIDE NEW TEMPERATURE GUAGE.
P3 RESTORE RECIRCULATION PUMP TO EXISTING OPERATION.
P4 PROVIDE NEW T&P RELIEF VALVE AND DISHCARGE PIPE.
ROUTE PIPE TO NEAREST FLOOR DRAIN AND TERMINATE
WITH AIR GAP.
P5 CONNECT NEW EXPANSION TANK PIPE INTO DOMESTIC
WATER SUPPLY PIPE.
P6 COORDINATE WITH OWNER FOR SCHEDULING OF TANK
STAGING AND INSTALLATION TO MINIMIZE SYSTEM DOWN
TIME.
P7 UTILIZE AS MUCH EXISTING STAINLESS STEEL PIPING AS
POSSIBLE. SEE SPECIFICATIONS NEW PIPE MATERIAL
INSTALLATION.
P9 CHECK VALVE.
P10 ISOLATION VALVE.
P11 BUTTERFLY VALVE.
1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING
CONSTRUCTION.
2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC.
INDICATED ON PLANS ARE BASED ON INFORMATION
FROM CONSTRUCTION DOCUMENTS AND FIELD
VERIFICATION OF EXISTING BUILDING.
3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK,
PIPING, EQUIPMENT, ETC. WITH OTHER TRADES.
SHEET NOTES
REVISION SCHEDULE
DATE DESCRIPTION BY
09/29/26 ADDENDUM #1 ACH
DHW - 140°
DHW - 140°
DHW - 140°
DHWR - 140°
ST-1
ET-1
P1
P4
P2
D2
D5
ET-2
ST-2
P1
P4
P2
D2
FINISHED FLOOR
EXISTING HOT WATER
CIRCULATION PUMP
DCW
DHWR
ST-2
ET-1
160° DHW TO LAUNDRY ROOM
160° DHWR FROM LAUNDRY ROOM
SOFTENED WATER SUPPLY
COMBINATION TEMPERATURE AND PRESSURE RELIEF
PER LOCAL CODE
FLOOR DRAIN
TEMP SENSOR
TO BOILERS
FROM BOILERS
TEMPERATURE GAUGE
TEMPERATURE
GAUGE
ISOLATION VALVE (TYP)
STRAINER
CHECK VALVE (TYP)
EXISTING CIRCULATION PUMP
BETWEEN TANK AND BOILERS TO
REMAIN.
FINISHED FLOOR
EXISTING HOT WATER
CIRCULATION PUMP
DCW
DHWR
ST-1
ET-1
140° DHW TO FIXTURES AND TMV
140° DHWR FROM SYSTEM
SOFTENED WATER SUPPLY
COMBINATION
TEMPERATURE AND
PRESSURE RELIEF PER
LOCAL CODE
FLOOR DRAIN
TEMP SENSOR
EXISTING CIRCULATION PUMP
BETWEEN TANK AND BOILERS
140° DHW FROM BOILERS
TO BOILERS
TO TMV
TEMPERATURE
GUAGE
TEMPERATURE GUAGE
/2
/4
R E
F E
R E
N C
E S
C A
L E
SHEET
PROJECT
PROJECT NO.
FILE NAME
DRAWN BY
DESIGNED BY
ORIGINAL ISSUE DATE
CLIENT PROJECT NO.
TITLE
REVIEWED BY
THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,
INC. AND MAY NOT BE USED, COPIED OR DUPLICATED
WITHOUT PRIOR WRITTEN CONSENT.
© 2024 I & S GROUP, INC.
9/29/2026 8:42:15 AM
M6-11
PLUMBING
SCHEDULES,
ISOMETRICS, AND
DETAILS
N.C.F. DIETARY &
LAUNDRY
NEWTON IOWA
HP, ACH
ACH
09/09/26
AWP
9522.00
26-34495
HOT WATER TANK
REPLACEMENT
M6-11 PLUMBING SCHEDULES, ISOMETRICS, AND DETAILS
600 34495 M6-11
NEW PIPING ISOMETRIC - 140° STORAGE TANK
DEMOLITION ISOMETRIC - 140° STORAGE TANK
NEW PIPING ISOMETRIC - 160° STORAGE TANK
DEMOLITION ISOMETRIC - 160° STORAGE TANK
NOTES:
1. INTALL PER MANUFACTURERS INSTRUCTIONS.
2. PROVIDE WITH ASME RATED TEMPERATURE AND PRESSURE RELIEF VALVE.
STORAGE TANK SCHEDULE
MARK MFG MODEL LOCATION SERVICE TANK VOL. FITTING SIZE DIAMETER LENGTH NOTES
ST-1 LAARS STHDI 48168 MECHANICAL ROOM 140° DOMESTIC HOT WATER 1225 3" 48" 168" 1,2
ST-2 LAARS STHDI 48084 MECHANICAL ROOM 160° DOMESTIC HOT WATER 580 3" 48" 84" 1,2
KEYPLAN
SUPPORT
BUILDING "H"
KEYNOTE LEGEND
D2 REMOVE AND DISPOSE OF EXISTING STORAGE TANK AND
PIPING AS NOTED ON PLANS.
D5 REMOVE AND DISPOSE OF EXISTING EXPANSION TANK.
P1 INSTALL NEW STORAGE TANK. INSTALL NEW PIPE TO TANK
AND MATCH EXISTING PIPE SIZES.
P2 PROVIDE NEW TEMPERATURE GUAGE.
P4 PROVIDE NEW T&P RELIEF VALVE AND DISHCARGE PIPE.
ROUTE PIPE TO NEAREST FLOOR DRAIN AND TERMINATE
WITH AIR GAP.
1. FIELD VERIFY ALL SITE CONDITIONS BEFORE STARTING
CONSTRUCTION.
2. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, ETC.
INDICATED ON PLANS ARE BASED ON INFORMATION
FROM CONSTRUCTION DOCUMENTS AND FIELD
VERIFICATION OF EXISTING BUILDING.
3. COORDINATE INSTALLATION OF ALL NEW DUCTWORK,
PIPING, EQUIPMENT, ETC. WITH OTHER TRADES.
SHEET NOTES
NOTES:
1. INSTALL UNIT AS SHOWN AND AS PER MANUFACTURER'S INSTRUCTIONS.
2. ASME RATED.
EXPANSION TANK SCHEDULE
MARK MFG MODEL
ACCEPTANCE
VOLUME (GAL)
WEIGHT
(LBS)
MAX. OPERATING
TEMPERATURE
WORKING PRESSURE
(MAX. PSI)
DIAMETER
(IN) HEIGHT (IN) NOTES
ET-1 TACO PAX170-150 24 240 240 150 16 65.75" 1,2
ET-2 TACO PAX254-150 34 280 240 150 20 67.25" 1,2
NOT TO SCALE8
ST-2 DETAIL
NOT TO SCALE5
ST-1 DETAIL
REVISION SCHEDULE
DATE DESCRIPTION BY
09/29/26 ADDENDUM #1 ACH
File details come from the government source that posted it. Updated .