RFB931700-01 Addendum #1 Summary
This is an Addendum #1 document issued by the State of Iowa Department of Administrative Services for the replacement of 25 interlocking doors at the Mount Pleasant Correctional Facility (MPCF) located at 1200 East Washington Street, Mount Pleasant, Iowa. The project encompasses replacement of doors across multiple buildings including the Northcore Building, 10 Cell area, Master Controls, Corridor Doors, Fire Exit Doors, Powerhouse, and Appliance Shop. The base bid includes all material, labor, and equipment associated with the work shown in the contract documents, excluding abatement and demolition of Powerhouse and Appliance Shop doors to be completed by the owner, with a $6,000 allowance for controls coordination and troubleshooting. A pre-bid meeting was held on November 7, 2023 at 11:00 AM at MPCF with both in-person and virtual attendance options. Bids were due November 30, 2023 at 2:00 PM, with bid opening scheduled for November 30, 2023 at 3:00 PM via conference call. The construction phase is scheduled for May 2024 through October 2024, with submittals due between December 2023 and February 2024 and closeout in October 2024. The addendum clarifies work hours as 6:00 AM to 4:00 PM, Monday through Thursday or Tuesday through Friday, with special 6:00 PM to 4:00 AM hours required for two of the three turnkey slider doors.
The construction budget is $777,400. Bid security of 5% of the total bid amount is required, and the apparent low bidder must submit a subcontractor and supplier list within 48 hours of bid opening. All bidders must comply with the modified ConsensusDocs 802 contract template, provide project-specific certificates of insurance and performance and payment bonds prior to contract execution, and register with the IMPACS Electronic Procurement System to submit bids. On-site supervision by the prime contractor is required at all times, and all personnel must pass background checks valid for two years and complete annual PREA training. Questions and substitution requests were due in writing by November 15, 2023 at 12:00 PM. The addendum includes updated drawings (Sheet A-5 Door Schedule and Hardware Sets, and Sheet A-6 General Demolition Notes) and provides site-specific rules prohibiting temporary partitions secured to ceilings due to hazardous materials in the Northcore Building ceiling, requiring one-door-at-a-time replacement sequencing in that building.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum 1 for RFB931700-01
Project Name: DOC MPCF Interlocking Doors Replacement
RFB #: 931700-01
DAS Project #: 9317.00
Date: 11/15/2023
Bids Due: November 30, 2023 @ 2 pm
1. See attached Pre-bid Meeting Minutes from the Pre-Bid Walkthrough on November 7, 2023 @
11 am and Attendee List
2. QUESTIONS
A. Question 1: Is there a project bid estimate available?
B. Answer 1: The construction budget is $777,400.
3. SPECIFICATIONS
A. SECTION 00 0107 SEALS PAGE
i. Seals have been signed
B. SECTION 01 1200 CONTRACT SUMMARY
i. Section 1.05 A: Work hours are 6:00 am to 4:00 pm, Monday through Thursday or Tuesday through Friday unless arrangements are made in advance. Work hours for two of the three Turnkey slider doors (S-1, S-2, S-3) will need to be
6:00 pm to 4:00 am.
4. DRAWINGS
A. SHEET A-5 Updated Door Schedule and Hardware Sets
B. SHEET A-6 Added General Demolition Notes
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9317.00 DOC MPCF Interlocking Door Replacements
1200 East Washington Street Mount Pleasant, Iowa 52641
P: 319-385-9511
RFB Pre-Bid Minutes: Meeting #1
Meeting Date Nov 7, 2023 Meeting Time 11:00 AM - 12:00 PM Central Time (US & Canada)
Meeting Location MPCF/Teams Video Conferencing Link https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTF mLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v 2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b 72-69be-4702-b867-64b92d76e44f%22%7d
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Notes
Attachments Attendee List.pdf, RFB931700-01 Project Manual.pdf, RFB931700-01 Drawings.pdf
Scheduled Attendees
Name Company Phone Number Email Attendance
Michael Nolan Horizon Architecture michael@horizon-architecture.com Present
Adam Douglas McGough Construction adam.douglas@mcgough.com Present
Leilani Hammel McGough Construction P: (515) 344-8980 leilani.hammel@mcgough.com Present
Jonathan Peters McGough Construction jon.peters@mcgough.com Absent
Jeremy Howk Mount Pleasant Correctional Facility
P: (319) 385-9511 jeremy.howk@iowa.gov Present
Tony Kempker Mount Pleasant Correctional Facility
P: (319) 385-9511 ext.
anthony.kempker@iowa.gov Present
James Trower State of Iowa - Department of Administrative Services james.trower@iowa.gov Absent
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description DAS - Owner Representative
• James Trower
McGough Construction - Construction Manager
• Adam Douglas, PX/Sr. Project Manager
• Leilani Hammel, Project Engineer
• Jon Peters, Superintendent
MPCF
State of Iowa - Department of Administrative Services Page 1 of 5 Printed On: Nov 10, 2023 08:21 AM CST https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTFmLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b72-69be-4702-b867-64b92d76e44f%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTFmLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b72-69be-4702-b867-64b92d76e44f%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTFmLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b72-69be-4702-b867-64b92d76e44f%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTFmLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b72-69be-4702-b867-64b92d76e44f%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTFmLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b72-69be-4702-b867-64b92d76e44f%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTFmLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b72-69be-4702-b867-64b92d76e44f%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_YWU1ZGI0NzUtZGRiYy00OTFmLWJmYTgtNWM2OGMwNDRhMmY1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%2268b50b72-69be-4702-b867-64b92d76e44f%22%7d https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HEWS6A81HRRSGQ6MFEE4W533?sig=1274cf742ad8883360e670c6b930c09df9adcfc02bb06912c12880aa3b6fd993 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HEJN5X1BCKSQB96J8WT5TS4T?sig=e68f9150a26e22d285c628e05181867ad385d9857f1f9b7578c13d1eda2db384 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/42578/01HEJN5TMBZZ2S4R9V70EXDV5H?sig=28c83760454af72e763ed1ee270549f5a893e28fab9d04fa6be33b6972014f70
• Jeremy Howk
• Tony Kempker
• Kristi Perry
Horizon
• Michael Nolan
Earth Services & Abatement
• Chris Riley
Official Documented Meeting Minutes See attached Attendee List.
Project Overview
2.1 1 Project Description Open
Description Base bid: All material, labor and equipment associated with all work shown on contract documents complete including the plans and specifications, excluding abatement and demolition of the Powerhouse and Appliance Shop doors to be done by owner. Include a $6,000 allowance for controls coordination and troubleshooting
Official Documented Meeting Minutes
• Door replacement will have to happen one door at a time in the Northcore Building.
• Mike Nolan reiterated that there is hazardous material in the ceiling in the Northcore building so no temp partitions should be secured to the ceiling. Both hazardous material reports are included in the project manual, too.
2.2 1 Project Schedule Open
Description
• Contract(s) Issued: 12/4/23
• Submittals: December 2023 - February 2024
• Construction: May 2024 - October 2024
• Closeout: October 2024
A pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, day before Thanksgiving, Thanksgiving and day after Thanksgiving, Christmas Day, day after Christmas.
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site.
• Construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
Meeting #1 - RFB Pre-Bid Project: 9317.00 DOC MPCF Interlocking Door Replacements
State of Iowa - Department of Administrative Services Page 2 of 5 Printed On: Nov 10, 2023 08:21 AM CST
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
• Temporary facilities by each trade bid packages for their workers.
• Tool control - Contractor shall provide all equipment and tools for Contractor’s own cleanup. Clean up shall be done at end of every shift or more frequently if required for the Contractor to perform their work, for other Contractors to perform their work, as required by the Owner’s operations, and at the discretion of the Construction Manager.
• Cell phones - Cell phones, weapons, and cameras/camcorders are not allowed inside the facility. The foreman will be allowed to have one cell phone.
• Background checks o Must be performed on all on site employees, including sub-contractors.
o The Contractor hereby explicitly authorizes the Iowa DAS to conduct criminal history and/or other background investigation(s) of the Contractor, its officers, supervisory personnel, employees, and other staff retained by the Contractor or their sub-contractors for the performance of the contract.
o A State of Iowa record check request form will be provided at the pre-construction meeting of successful bidder.
o Each contractor who will be working onsite must also take the PREA test which can be found here: https://docs.google.com/presentation/d/1_8IcvvpMCYdqasseVuOxzY2ISqjS3RUi6Oups7t6-zA/pub?start=false&loop=false&delayms=3000&slide=id.p
• Work hours: 6am - 4pm, Monday through Thursday or Tuesday through Friday unless arrangements are made in advance.
• View Specification 01 1200 - Contract Summary for more information.
Official Documented Meeting Minutes
• A job box can be kept in the basement of the Northcore building. The job box will have to have two locks, one form the contractor and one from MPCF. Tony noted that the job box will have to fit through a 3'-0" door.
o Contractors should come prepared with all tools inventoried prior to the first day onsite as this will allow for a quick inventory and can save a couple hours of time.
• Background checks are required for all employees and are good for 2 years, the PREA test will have to be completed yearly.
• Work hours for two of the turnkey slider doors will be 6:00 pm to 4:00 am.
RFB Overview
3.1 1 Bid Submission Open
Description
• Bids are due November 30, 2023 @ 2pm
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call on November 30, 2023 @ 3pm
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount
State of Iowa - Department of Administrative Services Page 3 of 5 Printed On: Nov 10, 2023 08:21 AM CST https://protect-us.mimecast.com/s/AmLdCjRv4AcYNrkJfWlxTi https://protect-us.mimecast.com/s/AmLdCjRv4AcYNrkJfWlxTi
• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov: November 15, 2023 by 12 pm.
• Addendum Issued:
• Bids Due: November 30, 2023
• Tentative NOI Issued: December 1, 2023
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
3.4 1 Pre-Bid Site Visits Open
Description
• Turnkey
• 10 Cell
• Master Controls
• Corridor Doors
• Fire Exit Doors
• Powerhouse/Appliance Shop
Questions
4.1 1 Questions Open
Description Submit all questions in writing to construction.procurement@iowa.gov.
State of Iowa - Department of Administrative Services Page 4 of 5 Printed On: Nov 10, 2023 08:21 AM CST mailto:Construction.Procurement@iowa.gov:
mailto:construction.procurement@iowa.gov
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 5 of 5 Printed On: Nov 10, 2023 08:21 AM CST
PROJECT XXXX.XX SEALS PAGE 00 0107 - 1
SECTION 00 0107
SEALS PAGE
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge.
Discipline:_____Architecture__________________ Stamp:
Company Name:____Horizon Architecture_______
Address:___3116 Alpine Court_________________
Telephone:___(563) 506-4965__________________
Name:___Michael Nolan, AIA__________________ Responsibility: All Architecture Sheets and Specs
License#:___06926_________________________ ______________________________________
I hereby certify that the portion of this technical submission described below was prepared by me or under my direct supervision and responsible charge.
Discipline: Electrical & Controls ________________ Stamp:
Company Name: Innovative Engineers, Inc._______
Address: 2871 Heinz Rd Suite B, Iowa City, IA 52240
Telephone: 319-855-4115_____________________
Name: Mohammed Abu-Hasan, PE_____________ Responsibility: Electrical & Controls Sheets
License#: 20081________________________________ _____________________________________
END OF SECTION
9317.00
M
AR
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-5
DOOR DETAILS
#Pln
MSN
11/8/2023
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
M
PC
F D oo rs
\1
M od el a nd D es ig n\ M
PC
F
D oo rs .p ln
.0
D O
C M
P C
F
IN
TE
R
LO
C
K
IN
G D
O O
R R
EP
LA
C
EM
EN
TS
IS
SU
ED
F
O R
P
ER
M
IT
A N
D C
O N
ST
R
U C
TI
O
N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
2" AS SCHED 2"
PE
R
S C
H
ED
U
LE
2"
PE
R
S C
H
ED
U
LE
PER SCHEDULE
2" AS SCHED 2"
PE
R
S C
H
ED
U
LE
2"
A-5
A-5
A-5
A-5
A B C
DOOR
FRAMES
DOOR
PANELS
TYP
TYP
4-5 LITES PER
MANUFACTURER
TYP
TYP
DOOR SCHEDULE
ID
CE-1
CE-2
CE-3
CW-1
CW-2
CW-3
FE-13
FE-14
FE-26
S-1
S-2
S-3
S-4
S-5
S-6
T-1
Quantity
W 3'-8"
3'-8"
3'-8"
3'-8"
3'-8"
3'-8"
3'-4"
3'-7 1/2"
3'-4"
3'-10"
3'-10"
3'-10"
3'-4"
3'-4"
3'-5"
3'
HT
7'-2"
7'-2"
7'-2"
7'-2"
7'-2"
7'-2"
7'
6'-11 1/4"
7'
6'-10"
6'-10"
6'-10"
6'-8"
6'-8"
6'-8"
7'
THK
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
2"
1 3/4"
2"
2"
2"
2"
2"
1 3/4"
1 3/4"
-3/4"
FRAME
3 & 4/A-5
3 & 4/A-5
3 & 4/A-5
3 & 4/A-5
3 & 4/A-5
PANEL
B
B
B
B
B
B
C
C
C
A
A
A
B
A
GLZ
12"x12"
12"x12"
12"x12"
12"x12"
12"x12"
12"x12"
MULTI
MULTI
MULTI
6"x12"
GATE
MULTI
HW SET
STENCIL
CORRIDOR E-1
CORRIDOR E-2
CORRIDOR E-3
CORRIDOR W-1
CORRIDOR W-2
CORRIDOR W-3
FIRE EXIT 13
FIRE EXIT 14
FIRE EXIT 26
10 CELL WEST
LOCK TYPE
MOGUL
MOGUL
MOGUL
MOGUL
MOGUL
MOGUL
MOGUL
PARACENTRIC
PARACENTRIC
PARACENTRIC
PARACENTRIC
PARACENTRIC
PARACENTRIC
NOTES
PATCH BROKEN BLOCK AT BASE
RETAIN AND REINSTALL PLACARDS
RETAIN AND REINSTALL PLACARDS
RETAIN AND REINSTALL PLACARDS
RETAIN GATE AND HOUSING, REPLACE
OPERATOR AND GUIDE TRACK. REPAINT ALL
RETAINED ASSEMBLY.
RETAIN AND REINSTALL PLACARDS
3/4" PLYWOOD PANEL WITH (3) BOLTED HINGES
AND 2" HOLE FOR CHAIN/PADLOCK SECUREMENT
EXISTING STEEL
DOOR OPERATOR HOUSING
NEW WELD
HEAD
NOTE:
1. SHIM DOOR DEVICE AS REQUIRED.
2" FIELD STITCH WELD @ 6" O.C. TO
DOOR OPENING EMBED.
2. FASTEN DOOR OPERATOR HOUSING
WITH MASONRY BOLT ANCHORS @ 12"
O.C. BEYOND DOOR R.O.
EXISTING STEEL JAMB
RECEIVER JAMB
EXISTING STEEL JAMB
DOOR BOTTOM GUIDE
LOCK COLUMN
NEW WELD
NEW WELD
NOTE:
1. SHIM DOOR DEVICE AS REQUIRED.
2" FIELD STITCH WELD @ 6" O.C. TO
DOOR OPENING EMBED.
2"
2" 3" 2"
TAMPER RESISTANT SEALANT
2" STEEL HEAD FRAME,
GROUT SOLID
ELECTRICAL CONDUIT (AS REQ)
DRILLED SLEEVE ANCHOR
2"
2" 3" 2"
2"
2" 3" 2"
TAMPER RESISTANT SEALANT
2" STEEL JAMB FRAME,
GROUT SOLID
DRILLED SLEEVE ANCHOR
ELECTRICAL CONDUIT (AS REQUIRED)
TAMPER RESISTANT SEALANT
2" STEEL JAMB FRAME,
GROUT SOLID
DRILLED SLEEVE ANCHOR
ELECTRICAL CONDUIT (AS REQUIRED)
ELECTRIC HINGE (AS REQUIRED)
JAMB
2"
2" 3 1/2" 2"
EXISTING METAL FRAME
INFILL. PATCH RUSTED
AREAS, PRIME AND PREP
FOR PAINT
NEW 2" STEEL HEAD FRAME
ELECTRICAL CONDUIT (AS REQ)
CONTINUOUS WELD CONTINUOUS WELD
2"
2" 3 1/2" 2"
2"
2" 3 1/2" 2"
EXISTING METAL
FRAME INFILL. PATCH
RUSTED AREAS, PRIME
AND PREP FOR PAINT
NEW 2" GALVANIZED
STEEL JAMB FRAME,
PAINTED
EXISTING METAL
FRAME INFILL. PATCH
RUSTED AREAS, PRIME
AND PREP FOR PAINT
CONTINUOUS WELD
NEW 2" GALVANIZED
STEEL JAMB FRAME,
PAINTED
CONTINUOUS WELD
JAMB
HARDWARE SETS
SET 1 - CORRIDOR DOORS
(2) STANDARD HINGES
(1) ELECTRIC HINGE
(1) ELECTRIC RELEASE MORTISE LOCKSET
(MOGUL KEY)
(1) MAG HOLD OPEN (FA CONNECTED)
(1) CLOSER
(1) DOOR POSITION SENSOR
(1) KICK PLATES
SET 2 - EXTERIOR CORRIDOR DOOR
(4) STANDARD HINGES
(1) MAG HOLD CLOSE (FA CONNECTED)
(1) OVERHEAD CLOSER
(1) DOOR POSITION SENSOR (THRU MAG)
(2) KICK PLATES
(2) PULL HANDLES
(1) THRESHOLD
(1) WEATHERSTRIPPING
SET 3 - EXTERIOR CORRIDOR DOOR
(OPENER)
(4) STANDARD HINGES
(1) MAG HOLD CLOSE (FA CONNECTED)
(1) AUTOMATIC OPENER/CLOSER
(1) REMOTE SWITCH
(1) DOOR POSITION SENSOR (THRU MAG)
(2) KICK PLATES
(2) PULL HANDLES
(1) THRESHOLD
(1) WEATHERSTRIPPING
SET 4 - EXTERIOR STAIR DOOR
(4) STANDARD HINGES
(1) PANIC EXIT DEVICE
(1) MORTISE LOCK/LATCH (MOGUL KEY)
(1) EXTERIOR HANDLE
(1) OVERHEAD CLOSER
(1) DOOR POSITION SENSOR
(2) KICK PLATES
(1) THRESHOLD
(1) WEATHERSTRIPPING
SET 5 - SLIDING DOORS
(1) SLIDING DOOR HARDWARE WITH MANUAL
RELEASE (PARACENTRIC KEYING)
SCALE: 1/4" = 1'-0"1 DOOR FRAMES AND PANELS
0 2' 4' 8'
SCALE: 1 1/2"= 1'-0"3 SLIDING DOOR HEAD
0 6'' 12'' 18''
SCALE: 1 1/2"= 1'-0"4 SLIDING DOOR JAMB DETAIL
0 6'' 12'' 18''
SCALE: 1 1/2"= 1'-0"5 DOOR HEAD DETAIL
0 6'' 12'' 18''
SCALE: 1 1/2"= 1'-0"6 DOOR JAMB DETAIL
0 6'' 12'' 18''
SCALE: 1 1/2"= 1'-0"7 EXTERIOR DOOR HEAD DETAIL
0 6'' 12'' 18''
SCALE: 1 1/2"= 1'-0"8 EXTERIOR DOOR JAMB DETAIL
0 6'' 12'' 18''
/7
/2
AD
D
EN
D
U
AR
K D
AT
E
D
ES
C R
IP
TI
O N
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE:
SHEET TITLE
A-6
APPLIANCE
SHOP AND
POWERHOUSE
KEY PLANS
#Pln
MSN
11/8/2023
E A S T
W A S H
IN
G
TO
N
S
TR
EE
T
M O
U N
T
PL
EA
S A N
T, I
A
C
U se rs \m ik en
\H or iz on
A rc hi te ct ur e\ H or iz on A rc hi te ct ur e
D oc um en ts
\P ro je ct s\ G en er al P ro je ct s\
G
-0
M
PC
F D oo rs
\1
M od el a nd D es ig n\ M
PC
F
D oo rs .p ln
.0
D O
C M
P C
F
IN
TE
R
LO
C
K
IN
G D
O O
R R
EP
LA
C
EM
EN
TS
IS
SU
ED
F
O R
P
ER
M
IT
A N
D C
O N
ST
R
U C
TI
O
N
M
IC
H A
EL
H
O R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
PH
3)
-4
W
W W
.H O
R
IZ
O N
-A R C H
IT
EC
TU
R E.
C O
M
SD-02
SD-01
APPLIANCE BARN - MAIN LEVEL
SD-03
APPLIANCE BARN - LOWER LEVEL
PD-03PD-04PD-05
PD-01
PD-07
PD-06
POWERHOUSE - FIRST FLOOR
PD-02
POWERHOUSE - SECOND FLOOR
POWERHOUSE AND APPLIANCE BARN DOOR SCHEDULE
ID
PD-01
PD-02
PD-03
PD-04
PD-05
PD-06
PD-07
SD-01
SD-02
SD-03
Quantity
W 5'
3'
4'
3'
3'
3'
2'-10"
6'
6'
6'
HT
7'
6'-8"
6'-8"
6'-8"
7'
7'
7'
7'
7'
7'
THK
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
1 3/4"
FRAME DEPTH
9.00"
9.00"
9.00"
9.00"
6.00"
8.00"
8.00"
5.50"
5.50"
5.50"
FRAME
1 (*)
PANEL
GLZ
10.75"x10.75"
24"x32"
36"x36"
18"x18"
24"x36"
24"x36"
24"x36"
HW SET
STENCIL
RECYCLE
NOTES
DOUBLE DOOR - VISION PANEL
SINGLE DOOR - HALF LITE
SINGLE DOOR - HALF LITE
SINGLE DOOR
SINGLE DOOR - LARGE VISION PANEL
SINGLE DOOR
SINGLE DOOR
DOUBLE DOOR, HALF LITE
DOUBLE DOOR, HALF LITE
DOUBLE DOOR, HALF LITE (*4" HEAD FRAME)
HARDWARE SETS
SET 7 - EXTERIOR DOUBLE DOORS
(3) HEAVY DUTY HINGES
(1) MORTISE DEADLOCK SET
(1) OVERHEAD CLOSER
(1) FLUSHBOLT SET
(1) ASTRAGAL
(1) COORDINATOR
(2) WALL OR FLOOR STOPS
(4) KICK PLATES
(1) THRESHOLD
(2) WEATHERSTRIPPING
SET 8 - EXTERIOR SINGLE DOORS WITH CLOSER
(3) HEAVY DUTY HINGES
(1) MORTISE DEADLOCK SET
(1) WALL OR FLOOR STOP
(2) KICK PLATES
(1) OVERHEAD CLOSER
(1) THRESHOLD
(2) WEATHERSTRIPPING
NOT TO SCALE1 APPLIANCE SHOP - MAIN LEVEL
NOT TO SCALE2 APPLIANCE SHOP - LOWER LEVEL
NOT TO SCALE3 POWERHOUSE 1st FLOOR
NOT TO SCALE4 POWERHOUSE - 2ND FLOOR
GENERAL DEMOLITION NOTES
1. ABATEMENT CONTRACTOR SHALL REMOVE
AND ABATE AREA AROUND EXTERIOR DOORS.
GENERAL CONTRACTOR TO COORDINATE WITH
ABATEMENT CONTRACTOR TO PROVIDE
TEMPORARY OPENING PROTECTIVES AND
DOORS.
2. TEMPORARY OPENING PROTECTIVES TO BE
3/4" PLYWOOD WITH PLYWOOD DOORS.
HARDWARE TO INCLUDE HINGES, HANDLE,
SPRING CLOSER AND HINGED HASP FOR USE
WITH OWNER PROVIDED PADLOCK.
3. TEMPORARY OPENING PROTECTIVES TO
REMAIN IN PLACE UNTIL NEW DOORS AND
SECURITY HARDWARE INSTALLED AND
FUNCTIONING.
/7
/2
AD
D
EN
D
U
File details come from the government source that posted it. Updated .