RFB937400-01 - Drawings.pdf

PDF 3 MB Posted

Attached to
HHS CHMI Voldeng Gym Conditioning & Ceiling Repairs
Solicitation number
RFB937400-01
Issued by
Carroll County, Iowa

About this file

This document contains the drawings, specifications, and schedules for the Mechanical and Electrical work for the HHS CHMI Ceiling Repair project in West Des Moines, Iowa. The project involves the removal and replacement of existing mechanical and electrical equipment, including blower coils, exhaust fans, lighting fixtures, and related components. New classroom air conditioning units, fabric ductwork, and lighting will be installed. All work must conform to applicable local, state, and national codes and regulations. The project requires coordination between the mechanical, electrical, and architectural trades.

The document outlines general and specific requirements for the mechanical and electrical work, including equipment specifications, installation standards, testing and balancing, as-built drawings, and O&M manuals. Pricing, contracting, and funding details are not provided in this technical drawing set.

View the file

Other files

File Type Posted
RFB937400-01 - Project Manual.pdf PDF
Drawings.pdf PDF
Project Manual.pdf PDF
1267262-event.pdf PDF
RFB937400-01 - Notice to Bidders.pdf PDF
RFB937400-01 - Bid Form.pdf PDF
Bid Form.pdf PDF
Notice to Bidders.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

09/12/24

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

M0.0

M

EC

H

AN

IC

AL

N O

TE

S

GENERAL MECHANICAL NOTES

1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE LOCAL,

STATE, AND NATIONAL CODES, AS WELL AS LOCAL UTILITY REQUIREMENTS. PROVIDE

ALL REQUIRED ACCESSORIES AND EQUIPMENT FOR A COMPLETE OPERATIONAL

SYSTEM AND MAINTAIN WARRANTY REQUIREMENTS. VERIFY ALL EQUIPMENT

PROVIDED IS SUITABLE FOR INTENDED USE.

2. WORK NOT SPECIFICALLY SHOWN IN DETAIL, REFERENCED, OR OTHERWISE IMPLIED,

SHALL BE PROVIDED IN ACCORDANCE WITH TRADE OR INDUSTRY BEST STANDARD

PRACTICES TO PROVIDE A COMPLETE OPERATIONAL SYSTEM.

3. ALL MATERIALS SHALL BE NEW AND SHALL BE OF THE TYPE AND SHALL MEET THE

CAPACITIES OF EQUIPMENT SPECIFIED ON THE DRAWINGS.

4. ALL EQUIPMENT LISTED UNDER THESE SPECIFICATIONS SHALL BE LIMITED TO

PRODUCTS REGULARLY PRODUCED AND RECOMMENDED FOR SERVICE IN

ACCORDANCE WITH ENGINEERING DATA, RATINGS, OR OTHER COMPREHENSIVE

LITERATURE MADE AVAILABLE TO THE PUBLIC AND IN EFFECT AT THE TIME OF

OPENING BIDS.

5. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE

MANUFACTURER'S INSTRUCTIONS AND CODE REQUIREMENTS FOR TYPE AND

CAPACITY OF EACH PIECE OF EQUIPMENT USED.

6. ALL CUTTING AND PATCHING REQUIRED FOR MECHANICAL WORK SHALL BE

PERFORMED BY THE MECHANICAL CONTRACTOR UNLESS NOTED OTHERWISE. ALL

FINISHED SURFACES THAT ARE CUT SHALL BE REPLACED IN KIND SO THERE IS NO

VISIBLE EVIDENCE OF CUTTING AND/OR PATCHING.

7. INSTALL HANGERS AND SUPPORTS AS REQUIRED TO ADEQUATELY AND SECURELY

SUPPORT MECHANICAL SYSTEM COMPONENTS IN A NEAT AND WORKMANLIKE

MANNER. DO NOT FASTEN SUPPORTS TO PIPES, DUCTS, MECHANICAL EQUIPMENT, OR

CONDUIT.

8. COORDINATE DUCTWORK ROUTING AND EQUIPMENT WITH BUILDING STRUCTURE,

LIGHTING, AND FIRE ALARM DEVICES.

9. DUCTWORK SUPPORTS SHALL BE SECURED TO STRUCTURE AT 5'-0" ON CENTER.

10. ALL EXPOSED MATERIALS SHALL BE PLENUM RATED.

11. NO LOADS SHALL BE PERMITTED TO BE HUNG FROM ROOF DECKING. ALL HANGERS

SHALL BE HUNG DIRECTLY FROM STRUCTURE.

12. PROVIDE THIRD PARTY TESTING AND BALANCING OF MECHANICAL SYSTEM.

13. PROVIDE AS-BUILT DRAWINGS FOR MECHANICAL SYSTEMS WITHIN 30 DAYS OF FINAL

COMPLETION.

14. PROVIDE O&M MANUALS FOR ALL SYSTEMS AND EQUIPMENT TO OWNER WITHIN 30

DAYS OF FINAL COMPLETION.

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

AutoCAD SHX Text

DAS NO.

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

MD1.01/8" = 1'-0"

MECHANICAL DEMO FLOOR PLAN1N

KEYED NOTES

REMOVE EXISTING BLOWER COIL AND RETURN TO OWNER.

STEAM AND CONDENSATE PIPING TO REMAIN FOR

RECONNECTION. REFER TO NEW WORK PLANS.

REMOVE EXISTING EXHAUST FAN AND RETURN TO OWNER.

REFER TO ARCHITECTURAL FOR INFILL REQUIREMENTS.

M

EC

H

AN

IC

AL

D

EM

O

FL

O O

R P

LA

N

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

ACU-1 ACU-2

1 1/2" LPS 1 1/4" LPS

3/4" CD 3/4" CD3/4" CD

09/12/24

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

M1.01/8" = 1'-0"

MECHANICAL FLOOR PLAN1N

KEYED NOTES

INSTALL NEW CLASSROOM AIR CONDITIONER. COORDINATE

WALL SLEEVE WITH EXISTING WINDOW OPENING. PROVIDE

FRONT AND TOP FILLER PANELS BETWEEN UNITS

FABRICATED AND PAINTED TO MATCH UNITS

RACK 1-1/2" LOW PRESSURE STEAM (LPS) AND 1/2" STEAM

CONDENSATE (CDS) PIPING ALONG WALL AS HIGH AS

POSSIBLE TO MAINTAIN FALL. COORDINATE WITH

ARCHITECTURAL FOR ELEVATIONS.

ROUTE 3/4" COOLING CONDENSATE (CD) ALONG MOLDING

HIGH ON WALL. CONDENSATE PIPING SHALL BE INSULATED

AND WRAPPED WITH PVC JACKET. COORDINATE WITH

ARCHITECTURAL ELEVATIONS.

3/4" CD, 1/2" CDS, AND 1-1/4" LPS TO ACU.

CONNECT 1-1/2" LPS AND 1/2" CDS TO EXISTING PIPING.

3/4" CD DOWN TO MOP BASIN.

M

EC

H

AN

IC

AL

F

LO

O R

PL

AN

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

14"Ø SA

"Ø

S A

14"Ø SA

14"Ø SA

09/12/24

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

M2.01/8" = 1'-0"

MECHANICAL CEILING PLAN1N

KEYED NOTES

14"Ø SA FABRIC DUCT DOWN TO ACU. REFER TO SHEET M1.0

FOR CONTINUATION.

ROUTE FABRIC DUCT IMMEDIATELY BELOW SOLID CEILING.

DUCT SHALL BE RUN HORIZONTALLY AND NOT SLOPED.

M

EC

H

AN

IC

AL

C

EI

LI

N

G

PL

AN

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

M6.0

M

EC

H

AN

IC

AL

SC

H

ED

U

LE

S

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

E0.0

EL

EC

TR

IC

AL

N

O

TE

S

SC

H

ED

U

LE

S

GENERAL ELECTRICAL NOTES

1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL

APPLICABLE LOCAL, STATE, AND NATIONAL CODES, AS WELL AS

LOCAL UTILITY REQUIREMENTS. CONTRACTOR SHALL

COORDINATE WITH LOCAL CODE OFFICIALS TO DETERMINE IF

ANY CODE INTERPRETATIONS BY CODE ENFORCEMENT

OFFICIALS WILL IMPACT PLANNED WORK.

2. PROVIDE ALL REQUIRED ACCESSORIES AND EQUIPMENT FOR A

COMPLETE OPERATIONAL SYSTEM AND MAINTAIN WARRANTY

REQUIREMENTS. VERIFY ALL EQUIPMENT PROVIDED IS SUITABLE

FOR INTENDED USE. INSTALL ALL EQUIPMENT IN STRICT

ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

3. WORK NOT SPECIFICALLY SHOWN IN DETAIL, REFERENCED, OR

OTHERWISE IMPLIED, SHALL BE PROVIDED IN ACCORDANCE

WITH TRADE OR INDUSTRY BEST STANDARD PRACTICES TO

PROVIDE A COMPLETE OPERATIONAL SYSTEM.

4. CIRCUIT ROUTING INDICATED IS DIAGRAMMATIC. WHEN CIRCUIT

DESTINATION IS INDICATED AND ROUTING IS NOT SHOWN,

DETERMINE EXACT ROUTING REQUIRED.

5. COORDINATE EXACT WIRING REQUIREMENTS WITH

MANUFACTURER'S REQUIREMENTS FOR EACH FIXTURE AND

PIECE OF EQUIPMENT.

6. INSTALL HANGERS AND SUPPORTS AS REQUIRED TO

ADEQUATELY AND SECURELY SUPPORT ELECTRICAL SYSTEM

COMPONENTS IN A NEAT AND WORKMANLIKE MANNER AS

SPECIFIED IN NECA 1. DO NOT FASTEN SUPPORTS TO PIPES,

DUCTS, MECHANICAL EQUIPMENT, OR CONDUIT.

7. INSTALL CONDUIT SECURELY IN A NEAT AND WORKMANLIKE

MANNER AS SPECIFIED IN NECA 1.

8. EQUIPMENT CONNECTIONS: MAKE CONDUIT CONNECTIONS TO

EQUIPMENT USING FLEXIBLE CONDUIT.

9. INSTALL DISCONNECT SWITCHES, CONTROLLERS, CONTROL

STATIONS, AND CONTROL DEVICES TO COMPLETE EQUIPMENT

WIRING REQUIREMENTS.

10. TEST LIGHTING SYSTEMS TO ENSURE PROPER CALIBRATION,

ADJUSTMENT, PROGRAMMING, AND OPERATION.

11. PROVIDE TYPE-WRITTEN PANEL DIRECTORY ON ELECTRICAL

PANELS. HANDWRITTEN TEXT IS NOT ACCEPTABLE.

12. COORDINATE COLOR OF RECEPTACLES AND COVER PLATES TO

MATCH THE COLOR SCHEME PER ARCHITECTURAL DRAWINGS.

13. PROVIDE AS-BUILT DRAWINGS FOR ELECTRICAL SYSTEMS

WITHIN 30 DAYS OF FINAL COMPLETION.

14. PROVIDE O&M MANUALS FOR ALL SYSTEMS AND EQUIPMENT

TO OWNER WITHIN 30 DAYS OF FINAL COMPLETION.

15. ALL EXPOSED CABLING SHALL BE PLENUM RATED.

16. CONTRACTOR(S) SHALL UNCONDITIONALLY WARRANTY IN

WRITING ALL MATERIALS, EQUIPMENT, AND WORKMANSHIP FOR

ONE YEAR FROM DATE OF ACCEPTANCE BY OWNER.

CONTRACTOR(S) SHALL PROVIDE FREE SERVICE FOR ALL

EQUIPMENT INVOLVED IN THEIR CONTRACT DURING THE

WARRANTY PERIOD.

ELECTRICAL LEGEND

EQUIPMENT POWER CONNECTION

EQUIPMENT DISCONNECT SWITCH

SINGLE POLE SWITCH - DECORATOR STYLE

S

0-10V DIMMER SWITCH - DECORATOR STYLE

SDM

PUMP W/ DISCONNECT SWITCH

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

R C

B .P

1-

R

F

42"

AFF

RCB.P1-12.1

S 42"

AFF

F

S

09/12/24

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

ED1.01/8" = 1'-0"

ELECTRICAL FLOOR PLAN1N

KEYED NOTES

DEMO POWER TO EXISTING MECHANICAL EQUIPMENT.

REMOVE CONDUIT AND CONDUCTORS BACK TO PANEL

RCB.P1-12.1.

DEMO LIGHT SWITCH AND ASSOCIATED CONTACTOR(S)

LOCATED IN ATTIC). REMOVE ALL CONDUCTORS. CONDUIT

MAY REMAIN FOR REUSE IF IN ACCEPTABLE CONDITION.

EL

EC

TR

IC

AL

F

LO

O

R

PL

AN

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

ED2.01/8" = 1'-0"

ELECTRICAL CEILING PLAN1N

KEYED NOTES

DEMO EXISTING LIGHT FIXTURE. BACK BOX TO REMAIN FOR

FEEDING AND SUPPORT OF NEW FIXTURES. REFER TO

ARCHITECTURAL FOR PATCHING OF HOLES.

EL

EC

TR

IC

AL

C

EI

LI

N G

PL

AN

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

ACU-1

40A-3P

ACU-2

40A-3P

R

F

S

F

R C

B .P

1-

RCB.P1-12.1

RCB.P1-12.1-12,14,16 RCB.P1-12.1-25,27,29

09/12/24

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

E1.01/8" = 1'-0"

ELECTRICAL FLOOR PLAN1N

EL

EC

TR

IC

AL

F

LO

O

R

PL

AN

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

A1

A1

A1

A1

A1

A1

A1

A1

RCB.P1-12.1-3

20A-1P

TYP 8

S

DM

S

09/12/24

FA

X:

-4

-1

W

ES

T D

ES

M

O

IN

ES

, I

A

O

FF

IC

E

PA

R

K R

D

#1

TE

L:

-4

-1

H

H S

C H

M I C

EI

LI

N G

R

EP

A

IR

9374.00

E2.01/8" = 1'-0"

ELECTRICAL CEILING PLAN1N

KEYED NOTES

HANG FIXTURES FROM EXISTING MOUNTING PLATE FROM

REMOVED FIXTURES.

EL

EC

TR

IC

AL

C

EI

LI

N G

PL

AN

AutoCAD SHX Text

PROJECT NO.

AutoCAD SHX Text

SHEET NUMBER

AutoCAD SHX Text

ISSUE DATE

A0 CHMI GYM CEILING 11x17 091024 A.0.
A01 CHMI GYM CEILING 11x17 091024 A.0.
A1 CHMI GYM CEILING 11x17 091024 A1.0
A1_1 CHMI GYM CEILING 11x17 091024 A1.1
A2 CHMI GYM CEILING 11x17 091024 A2.0
A3 CHMI GYM CEILING 11x17 091024 A3.0
MEP CHMI Gym 100% CD MEP Set 2024.09.11.pdf
Sheets and Views
M1.1-M0.0
MD1.1-MD1.0
M1.1-M1.0
M1.1-M2.0
M1.1-M6.0
E1.1-E0.0
ED1.1-ED1.0
ED1.1-ED2.0
E1.1-E1.0
E1.1-E2.0
MEP CHMI Gym Revised Sheets M1.0 & M2.0.pdf
Sheets and Views
M1.1-M1.0
M1.1-M2.0

File details come from the government source that posted it. Updated .