This document is a set of technical drawings and bidding documents prepared by the Iowa Department of Administrative Services (DAS) for the IMHI Infirmary Building Roof Replacement project located at 2277 Iowa Avenue, Independence, Iowa 50644. The project, identified as RFB951900-01 with project number 9519.00, involves the complete replacement of the building's roof system with an issue date of July 31, 2026. The scope of work includes the removal of existing asphalt shingle roofing down to plywood, removal of EPDM roof membrane systems, installation of new asphalt shingle roofing over synthetic underlayment to match existing colors, installation of new EPDM membrane roofing, and associated flashing and vent work. The drawings specify multiple roof details including wall flashing, kickout flashing, scupper details, wind turbine vents, and box roof vents. The contractor is responsible for maintaining and preserving existing conditions including copper gutters, downspouts, stone parapet caps, and gutter systems that are to remain in place during construction. Field verification of all existing dimensions, site conditions, and building conditions is required prior to commencing demolition, and the building interior must remain dry throughout the re-roofing project.

The drawings indicate that site staging and access to the gated area must be coordinated with the owner, and the interior of the building will not be accessible during the project duration. The design includes ice and water shield underlayment applied a minimum of three feet on asphalt shingle areas and two feet on EPDM areas, rigid insulation layers, high-density cover board, and metal edge treatments with dark bronze-colored flashing and metal components. All existing roofing elements to remain, including copper materials, must be protected during demolition and new construction, with any damaged existing construction requiring restoration to the same or better condition than before damage occurred. The specifications require compliance with manufacturer requirements for roof membrane seam adhesion, proper fastening and sealant applications, and site verification of existing conditions prior to construction commencement.

View the file

Other files

File Type Posted
RFB951900-01 - Project Manual.pdf PDF
RFB951900-01 - Notice to Bidders.pdf PDF
RFB951900-01 - Bid Form.pdf PDF
RFB951900-01 - Addendum #1.pdf PDF
1424601-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOOR IDENTIFICATION

NOTE REFERENCE

ROOM IDENTIFICATION

BUILDING SECTION

WINDOW IDENTIFICATION

ROOM NAME

DETAIL NUMBER

DRAWING SHEET NUMBER

ELEVATION REFERENCE

ELEVATION NUMBER

DRAWING SHEET NUMBER

A1 A1.1

MATCHLINE

STRUCTURAL GRIDLINE

WALL SECTION

DETAIL NUMBER

DRAWING SHEET NUMBER

A1

A1.1

A1.1

DETAIL SECTION/ DETAIL CALLOUT

DETAIL NUMBER

DRAWING SHEET NUMBER

A1

A1.1

ROOM NAME

ROOM NUMBER

A1

CEILING IDENTIFICATION1

WALL IDENTIFICATION1

LEVELLEVEL 1

SPOT ELEVATION

0'-0"

0'-0"

LEVEL IDENTIFICATION

ELEVATION

FLOORING FINISH TRANSITION

CORNER GUARDS, TYP.

CG

CASEWORK IDENTIFICATION

WIDTH

HEIGHT (INCLUDES COUNTERTOP)

DEPTH

MODEL NUMBER ('M' DENOTES MODIFICATION

100M

EXTRA SHELF MODIFICATION DESCRIPTION

EARTH

PLYWOOD

GYPSUM WALLBOARD

CONCRETE BLOCK

CONCRETE

RIGID INSULATION

BATT INSULATION

DIMENSION LUMBER

WOOD

SAND & GRAVEL

EXPANSION JOINT

INDEPENDENCE, IA

PROJECT

HIGHWAY 20

IO

W

A A

V E

232ND ST

PROJECT

232ND ST

NOTES:

1. THE INTERIOR OF THE BUILDING WILL NOT BE ACCESSIBLE FOR THE DURATION OF THE PROJECT.

2. SITE STAGING TO BE COORDINATED WITH THE OWNER.

3. COORDINATE ACCESS TO THE GATED AREA WITH THE OWNER.

GATED AREA

PROJECT NUMBER:

DATE:

DRAWING INDEX:

BIDDING DOCUMENTS

07-31-2026

IMHI INFIRMARY BUILDING ROOF REPLACEMENT

2277 IOWA AVE, INDEPENDENCE, IA 50644

IOWA DEPARTMENT OF ADMINISTRATIVE SERVICES (DAS)

9519.00

.0

IM

H

I

IN

F

IR

M A

R Y

B U

IL

D

IN

G

R O

O F

R E

P L A

C E

M E

N T

B

ID

D

IN

G

D O

C U

M E

N T

S

I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge. I am a duly registered architect under the laws of the State of Iowa.

Registration Expires

Reg. #

Pages or Sheets covered by this seal:

Signature

Date issued

O L

N AE

ROF

N S

C E

E

WOI A

I D

L P

T C

E C

TI

H

A R

SS I

BRUCE BONESTROO 06771

ARCHITECT

As listed above

07-31-202606-30-2028

BRUCE

BONESTROO

06771

ARCHITECTURE

AD1.0 DEMOLITION ROOF PLAN

A1.0 ROOF PLAN

A2.0 EXTERIOR ELEVATION

A3.0 ROOF DETAILS

GENERAL

G0.0 COVER

MATERIALS LEGEND

SYMBOLS LEGEND ABBREVIATIONS

ACT Acoustical Ceiling Tile

AFF After Finish Floor

ALUM Aluminum

ADA Americans with Disabilities Act

& And

L Angle

@ At

BCS Baby Changing Station

BOL Bollard

CIP Cast In Place

CBB Cement Backer Board

CL Center Line

CLR Clear

CONC Concrete

CONF Conference

CJ Construction Joint

CONT Continuous

CLJ Control Joint

CG Corner Guard

DIA Diameter

DS Downspout

EA Each

EHD Electric Hand Dryer

EWC Electric Water Cooler

EL Elevation

ELEV Elevation

ENG Engineered

EQ Equal

ETC Etcetera

EPDM Ethylene Propylene DieneTerpolymer

EXP Expansion

EJ Expansion Joint

EXT Exterior

EIFS Exterior Insulation Finish System

FRP Fiberglass Reinforced Panel

FF Finish Floor

FE Fire Extinguisher

FEC Fire Extinguisher Cabinet

FD Floor Drain

FT Foot or Feet

GA Gage

GT Glazing Type

GB Grab Bar

GYP Gypsum

GYP BD Gypsum Board

HM Hollow Metal

HSS Hollow Structural Sections

IR Impact Resistant

IT Information Technology

IMP Insulated Metal Panel

INSUL Insulation

INT Interior

JT Joint

MFR Manufacturer

MAX Maximum

MECH Mechanical

MEPT Mechanical/ Electrical/ Plumbing/ Technology

MTL Metal

MIN Minimum

MIR Mirror

NIC Not In Contract

OC On Center

OHS Overhead Sectional Door

PT Paint

PTD Paper Towel Dispenser

PLAM Plastic Laminate

PVC Polyvinyl Chloride

LB Pound

RCP Reflected Ceiling Plan

REQD Required

REV Reversed

RTU Roof Top Unit

SNR Sanitary Napkin Receptacle

SJ Saw Joint

SIM Similar

SDS Soap Dispenser

STL Steel

STRUCT Structure

TKSP Tack Strip

MIL Thousands of an Inch

TP Toilet Paper Dispenser

TOW Top of Wall

TYP Typical

VIF Verify in Field

VERT Vertical w/ With

WD Wood

PROXIMITY MAP

TYP

NOT IN

SCOPE

8 8

8 8

9 9

8 8 8

5 5

TYP

TYP

TYP

TYP

7 7

TYP

6 6 6 6 6 6

6 6

TYP

TYP

EXIT

DOOR

BELOW

EXIT

DOOR

BELOW

EXIT

DOOR

BELOW

EXIT

DOOR

BELOW

TYP

46 6

TYP

TYP

TYP

TYP

TYP

TYP

TYP

PHOTO - A

PHOTO - B

PHOTO - D

PHOTO - C

PHOTO - E

PHOTO - F

A. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING AND PRESERVING THE EXISTING

CONDITIONS WHICH ARE TO REMAIN, INCLUDING, BUT NOT LIMITED TO, COPPER

GUTTERS, DOWNSPOUTS, ETC. IF ANY EXISTING CONSTRUCTION TO REMAIN IS

DAMAGED, CONTRACTOR IS RESPONSIBLE FOR RESTORING THE DAMAGED AREA TO

A CONDITION THE SAME OR BETTER THAN BEFORE DAMAGE OCCURRED.

B. EFFORTS HAVE BEEN MADE TO DOCUMENT EXISTING CONDITIONS. HOWEVER,

GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

CONDITIONS PRIOR TO COMMENCING DEMOLITION. FIELD VERIFY ALL EXISTING

DIMENSIONS, SITE CONDITIONS, AND BUILDING CONDITIONS.

C. THESE DEMOLITION DRAWINGS REPRESENT THE LAYOUT OF EXISTING CONDITIONS

& MAJOR COMPONENTS. THEY ARE NOT TO BE CONSTRUED AS A COMPLETE

REPRESENTATION OF MATERIALS & INCIDENTAL CONSTRUCTION.

D. THE BUILDING INTERIOR IS TO REMAIN DRY DURING THE RE-ROOFING PROJECT.

B ACDE

FG

B ACDEFG

©2024REVISIONS:

PROJECT NUMBER

PROJECT ISSUE DATE

REV DATE DESCRIPTION

A R

C H

IT

E

C T

F

O

LD

K el lo g g A ve m es

IA

P h on e

: 5

.2

.0

AD1.0

DEMOLITION ROOF

PLAN

IM

H

I I N

F

IR

M A

R Y

B U

IL

D

IN

G

R O

O F

R E

P

LA

C E

M E

N T

IO

W

A D

EP

AR

TM

EN

T O

F

AD

M

IN

IS

TR

AT

IV

E

SE

R

VI

C

ES

(D

AS

IO

W

A

AV

E, IN

D

EP

EN

D

EN

C

E, IA

07-31-2026 9519.00

BIDDING DOCUMENTS

ROOF DEMOLITION NOTES

1 REMOVE ASPHALT SHINGLE ROOF DOWN TO PLYWOOD. REVIEW QUAILITY OF

PLYWOOD. PREP FOR NEW CONSTRUCTION.

2 REMOVE EPDM ROOF MEMBRANE AND ANY COVERBOARD AND INSULATION. REVIEW

QUALITY OF ROOF DECK. PREP FOR NEW CONSTRUCTION.

3 (E) ROOF TO REMAIN. PROTECT DURING CONSTRUCTION.

4 (E) GUTTER SYSTEM TO REMAIN IN PLACE. PROTECT DURING CONSTRUCTION.

5 (E) SCUPPER CONDUCTOR HEAD AND DOWNSPOUT TO REMAIN IN PLACE. PROTECT

DURING CONSTRUCTION. REMOVE (E) SCUPPER FLASHING. PREP FOR NEW

CONSTRUCTION.

6 (E) DOWNSPOUT TO REMAIN IN PLACE. PROTECT DURING CONSTRUCTION.

7 (E) STONE PARAPET CAP TO REMAIN. PROTECT DURING CONSTRUCTION.

8 REMOVE AND DISPOSE OF VENT. PREP FOR NEW CONSTRUCTION.

9 (E) VENT TO REMAIN. REMOVE AND DISPOSE OF BOOT FLASHING.

10 NOT USED.

11 REMOVE AND DISPOSE OF (E) FLASHING. (E) REGLET-MOUNTED FLASHING RECEIVERS

TO REMAIN WHERE PROVIDED FOR REUSE. PREP FOR NEW CONSTRUCTION.

SCALE:

TRUE

1/8" = 1'-0"G1 DEMOLITION ROOF PLAN

GENERAL NOTESEXISTING PHOTOS

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

PHOTO - A PHOTO - B

PHOTO - C PHOTO - D

PHOTO - E PHOTO - F

A. CONTRACTOR IS RESPONSIBLE FOR MAINTAINING AND PRESERVING THE EXISTING

CONDITIONS WHICH ARE TO REMAIN, INCLUDING, BUT NOT LIMITED TO, COPPER

GUTTERS, DOWNSPOUTS, ETC. IF ANY EXISTING CONSTRUCTION TO REMAIN IS

DAMAGED, CONTRACTOR IS RESPONSIBLE FOR RESTORING THE DAMAGED AREA TO

A CONDITION THE SAME OR BETTER THAN BEFORE DAMAGE OCCURRED.

B. EFFORTS HAVE BEEN MADE TO DOCUMENT EXISTING CONDITIONS. HOWEVER,

GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

CONDITIONS PRIOR TO COMMENCING DEMOLITION. FIELD VERIFY ALL EXISTING

DIMENSIONS, SITE CONDITIONS, AND BUILDING CONDITIONS.

C. THESE DEMOLITION DRAWINGS REPRESENT THE LAYOUT OF EXISTING CONDITIONS

& MAJOR COMPONENTS. THEY ARE NOT TO BE CONSTRUED AS A COMPLETE

REPRESENTATION OF MATERIALS & INCIDENTAL CONSTRUCTION.

D. THE BUILDING INTERIOR IS TO REMAIN DRY DURING THE RE-ROOFING PROJECT.

A2.0

G1

41'-0" 62'-0" 59'-0" 62'-0" 41'-0"

VIF

265'-0"

V

IF

9' -0

V

IF

'-0

V

IF

'-0

VIF

43'-0"

V

IF

6' -0

8"

8"

8" / 12"

8"

8"

8"

8"

8" / 12" 8" / 12"

8"

8"

8"

8" / 12"

8"

8"

NOT IN

SCOPE

TYP

TYP

TYP

TYP

6 6 6 6 6 6

6 6

8 8

8 8

9 9

8 8 8

TYP

TYP

G1 A3.0

TYP

TYP

TYP

TYP

TYP

TYP

A1.0 G4

A1.0 G4

MIR

EXIT

DOOR

BELOW

EXIT

DOOR

BELOW

EXIT

DOOR

BELOW

EXIT

DOOR

BELOW

46 64

TYP

TYP

TYP

TYP

TYP

TYP

B2 A3.0

SimTYP

RIDGE

HIP

R

ID

GE

VALL

EY

HIP RIDGE

HIP RIDGE HIP

R

ID

GE

VALLEY

R

ID

G E

RIDGE

HIP RIDGE

VALLEY

HIP

R

ID

GE

HIP

R

ID

GEHIP RIDGE

VALL

EY

R

ID

G E

RIDGE

VALL

EYVALLEY

VALL

EYVALLEY

R

ID

G E

HIP RIDGE

HIP

R

ID

GE

D1 A3.0

TYP

TYP

B1 A3.0

TYP

TYP

B ACDE

FG

B ACDEFG

©2024REVISIONS:

PROJECT NUMBER

PROJECT ISSUE DATE

REV DATE DESCRIPTION

A R

C H

IT

E

C T

F

O

LD

K el lo g g es

IA

on e

: 5

.2

.0

A1.0

ROOF PLAN

IM

H

I I N

F

IR

M A

R Y

B U

IL

D

IN

G

R O

O F

R E

P

LA

C E

M E

N T

IO

W

A D

EP

AR

TM

EN

T O

F

AD

M

IN

IS

TR

AT

IV

E

SE

R

VI

C

ES

(D

AS

IO

W

A

AV

E, IN

D

EP

EN

D

EN

C

E, IA

07-31-2026 9519.00

BIDDING DOCUMENTS

ROOF PLAN NOTES

1 ASPHALT SHINGLE ROOF OVER SYNTHETIC UNDERLAYMENT. COLOR TO MATCH

EXISTING SHINGLES.

2 EDPM ROOF MEMBRANE.

3 (E) ROOF TO REMAIN. PROTECT DURING CONSTRUCTION.

4 (E) GUTTER SYSTEM TO REMAIN IN PLACE. PROTECT DURING CONSTRUCTION.

5 SCUPPER. SEE DETAIL G4/A3.0.

6 (E) DOWNSPOUT TO REMAIN IN PLACE. PROTECT DURING CONSTRUCTION.

7 (E) STONE PARAPET CAP TO REMAIN. PROTECT DURING CONSTRUCTION.

8 WIND TURBINE ROOF VENT. SEE DETAIL G2/A3.0.

9 (E) VENT. SEE DETAIL D2/A3.0.

10 NOT USED.

11 CRICKET TO SCUPPER.

12 BOX ROOF VENT. SEE DETAIL E2/A3.

13 PROVIDE NEW FLASHING ALONG ENTIRE WALL. SEE DETAIL B2/A3.0.

14 PROVIDE NEW KICKOUT FLASHING TO DIVERT WATER AWAY FROM WALL. SEE DETAIL

D4/A3.0.

15 ROOF CORNICE.

16 ADHERED ICE & WATER SHIELD BELOW SHINGLES - SHADED GRAY. WRAP UP WALL TO

TOP OF FLASHING.

GENERAL NOTES

SCALE:

TRUE

1/8" = 1'-0"G1 ROOF PLAN

SCALE:

TRUE

1/2" = 1'-0"G4 ENLARGED ROOF PLAN

GUTTERS, DOWNSPOUTS, ETC. IF ANY EXISTING CONSTRUCTION TO REMAIN IS

DAMAGED, CONTRACTOR IS RESPONSIBLE FOR RESTORING THE DAMAGED AREA TO

A CONDITION THE SAME OR BETTER THAN BEFORE DAMAGE OCCURRED.

B. EFFORTS HAVE BEEN MADE TO DOCUMENT EXISTING CONDITIONS. HOWEVER,

GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

CONDITIONS PRIOR TO COMMENCING DEMOLITION. FIELD VERIFY ALL EXISTING

DIMENSIONS, SITE CONDITIONS, AND BUILDING CONDITIONS.

C. THESE DEMOLITION DRAWINGS REPRESENT THE LAYOUT OF EXISTING CONDITIONS

& MAJOR COMPONENTS. THEY ARE NOT TO BE CONSTRUED AS A COMPLETE

REPRESENTATION OF MATERIALS & INCIDENTAL CONSTRUCTION.

D. THE BUILDING INTERIOR IS TO REMAIN DRY DURING THE RE-ROOFING PROJECT.

8"

8"

8"

8"

8"

16 16

3TYP

5 5

6 6 6

4 4

6 6 6

TYP

TYP

TYP

TYP

G1 A3.0

TYP

TYP

TYP

TYP

TYP

TYP

TYP

D1 A3.0

TYP

E4

A3.0

SimTYP

6 6

B ACDE

FG

B ACDEFG

©2024REVISIONS:

PROJECT NUMBER

PROJECT ISSUE DATE

REV DATE DESCRIPTION

A R

C H

IT

E

C T

F

O

LD

K el lo g g es

IA

on e

: 5

.2

.0

A2.0

EXTERIOR ELEVATION

IM

H

I I N

F

IR

M A

R Y

B U

IL

D

IN

G

R O

O F

R E

P

LA

C E

M E

N T

IO

W

A D

EP

AR

TM

EN

T O

F

AD

M

IN

IS

TR

AT

IV

E

SE

R

VI

C

ES

(D

AS

IO

W

A

AV

E, IN

D

EP

EN

D

EN

C

E, IA

07-31-2026 9519.00

BIDDING DOCUMENTS

EXTERIOR ELEVATION NOTES

1 ASPHALT SHINGLE ROOF OVER SYNTHETIC UNDERLAYMENT. COLOR TO MATCH

EXISTING SHINGLES.

2 EDPM ROOF.

3 (E) ROOF TO REMAIN.

4 (E) GUTTER SYSTEM TO REMAIN IN PLACE. PROTECT DURING CONSTRUCTION.

5 SCUPPER. SEE DETAIL G4/A3.0.

6 (E) DOWNSPOUT TO REMAIN IN PLACE. PROTECT DURING CONSTRUCTION.

7 (E) STONE PARAPET CAP TO REMAIN. PROTECT DURING CONSTRUCTION.

8 WIND TURBINE ROOF VENT. SEE DETAIL G2/A3.0.

9 (E) VENT. SEE DETAIL D2/A3.0.

10 NOT USED.

11 FLASHING. COLOR: DARK BRONZE.

12 BOX ROOF VENT. SEE DETAIL E2/A3.0.

13 PROVIDE NEW FLASHING ALONG ENTIRE WALL. SEE DETAIL B2/A3.0.

14 (E) CLADDING TO REMAIN.

15 ROOF CORNICE.

16 METAL ROOF EDGE. COLOR: MATCH EXISTING STONE PARAPET CAP. SITE VERIFY

PROFILE RADIUS.

GENERAL NOTES

SCALE: 1/8" = 1'-0"G1 EXTERIOR ELEVATION - NORTH EAST

GUTTERS, DOWNSPOUTS, ETC. IF ANY EXISTING CONSTRUCTION TO REMAIN IS

DAMAGED, CONTRACTOR IS RESPONSIBLE FOR RESTORING THE DAMAGED AREA TO

A CONDITION THE SAME OR BETTER THAN BEFORE DAMAGE OCCURRED.

B. EFFORTS HAVE BEEN MADE TO DOCUMENT EXISTING CONDITIONS. HOWEVER,

GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING

CONDITIONS PRIOR TO COMMENCING DEMOLITION. FIELD VERIFY ALL EXISTING

DIMENSIONS, SITE CONDITIONS, AND BUILDING CONDITIONS.

C. THESE DEMOLITION DRAWINGS REPRESENT THE LAYOUT OF EXISTING CONDITIONS

& MAJOR COMPONENTS. THEY ARE NOT TO BE CONSTRUED AS A COMPLETE

REPRESENTATION OF MATERIALS & INCIDENTAL CONSTRUCTION.

D. THE BUILDING INTERIOR IS TO REMAIN DRY DURING THE RE-ROOFING PROJECT.

ICE & W

ATER SHIELD

3'-0 " M

IN

7" V

IF

EDPM2'-0

" M

IN

B ACDE

FG

B ACDEFG

©2024REVISIONS:

PROJECT NUMBER

PROJECT ISSUE DATE

REV DATE DESCRIPTION

A R

C H

IT

E

C T

F

O

LD

K el lo g g es

IA

on e

: 5

.2

.0

A3.0

ROOF DETAILS

IM

H

I I N

F

IR

M A

R Y

B U

IL

D

IN

G

R O

O F

R E

P

LA

C E

M E

N T

IO

W

A D

EP

AR

TM

EN

T O

F

AD

M

IN

IS

TR

AT

IV

E

SE

R

VI

C

ES

(D

AS

IO

W

A

AV

E, IN

D

EP

EN

D

EN

C

E, IA

07-31-2026 9519.00

BIDDING DOCUMENTS

GENERAL NOTES ROOF DETAIL NOTES

1 (E) MASONRY WALL.

2 (E) FRAMING.

3 (E) GUTTER, HANGER, AND STRAP.

4 (E) DOWNSPOUT.

5 ASPHALT SHINGLE SYSTEM.

6 ADHERED ICE & WATER SHIELD.

7 DRIP FLASHING.

8 REVIEW QUALITY OF (E) PLYWOOD TO REMAIN. REPLACE PLYWOOD IF REQUIRED DUE

TO DAMAGE.

9 (E) COPPER TO REMAIN. PROTECT DURING DEMOLITION AND NEW CONSTRUCTION.

10 GALVANIZED WIND TURBINE VENT. MATCH SIZE OF EXISTING VENT.

11 ROOF VENT. MATCH SIZE OF EXISTING VENT.

12 6" MIN OVERLAP OF ADHERED ICE & WATER SHIELD ON ROOF MEMBRANE.

13 EDPM ROOF MEMBRANE; FULLY ADHERED.

14 1/2" HIGH DENSITY COVER BOARD.

15 RIGID INSULATION.

16 ADHERE SEAM PER ROOF MANUFACTURER'S REQUIREMENTS.

17 METAL STEP FLASHING.

18 BOOT FLASHING.

19 5/8" ROOF COVER BOARD ADHERED TO DECK - TYPE X.

20 VAPOR BARRIER ADHERED TO COVERBOARD AND PARAPET.

21 WELDED METAL SCUPPER SLEEVE.

22 REINFORCED PERIMETER FASTENING STRIP.

23 ROOF EDGE SECUREMENT FASTENER.

24 PREFINISHED METAL COUNTERFLASHING OVER METAL TERMINATION BAR WITH

FASTENERS AND SEALANT PER SPECIFICATION REQUIREMENTS. COLOR: DARK

BRONZE.

25 REVIEW QUALITY OF (E) ROOF DECK TO REMAIN. REPLACE IF REQUIRED DUE TO

DAMAGE.

26 SCUPPER SIDEWALL BEYOND.

27 (E) CONDUCTOR HEAD AND DOWNSPOUT.

28 PREFINISHED METAL WIND CLIP. COLOR: DARK BRONZE.

29 SELF-ADHERED ROOF UNDERLAYMENT.

30 CONTINUOUS BUTYL SEAL.

31 PREFINISHED METAL CAP & BASE FLASHING SECURED WITH CLEATS. COLOR: DARK

BRONZE.

32 (E) REGLET-MOUNTED FLASHING RECEIVER.

33 (E) STONE SILL.

34 TWO PIECE COATED METAL ROOF EDGE AT PERIMETER. ATTACH CONTINUOUS METAL

CLEAT AT FACE EDGE. TERMINATE BASE OF ROOF EDGE BASE CLEAT WITH

CONTINUOUS BUTYL SEAL. COLOR: MATCH EXISTING STONE PARAPET CAP. SITE

VERIFY PROFILE RADIUS.

35 TREATED WOOD BLOCKING.

SCALE: 1 1/2" = 1'-0"G1 ROOF DETAIL

ASPHALT

SCALE: 1 1/2" = 1'-0"G2 ROOF DETAIL

WIND TURBINE VENT

SCALE: 1 1/2" = 1'-0"D2 ROOF DETAIL

ROOF PIPE BOOT

SCALE: 1 1/2" = 1'-0"D1 ROOF DETAIL

EPDM & CORNICE

SCALE: 1 1/2" = 1'-0"B2 ROOF DETAIL

WALL FLASHING

SCALE: 1 1/2" = 1'-0"B1 ROOF DETAIL

EPDM TO ASPHALT

SCALE: 1 1/2" = 1'-0"G4 ROOF DETAIL

SCUPPER

SCALE: 1 1/2" = 1'-0"E2 ROOF DETAIL

BOX ROOF VENT

SCALE: 1 1/2" = 1'-0"E4 ROOF DETAIL

SILL

D4 TYPICAL KICKOUT FLASHING DETAIL

Sheets
A1.0 - ROOF PLAN
A2.0 - EXTERIOR ELEVATION
A3.0 - ROOF DETAILS
AD1.0 - DEMOLITION ROOF PLAN
G0.0 - COVER

File details come from the government source that posted it. Updated .