This document is an Addendum to a Request for Bids (RFB) issued by the Iowa Department of Administrative Services for the demolition and replacement of the existing HVAC controls system at the Alcoholic Beverages Division (ABD) facility located in Ankeny, Iowa. The project involves the upgrade of the HVAC controls system, with specific details and requirements outlined in the addendum. The bid submission deadline and bid opening date are provided, as well as information regarding a mandatory pre-bid conference for interested bidders. The contract term and any renewal options are not specified in the addendum.
The addendum provides pricing and cost information, including requirements for the bidder to provide separate pricing for the base bid and any add alternates. There is no mention of any set-aside requirements or the identity of any incumbent contractors. The source of funding for the project is also not disclosed in the addendum.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABD Ankeny HVAC Controls Upgrade
Ankeny, Iowa
DAS#9312.00
RFB931200-01
PROJECT 9312.00 ADDENDUM #01 Page - 1 10-11-2023
ADDENDUM #01
Project Name:
DAS#9312.00
Dated: October 11, 2023
This Addendum forms a part of the bidding and contract documents. This Addendum supersedes and supplements all portions of the original bidding and contract documents dated Sept. 8, 2023 with which it conflicts.
ACKNOWLEDGE RECEIPT OF THIS ADDENDUM IN THE SPACE PROVIDED ON THE
BID FORM. FAILURE TO DO SO MAY SUBJECT THE BIDDER TO
DISQUALIFICATION.
1. GENERAL CLARIFICATIONS
A. The thermostat in Corridor 151 has been removed. This is the corridor just to the south of the main entrance.
2. SPECIFICATIONS
A. Add Section 00 0105 Certifications Page (Attached to this Addendum)
B. Section 00 0115- List of Drawing Sheets, Replace with attached Sheet.
C. Section 00 0110-Table of Contents, Replace with attached Sheets.
D. Remove Section 00 0107 Seals Page in its entirety.
E. Section 00 4116-Bid Form, Replace with Attached Sheets.
3. QUESTIONS
A. Can the existing conduits and raceways be used to route the control wiring? A> Yes, the existing conduits and raceways can be used.
B. Can the existing wiring be used if it is in good condition? A> No, all wiring will be replaced.
C. Can existing controls components be reused if they are in good condition? No, all components are to be replaced. Anything still in good condition that can be reused will be turned over to owner for spare parts as an owner option.
D. Can wiring be routed through the warehouse in wire racks? A> Yes, the existing wire racks can be re-used in the warehouse area. The wiring shall be plenum rated.
E. Should the entire control valve be replaced or only the actuator? A> Replacement of the VAV
– HW Reheat Valves (Detail F2/M503) and Fan Powered VAV – HW Reheat Control Valves (Detail E5/M503) shall be bid as an alternate to the base bid. See revised drawings and bid
PROJECT 9312.00 ADDENDUM #01 Page - 2 form attached to this addendum. Base Bid: Replace Actuators. Alternate Bid: Replace Entire Valves.
F. Do we have existing airflow and water flow information on the VAV boxes? A> See updated drawings attached to this addendum.
G. Are we replacing the internal controls for the RTU’s? A> No, the internal controls for the RTUs are remaining in place. The new control system will communicate with the RTU controller to provide setpoints and other information relevant to implement the control sequence. The existing controls are LonWorks.
H. Will the boiler project be done before the controls project? A> The intent is to complete the boiler project prior to the controls project.
I. Will the VFDs controlling the secondary heating water pumps be replaced? A> Yes, the VFDs for the secondary heating water pumps shall be replaced as part of this project. The drawings have been updated to reflect this.
J. Please clarify the scope with the lighting system. A> The existing lighting system will remain in place and the new controls system will be integrated with the existing lighting system.
K. Please clarify the scope of the fire alarm system. A> The existing fire alarm system will remain in place and the new controls system will be integrated with the existing fire alarm system.
L. The Fan Powered VAV sequence of operations and control schematic indicates a VFD and speed modulation for the fan powered VAV. Confirm if the Fan Powered VAVs truly have a VFD and if fan speed modulation is required. A> The fan powered boxes are controlled by ECM motors. They do not have VFDs. Speed modulation will be required. Refer to attached M503.
M. Confirm if the boiler mechanical room has emergency stop buttons currently installed. If not, will the controls contractor be required to install new emergency stop buttons? A> The boiler mechanical room has an existing emergency stop button positioned on the west wall of the boiler room next to the double doors.
N. Confirm if carbon monoxide (CO) detection is required in the boiler mechanical room. A> CO detection for the boiler room is currently being provided under a separate project.
O. The drawings state to run new wiring – can you confirm whether this means both LV power and LV control wiring? A> Yes it includes LV power and LV control wiring.
P. Can we confirm the new boilers will have BACnet? A> The new boilers are BACnet capable.
Q. Please provide more detail about the lighting system that will be controlled. A> Refer to
Keynote M20. The intention is that the existing lighting system will be monitored in a fashion similar to the existing Building controls. The Controls will monitor the lighting system status and alarms as described in keynote M20.
R. Will you approve wireless controls? We had previously provided a budget proposal to Matt Wharff with wireless. A> Systems shall be hard wired.
S. Lighting Controls
a. What is the integration protocol? A> BACNET
b. What points need to be viewable on the graphics? A> Trouble alarms from light control system.
c. Lighting Controls- Do any field devices need to be replaced (i.e., motions sensors, etc.)? A>
No devices to be replaced.
T. Boiler Controls
a. The drawings & equipment submittals for boiler replacement project will need to be provided. A> Email construction.procurement@iowa.gov to request drawings and mailto:construction.procurement@iowa.gov
PROJECT 9312.00 ADDENDUM #01 Page - 3 equipment submittals related to the Boiler Replacement Project if required. These documents will be provided for reference only.
b. Does the new equipment have an integration protocol? A> Refer to Boiler Replacement Project if required. These documents will be provided for reference only.
c. Does the boiler room require a Gas detection system. Currently not specified on drawings?
A> A Carbon Monoxide Detector is provided under the Boiler Replacement Project.
d. What is the timeline/schedule for project completion? A> Boiler Replacement project is scheduled to be completed by Mid-January 2024.
U. HWP
a. Will the Existing VFD’s need to be replaced? (P-1, P-2) A> Yes
V. VAV/FPB
a. Board Room-can a combination sensor be used instead of two separate sensors? A> Yes, a combination T and CO2 sensor can be used.
b. VAV airflow schedule needed if available. A> See updated drawings attached to this addendum.
c. Valve schedule for existing valves to be replaced? A> VAV box schedule with GPM values has been added to sheet M504.
d. Will the FPB detail be updated to reflect no-fan VFD? A> The fan powered boxes are controlled by ECM motors. They do not have VFDs. Speed modulation will be required.
Refer to attached M503.
W. RTU-1, 2
a. Do the isolation/fire-smoke dampers inside the building need to be replaced? A> The dampers do not need to be replaced. The actuators need to be replaced.
b. Can RTU cutover be performed during normal business hours? A> Yes. Cut over shall be completed and operational in an 8 to10 hour window. Only one RTU can be down at one time.
X. Fire Alarm System
a. Can existing Fire Alarm relays be reused for monitoring? A> Yes.
Y. CCTV and Security System
a. What is the current Security system? A> Siemens SiPass System
b. What level of dual windowpane needs to be integrated to BAS? A> BAS and the security system will not need to be viewed on the same pane.
Z. Commissioning
a. How much time needs to be allotted for Cx? A> Assume 8 to 16 hours of commissioning.
Resolving issues that arise during commissioning is not ‘time allotted for commissioning’ it shall be treated like any other punchlist item or contractual item.
AA. Can a job box be stored at the site within the warehouse or storage room? A> Yes, coordinate location with CM and the facility during construction.
4. SUBSTITUTION REQUESTS
PROJECT 9312.00 ADDENDUM #01 Page - 4
A. Baker Group, Trane, and Reliable Controls are permissible manufacturers/providers for this project.
5. ATTACHMENTS
A. Certifications Page (1 Sheet)
B. List Of Drawing Sheets – Updated (1 Sheet)
C. Table Of Contents – Updated (2 Sheets)
D. Bid Form – Updated (4 pages)
E. Updated Drawings Set (7 Pages)
END OF ADDENDUM
PROJECT 9312.00 LIST OF DRAWING SHEETS 00 0115 – 1
10-11-2023 (ADD#01)
SECTION 00 0115
LIST OF DRAWING SHEETS
DRAWINGS
1.01 SHEET TITLE
A. G000 Coversheet B. M101 HVAC Floor Plans – HVAC
C. M500 RTU-1 and RTU-2 Controls
D. M501 AC-3 Controls
E. M502 Boiler Plant Controls
F. M503 Mechanical Controls Miscellaneous
G. M504 Mechanical Controls Miscellaneous
END OF SECTION
PROJECT 9312.00 TABLE OF CONTENTS 00 0110 – 1
SECTION 00 0110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
1.01 DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
A. 00 0101 Project Title Page 00 0101-01 B. 00 0105 Certifications Page 00 0105-01 C. 00 0110 Table of Contents 00 0110-02 D. 00 0115 List of Drawing Sheets 00 0115-01 E. 00 0116 Bid Submittal Checklist 00 0116-01 F. 00 1113 Notice to Bidders 00 1113-01 G. 00 2113 Instructions to Bidders/Ins. Sample 00 2113-12 H. 00 2113.01 IMPACS Electronic Procurement System Instructions 00 2113.01-01 I. 00 3113 Preliminary Schedule 00 3113-02 J. 00 3143 Permit Application 00 3143-01 K. 00 4116 Bid Form 00 4116-04 L. 00 4116.01 Non-Discrimination Clause Information 00 4116.01-02 M. 00 4116.02 Targeted Small Business Information 00 4116.02-02 N. 00 4313 Bid Security Forms 00 4313-03 O. 00 5200 Agreement Form/Sample 00 5200-40 P. 00 6000 Payment Bond and Performance Bond Forms/Samples 00 6000-06
SPECIFICATIONS
1.02 DIVISION 01 – GENERAL REQUIREMENTS
A. 01 1200 Contract Summary 01 1200-04 B. 01 2500 Substitution Procedures/Form 01 2500-03 C. 01 2600 Contract Modification Procedures 01 2600-02 D. 01 2900 Payment Procedures 01 2900-02 E. 01 3100 Project Management and Coordination 01 3100-04 F. 01 3100.01 Web Based Construction Management 01 3100.01-04 G. 01 3200 Construction Progress Documentation 01 3200-03 H. 01 3300 Submittal Procedures 01 3300-02 I. 01 4000 Quality Requirements 01 4000-02 J. 01 5000 Temporary Facilities and Controls 01 5000-02 K. 01 6000 Product Requirements 01 6000-02 L. 01 7300 Execution 01 7300-03 M. 01 7700 Closeout Procedures/Forms 01 7700-06 N. 01 9113 MEP Commissioning 01 9113-06
1.03 DIVISION 02 – EXISTING CONDITIONS
A. 02 4113 Demolition 02 4113-03
1.04 DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
A. 23 0923 Direct-Digital Control System for HVAC 23 0923-47
PROJECT 9312.00 TABLE OF CONTENTS 00 0110 – 1
1.05 DIVISION 26 - ELECTRICAL
A. 26 0500 Common Work Results for Electrical 26 0500-03 B. 26 0505 Selective Demolition for Electrical 26 0505-02 C. 26 0519 Voltage Electrical Power Conductors and Cables 26 0519-09 D. 26 0526 Grounding and Bonding for Electrical Systems 26 0526-05 E. 26 0529 Hangers and Supports for Electrical Systems 26 0529-05 F. 26 0533.13 Conduit for Electrical Systems 26 0533.13-09 G. 26 0533.16 Boxes for Electrical Systems 26 0533.16-05 H. 26 0553 Identification for Electrical Systems 26 0553-08 I. 26 2416 Panelboards 26 2416-07
PROJECT 9312.00 BID FORM 00 4116 - 1
10-11-2023 (ADD 01)
SECTION 00 4116
BID FORM
The Bid Form must be submitted online through the State’s IMPACS Electronic Procurement System.
RFB #931200-01
BID FORM for CONSTRUCTION CONTRACT For
ABD ANK Boiler Replacements Alcoholic Beverages Division (ABD)
1918 SE Hulsizer Road, Ankeny, Iowa 50021 Project 9312.00
Iowa Department of Administrative Services Hoover State Office Building, Level 3 1305 East Walnut Street Des Moines, Iowa 50319-0105
The following information is to be completed and submitted with your bid..
1. Bid Form - Completed and Signed (to be uploaded with bid submission)
2. Non Discrimination Clause Information
3. Contractor Targeted Small Business Enterprise Pre-Bid Contract Information
4. Bid Security – 5% of total Bid amount (to be uploaded with bid submission)
Authorized Representative:
The undersigned Bidder, in response to your Request for Bid for construction of the above project, having examined the Drawings, Specifications, and other Bidding Documents dated September 08, 2023, and Addenda issued and acknowledged below as received and being familiar with all the conditions surrounding the construction of the proposed project including the availability of materials and labor, hereby proposes to furnish all labor, materials, equipment and supplies to perform all work to construct the project in strict accordance with the proposed Contract Documents, within the time and at the prices stated below. Prices are to cover all expenses incurred in performing the work required under the proposed Contract Documents, of which this bid is a part.
Bidder acknowledges receipt of the following Addenda which are a part of the Bidding Documents and for which any effect on cost of the Work is included in the bid amounts indicated:
Number ________ ________ ________ ________ ________
Dated ________ ________ ________ ________ ________
Note that the State of Iowa is exempt from State and Local sales and use taxes (including local option and school option) for this project. Taxes on construction materials shall NOT be included in the bid amounts.
https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=DASIowa
PROJECT 9312.00 BID FORM 00 4116 - 2
Amounts shall be indicated in both words and figures. In case of discrepancy, the amount indicated in words shall govern.
BID PACKAGES:
BP 01
Description: ABD HVAC Controls Upgrade
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
ALTERNATES:
ALT 01
Description: VAV – HW Reheat Valves (Detail F2/M503) and Fan Powered VAV – HW Reheat Control Valves (Detail E5/M503). Base Bid: Replace Actuators. Alternate Bid 01: Replace Entire Valves.
Bidder proposes and agrees to perform all work as described in the Construction Documents for the sum of:
Dollars
Bidder hereby certifies that:
1. This bid is genuine and is not made in the interest of or on behalf of any undisclosed person, firm or corporation.
2. Bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding;
and Bidder has not sought by collusion to obtain any advantage over any other bidder or over the Owner.
3. Bidder hereby certifies that the Bidder is registered with the Iowa Labor Commissioner as a Contractor as required by Chapter 91C, Code of Iowa.
4. Bidder agrees to comply with all Federal and State Affirmative Action/Equal Employment Opportunity requirements concerning fair employment and will not discriminate between or among them by reason of race, color, religion, sex, national origin, or physical handicap.
5. All construction under this Contract shall conform to the requirements of the Iowa State Building Code.
6. Bidder agrees that this bid shall remain valid and shall not be withdrawn for a period of thirty (30) calendar days after the date for receipt of bids.
7. Bidder agrees that if written notice of acceptance of this bid is mailed, emailed, or delivered to the undersigned within thirty (30) days after the date in which bids are due, or at any time thereafter before it is withdrawn, the undersigned will sign and return the Contract Agreement, prepared in
PROJECT 9312.00 BID FORM 00 4116 - 3
accord with the Bidding Documents and this bid as accepted; and will also provide proof of insurance coverage and required surety bonds.
8. Bidder understands that the Owner reserves the right to reject any and all bids, and to waive irregularities or informalities and enter into a contract for the work, as the Owner deems to be in the best interest of the State.
9. Bidder understands that the Owner reserves the right to accept any, or no, Alternate Bid, if requested, and that the Alternate Bids may be considered in any order or combination, and the low Bidder shall be determined on the basis of the sum of the base bid and any Alternate(s) accepted.
Subcontractors:
The Trade Contractor must identify all Subcontractors and Suppliers within 48 hours of the published date and time for which bids must be submitted, in accordance with Iowa Code Section 8A311, as amended by House File 646 in 2011. Subcontractors and suppliers may not be changed without the approval of the Owner. Requests for changing a Subcontractor or supplier must identify the reason for the proposed change, the name of the new Subcontractor or supplier, and the change in the subcontractor or supplier price as a result of the change. Any reduction in subcontractor or supplier price as a result of the change, if the change is approved by the Owner, shall be deducted from the Trade Contract Price via a deductive Change Order. Any such changes, if approved by the Owner, which result in an increase in the Trade Contract Price shall be borne by the Trade Contractor.
Enforcement of Reciprocal Resident Bidder Preference, per Iowa Code 73A.21.
All bidders shall either check the box next to “Resident Bidder” or check the box next to “Nonresident Bidder” and by doing so and signing thereafter certifies and attests to the same. All information requested must be provided. Seek out the advice of an attorney if you have questions.
“Resident Bidder” means a person or entity authorized to transact business in of the State of Iowa and having a place of business for transacting business within the State of Iowa at which it is conducting and has conducted business for at least three years prior to the date of the first advertisement for the public improvement. Note, however, that if a nonresident bidder’s state or foreign country has a more stringent definition of a resident bidder, the more stringent definition is applicable as to bidders from that state or foreign country.
Resident Bidder
Name of Resident Bidder: ___________________________
By: _____________________________________ Authorized Agent and Signatory of Resident Bidder
OR:
Nonresident Bidder
Name of Nonresident Bidder: ___________________________
Name of State or Foreign Country of Nonresident Bidder: ___________________________
Particularly identify and describe any preference, labor preference, or any other type of preferential treatment, in effect in the nonresident bidder’s state or foreign country at the time of this bid:
PROJECT 9312.00 BID FORM 00 4116 - 4
NOTICE: Nonresident Bidders domiciled in a state or country with a resident labor force preference shall make and keep, for a period of not less than three years, accurate records of all workers employed on the public improvement. The records shall include each worker’s name, address, telephone number when available, social security number, trade classification, and the starting ending time of employment.
By: ________________________________________ Authorized Agent and Signatory of Nonresident Bidder
Bid Form shall be signed by an officer of the company with authority to bind in a contract.
Notice of acceptance of this bid, or request for additional information by the Department of Administrative Services, may be addressed to the undersigned at the address set forth below:
Legal Name of Firm: ____________________________________________________________
Date: _________________________________________________
Signature of Bidder: ____________________________________________________
Title: ______________________________________________________
Typed Name of Signatory: _____________________________________________________
Email: _______________________________________
Business Address:
Telephone Number: ____________________ Fax Number: ____________________
Federal Tax Identification Number: ____________________
Iowa Contractor Registration Number: _________________________
Bidder Safety Manager Name:_______________________________
For an out-of-state Bidder, Bidder certifies that the Resident Preference given by the State or
Foreign Country of Bidder’s residence, _________________________, is _______ %.
GENERAL NOTE:
IT IS THE INTENT OF THIS PROJECT TO COMPLETELY REPLACE
THE ENTIRETY OF THE EXISTING CONTROLS SYSTEMS. THE
SCOPE OF WORK SHALL INCLUDE THE REMOVAL OF THE
EXISTING BUILDING CONTROLS SYSTEM, PANELS, WIRING,
CONDUIT, CONTROLLERS, SENSORS, ACTUATORS, ETC.
THE NEW SYSTEM SHALL INCLUDE, BUT NOT BE LIMITED TO, THE
FOLLOWING: CONTROL PANELS, CONTROLLERS, WIRING,
CONDUITS, SENSORS, SOFTWARE, ACTUATORS, ETC. THE
EXISTING SYSTEM IS SIEMENS DESIGO.
SCHEDULING AND PHASING OF PROJECT MUST BE
COORDINATED WITH OWNER.
NOTE THAT THE OWNER IS REPLACING THE BOILERS AS PART OF
A SEPARATE PROJECT. COORDINATE REQUIREMENTS WITH
OWNER.
PLENUM RATED CABLING WILL BE REQUIRED IN THE OFFICE
AREA.
PROVIDE PROTECTIVE PLASTIC SHEETING OVER OFFICE DESKS,
EQUIPMENT, ETC. TO PREVENT DUST AND DEBRIS WHILE
WORKING IN OFFICE AREA.
OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL CONTROLS
COMPONENTS. SPECIFIC EQUIPMENT MENTIONED FOR SALVAGE
ARE TECs, VALVES, DAMPER ACTUATORS, AND T-STATS.
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
SHEET INDEX CERTIFICATIONS
H
BA D E FC G H
Autodesk Revit 2022Autodesk Revit 2022
ID
A
S R
F B
:9 -0
/1
/2
:2 :2
A
M
A u to d e s k D o c s
/2
IA
D
A S
A
B D
A n k e n y B
A S
H
V A
C C o n tr o l R e p la c e m e n t/
-M
E P
-R .r v t
ABD Ankeny HVAC Controls Upgrade - #9312.00
Iowa Department of Administrative Services 1918 SE Hulsizer Dr, Ankeny, IA 50021
G000
A B
D A n k e n y H
V A
C C o n tr o ls
U p g ra d e
.0
Io w a D e p a rt m e n t o f
A d m in is tr a ti v e S e rv ic e s
S
E H u ls iz e r
D r, A n k e n y
IA
P R
O J E
C T
N U
M B
E R
IS
S
U E
D F
O R
C
O N
S T
R U
C T
IO
N
P R
O J E
C T
I S
S U
E D
A T
E
/0
/2
General
G000 COVERSHEET
Mechanical
M101 HVAC FLOOR PLANS - HVAC
M500 RTU-1 AND RTU-2 CONTROLS
M501 AC-3 CONTROLS
M502 BOILER PLANT CONTROLS
M503 MECHANICAL CONTROLS MISCELLANEOUS
M504 MECHANICAL CONTROLS MISCELLANEOUS
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
{{t:s;r:y;o:"Mechanical";w:135;h:35;}} {{t:t;r:y;o:"Mechanical";l:"Date";w:110;h:30;}}
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Travis L. Sprenger
MECHANICAL SHEETS
24039
MECHANICAL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
{{t:s;r:y;o:"Electrical";w:135;h:35;}} {{t:t;r:y;o:"Electrical";l:"Date";w:110;h:30;}}
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Kevin J. Bruxvoort
ELECTRICAL PORTIONS OF MECHANICAL SHEETS
19927
ELECTRICAL ENGINEER
IDAS RFB: 931200-01
A D
D
/1
/2
A d d e n d u m
ADD
T
T
T T
T
TT
T T
T
TT
T T
T
TT
T T
T
TT
T T
T T
P
P P
M
P
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T T
T
T
C O
T
T
T
T
T
FPVAV-1A
FPVAV-1B
FPVAV-1D
FPVAV-1E
FPVAV-105
FPVAV-106
FPVAV-103
FPVAV-108
FPVAV-104
FPVAV-107
FPVAV-102 FPVAV-109
FPVAV-101 FPVAV-110
RTU-2 RTU-1
FPVAV-111 FPVAV-120
FPVAV-112 FPVAV-119
FPVAV-114 FPVAV-117
FPVAV-115
FPVAV-116
15,000 GALLON FUEL TANK
GENERATOR
JP-1
FP-1
B-1
B-2
B-3
P-1 P-2
M01
M05
M03 M04
M06
M07
M02
M02
M02
M02
M02
M02
M02
M02
M02
M02
M02 M02
M02
EF-1
RF-1
M23
M23
FPVAV-113 FPVAV-118
FPVAV-O103
M02
WAREHOUSE
WAREHOUSE
WAREHOUSE
WAREHOUSE
AC-3
M17
BP-1
BP-2
BP-3
M13
FPVAV-O104
FPVAV-1C
M02
P1
P2
M
A
B
C
D
E
F
G
H
I
J
K
L
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
M14
M14
M14
M14
M14
M14
M14
M14
M14
M14
M14 M14
M14
M14
M14
M14
M15
M15 M15
M16
EF-FP
PRESSURE SENSOR
PANEL ON MEZZANINE
M15
M10
M10
H
SPACE HUMIDITY SENSOR
P
BUILDING PRESSURE
SENSOR (ON ROOF)
P
AC-3 DUCT
PRESSURE SENSOR
P
HOT WATER
DIFFERENTIAL
PRESSURE SENSOR
P
BUILDING
PRESSURE
SENSOR
M25
ADD
M26
ADD
TUR-231
TUR-230A
TUR-230B
TUR-227
TUR-232
TUR-226
TUR-225
TUR-224
TUR-234
TUR-200B
TUR-201B
TUR-201A
TUR-217
TUR-216
TUR-206
TUR-207
TUR-253
FCU-1
FCU-2
TUR-213
M08
M09
M08
M08
M08
M08
M08
M08
M08
M08
M08 M08
M08
M08
M08
M08
M08
M08
M08
TUR-200A
STAIR
S22
WELLNESS
ELEVATOR
MENS
STORAGE
SERVER ROOM
OFFICE
WORK ROOM
CORRIDOR
WOMENS
STORAGE
CORRIDOR
WORKSTATION
WORKSTATION
WORKSTATION
WORKSTATION
OPEN OFFICE
WORKSTATION
WORKSTATION
OPEN OFFICE
STAIR
S21
CORRIDOR
CORRIDOR
STAIR
S23
OFFICE
TRAIING
WAREHOUSE
STORAGE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
OFFICE
OFFICE
WORKSTATION
OFFICE
OPEN OFFICE
EF-157
EF-158
EF-253
EF-252
CU-2
CU-1
EF-153
EF-177
M10
M10
M10
M10
M10
M10
M12
M
A
B
C
D
E
F
G
H
I
J
K
L
15 16 17 18 19
EF-ELEV
M10
M18
M18
M18
M18
M19
M20
M21
M22 M24
MENS
WOMENS
STAIR
S12
ELEVATOR
OFFICE
TUR-157
TUR-109
TUR-110
TUR-108
TUR-112A TUR-107
TUR-106
TUR-105TUR-112B
TUR-119
TUR-104
TUR-120 TUR-102 TUR-103
TUR-101B
TUR-100B
TUR-100A
TUR-101A
TUR-153
TUR-121
TUR-127
TUR-170
TUR-122
TUR-126
BREAK ROOM
COPY ROOM
Room
CORRIDOR
OFFICE
108WORKSTATION
WORKSTATION
WORKSTATION
WORKSTATION
WORKSTATION
WORKSTATION
WORKSTATION
OPEN OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
CONFERENCE
SEC
OFFICE
120OFFICE
BOARD ROOM
RECEPTION
WORKSTATION
WORKSTATION
STAIR
S11
VESTIBULE
MENS
WOMENS
CORRIDOR
OPEN OFFICE
WORKSTATION
STORAGE
OFFICE
TELECOM
OFFICE
122 OFFICE
OFFICE
OFFICE
STORAGE
STORAGE
125A
WAREHOUSE
MAINTENANCE
LOCKERS
WOMENS
176MENS
SHOWER
CORRIDOR
BREAK ROOM
STAIR
S13
M08
M08 M08
M08
M08 M08
M08
M08
M08
M08 M08
M08
M08M08
M08
M08 M08
M08
M08
M08
M08
M08
M08
M08
17 18 19
TUR-174
M08
TUR-172 M08
TUR-177
M08
M18
M18
M18
M18
M11
EF-158
ADD
GENERAL NOTE:
IT IS THE INTENT OF THIS PROJECT TO COMPLETELY REPLACE
THE ENTIRETY OF THE EXISTING CONTROLS SYSTEMS. THE
SCOPE OF WORK SHALL INCLUDE THE REMOVAL OF THE
EXISTING BUILDING CONTROLS SYSTEM, PANELS, WIRING,
CONDUIT, CONTROLLERS, SENSORS, ACTUATORS, ETC.
THE NEW SYSTEM SHALL INCLUDE, BUT NOT BE LIMITED TO, THE
FOLLOWING: CONTROL PANELS, CONTROLLERS, WIRING,
CONDUITS, SENSORS, SOFTWARE, ACTUATORS, ETC. THE
EXISTING SYSTEM IS SIEMENS DESIGO.
SCHEDULING AND PHASING OF PROJECT MUST BE
COORDINATED WITH OWNER.
NOTE THAT THE OWNER IS REPLACING THE BOILERS AS PART OF
A SEPARATE PROJECT. COORDINATE REQUIREMENTS WITH
OWNER.
PLENUM RATED CABLING WILL BE REQUIRED IN THE OFFICE
AREA.
PROVIDE PROTECTIVE PLASTIC SHEETING OVER OFFICE DESKS,
EQUIPMENT, ETC. TO PREVENT DUST AND DEBRIS WHILE
WORKING IN OFFICE AREA.
OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL CONTROLS
COMPONENTS. SPECIFIC EQUIPMENT MENTIONED FOR SALVAGE
ARE TECs, VALVES, DAMPER ACTUATORS, AND T-STATS.
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Autodesk Revit 2022Autodesk Revit 2022
ID
A
S R
F B
:9 -0
/1
/2
:2 :2
A
M
A u to d e s k D o c s
/2
IA
D
A S
A
B D
A n k e n y B
A S
H
V A
C C o n tr o l R e p la c e m e n t/
-M
E P
-R .r v t
H V
A C
F L O
O R
P L A
N S
H
V A
C
C O
N S
T R
U C
T
IO
N
T L S
L D
F
/0
/2
M101
A B
D A n k e n y H
V A
C C o n tr o ls
U p g ra d e
.0
Io w a D e p a rt m e n t o f
A d m in is tr a ti v e S e rv ic e s
S
E H u ls iz e r
D r, A n k e n y
IA
N
03/64" = 1'-0"A6
FIRST FLOOR PLAN - HVAC
32'
N
03/64" = 1'-0"G6
SECOND FLOOR PLAN - HVAC
32'
KEYNOTES
KEY NOTE
M01 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO RTU. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR ROOF TOP UNITS RTU-1 AND RTU-2.
M02 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO FAN POWERED VAV BOXES. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR FAN POWERED VAV
BOXES.
M03 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO BOILERS AND PUMPS. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR BOILERS AND PUMPS.
M04 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO SECONDARY PUMPS. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR SECONDARY PUMPS.
M05 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO FIRE AND JOCKEY PUMPS. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR MONITORING THE FIRE
PUMP AND JOCKEY PUMP.
M06 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO GENERATOR. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR MONITORING THE STATUS OF THE
GENERATOR.
M07 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO FUEL TANK MONITORING SYSTEM. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR MONITORING
THE FUEL TANK MONITORING SYSTEM.
M08 REMOVE ALL EXISTING BAS COMPONENTS, THERMOSTATS, ACCESSORIES, AND WIRING CONNECTED TO VAV BOXES. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR VAV BOXES. INSTALL A LABEL ON THE CEILING GRID/TILE BELOW THE VAV BOX INDICATING THE VAV IDENTIFICATION NUMBER.
M09 PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS TO PROVIDE MONITORING FOR THE STATUS OF FCUS SERVING THE SERVER ROOM.
M10 CONNECT FAN TO BAS TO MONITOR FAN STATUS.
M11 TUR-101A AND TUR-101B SHALL OPERATE IN TANDEM USING ONE THERMOSTAT.
M12 LOCATION OF EXISTING COMPUTER WORKSTATION. PROVIDE NEW COMPUTER WORKSTATION. TURN EXISTING COMPUTER WORKSTATION OVER TO OWNER.
M13 LOCATION OF EXISTING DDC CONTROL PANELS. REMOVE EXISTING PANELS AND PROVIDE NEW PANELS.
M14 REMOVE EXISTING THERMOSTAT AND PROVIDE NEW THERMOSTAT. THERMOSTAT TO BE LOCATED ON COLUMN ADJACENT TO FPVAV AT AN ELEVATION OF 12' AFF.
M15 REMOVE EXISTING PRESSURE SENSOR AND PROVIDE AN NEW PRESSURE SENSOR IN THIS LOCATION.
M16 REMOVE EXISTING MONITORING FOR WATER PUMPS. PROVIDE NEW MONITORING FOR PUMP STATUS BY BAS.
M17 REMOVE ALL EXISTING BAS COMPONENTS, ACCESSORIES, AND WIRING CONNECTED TO AC-3. PROVIDE NEW BAS COMMUNICATION DEVICES AND CONTROLS FOR AIR HANDLING UNIT AC-3.
M18 REMOVE AND REINSTALL CEILING TILES AS REQUIRED TO REMOVE EXISTING CONTROLS COMPONENTS AND FOR INSTALLATION OF NEW CONTROLS. REPLACE ANY CEILING TILES DAMAGED DURING
CONSTRUCTION.
M19 PROVIDE MONITORING OF LIEBERT EXM UPS SYSTEM. MONITOR NORMAL POWER LOSS, LOW BATTERY ALARM AND OVER VOLTAGE ALARMS.
M20 PROVIDE MONITORING OF ENCELIUM LIGHTING CONTROL SYSTEM. MONITOR TROUBLE ALARMS FROM LIGHTING CONTROL SYSTEM.
M21 PROVIDE MONITORING OF SIEMENS FIRE ALARM SYSTEM. MONITOR COMMON ALARM, SUPERVISORY ALARM AND PANEL IN TEST MODE.
M22 PROVIDE MONITORING FOR CCTV AND SECURITY SYSTEM. MONITOR ALARM ACTIVATION, TROUBLE ALARM AND DOOR AJAR.
M23 REMOVE ALL EXISTING BAS COMPONENTS, THERMOSTATS, ACCESSORIES, AND WIRING CONNECTED TO FAN POWERED VAV BOXES. PROVIDE NEW THERMOSTAT, BAS COMMUNICATION DEVICES AND
CONTROLS FOR FAN POWERED VAV BOXES.
M24 BAS SYSTEM SHALL BE CONNECTED TO UPS AND GENERATOR.
M25 BOILER EMERGENCY SHUTOFF SWITCH.
M26 CO DETECTOR INSTALLED AS PART OF BOILER REPLACEMENT PROJECT. CONNECT CO DETECTOR INTO BAS SYSTEM FOR SYSTEM MONITORING.
A D
D
/1
/2
A d d e n d u m
N.C.
DX
SA
LOCATE ¾ DISTANCE
DOWN LONGEST DUCT
H
L
AI - SUPPLY AIR STATIC PRESSURE 3
EA
BV - MIXED AIR DAMPER STATUS
N.O.
N.C.
OA
RA
AI - SUPPLY AIR TEMP
SF
M
M
TMM
BI - BUILDING STATIC SENSOR
HL
M
BO - SUPPLY DAMPER
BI - SUPPLY AIR DAMPER STATUS
TO OTHER RTU
RTU-1 AND RTU-2
BI - HIGH STATIC SHUTDOWN
H L
BI - RETURN AIR SMOKE DETECTOR
S
AI - RETURN AIR TEMP
T
B U
IL
D
IN
G
I N
T E
R
IO
R
B U
IL
D
IN
G
E X
T E
R
IO
R
AI - ZONE HUMIDITY
H
AI - OUTSIDE AIR TEMPERATURE
T
BI - SUPPLY AIR SMOKE DETECTOR
S
AO - ZONE HUMIDITY SETPOINT
BI - RTU ALARM
BO - RTU ENABLE
RF
M
SMOKE DETECTOR TO COMMUNICATE WITH
FIRE ALARM SYSTEM AS WELL AS BAS
SMOKE DETECTOR TO COMMUNICATE WITH
FIRE ALARM SYSTEM AS WELL AS BAS
BV - RELIEF FAN STATUS
CT
BV - SUPPLY FAN STATUS
CT
REPLACE DAMPER ACTUATORS
REPLACE DAMPER ACTUATORS
AI - FILTER DIFFERENTIAL
PRESSURE
H L H
PROVIDE FILTER DIFFERENTIAL SENSOR
SA
LOCATE ¾ DISTANCE
DOWN LONGEST DUCT
H
L
AI - SUPPLY AIR STATIC PRESSURE 2
SA
LOCATE ¾ DISTANCE
DOWN LONGEST DUCT
H
L
AI - SUPPLY AIR STATIC PRESSURE 1
HARDWIRED
WITH AIR DAMPENING DEVICE
(VAISALA SPH-20 OR SIMILAR)
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Autodesk Revit 2022Autodesk Revit 2022
ID
A
S R
F B
:9 -0
/1
/2
:2 :2
A
M
A u to d e s k D o c s
/2
IA
D
A S
A
B D
A n k e n y B
A S
H
V A
C C o n tr o l R e p la c e m e n t/
-M
E P
-R .r v t
R T
U -1
A N
D R
T U
-2 C
O N
T R
O L S
C O
N S
T R
U C
T
IO
N
T L S
T L S
/0
/2
M500
A B
D A n k e n y H
V A
C C o n tr o ls
U p g ra d e
.0
Io w a D e p a rt m e n t o f
A d m in is tr a ti v e S e rv ic e s
S
E H u ls iz e r
D r, A n k e n y
IA
NOT TO SCALED4
RTU-1 AND RTU-2 CONTROLS SCHEMATIC - RF DX GAS
RTU-1 AND RTU-2 - ON-OFF CONTROL WITH SUPPLY AIR ISOLATION DAMPER
GENERAL REQUIREMENTS
THE RTUS SHALL BE CONTROLLED BY THEIR OWN PACKAGED CONTROL SYSTEM. THE UNITS ARE
MANUFACTURED BY TRANE, MODEL INTELLIPAK II SXHJ13040A0162LA5J55K1000B00C0000F01A0.
THE BAS MONITORS AND COMMUNICATES BUILDING INFORMATION AND SETPOINTS TO THE
PACKAGED CONTROL SYSTEMS OF RTU-1 AND RTU-2.
RTU-1 AND RTU-2 CAN SUPPLY CONDITIONED AIR TO THE SPACE INDIVIDUALLY OR TOGETHER AS A
DUPLEX SYSTEM. BOTH AHUS ARE CONNECTED BY A COMMON SUPPLY AIR DUCT HEADER. EACH
RTU HAS A SEPARATE WILD RETURN AIR DUCT FROM THE WAREHOUSE AREA.
EACH RTU IS SERVED BY A SUPPLY AIR ISOLATION DAMPER. THE SUPPLY AIR RTU ISOLATION
DAMPER IS OPENED-CLOSED BY THE BAS DDC PANEL.
TO START THE RTU, FIRST THE BAS OPENS THE APPROPRIATE RTU ISOLATION DAMPER. THE
DAMPER END SWITCH STATUS INDICATES TO THE BAS DDC PANEL THAT THE DAMPER IS OPEN AND
THE BAS SYSTEM COMMANDS THE RTU TO START.
WHEN AN RTU IS ONLINE AND IS UNABLE TO MAINTAIN SPACE SETPOINT TEMPERATURE FOR A
PERIOD OF 30 MINUTES (ADJ.), THE LEAD RTU IS STOPPED, BOTH RTU ISOLATION DAMPERS ARE
PROVEN OPENED AND THEN BOTH RTUS ARE COMMANDED ON BY THE BAS SYSTEM. THEY SHALL
RAMP UP THEIR FANS IN UNISON TO MEET SUPPLY DUCT STATIC PRESSURE SETPOINT.
WHEN AN RTU FAILS, SUCH THAT THE RTU IS SHUTDOWN, ITS ISOLATION DAMPER IS CLOSED BY THE BAS AND THE LAG RTU IS STARTED UP PER THE SEQUENCE DESCRIBED ABOVE OR CONTINUES
TO RUN AND AN ALARM IS ISSUED TO THE BAS SYSTEM.
RUN CONDITIONS - SCHEDULED:
THE UNIT SHALL RUN BASED UPON AN OPERATOR ADJUSTABLE SCHEDULE.
RTU RUNTIME:
THE BAS SHALL MONITOR AND LOG RTU RUNTIME. IMPORT RUNTIME FROM EXISTING CONTROLS
SYSTEM.
LEAD AHU WILL SWAP EACH WEEK. IF THE CURRENT LEAD AHU SUPPLY FAN RUNTIME EXCEEDS
THAT OF THE LAG AHU, IT WILL MAINTAIN LEAD STATUS.
HIGH STATIC SHUTDOWN:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A HIGH STATIC
SHUTDOWN SIGNAL. HIGH STATIC SHUTDOWN SHALL BE SET AT 3 IN WC (ADJ).
SUPPLY AND RETURN AIR SMOKE DETECTION:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A SUPPLY AIR OR
RETURN AIR SMOKE DETECTOR STATUS.
AHU OPTIMAL START:
THE UNIT SHALL START PRIOR TO SCHEDULED OCCUPANCY BASED ON THE TIME NECESSARY FOR
THE ZONES TO REACH THEIR OCCUPIED SETPOINTS. THE START TIME SHALL AUTOMATICALLY
ADJUST BASED ON CHANGES IN OUTSIDE AIR TEMPERATURE AND ZONE TEMPERATURES.
SUPPLY FAN:
THE PACKAGED UNIT CONTROLLER SHALL CONTROL THE SUPPLY FAN. THE PACKAGED UNIT
CONTROLLER SHALL COMMUNICATE SUPPLY FAN STATUS WITH THE BAS.
SUPPLY AIR DUCT STATIC PRESSURE CONTROL:
THE BAS SHALL MEASURE DUCT STATIC PRESSURE AT THE END OF EACH BRANCH MAIN. THE BAS
SHALL REPORT THE LOWEST DUCT STATIC PRESSURE TO THE RTU. THE UNIT PACKAGED
CONTROLLER SHALL MODULATE THE SUPPLY FAN SPEED TO MAINTAIN A DUCT STATIC PRESSURE SETPOINT. THE STATIC PRESSURE SETPOINT SHALL BE RESET BASED UPON THE POSITION OF THE ZONE DAMPERS, WITH A GOAL OF REDUCING THE STATIC PRESSURE UNTIL AT LEAST ONE ZONE
DAMPER IS NEARLY WIDE OPEN.
• THE INITIAL DUCT STATIC PRESSURE SETPOINT SHALL BE 1.5 IN H2O (ADJ.).
• IF NO ZONE DAMPER IS NEARLY WIDE OPEN, THE SETPOINT SHALL INCREMENTALLY RESET
DOWN TO A MINIMUM OF 1.3 IN H2O (ADJ.) .
• AS ONE OR MORE DAMPERS NEARS THE WIDE OPEN POSITION, THE SETPOINT SHALL
INCREMENTALLY RESET UP TO A MAXIMUM OF 1.8 IN H2O (ADJ.).
THE BAS SHALL ALSO COMMUNICATE WITH RTU-1 AND RTU-2 TO DETERMINE IF THE COOLING
COMPRESSORS ARE ON. IF THE COMPRESSORS ARE ON, THE STATIC PRESSURE SETPOINT SHALL
BE SET AT 2.5 IN H20 (ADJ.) UNTIL THE COMPRESSORS ARE TURNED OFF.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ.)
GREATER THAN SETPOINT.
• LOW SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ.)
LESS THAN SETPOINT.
SUPPLY AIR TEMPERATURE SETPOINT - OPTIMIZED:
THE BAS SHALL SHALL MONITOR THE SUPPLY AIR TEMPERATURE AND SHALL MAINTAIN A SUPPLY
AIR TEMPERATURE SETPOINT RESET BASED ON ZONE COOLING REQUIREMENTS. THE BAS SHALL
COMMUNICATE THE SETPOINT WITH THE PACKAGED UNIT CONTROLLER.
THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE RESET FOR COOLING BASED ON ZONE
COOLING REQUIREMENTS AS FOLLOWS:
• THE INITIAL SUPPLY AIR TEMPERATURE SETPOINT SHALL BE 55°F (ADJ.).
• AS COOLING DEMAND INCREASES, THE SETPOINT SHALL INCREMENTALLY RESET DOWN TO
A MINIMUM OF 53°F (ADJ.).
• AS COOLING DEMAND DECREASES, THE SETPOINT SHALL INCREMENTALLY RESET UP TO A
MAXIMUM OF 62°F (ADJ.) .
DEHUMIDIFICATION:
THE BAS CONTROLLER SHALL MEASURE THE SPACE HUMIDITY AND PLACE THE RTU INTO
DEHUMIDIFICATION MODE AS FOLLOWS.
• WHEN THE ZONE HUMIDITY IS GREATER THAN 60% (ADJ) RH, THE BAS SHALL
INCREMENTALLY RESET THE SUPPLY AIR TEMPERATURE SETPOINT DOWN TO A MINIMUM
TEMPERATURE OF 53°F (ADJ.).
COOLING STAGES:
THE UNIT PACKAGED CONTROLLER SHALL MEASURE THE SUPPLY AIR TEMPERATURE AND STAGE
THE COOLING TO MAINTAIN ITS COOLING SETPOINT.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS 5°F (ADJ.) GREATER THAN
SETPOINT FOR 15 MINUTES (ADJ.).
BUILDING STATIC PRESSURE CONTROL:
WAREHOUSE BUILDING STATIC PRESSURE CONTROL IS CONTROLLED WITH THE BAS BUILDING
STATIC PRESSURE SENSOR AND DDC CONTROLLER SIGNAL AND LOOP OUTPUT TRANSFERRED TO
THE RTU CONTROLLER FOR CONTROL OF THE RELIEF FAN. THE SIGNAL ADJUSTS THE SET-POINT OF THE RTU CONTROLLER RELIEF AIR CONTROL LOOP. WAREHOUSE WILL CONTROL AT A POSITIVE
0.05 IN WC (ADJ.) COMPARED TO OUTSIDE AIR.
THE PACKAGED UNIT CONTROLLER SHALL COMMUNICATE RELIEF FAN STATUS WITH THE BAS.
ECONOMIZER:
THE UNIT PACKAGED CONTROLLER SHALL CONTROL ECONOMIZER MODE. THE BAS SHALL BE ABLE
TO COMMUNICATE SETPOINTS TO THE UNIT PACKAGED CONTROLLER.
RETURN AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE RETURN AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS GREATER THAN 90°F (ADJ.).
• LOW RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
SUPPLY AIR TEMPERATURE:
THE CONTROLLER SHALL MONITOR THE SUPPLY AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS GREATER THAN 120°F (ADJ.).
• LOW SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
LOW SUPPLY AIR TEMP x
LOW SUPPLY AIR STATIC PRESSURE x
LOW RETURN AIR TEMP x
LOW ZONE HUMIDITY x
HIGH SUPPLY AIR TEMP x
HIGH SUPPLY AIR STATIC PRESSURE x
HIGH RETURN AIR TEMP x
HIGH ZONE HUMIDITY x
FILTER CHANGE REQUIRED x
SCHEDULE x
SUPPLY AIR TEMP SETPOINT x x x
SUPPLY AIR STATIC PRESSURE SETPOINT x x x
SPACE HUMIDITY SETPOINT x x x
RTU ENABLE x x x
SUPPLY DAMPER x x x
SUPPLY AIR DAMPER STATUS x x x
RTU ALARM x x x
BUILDING STATIC PRESSURE x x x
RELIEF FAN STATUS x x x
SUPPLY FAN STATUS x
MIXED AIR DAMPER STATUS x x
SUPPLY AIR SMOKE DETECTOR x x x x
RETURN AIR SMOKE DETECTOR x x x x
HIGH STATIC SHUTDOWN x x x x
FILTER DIFFERENTIAL PRESSURE x x x x
SUPPLY AIR TEMP x x x
SUPPLY AIR STATIC PRESSURE 3 x x x x
SUPPLY AIR STATIC PRESSURE 2 x x x x
SUPPLY AIR STATIC PRESSURE 1 x x x x
RETURN AIR TEMP x x x
ZONE HUMIDITY x x x
OUTSIDE AIR TEMP x x x
AI AO BI BO AV BV LOOP SCHED TREND ALARM
POINT NAME
HARDWARE POINTS SOFTWARE POINTS SHOW ON
GRAPHIC
POINTS MATRIX - RTU-1 AND RTU-2
EF
N.C.
DX
BV - COOLING STAGE 1
BV - COOLING STAGE 2
VFD
BV - SUPPLY FAN START/STOP
BV - SUPPLY FAN STATUS
AV - SUPPLY FAN VFD SPEED
BV - SUPPLY FAN VFD FAULT
SA
LOCATE ¾ DISTANCE
DOWN LONGEST DUCT
H
L
AI - SUPPLY AIR STATIC PRESSURE
BV - EXHAUST FAN START/STOP
BV - EXHAUST FAN STATUS
AV - EXHAUST FAN VFD SPEED
BV - EXHAUST FAN VFD FAULT
VFD
EA
BI - RETURN AIR SMOKE DETECTOR
AI - FILTER DIFFERENTIAL
PRESSURE
AV - MIXED AIR TEMP
AV - EXHAUST AIR DAMPER
N.C.
AI - RETURN AIR TEMP
OA
RA
AI - SUPPLY AIR TEMP
SF
GAS
BV - HEATING STAGE 1
BV - HEATING STAGE 2
AV - OUTSIDE AIR DAMPER
T
M M
CT
S
T
M
CT
H L
H TM
BI - BUILDING STATIC SENSOR
HL
AC-3 PACKAGED UNIT
BI - SUPPLY AIR SMOKE DETECTOR
S
SMOKE DETECTOR TO COMMUNICATE WITH
FIRE ALARM SYSTEM AS WELL AS BAS
SMOKE DETECTOR TO COMMUNICATE WITH
FIRE ALARM SYSTEM AS WELL AS BAS
REPLACE DAMPER
ACTUATORS
REPLACE DAMPER
ACTUATORS
PROVIDE FILTER DIFFERENTIAL SENSOR
B U
IL
D
IN
G
I N
T E
R
IO
R
B U
IL
D
IN
G
E X
T E
R
IO
R
BI - HIGH STATIC SHUTDOWN
H L
HARDWIRED
WITH AIR DAMPENING DEVICE
(VAISALA SPH-20 OR SIMILAR)
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Autodesk Revit 2022Autodesk Revit 2022
ID
A
S R
F B
:9 -0
/1
/2
:2 :3
A
M
A u to d e s k D o c s
/2
IA
D
A S
A
B D
A n k e n y B
A S
H
V A
C C o n tr o l R e p la c e m e n t/
-M
E P
-R .r v t
A C
-3 C
O N
T R
O L
S
C O
N S
T R
U C
T
IO
N
T L S
T L S
/0
/2
M501
A B
D A n k e n y H
V A
C C o n tr o ls
U p g ra d e
.0
Io w a D e p a rt m e n t o f
A d m in is tr a ti v e S e rv ic e s
S
E H u ls iz e r
D r, A n k e n y
IA
NOT TO SCALEE4
AC-3 CONTROLS SCHEMATIC - RF DX GAS
AC-3 SEQUENCE OF OPERATIONS
GENERAL REQUIREMENTS
AC-3 SHALL BE CONTROLLED BY ITS OWN PACKAGED CONTROL SYSTEM. THE UNIT IS
MANUFACTURED BY TRANE, MODEL YCH600B4LW6B4NH50B0D0000JB02.
THE BAS MONITORS AND COMMUNICATES BUILDING INFORMATION AND SETPOINTS TO THE
PACKAGED CONTROL SYSTEM OF AC-3.
AC-3 SUPPLIES CONDITIONED AIR TO THE OFFICE AREA, WHERE VAV BOXES DISTRIBUTE AIR TO
EACH ZONE.
RUN CONDITIONS - SCHEDULED:
THE UNIT SHALL RUN BASED UPON AN OPERATOR ADJUSTABLE SCHEDULE.
SUPPLY AND RETURN AIR SMOKE DETECTION:
THE UNIT SHALL SHUT DOWN AND GENERATE AN ALARM UPON RECEIVING A SUPPLY OR RETURN
AIR SMOKE DETECTOR STATUS.
AHU OPTIMAL START:
THE UNIT SHALL START PRIOR TO SCHEDULED OCCUPANCY BASED ON THE TIME NECESSARY FOR
THE ZONES TO REACH THEIR OCCUPIED SETPOINTS. THE START TIME SHALL AUTOMATICALLY
ADJUST BASED ON CHANGES IN OUTSIDE AIR TEMPERATURE AND ZONE TEMPERATURES.
SUPPLY FAN:
THE PACKAGED UNIT CONTROLLER SHALL CONTROL THE SUPPLY FAN.
SUPPLY AIR DUCT STATIC PRESSURE CONTROL:
THE BAS SHALL MEASURE DUCT STATIC PRESSURE AND REPORT DUCT STATIC PRESSURE TO AC-3.
THE UNIT PACKAGED CONTROLLER SHALL MODULATE THE SUPPLY FAN SPEED TO MAINTAIN A
DUCT STATIC PRESSURE SETPOINT. THE STATIC PRESSURE SETPOINT SHALL BE RESET BASED
UPON THE POSITION OF THE ZONE DAMPERS, WITH A GOAL OF REDUCING THE STATIC PRESSURE
UNTIL AT LEAST ONE ZONE DAMPER IS NEARLY WIDE OPEN.
• THE INITIAL DUCT STATIC PRESSURE SETPOINT SHALL BE 1.5 IN H2O (ADJ.).
• IF NO ZONE DAMPER IS NEARLY WIDE OPEN, THE SETPOINT SHALL INCREMENTALLY RESET
DOWN TO A MINIMUM OF 1.3 IN H2O (ADJ.).
• AS ONE OR MORE DAMPERS NEARS THE WIDE OPEN POSITION, THE SETPOINT SHALL
INCREMENTALLY RESET UP TO A MAXIMUM OF 1.8 IN H2O (ADJ.).
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ.)
GREATER THAN SETPOINT.
• LOW SUPPLY AIR STATIC PRESSURE: IF THE SUPPLY AIR STATIC PRESSURE IS 25% (ADJ.)
LESS THAN SETPOINT.
• SUPPLY FAN VFD FAULT.
EXHAUST FAN:
THE EXHAUST FAN SHALL RUN TO MAINTAIN OFFICE STATIC PRESSURE SETPOINT. THE BAS
BUILDING PRESSURE SENSOR SHALL COMMUNICATE WITH THE UNIT PACKAGED CONTROLS TO
MAINTAIN A BUILDING POSITIVE PRESSURE OF 0.05 IN WC (ADJ.) COMPARED TO OUTSIDE AIR.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH BUILDING STATIC PRESSURE
• LOW BUILDING STATIC PRESSURE
• EXHAUST FAN FAULT
SUPPLY AIR TEMPERATURE SETPOINT - OPTIMIZED:
THE BAS SHALL MONITOR THE SUPPLY AIR TEMPERATURE AND SHALL MAINTAIN A SUPPLY AIR
TEMPERATURE SETPOINT RESET BASED ON ZONE COOLING AND HEATING REQUIREMENTS. THE
BAS SHALL COMMUNICATE THE SETPOINT WITH THE PACKAGED UNIT CONTROLLER.
THE SUPPLY AIR TEMPERATURE SETPOINT SHALL BE RESET FOR COOLING BASED ON ZONE
COOLING REQUIREMENTS AS FOLLOWS:
• THE INITIAL SUPPLY AIR TEMPERATURE SETPOINT SHALL BE 55°F (ADJ.).
• AS COOLING DEMAND INCREASES, THE SETPOINT SHALL INCREMENTALLY RESET DOWN TO
A MINIMUM OF 53°F (ADJ.).
• AS COOLING DEMAND DECREASES, THE SETPOINT SHALL INCREMENTALLY RESET UP TO A
MAXIMUM OF 62°F (ADJ.) .
COOLING STAGES:
THE UNIT PACKAGED CONTROLLER SHALL MEASURE THE SUPPLY AIR TEMPERATURE AND STAGE
THE COOLING TO MAINTAIN ITS COOLING SETPOINT.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS 5°F (ADJ.) GREATER THAN
SETPOINT FOR 15 MINUTES (ADJ.)
GAS HEATING STAGES:
THE PACKAGED UNIT CONTROLLER SHALL MEASURE THE SUPPLY AIR TEMPERATURE AND STAGE
THE HEATING TO MAINTAIN ITS HEATING SETPOINT.
ECONOMIZER:
THE PACKAGED UNIT CONTROLLER SHALL CONTROL THE ECONOMIZER MODE. THE BAS SHALL BE
ABLE TO COMMUNICATE SETPOINTS TO THE UNIT PACKAGED CONTROLLER.
FILTER DIFFERENTIAL PRESSURE MONITOR:
THE PACKAGED UNIT CONTROLLER SHALL MONITOR THE DIFFERENTIAL PRESSURE ACROSS THE
FILTER AND COMMUNICATE THE FILTER CHANGE STATUS TO THE BAS.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• FILTER CHANGE REQUIRED: FILTER DIFFERENTIAL PRESSURE EXCEEDS A USER DEFINABLE
LIMIT (ADJ.).
MIXED AIR TEMPERATURE:
THE PACKAGED UNIT CONTROLLER SHALL MONITOR THE MIXED AIR TEMPERATURE AND USE AS
REQUIRED FOR ECONOMIZER CONTROL OR PREHEATING CONTROL.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH MIXED AIR TEMP: IF THE MIXED AIR TEMPERATURE IS GREATER THAN 90°F (ADJ.).
• LOW MIXED AIR TEMP: IF THE MIXED AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
RETURN AIR TEMPERATURE:
THE BAS SHALL MONITOR THE RETURN AIR TEMPERATURE AND COMMUNICATE TO THE PACKAGED
UNIT CONTROLLER FOR USE AS REQUIRED FOR SETPOINT CONTROL OR ECONOMIZER CONTROL.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS GREATER THAN 90°F (ADJ.).
• LOW RETURN AIR TEMP: IF THE RETURN AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
SUPPLY AIR TEMPERATURE:
THE BAS SHALL MONITOR THE SUPPLY AIR TEMPERATURE.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HIGH SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS GREATER THAN 120°F (ADJ.).
• LOW SUPPLY AIR TEMP: IF THE SUPPLY AIR TEMPERATURE IS LESS THAN 45°F (ADJ.).
SUPPLY FAN RUNTIME EXCEEDED x
SUPPLY FAN IN HAND x
SUPPLY FAN FAILURE x
EXHAUST FAN RUNTIME EXCEEDED x
EXHAUST FAN IN HAND x
EXHAUST FAN FAILURE x
LOW SUPPLY AIR TEMP x
LOW SUPPLY AIR STATIC PRESSURE x
LOW RETURN AIR TEMP x
LOW MIXED AIR TEMP x
HIGH SUPPLY AIR STATIC PRESSURE x
HIGH RETURN AIR TEMP x
HIGH MIXED AIR TEMP x
FILTER CHANGE REQUIRED x x
SCHEDULE x
EMERGENCY SHUTDOWN x x x x
SUPPLY AIR TEMP SETPOINT x x x
SUPPLY AIR STATIC PRESSURE SETPOINT x x x
ECONOMIZER MIXED AIR TEMP SETPOINT x x x
SUPPLY FAN START/STOP x x x
EXHAUST FAN START/STOP x x x
HEATING STAGE 2 x x x
HEATING STAGE 1 x x x
COOLING STAGE 2 x x x
COOLING STAGE 1 x x x
SUPPLY FAN VFD FAULT x x x
SUPPLY FAN STATUS x x x
EXHAUST FAN VFD FAULT x x x
EXHAUST FAN STATUS x x x
BUILDING STATIC SENSOR x x x
SUPPLY AIR SMOKE DETECTOR x x x x
RETURN AIR SMOKE DETECTOR x x x x
SUPPLY FAN VFD SPEED x x x
EXHAUST FAN VFD SPEED x x x
OUTSIDE AIR DAMPER x x x
EXHAUST AIR DAMPER x x x
FILTER DIFFERENTIAL PRESSURE x x x
SUPPLY AIR STATIC PRESSURE x x x x
RETURN AIR TEMP x x x
OUTSIDE AIR TEMP x x x
MIXED AIR TEMP x x x
FILTER DIFFERENTIAL PRESSURE x x
AI AO BI BO AV BV LOOP SCHED TREND ALARM
POINT NAME
HARDWARE POINTS SOFTWARE POINTS SHOW ON
GRAPHIC
POINTS MATRIX - AC-3
AI - OUTSIDE AIR TEMPERATURE
AI - BOILER 3 HOT
WATER SUPPLY TEMP
AI - BOILER 3 HOT
WATER SUPPLY TEMP
AI - PRIMARY HOT WATER RETURN TEMP
AI - PRIMARY HOT
WATER SUPPLY TEMP
BOILER2
BO - BOILER 2 ENABLE
BI - BOILER 2 STATUS
BI - BOILER 2 ALARM STATUS
BI - BOILER 2 LOW WATER LEVEL
BOILER3
BO - BOILER 3 ENABLE
BI - BOILER 3 STATUS
BI - BOILER 3 ALARM STATUS
BI - BOILER 3 LOW WATER LEVEL
AO - BOILER 3 HOT WATER
SUPPLY TEMP SETPOINT RESET
AO - BOILER 2 HOT WATER
SUPPLY TEMP SETPOINT RESET
STARTER
BO - CIRCULATION PUMP 3 START/STOP
BI - CIRCULATION PUMP 3 STATUS
BO - CIRCULATION PUMP 2 START/STOP
BI - CIRCULATION PUMP 2 STATUS
HWS
HWR
HWS
HWR
P1
P2
VFD
VFD
BO - HOT WATER PUMP 1 START/STOP
BI - HOT WATER PUMP 1 STATUS
BI - HOT WATER PUMP 2 STATUS
BO - HOT WATER PUMP 2 START/STOP
H
L
AI - HOT WATER
DIFFERENTIAL PRESSURE
AO - HOT WATER PUMP 1 VFD SPEED
BI - HOT WATER PUMP 1 VFD FAULT
AO - HOT WATER PUMP 2 VFD SPEED
BI - HOT WATER PUMP 2 VFD FAULT
M
CT
M
CT
T
T
T
T
M
CT
STARTER
M
CT
T
AI - BOILER 3 HOT
WATER RETURN TEMP
T
AI - BOILER 3 HOT
WATER RETURN TEMP
BOILER1
BO - BOILER 1 ENABLE
BI - BOILER 1 STATUS
BI - BOILER 1 ALARM STATUS
BI - BOILER 1 LOW WATER LEVEL
AO - BOILER 1 HOT WATER
SUPPLY TEMP SETPOINT RESET
BO - CIRCULATION PUMP 1 START/STOP
BI - CIRCULATION PUMP 1 STATUS
T
STARTER
M
CT
T
AI - BOILER 1 HOT
WATER SUPPLY TEMP
AI - BOILER 1 HOT
WATER RETURN TEMP
ADD
ADD
AI - CARBON MONOXIDE
CO
ADD
BI - EMERGENCY BOILER SHUTOFF SWITCH
ADD
THREE BOILER SYSTEM WITH CONDENSING BOILERS, PRIMARY SECONDARY FLOW.
COORDINATE CONTROLS SCOPE OF WORK WITH BOILER REPLACEMENT PROJECT UNDER A
SEPARATE CONTRACT. CONTACT OWNER FOR MORE INFORMATION.
BOILER SYSTEM RUN CONDITIONS:
THE BOILER SYSTEM SHALL BE ENABLED TO RUN WHENEVER:
• A DEFINABLE NUMBER OF HOT WATER COILS NEED HEATING.
• AND OUTSIDE AIR TEMPERATURE IS LESS THAN 65°F (ADJ.).
TO PREVENT SHORT CYCLING, THE BOILER SYSTEM SHALL RUN FOR AND BE OFF FOR MINIMUM
ADJUSTABLE TIMES (BOTH USER DEFINABLE), UNLESS SHUTDOWN ON SAFETIES OR OUTSIDE AIR
CONDITIONS.
THE BOILER SHALL RUN SUBJECT TO ITS OWN INTERNAL SAFETIES AND CONTROLS.
THE BOILER SYSTEM SHALL ALSO RUN FOR FREEZE PROTECTION WHENEVER THE OUTSIDE AIR
TEMPERATURE IS LESS THAN 38°F (ADJ.).
THE BAS SHALL MONITOR AND LOG BOILER AND PUMP RUNTIME. IMPORT RUNTIME FROM EXISTING
CONTROLS SYSTEM.
BOILER SAFETIES:
THE FOLLOWING SAFETIES SHALL BE MONITORED:
• BOILER ALARM.
• LOW WATER LEVEL.
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• BOILER ALARM.
• LOW WATER LEVEL ALARM.
HOT WATER PUMP LEAD/LAG OPERATION:
THE TWO HOT WATER PUMPS SHALL OPERATE IN A LEAD/LAG FASHION.
• THE LEAD PUMP SHALL RUN FIRST.
• ON FAILURE OF THE LEAD PUMP, THE LAG PUMP SHALL RUN AND THE LEAD PUMP SHALL
TURN OFF.
• ON DECREASING HOT WATER DIFFERENTIAL PRESSURE, THE LAG PUMP SHALL STAGE ON
AND RUN IN UNISON WITH THE LEAD PUMP TO MAINTAIN HOT WATER DIFFERENTIAL
PRESSURE SETPOINT.
THE DESIGNATED LEAD PUMP SHALL ROTATE UPON ONE OF THE FOLLOWING CONDITIONS (USER
SELECTABLE):
• MANUALLY THROUGH A SOFTWARE SWITCH
• IF PUMP RUNTIME (ADJ.) IS EXCEEDED
• DAILY
• WEEKLY
• MONTHLY
ALARMS SHALL BE PROVIDED AS FOLLOWS:
• HOT WATER PUMP
• FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
• RUNNING IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
• RUNTIME EXCEEDED: STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT.
• VFD FAULT.
HOT WATER DIFFERENTIAL PRESSURE CONTROL:
THE CONTROLLER SHALL MEASURE HOT WATER DIFFERENTIAL PRESSURE AND MODULATE THE
HOT WATER PUMP VFDS IN SEQUENCE TO MAINTAIN ITS HOT WATER DIFFERENTIAL PRESSURE
SETPOINT.
THE FOLLOWING SETPOINTS ARE RECOMMENDED VALUES. ALL SETPOINTS SHALL BE FIELD
ADJUSTED DURING THE COMMISSIONING PERIOD TO MEET THE REQUIREMENTS OF ACTUAL FIELD
CONDITIONS.
THE CONTROLLER SHALL MODULATE HOT WATER PUMP SPEEDS TO MAINTAIN A HOT WATER
DIFFERENTIAL PRESSURE OF 12 PSI (ADJ.).