This document is an addendum to a Request for Bids (RFB) issued by the Iowa Department of Administrative Services (DAS) for the ISD Elementary School & Outreach Building Fire Alarm Replacement project at the Iowa School for the Deaf in Council Bluffs, Iowa. The addendum provides clarifications regarding the pre-bid meeting location and parking, and includes a substitution request approval for the Siemens Desigo fire alarm system. The project involves the demolition and replacement of the fire alarm systems in the Outreach Building and Elementary Building at the Iowa School for the Deaf.

The project is funded by the State of Iowa and located in Pottawattamie County. No additional details are provided regarding pricing terms, set asides, incumbents, funding amounts or sources, or the contract term and renewal options.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISD Elem. School & Outreach Bld. Fire Alarm Replacement Council Bluffs, IA

DAS 9381.00

RFB938100-01

Addendum #1

ADDENDUM #1

Project Name:

ISD Elem. School & Outreach Bld. Fire Alarm Replacement

DAS# 9381.00

RFB 938100-01

Addendum #1 Dated: February 14, 2024

This Addendum forms a part of the bidding and contract documents. This Addendum supersedes and supplements all portions of the original bidding and contract documents dated Feb. 02, 2024 with which it conflicts.

ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE

BID FORM. FAILURE TO DO SO MAY SUBJECT THE BIDDER TO

DISQUALIFICATION.

1) CLARIFICATIONS

A. The Pre-bid meeting will be held at the Infirmary Building (AKA Outreach Building).

See attached map for location and parking.

2) PLANS

A. No items.

3) QUESTIONS AND CLARIFICATIONS

A. No items.

4) SUBSTITUTION REQUESTS

A. Siemens Desigo - Approved

5) ATTACHMENTS

A. Pre-bid Meeting Location and Parking (1 page)

B. Subst. Request Siemens Desigo System (2 pages)

END OF ADDENDUM

Io w a S c h o o l f o r th e D e a f

H ar ry L an gd o n

B lv d , C o u n ci l B lu ff s, IA

In fir m ar y B ui ld in g

A .K

.A O ut re ac h

B ui lid ng

P ar ki ng

ISD Elem. School & Outreach Bldg. Fire Alarm Replacement

PROJECT 9381.00 SUBSTITUTION PROCEDURES 01 2500 - 2

02-02-2024 [Type text]

SUBSTITUTION REQUEST FORM

Project:

To:

Re:

Substitution Request Number:

From:

Date:

A/E Project Number:

Specification Title: Description:

Section: Page: Article/Paragraph:

Proposed Substitution:

Manufacturer: Address: Phone:

Trade Name: Model No.:

History: New product 2-5 years old 5-10 yrs old More than 10 years old

Differences between proposed substitution and specified product:

Point-by-point comparative data prepared by contractor and attached - REQUIRED BY A/E

Reason for not providing specified item:

Similar Installation:

Project: Architect:

Address: Owner:

Date Installed:

Proposed substitution affects other parts of Work: No Yes; explain

Supporting Data Attached: Drawings Product Data Samples Tests Reports

IA School for the Deaf Fire Panel Replacement

Siemens

2/13/2024Michael Bradbury – Issuing Officer

Fire Panel Subsitution

Add Siemens to fire alarm spec'd manufacturer

Siemens 7901 Birchwood Ct Johnston, IA 1800-832-6569

Desigo

XX

See attached flyers of products

X

XX

FC/FV 2025

Woodward Resource Center

34 Cedar St

Woodward, IA Multiple panels being installed phase1 and 2

State of IA

Shive-Hattery Inc.

268100

2.1

Manufacturers

ISD Elem. School & Outreach Bldg. Fire Alarm Replacement

PROJECT 9381.00 SUBSTITUTION PROCEDURES 01 2500 - 3

02-02-2024 [Type text]

SUBSTITUTION REQUEST FORM

(Continued)

The Undersigned certifies:

• Proposed substitution has been fully investigated and determined to be equal or superior in all respects to specified product.

• Same warranty will be furnished for proposed substitution as for specified product.

• Same maintenance service and source of replacement parts, as applicable, is available.

• Proposed substitution will have no adverse effect on other trades and will not affect or delay progress schedule.

• Cost data as stated above is complete. Claims for additional costs related to accepted substitution which may subsequently become apparent are to be waived.

• Proposed substitution does not affect dimensions and functional clearances.

• Payment will be made for changes to building design, including A/E design, detailing, and construction costs caused by the substitution.

• Coordination, installation, and changes in the Work as necessary for accepted substitution will be complete in all respects.

Submitted by:

Signed by:

Firm:

Address:

Telephone:

Attachments:

A/E's REVIEW AND ACTION

Substitution approved - Make submittals in accordance with Specification Section 01 3300.

Substitution approved as noted - Make submittals in accordance with Specification Section 01 3300.

Substitution rejected - Use specified materials.

Substitution Request received too late - Use specified materials.

Signed by: Date:

Additional Comments: Contractor Subcontractor Supplier Manufacturer A/E

Keith Martin

Siemens

7901 Birchwood Ct Johnston, IA 50131

515-314-9998 Direct cell

X

2/13/24