This document comprises technical drawings and specifications for the HHS CHMI Voldeng Gym Conditioning & Ceiling Repairs project, a construction initiative undertaken by the State of Iowa Department of Corrections. The project scope includes mechanical work, electrical work, and general construction services at the facility, with an anticipated start date in April 2025 and completion deadline of June 20, 2025. The mechanical work involves removal of existing blower coil and exhaust fan equipment, installation of new classroom air conditioning units (ACU-1 and ACU-2), and installation of new steam and condensate piping systems rated at 1½-inch low pressure steam (LPS), ½-inch steam condensate (CDS), and ¾-inch cooling condensate (CD) lines. Electrical work includes demolition of existing power and lighting circuits, installation of new 40-ampere, 3-phase power connections for the air conditioning units, and installation of new lighting fixtures with dimmer switches and associated controls. The drawings specify coordination requirements with architectural elements, including wall sleeves integrated with existing window openings and filler panels between units. An optional pre-bid meeting was scheduled for October 22, 2024, with bid submissions due no later than 2:00 pm on October 31, 2024, and opening at 3:00 pm the same day. Substitution requests were to be received by 1:00 pm on October 25, 2024.
All work shall conform to applicable local, state, and national codes, with materials being new and equipment meeting specified capacities and manufacturer requirements. The mechanical contractor is responsible for all cutting, patching, and finished surface restoration, with ductwork supports secured to structure at 5-foot on-center intervals and all exposed materials plenum-rated. Third-party testing and balancing of the mechanical system, as-built drawings within 30 days of final completion, and operations and maintenance manuals for all systems and equipment are required deliverables. Electrical work requires type-written panel directories, proper calibration and testing of lighting systems, one-year unconditional warranties on all materials and equipment, and free service during the warranty period. The project is exempt from Iowa Sales Tax, Davis Bacon Wages do not apply, and bidders must include a 5% bid security with their submission. The State of Iowa seeks to provide opportunities for Targeted Small Businesses in accordance with Chapter 73 of the Code of Iowa, requiring bidders to search the Targeted Small Business Directory and provide subcontractor information with their bid submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFB937400-01 - Bid Form.pdf | ||
| Bid Form.pdf | ||
| RFB937400-01 - Drawings.pdf | ||
| RFB937400-01 - Project Manual.pdf | ||
| Project Manual.pdf | ||
| 1267262-event.pdf | ||
| RFB937400-01 - Notice to Bidders.pdf | ||
| Notice to Bidders.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
09/12/24
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
M0.0
M
EC
H
AN
IC
AL
N O
TE
S
GENERAL MECHANICAL NOTES
1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL APPLICABLE LOCAL,
STATE, AND NATIONAL CODES, AS WELL AS LOCAL UTILITY REQUIREMENTS. PROVIDE
ALL REQUIRED ACCESSORIES AND EQUIPMENT FOR A COMPLETE OPERATIONAL
SYSTEM AND MAINTAIN WARRANTY REQUIREMENTS. VERIFY ALL EQUIPMENT
PROVIDED IS SUITABLE FOR INTENDED USE.
2. WORK NOT SPECIFICALLY SHOWN IN DETAIL, REFERENCED, OR OTHERWISE IMPLIED,
SHALL BE PROVIDED IN ACCORDANCE WITH TRADE OR INDUSTRY BEST STANDARD
PRACTICES TO PROVIDE A COMPLETE OPERATIONAL SYSTEM.
3. ALL MATERIALS SHALL BE NEW AND SHALL BE OF THE TYPE AND SHALL MEET THE
CAPACITIES OF EQUIPMENT SPECIFIED ON THE DRAWINGS.
4. ALL EQUIPMENT LISTED UNDER THESE SPECIFICATIONS SHALL BE LIMITED TO
PRODUCTS REGULARLY PRODUCED AND RECOMMENDED FOR SERVICE IN
ACCORDANCE WITH ENGINEERING DATA, RATINGS, OR OTHER COMPREHENSIVE
LITERATURE MADE AVAILABLE TO THE PUBLIC AND IN EFFECT AT THE TIME OF
OPENING BIDS.
5. EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS AND CODE REQUIREMENTS FOR TYPE AND
CAPACITY OF EACH PIECE OF EQUIPMENT USED.
6. ALL CUTTING AND PATCHING REQUIRED FOR MECHANICAL WORK SHALL BE
PERFORMED BY THE MECHANICAL CONTRACTOR UNLESS NOTED OTHERWISE. ALL
FINISHED SURFACES THAT ARE CUT SHALL BE REPLACED IN KIND SO THERE IS NO
VISIBLE EVIDENCE OF CUTTING AND/OR PATCHING.
7. INSTALL HANGERS AND SUPPORTS AS REQUIRED TO ADEQUATELY AND SECURELY
SUPPORT MECHANICAL SYSTEM COMPONENTS IN A NEAT AND WORKMANLIKE
MANNER. DO NOT FASTEN SUPPORTS TO PIPES, DUCTS, MECHANICAL EQUIPMENT, OR
CONDUIT.
8. COORDINATE DUCTWORK ROUTING AND EQUIPMENT WITH BUILDING STRUCTURE,
LIGHTING, AND FIRE ALARM DEVICES.
9. DUCTWORK SUPPORTS SHALL BE SECURED TO STRUCTURE AT 5'-0" ON CENTER.
10. ALL EXPOSED MATERIALS SHALL BE PLENUM RATED.
11. NO LOADS SHALL BE PERMITTED TO BE HUNG FROM ROOF DECKING. ALL HANGERS
SHALL BE HUNG DIRECTLY FROM STRUCTURE.
12. PROVIDE THIRD PARTY TESTING AND BALANCING OF MECHANICAL SYSTEM.
13. PROVIDE AS-BUILT DRAWINGS FOR MECHANICAL SYSTEMS WITHIN 30 DAYS OF FINAL
COMPLETION.
14. PROVIDE O&M MANUALS FOR ALL SYSTEMS AND EQUIPMENT TO OWNER WITHIN 30
DAYS OF FINAL COMPLETION.
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
AutoCAD SHX Text
DAS NO.
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
MD1.01/8" = 1'-0"
MECHANICAL DEMO FLOOR PLAN1N
KEYED NOTES
REMOVE EXISTING BLOWER COIL AND RETURN TO OWNER.
STEAM AND CONDENSATE PIPING TO REMAIN FOR
RECONNECTION. REFER TO NEW WORK PLANS.
REMOVE EXISTING EXHAUST FAN AND RETURN TO OWNER.
REFER TO ARCHITECTURAL FOR INFILL REQUIREMENTS.
M
EC
H
AN
IC
AL
D
EM
O
FL
O O
R P
LA
N
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
ACU-1 ACU-2
1 1/2" LPS 1 1/4" LPS
3/4" CD 3/4" CD3/4" CD
09/12/24
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
M1.01/8" = 1'-0"
MECHANICAL FLOOR PLAN1N
KEYED NOTES
INSTALL NEW CLASSROOM AIR CONDITIONER. COORDINATE
WALL SLEEVE WITH EXISTING WINDOW OPENING. PROVIDE
FRONT AND TOP FILLER PANELS BETWEEN UNITS
FABRICATED AND PAINTED TO MATCH UNITS
RACK 1-1/2" LOW PRESSURE STEAM (LPS) AND 1/2" STEAM
CONDENSATE (CDS) PIPING ALONG WALL AS HIGH AS
POSSIBLE TO MAINTAIN FALL. COORDINATE WITH
ARCHITECTURAL FOR ELEVATIONS.
ROUTE 3/4" COOLING CONDENSATE (CD) ALONG MOLDING
HIGH ON WALL. CONDENSATE PIPING SHALL BE INSULATED
AND WRAPPED WITH PVC JACKET. COORDINATE WITH
ARCHITECTURAL ELEVATIONS.
3/4" CD, 1/2" CDS, AND 1-1/4" LPS TO ACU.
CONNECT 1-1/2" LPS AND 1/2" CDS TO EXISTING PIPING.
3/4" CD DOWN TO MOP BASIN.
M
EC
H
AN
IC
AL
F
LO
O R
PL
AN
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
14"Ø SA
"Ø
S A
14"Ø SA
14"Ø SA
09/12/24
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
M2.01/8" = 1'-0"
MECHANICAL CEILING PLAN1N
KEYED NOTES
14"Ø SA FABRIC DUCT DOWN TO ACU. REFER TO SHEET M1.0
FOR CONTINUATION.
ROUTE FABRIC DUCT IMMEDIATELY BELOW SOLID CEILING.
DUCT SHALL BE RUN HORIZONTALLY AND NOT SLOPED.
M
EC
H
AN
IC
AL
C
EI
LI
N
G
PL
AN
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
M6.0
M
EC
H
AN
IC
AL
SC
H
ED
U
LE
S
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
E0.0
EL
EC
TR
IC
AL
N
O
TE
S
SC
H
ED
U
LE
S
GENERAL ELECTRICAL NOTES
1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL
APPLICABLE LOCAL, STATE, AND NATIONAL CODES, AS WELL AS
LOCAL UTILITY REQUIREMENTS. CONTRACTOR SHALL
COORDINATE WITH LOCAL CODE OFFICIALS TO DETERMINE IF
ANY CODE INTERPRETATIONS BY CODE ENFORCEMENT
OFFICIALS WILL IMPACT PLANNED WORK.
2. PROVIDE ALL REQUIRED ACCESSORIES AND EQUIPMENT FOR A
COMPLETE OPERATIONAL SYSTEM AND MAINTAIN WARRANTY
REQUIREMENTS. VERIFY ALL EQUIPMENT PROVIDED IS SUITABLE
FOR INTENDED USE. INSTALL ALL EQUIPMENT IN STRICT
ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.
3. WORK NOT SPECIFICALLY SHOWN IN DETAIL, REFERENCED, OR
OTHERWISE IMPLIED, SHALL BE PROVIDED IN ACCORDANCE
WITH TRADE OR INDUSTRY BEST STANDARD PRACTICES TO
PROVIDE A COMPLETE OPERATIONAL SYSTEM.
4. CIRCUIT ROUTING INDICATED IS DIAGRAMMATIC. WHEN CIRCUIT
DESTINATION IS INDICATED AND ROUTING IS NOT SHOWN,
DETERMINE EXACT ROUTING REQUIRED.
5. COORDINATE EXACT WIRING REQUIREMENTS WITH
MANUFACTURER'S REQUIREMENTS FOR EACH FIXTURE AND
PIECE OF EQUIPMENT.
6. INSTALL HANGERS AND SUPPORTS AS REQUIRED TO
ADEQUATELY AND SECURELY SUPPORT ELECTRICAL SYSTEM
COMPONENTS IN A NEAT AND WORKMANLIKE MANNER AS
SPECIFIED IN NECA 1. DO NOT FASTEN SUPPORTS TO PIPES,
DUCTS, MECHANICAL EQUIPMENT, OR CONDUIT.
7. INSTALL CONDUIT SECURELY IN A NEAT AND WORKMANLIKE
MANNER AS SPECIFIED IN NECA 1.
8. EQUIPMENT CONNECTIONS: MAKE CONDUIT CONNECTIONS TO
EQUIPMENT USING FLEXIBLE CONDUIT.
9. INSTALL DISCONNECT SWITCHES, CONTROLLERS, CONTROL
STATIONS, AND CONTROL DEVICES TO COMPLETE EQUIPMENT
WIRING REQUIREMENTS.
10. TEST LIGHTING SYSTEMS TO ENSURE PROPER CALIBRATION,
ADJUSTMENT, PROGRAMMING, AND OPERATION.
11. PROVIDE TYPE-WRITTEN PANEL DIRECTORY ON ELECTRICAL
PANELS. HANDWRITTEN TEXT IS NOT ACCEPTABLE.
12. COORDINATE COLOR OF RECEPTACLES AND COVER PLATES TO
MATCH THE COLOR SCHEME PER ARCHITECTURAL DRAWINGS.
13. PROVIDE AS-BUILT DRAWINGS FOR ELECTRICAL SYSTEMS
WITHIN 30 DAYS OF FINAL COMPLETION.
14. PROVIDE O&M MANUALS FOR ALL SYSTEMS AND EQUIPMENT
TO OWNER WITHIN 30 DAYS OF FINAL COMPLETION.
15. ALL EXPOSED CABLING SHALL BE PLENUM RATED.
16. CONTRACTOR(S) SHALL UNCONDITIONALLY WARRANTY IN
WRITING ALL MATERIALS, EQUIPMENT, AND WORKMANSHIP FOR
ONE YEAR FROM DATE OF ACCEPTANCE BY OWNER.
CONTRACTOR(S) SHALL PROVIDE FREE SERVICE FOR ALL
EQUIPMENT INVOLVED IN THEIR CONTRACT DURING THE
WARRANTY PERIOD.
ELECTRICAL LEGEND
EQUIPMENT POWER CONNECTION
EQUIPMENT DISCONNECT SWITCH
SINGLE POLE SWITCH - DECORATOR STYLE
S
0-10V DIMMER SWITCH - DECORATOR STYLE
SDM
PUMP W/ DISCONNECT SWITCH
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
R C
B .P
1-
R
F
42"
AFF
RCB.P1-12.1
S 42"
AFF
F
S
09/12/24
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
ED1.01/8" = 1'-0"
ELECTRICAL FLOOR PLAN1N
KEYED NOTES
DEMO POWER TO EXISTING MECHANICAL EQUIPMENT.
REMOVE CONDUIT AND CONDUCTORS BACK TO PANEL
RCB.P1-12.1.
DEMO LIGHT SWITCH AND ASSOCIATED CONTACTOR(S)
LOCATED IN ATTIC). REMOVE ALL CONDUCTORS. CONDUIT
MAY REMAIN FOR REUSE IF IN ACCEPTABLE CONDITION.
EL
EC
TR
IC
AL
F
LO
O
R
PL
AN
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
ED2.01/8" = 1'-0"
ELECTRICAL CEILING PLAN1N
KEYED NOTES
DEMO EXISTING LIGHT FIXTURE. BACK BOX TO REMAIN FOR
FEEDING AND SUPPORT OF NEW FIXTURES. REFER TO
ARCHITECTURAL FOR PATCHING OF HOLES.
EL
EC
TR
IC
AL
C
EI
LI
N G
PL
AN
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
ACU-1
40A-3P
ACU-2
40A-3P
R
F
S
F
R C
B .P
1-
RCB.P1-12.1
RCB.P1-12.1-12,14,16 RCB.P1-12.1-25,27,29
09/12/24
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
E1.01/8" = 1'-0"
ELECTRICAL FLOOR PLAN1N
EL
EC
TR
IC
AL
F
LO
O
R
PL
AN
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
A1
A1
A1
A1
A1
A1
A1
A1
RCB.P1-12.1-3
20A-1P
TYP 8
S
DM
S
09/12/24
FA
X:
-4
-1
W
ES
T D
ES
M
O
IN
ES
, I
A
O
FF
IC
E
PA
R
K R
D
#1
TE
L:
-4
-1
H
H S
C H
M I C
EI
LI
N G
R
EP
A
IR
9374.00
E2.01/8" = 1'-0"
ELECTRICAL CEILING PLAN1N
KEYED NOTES
HANG FIXTURES FROM EXISTING MOUNTING PLATE FROM
REMOVED FIXTURES.
EL
EC
TR
IC
AL
C
EI
LI
N G
PL
AN
AutoCAD SHX Text
PROJECT NO.
AutoCAD SHX Text
SHEET NUMBER
AutoCAD SHX Text
ISSUE DATE
| A0 CHMI GYM CEILING 11x17 091024 A.0. |
| A01 CHMI GYM CEILING 11x17 091024 A.0. |
| A1 CHMI GYM CEILING 11x17 091024 A1.0 |
| A1_1 CHMI GYM CEILING 11x17 091024 A1.1 |
| A2 CHMI GYM CEILING 11x17 091024 A2.0 |
| A3 CHMI GYM CEILING 11x17 091024 A3.0 |
| MEP CHMI Gym 100% CD MEP Set 2024.09.11.pdf |
| Sheets and Views |
| M1.1-M0.0 |
| MD1.1-MD1.0 |
| M1.1-M1.0 |
| M1.1-M2.0 |
| M1.1-M6.0 |
| E1.1-E0.0 |
| ED1.1-ED1.0 |
| ED1.1-ED2.0 |
| E1.1-E1.0 |
| E1.1-E2.0 |
| MEP CHMI Gym Revised Sheets M1.0 & M2.0.pdf |
| Sheets and Views |
| M1.1-M1.0 |
| M1.1-M2.0 |
File details come from the government source that posted it. Updated .