RFB930400-01 - Capitol Complex Parking Garage Concrete & Piping Repairs - Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- RFB930400-01
- Issued by
- Polk County, Iowa
About this file
This document is a comprehensive set of engineering drawings for the Capitol Complex Parking Garage Concrete and Piping Repair project, prepared by Shive-Hattery for the Iowa Department of Administrative Services (DAS). The project involves extensive concrete and piping repairs across a multi-level parking structure located at East Grand and Pennsylvania Avenue in Des Moines, Iowa. The drawings are dated April 26, 2023, and include structural, plumbing, and demolition plans for levels B through 5, with detailed schematics for concrete patching, storm drainage, sanitary systems, and vent installations. The work is divided into base bid and future phase items, with specific quantities noted for storm piping removal and replacement, drain replacements, horizontal patching, crack sealing, and traffic surface membrane applications.
The project scope includes repairing concrete surfaces, replacing drainage systems, sealing cracks, and applying new surface membranes across various levels of the parking garage. Specific repair techniques involve removing unsound concrete, sandblasting exposed steel, applying zinc-rich coatings, and installing new waterproofing membranes. The technical specifications outline precise requirements for concrete patch materials, with approved products from manufacturers like BASF, Sika Corporation, and Euclid Chemical Company. Quantities are approximate, and contractors are instructed to verify measurements on-site. The drawings emphasize the importance of maintaining the structural integrity of the existing building and coordinating work schedules with the owner to minimize disruption to occupied areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAPITOL COMPLEX PARKING GARAGE
N
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
SHEET INDEX CERTIFICATIONS
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :0
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
9304.00 - DAS CC PARKING RAMP CONCRETE AND
PIPING REPAIR
G000
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
P R
O J E
C T
N U
M B
E R
IS
S
U E
D F
O R
C
O N
S T
R U
C T
IO
N
P R
O J E
C T
I S
S U
E D
A T
E
/2
/2
EAST GRAND AND PENNSYLVANIA AVENUE, DES MOINES,
IOWA 50309
SHEET LIST
SHEET NAME
G000 COVER SHEET
STRUCTURAL
S000 STRUCTURAL GENERAL INFORMATION
S101 LEVEL B FOUNDATION PLAN
S102 LEVEL A FRAMING PLAN
S103 LEVEL 1 FRAMING PLAN
S104 LEVEL 2 FRAMING PLAN
S105 LEVEL 3 FRAMING PLAN
S106 LEVEL 4 FRAMING PLAN
S107 LEVEL 5 FRAMING PLAN
S108 PARTIAL TOP LEVEL FRAMING PLAN
S200 STAIR ELEVATION PHOTOS
S500 DETAILS
PLUMBING
P000 PLUMBING GENERAL INFORMATION
PD101 LEVEL B PLUMBING DEMOLITION PLAN
PD102 LEVEL A PLUMBING DEMOLITION PLAN
PD103 LEVEL 1 PLUMBING DEMOLITION PLAN
PD104 LEVEL 2 PLUMBING DEMOLITION PLAN
PD105 LEVEL 3 PLUMBING DEMOLITION PLAN
PD106 LEVEL 4 PLUMBING DEMOLITION PLAN
PD107 LEVEL 5 PLUMBING DEMOLITION PLAN
P101 LEVEL B PLUMBING PLAN
P102 LEVEL A PLUMBING PLAN
P103 LEVEL 1 PLUMBING PLAN
P104 LEVEL 2 PLUMBING PLAN
P105 LEVEL 3 PLUMBING PLAN
P106 LEVEL 4 PLUMBING PLAN
P107 LEVEL 5 PLUMBING PLAN
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Alexander C. Brase
S SHEETS, G000
23203
STRUCTURAL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Tyson L. Scheidecker
P SHEETS
21691
MECHANICAL ENGINEER
04/26/2023
04/26/2023
QUANTITIES (FOR REFERENCE ONLY)
QUANTITIES NOTE:
APPROXIMATE QUANTITIES ARE PROVIDED FOR REFERENCE ONLY AND CONTRACTOR SHALL
VERIFY ALL QUANTITIES SHOWN ON PLANS. PAYMENT FOR ADDITIONAL QUANTITIES SHOWN ON
PLANS WILL NOT BE COMPENSATED AS ADDITIONAL WORK EVEN IF A DESCREPANCY IS SHOWN IN
THE PROVIDED QUANTITIES.
BASE BID ITEMS
STORM PIPING REMOVAL AND REPLACEMENT
QUANTITY
UNITS
LF
SYMBOL
STORM DRAIN REMOVAL AND REPLACEMENT 21 EA
HORIZONTAL PATCHING FOR DRAIN REPLACEMENT 273 SF
CRACK SEALING, ROUT AND SEAL 750 LF
HORIZONTAL PATCHING 95 SF
TRAFFIC SURFACE MEMBRANE 10,668 SF
JOINT REPAIR, BETWEEN DOUBLE TEE FLANGES 1,625 LF
FUTURE PHASE BID ITEMS QUANTITY UNITS SYMBOL
STORM PIPING REMOVAL AND REPLACEMENT 700 LF
STORM DRAIN REMOVAL AND REPLACEMENT 19 EA
HORIZONTAL PATCHING FOR DRAIN REPLACEMENT 247 SF
TEE BEAM PATCHING 54 SF
CORBEL PATCHING 19 SF
DOUBLE TEE STEM PATCHING 42 SF
DOUBLE TEE FLANGE PATCHING 18 SF
COLUMN PATCHING 13 SF
CRACK SEALING, ROUT AND SEAL 306 LF
TRAFFIC SURFACE MEMBRANE 4,848 SF
STAIR PATCHING 400 SF
STAIR TREAD PATCHING 1 EA
MECH. DWGS
MECH. DWGS
MECH. DWGS
MECH. DWGS
SXX
SXX
SXX
SXX
SXX
PHOTOS
PHOTOS
TEE BEAM PATCHING 7 SF SXX
COLUMN PATCHING 4 SF SXX
COLUMN SPLICE REPAIR 1 EA SXX
L-BEAM PATCHING 19 SF SXX
CLEAN & PAINT OVERHEAD SLAB WELDS, POSSIBLE RE-
WELDING
1 EA SXX
1. THE GENERAL STRUCTURAL NOTES ARE INTENDED TO SUPPLEMENT THE DRAWINGS AND
SPECIFICATIONS. SHOULD CONFLICTS EXIST BETWEEN THESE DRAWINGS AND THE
SPECIFICATIONS NOTIFY THE ENGINEER OF ANY SUCH CONFLICTS.
2. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ALL PROJECT DRAWINGS AND
SPECIFICATIONS. REFER TO ALL DRAWINGS FOR THE COORDINATION OF THE WORK IN THIS
PROJECT.
3. THE INTENT OF THESE PLANS AND NOTES IS TO PRESENT THE PROJECT REQUIREMENTS.
MAJOR DETAILS HAVE BEEN SHOWN ON THE DRAWINGS. HOWEVER, CERTAIN MINOR DETAILS
MUST BE WORKED OUT IN THE FIELD OR SHOP DRAWING PROCESS BY THE CONTRACTOR.
4. UNLESS NOTED OTHERWISE, DETAILS SHOWN ON DRAWINGS ARE TO BE CONSIDERED TYPICAL
FOR ALL SIMILAR CONDITIONS.
5. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW THE APPLICABLE SAFETY CODES
AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION.
6. EXISTING CONDITIONS:
A. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS AND CONDITIONS
RELATING TO EXISTING CONSTRUCTION AND EXISTING SERVICES ON SITE. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS OF WORK ITEMS WITH THE
DRAWINGS PRIOR TO PROCEEDING WITH THE WORK. ANY DISCREPANCIES WITH THE
CONTRACT DOCUMENTS SHALL BE REPORTED TO THE ARCHITECT AND ENGINEER BEFORE
PROCEEDING WITH THE AFFECTED PART OF THE WORK.
B. DURING CONSTRUCTION THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH
ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION (DISCOVERY).
SUCH CONDITIONS MAY INTERFERE WITH THE NEW CONSTRUCTION OR REQUIRE
PROTECTION AND/OR SUPPORT OF EXISTING WORK DURING CONSTRUCTION. IT MAY ALSO
CONSIST OF DAMAGED OR DETERIORATION OF STRUCTURAL MATERIALS OR COMPONENTS
WHICH COULD JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE BUILDING(S). THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL DISCOVERIES WHICH MAY INTERFERE
WITH THE PROPER EXECUTION OF THE WORK OR JEOPARDIZE THE STRUCTURAL INTEGRITY
OF THE BUILDING(S) PRIOR TO PROCEEDING WITH THE WORK RELATED TO SUCH
DISCOVERIES.
C. DURING THE CONSTRUCTION PROCESS, IT SHALL BE SOLELY THE CONTRACTOR'S
RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE AND TO
PROTECT IT FROM DAMAGE ANY PORTIONS THAT ARE TO REMAIN.
7. BEFORE SUBMITTING A BID, EACH BIDDER SHALL VISIT THE SITE AND BECOME FULLY
ACQUAINTED WITH THE EXISTING CONDITIONS, CONSTRUCTION REQUIREMENTS,
RESTRICTIONS, QUANTITIES AND EQUIPMENT NECESSARY TO COMPLETE THE WORK. THE BID
SHALL INCLUDE ALL ITEMS REQUIRED TO COMPLETE THE WORK WITHIN THE EXISTING
CONDITIONS. DISRUPTION OF THE OWNERS NORMAL ACTIVITIES AROUND THE CONSTRUCTION
SITE SHALL BE KEPT TO A MINIMUM.
8. THE COST OF ADDITIONAL DESIGN WORK DUE TO ERRORS AND OMISSIONS BY THE
CONTRACTOR DURING CONSTRUCTION SHALL BE BORNE BY THE RESPONSIBLE CONTRACTOR.
9. ANY ENGINEERING DESIGN PROVIDED BY OTHER AND SUBMITTED FOR REVIEW OR RECORD
SHALL BEAR THE STAMP AND SIGNATURE OF A PROFESSIONAL STRUCTURAL ENGINEER
REGISTERED IN THE STATE WHERE THE PROJECT EXISTS.
10. CONTRACTOR SHALL COORDINATE WORK SCHEDULES WITH THE OWNER TO ESTABLISH
CONSTRUCTION SEQUENCING AROUND ANY OCCUPIED AREAS. CONTRACTOR SHALL NOT
PROCEED TO OCCUPIED AREAS UNTIL AUTHORIZED BY THE OWNER.
11. ALL ELEMENTS AND SURFACES DAMAGED BY DEMOLITION, BUT NOT SCHEDULED FOR REMOVAL
SHALL BE REPAIRED AND REFINISHED TO MATCH THE ADJACENT SURFACES AT NO ADDITIONAL
COST TO THE OWNER.
12. CONTRACTOR SHALL REMOVE ALL DEBRIS AND WASTE MATERIALS RESULTING FROM
CONSTRUCTION FROM THE SITE, UNLESS NOTED OTHERWISE.
13. CONTRACTOR SHALL MINIMIZE CREATION OF DUST, DIRT AND WINDBORNE DEBRIS FROM
BLOWING ACROSS THE SITE AND ONTO ADJACENT SITES.
14. CONTRACTOR TO COORDINATE WITH OWNER ON RE-STRIPING AFTER MEMBRANE
INSTALLATION.
GENERAL NOTES
1. HORIZONTAL APPLICATIONS - DEPTHS ≤ 1"
A. MASTEREMACO T 310CI BY BASF
B. SIKAQUICK 1000 BY SIKA CORPORATION
C. DURALTOP FLOWABLE MORTAR BY THE EUCLID CHEMICAL COMPANY
D. APPROVED EQUIVALENT
2. HORIZONTAL APPLICATIONS (MAY REQUIRE AGGREGATE) - DEPTHS > 1"
A. MASTEREMACO T 310CI BY BASF
B. SIKACRETE 100 CI BY SIKA CORPORATION
C. EUCOCRETE SUPREME BY THE EUCLID CHEMICAL COMPANY
D. APPROVED EQUIVALENT
3. VERTICAL/OVERHEAD APPLICATIONS
A. MASTEREMACO N 425 CI BY MASTER BUILDERS SOLUTIONS
B. SIKAQUICK VOH BY SIKA CORPORATION
C. SPEED CRETE PM BY THE EUCLID CHEMICAL COMPANY
D. APPROVED EQUIVALENT
APPROVED PROJECT GROUTS
1. ALL CONCRETE SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE AMERICAN
CONCRETE INSTITUTES PUBLICATIONS: ACI 301, ACI 305.1, ACI 306.1, ACI 315, AND ACI 318
UNLESS NOTED OTHERWISE.
2. CONCRETE COMPRESSIVE STRENGTH (28 DAY)(F'c)
TOPPING SLAB 5000 PSI
3. CONCRETE REINFORCEMENT STANDARDS:
DEFORMED BARS ASTM A615 Fy = 60 KSI WELDED WIRE REINFORCEMENT (WWR) ASTM A1064 Fy = 65 KSI
4. ALL CONCRETE SHALL BE STONE AGGREGATE UNLESS NOTED OTHERWISE. SUBMIT MIX DESIGN
AND DOCUMENTATION FOR APPROVAL PER ACI 318.
5. REINFORCEMENT PROTECTION
A. CONCRETE PLACED AGAINST EARTH - 3"
B. CONCRETE PLACED IN FORMS BUT EXPOSED TO WEATHER OR EARTH:
a. BARS #5 AND SMALLER - 1 1/2"
b. BARS LARGER THAN #5 - 2"
C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
a. SLABS, WALLS, AND JOISTS - 3/4"
b. BEAMS, COLUMNS - 1 1/2"
6. REINFORCING STEEL SHALL BE SECURELY FASTENED INTO FORMS PRIOR TO POURING
CONCRETE. WET SETTING OF REINFORCING STEEL WILL NOT BE ACCEPTED PER ACI.
7. TOPPING SLAB MIX DESIGN:
A. COARSE AGGREGATE: 100% PASSING 1/2" SIEVE
B. FINE AGGREGATE: 100% PASSING NO. 8 SIEVE
C. WATER CEMENT RATIO: 0.4
D. SLUMP (WITH WATER REDUCER): 5"-8"
a. WATER SHALL NOT BE ADDED AT THE SITE WITHOUT THE APPROVAL OF THE DESIGN
PROFESSIONAL
E. AIR CONTENT: 6% ± 1.5%
F. REINFORCING: 5 LBS/CUBIC YARD OF MACROFIBER, SEE SPECIFICATIONS FOR MORE
INFORMATION
G. CURING: REFER TO SPECIFICATIONS FOR APPROVED CURING METHODS
CAST-IN-PLACE CONCRETE
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :0
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
S T
R U
C T
U R
A L
G E
N E
R A
L
IN
F O
R M
A T
IO
N
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S000
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
UP
14 13.3 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1 a¹
A
A.2
B
C
D
E
F
C.5
16'-0" 7'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
A
S
SLOPE
DOWN
S59
S60
S61S62 S63
S64 S65 S66
S67
D O
W N
F R
O M
L E
V E
L A
S75
S76
S77
S78
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :1
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
L E
V E
L B
F O
U N
D A
T
IO
N P
L A
N C
O N
S T
R U
C T
IO
N
A C
B
C R
M
/2
/2
S101
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
KEYNOTES
KEY NOTE
S59 FUTURE PHASE. APPROXIMATELY 1 SQUARE FEET OF CORBEL PATCHING. SEE DETAIL
A3/S500 FOR MORE INFORMATION.
S60 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S61 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S62 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S63 FUTURE PHASE. APPROXIMATELY 10 SQUARE FEET OF OVERHEAD TEE BEAM
PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S64 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF OVERHEAD TEE BEAM PATCHING.
SEE DETAIL A3/S500 FOR MORE INFORMATION.
S65 FUTURE PHASE. APPROXIMATELY 4 SQUARE FEET OF OVERHEAD DOUBLE TEE FLANGE
PATCHING. SEE DETAIL C2/S500 FOR MORE INFORMATION.
S66 FUTURE PHASE. APPROXIMATELY 12 SQUARE FEET OF COLUMN PATCHING. SEE DETAIL
C2/S500 FOR MORE INFORMATION.
S67 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S75 BASE BID. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD L-BEAM PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S76 BASE BID. APPROXIMATELY 3 SQUARE FEET OF OVERHEAD TEE BEAM PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S77 BASE BID. APPROXIMATELY 10 SQUARE FEET OF OVERHEAD L-BEAM PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S78 CLEAN RUST AND PAINT WELDS WITH ZINC-RICH PAINT AT OVERHEAD SLAB
CONNECTIONS. RE-WELD AS NEEDED.
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
LEVEL B FOUNDATION PLAN
15'
NOTE: MAJORITY OF WORK ON THIS SHEET
TO BE IN FUTURE PHASE. KEYNOTES S75 -
S78 TO BE BASE BID.
DN
14 13.3 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1 a¹
A
A.2
B
C
D
E
F
C.5
16'-0" 7'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
S04
TYP
C
S
SLOPE
DOWN
S16
S15
S14
TYP
TYP
S43 S44
S45
S46
S47
S48
S49
S50S51 S52
S53
S54 S55 S56
S57 S58
EAST GRAND STREET ENTRANCE TO PARKING RAMP
E A
S T
G R
A N
D S
T R
E E
T
D O
W N
F R
O M
L E
V E
L
U P
F R
O M
L E
V E
L B
S74
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :1
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
L E
V E
L A
F R
A M
IN
G
P L A
N
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S102
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
LEVEL A FRAMING PLAN
15'
KEYNOTES
KEY NOTE
S04 BASE BID. DOUBLE TEE FLANGE JOINT REPAIR BETWEEN DOUBLE TEE FLANGES AT
SPECIFIED LOCATIONS. SEE DETAIL B4/S500 FOR MORE INFORMATION.
S14 FUTURE PHASE. CONCRETE REMOVAL AND PATCHING AS REQUIRED FOR STORM DRAIN
REPLACEMENT. ASSUME 13 SQUARE FEET OF PATCHING PER LOCATION, ACTUAL
REQUIREMENT MAY VARY. SEE MECHANICAL DRAWINGS AND DETAIL D2/P107 FOR MORE
INFORMATION.
S15 FUTURE PHASE. ROUT AND SEAL CONCRETE CRACK IN DOUBLE TEE TOPPING SLAB. SEE
DETAIL C4/S500 FOR MORE INFORMATION.
S16 FUTURE PHASE. NEW TRAFFIC SURFACE MEMBRANE COATING. 4'-0" IN TOTAL WIDTH, 3'-8"
WIDTH ON HORIZONTAL SURFACE WITH 4" EXTENSION UP THE FACE OF THE WALL. SEE
DETAIL A4/S500 FOR MORE INFORMATION.
S43 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S44 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S45 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF CORBEL PATCHING. SEE DETAIL
A3/S500 FOR MORE INFORMATION.
S46 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S47 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF CORBEL PATCHING. SEE DETAIL
A3/S500 FOR MORE INFORMATION.
S48 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S49 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF CORBEL PATCHING. SEE DETAIL
A3/S500 FOR MORE INFORMATION.
S50 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S51 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S52 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF OVERHEAD TEE BEAM PATCHING.
SEE DETAIL A3/S500 FOR MORE INFORMATION.
S53 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD TEE BEAM PATCHING.
SEE DETAIL A3/S500 FOR MORE INFORMATION.
S54 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD TEE BEAM PATCHING.
SEE DETAIL A3/S500 FOR MORE INFORMATION.
S55 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF COLUMN PATCHING. SEE DETAIL
C2/S500 FOR MORE INFORMATION.
S56 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD TEE BEAM PATCHING.
SEE DETAIL A3/S500 FOR MORE INFORMATION.
S57 FUTURE PHASE. APPROXIMATELY 5 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S58 FUTURE PHASE. APPROXIMATELY 4 SQUARE FEET OF OVERHEAD DOUBLE TEE STEM
PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S74 REPLACE OVERHEAD DRAIN PIPE, SEE MECHANICAL DRAWINGS FOR MORE INFORMATION.
NOTE: MAJORITY OF WORK ON THIS SHEET
TO BE IN FUTURE PHASE. DOUBLE TEE
FLANGE JOINT REPAIR AND KEYNOTE S74
TO BE BASE BID.
14 13.3 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1 a¹
A
A.2
B
C
D
E
F
C.5
16'-0" 7'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
S09
S04
S10
S11
S12
S13
S13
S13
S13
S13 S13 S13 S13
S13
TYP
E
S
SLOPE
DOWN
S16
S15 S14
TYP
TYP
S27
S28 S29
S30
S31
S32
S33 S34
S35 S36 S37
S38
S39
S40
S41
S42
E A
S T
D E
S M
O
IN
E S
S T
R E
E T
LANE 1 ENTRY
LANE 2
REVERSIBLE
ENTRY/EXIT
LANE 3 EXIT
LANE 4 EXIT
LANE 5 EXIT
E A
S T
G R
A N
D S
T R
E E
T
D O
W N
F R
O M
L E
V E
L
U P
F R
O M
L E
V E
L A
S71
S72
S73
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :1
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
L E
V E
L
F R
A M
IN
G
P L A
N
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S103
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
LEVEL 1 FRAMING PLAN
15'
KEYNOTES
KEY NOTE
S04 BASE BID. DOUBLE TEE FLANGE JOINT REPAIR BETWEEN DOUBLE TEE FLANGES
AT SPECIFIED LOCATIONS. SEE DETAIL B4/S500 FOR MORE INFORMATION.
S09 BASE BID. DOUBLE TEE FLANGE JOINT REPAIR BETWEEN DOUBLE TEE TOPPING
SLABS AT BETWEEN CURBS WHERE POSSIBLE. SEE DETAIL B4/S500 FOR MORE
INFORMATION.
S10 BASE BID. APPROXIMATELY 8 SQUARE FEET OF HORIZONTAL PATCHING. SEE
DETAIL A2/S500 FOR MORE INFORMATION.
S11 BASE BID. APPROXIMATELY 45 SQUARE FEET OF HORIZONTAL PATCHING. SEE
DETAIL A2/S500 FOR MORE INFORMATION.
S12 BASE BID. APPROXIMATELY 12 SQUARE FEET OF HORIZONTAL PATCHING. SEE
DETAIL A2/S500 FOR MORE INFORMATION.
S13 BASE BID. APPROXIMATELY 1 SQUARE FEET OF HORIZONTAL PATCHING. SEE
DETAIL A2/S500 FOR MORE INFORMATION.
S14 FUTURE PHASE. CONCRETE REMOVAL AND PATCHING AS REQUIRED FOR
STORM DRAIN REPLACEMENT. ASSUME 13 SQUARE FEET OF PATCHING PER
LOCATION, ACTUAL REQUIREMENT MAY VARY. SEE MECHANICAL DRAWINGS
AND DETAIL D2/P107 FOR MORE INFORMATION.
S15 FUTURE PHASE. ROUT AND SEAL CONCRETE CRACK IN DOUBLE TEE TOPPING
SLAB. SEE DETAIL C4/S500 FOR MORE INFORMATION.
S16 FUTURE PHASE. NEW TRAFFIC SURFACE MEMBRANE COATING. 4'-0" IN TOTAL
WIDTH, 3'-8" WIDTH ON HORIZONTAL SURFACE WITH 4" EXTENSION UP THE
FACE OF THE WALL. SEE DETAIL A4/S500 FOR MORE INFORMATION.
S27 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF CORBEL PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S28 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD DOUBLE TEE
STEM PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S29 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE
FLANGE PATCHING. SEE DETAIL C2/S500 FOR MORE INFORMATION.
KEYNOTES
KEY NOTE
S30 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD DOUBLE TEE
STEM PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S31 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF CORBEL PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S32 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD DOUBLE TEE
STEM PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S33 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF CORBEL PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S34 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF CORBEL PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S35 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF OVERHEAD DOUBLE TEE
FLANGE PATCHING. SEE DETAIL C2/S500 FOR MORE INFORMATION.
S36 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD TEE BEAM
PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S37 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD TEE BEAM
PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S38 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF OVERHEAD DOUBLE TEE
STEM PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S39 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF OVERHEAD DOUBLE TEE
STEM PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S40 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD TEE BEAM
PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S41 FUTURE PHASE. APPROXIMATELY 2 SQUARE FEET OF CORBEL PATCHING. SEE
DETAIL A3/S500 FOR MORE INFORMATION.
S42 FUTURE PHASE. APPROXIMATELY 5 SQUARE FEET OF OVERHEAD DOUBLE TEE
STEM PATCHING. SEE DETAIL E2/S500 FOR MORE INFORMATION.
S71 BASE BID. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD L-BEAM PATCHING.
SEE DETAIL A3/S500 FOR MORE INFORMATION.
S72 BASE BID. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD TEE BEAM
PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S73 BASE BID. APPROXIMATELY 4 SQUARE FEET OF OVERHEAD L-BEAM PATCHING.
SEE DETAIL A3/S500 FOR MORE INFORMATION.
NOTE: MAJORITY OF WORK ON THIS SHEET
TO BE IN FUTURE PHASE. DOUBLE TEE
FLANGE JOINT REPAIR, HORIZONTAL
PATCHING, AND KEYNOTES S71 - S73 TO
BE BASE BID.
14 13.3 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1
A
A.2
B
C
D
E
F
C.5
16'-0" 7'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
S04
A
S
TYP
SLOPE
DOWN
S14 S15
S16
TYP
TYP
S18 S19
S20
S21
S22 S23
S24
S25
S26
D O
W N
F R
O M
L E
V E
L
U P
F R
O M
L E
V E
L
S68
S69
S70
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :2
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
L E
V E
L
F R
A M
IN
G
P L A
N
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S104
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
LEVEL 2 FRAMING PLAN
15'
KEYNOTES
KEY NOTE
S04 BASE BID. DOUBLE TEE FLANGE JOINT REPAIR BETWEEN DOUBLE
TEE FLANGES AT SPECIFIED LOCATIONS. SEE DETAIL B4/S500 FOR
MORE INFORMATION.
S14 FUTURE PHASE. CONCRETE REMOVAL AND PATCHING AS REQUIRED
FOR STORM DRAIN REPLACEMENT. ASSUME 13 SQUARE FEET OF
PATCHING PER LOCATION, ACTUAL REQUIREMENT MAY VARY. SEE
MECHANICAL DRAWINGS AND DETAIL D2/P107 FOR MORE
INFORMATION.
S15 FUTURE PHASE. ROUT AND SEAL CONCRETE CRACK IN DOUBLE TEE
TOPPING SLAB. SEE DETAIL C4/S500 FOR MORE INFORMATION.
S16 FUTURE PHASE. NEW TRAFFIC SURFACE MEMBRANE COATING. 4'-0"
IN TOTAL WIDTH, 3'-8" WIDTH ON HORIZONTAL SURFACE WITH 4"
EXTENSION UP THE FACE OF THE WALL. SEE DETAIL A4/S500 FOR
MORE INFORMATION.
S18 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD
DOUBLE TEE STEM PATCHING. SEE DETAIL E2/S500 FOR MORE
INFORMATION.
S19 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD
DOUBLE TEE STEM PATCHING. SEE DETAIL E2/S500 FOR MORE
INFORMATION.
S20 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF CORBEL
PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S21 FUTURE PHASE. APPROXIMATELY 6 SQUARE FEET OF OVERHEAD
DOUBLE TEE FLANGE PATCHING. SEE DETAIL C2/S500 FOR MORE
INFORMATION.
S22 FUTURE PHASE. APPROXIMATELY 8 SQUARE FEET OF OVERHEAD
TEE BEAM PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S23 FUTURE PHASE. APPROXIMATELY 4 SQUARE FEET OF OVERHEAD
TEE BEAM PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S24 FUTURE PHASE. APPROXIMATELY 14 SQUARE FEET OF OVERHEAD
TEE BEAM PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S25 FUTURE PHASE. APPROXIMATELY 4 SQUARE FEET OF OVERHEAD
TEE BEAM PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S26 FUTURE PHASE. APPROXIMATELY 1 SQUARE FOOT OF OVERHEAD
TEE BEAM PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S68 BASE BID. APPROXIMATELY 2 SQUARE FEET OF OVERHEAD TEE
BEAM PATCHING. SEE DETAIL A3/S500 FOR MORE INFORMATION.
S69 BASE BID. APPROXIMATELY 4 SQUARE FEET OF COLUMN PATCHING.
SEE DETAIL C2/S500 FOR MORE INFORMATION.
S70 BASE BID. CLEAN OFF RUST AND PAINT COLUMN SPLICE PLATES
WITH ZINC-RICH PAINT. APPLY NEW 2" JOINT SEALANT AFTER PAINT
HAS DRIED. NEW JOINT APPROX. 3' IN LENGTH.
NOTE: MAJORITY OF WORK ON THIS SHEET
TO BE FUTURE PHASE. DOUBLE TEE
FLANGE JOINT REPAIR, KEYNOTES S68 -
S70 TO BE BASE BID.
14 13.3 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1
A
A.2
B
C
D
E
F
C.5
16'-0" 7'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
S07 S08
S03
S02
TYP
TYP
S01
TYP
C 5S
SLOPE
DOWN
S17
D O
W N
F R
O M
L E
V E
L
U P
F R
O M
L E
V E
L
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :2
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
L E
V E
L
F R
A M
IN
G
P L A
N
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S105
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
LEVEL 3 FRAMING PLAN
15'
KEYNOTES
KEY NOTE
S01 BASE BID. CONCRETE REMOVAL AND PATCHING AS REQUIRED
FOR STORM DRAIN REPLACEMENT. ASSUME 13 SQUARE FEET
OF PATCHING PER LOCATION, ACTUAL REQUIREMENT MAY
VARY. SEE MECHANICAL DRAWINGS AND DETAIL D2/P107 FOR
MORE INFORMATION.
S02 BASE BID. ROUT AND SEAL CONCRETE CRACK IN DOUBLE TEE
TOPPING SLAB. SEE DETAIL C4/S500 FOR MORE INFORMATION.
S03 BASE BID. NEW TRAFFIC SURFACE MEMBRANE COATING. 4'-0" IN
TOTAL WIDTH, 3'-8" WIDTH ON HORIZONTAL SURFACE WITH 4"
EXTENSION UP THE FACE OF THE WALL. SEE DETAIL A4/S500
FOR MORE INFORMATION.
S07 BASE BID. APPROXIMATELY 10 SQUARE FEET OF HORIZONTAL
PATCHING. SEE DETAIL A2/S500 FOR MORE INFORMATION.
S08 BASE BID. APPROXIMATELY 4 SQUARE FEET OF HORIZONTAL
PATCHING. SEE DETAIL A2/S500 FOR MORE INFORMATION.
S17 FUTURE PHASE. APPROXIMATELY 3 SQUARE FEET OF
OVERHEAD FLANGE PATCHING. SEE DETAIL C2/S500 FOR MORE
INFORMATION.
NOTE: MAJORITY OF WORK ON THIS SHEET
TO BE BASE BID. OVERHEAD FLANGE
PATCHING TO BE IN FUTURE PHASE.
14 13.3 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1
A
A.2
B
C
D
E
F
C.5
16'-0" 7'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
S03S02
S04
S01 S03 S02
S06
TYP TYP
TYP
TYP
TYP TYP
E 5S
SLOPE
DOWN
D O
W N
F R
O M
L E
V E
L
U P
F R
O M
L E
V E
L
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :2
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
L E
V E
L
F R
A M
IN
G
P L A
N
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S106
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
LEVEL 4 FRAMING PLAN
15'
KEYNOTES
KEY NOTE
S01 BASE BID. CONCRETE REMOVAL AND PATCHING AS REQUIRED
FOR STORM DRAIN REPLACEMENT. ASSUME 13 SQUARE FEET
OF PATCHING PER LOCATION, ACTUAL REQUIREMENT MAY
VARY. SEE MECHANICAL DRAWINGS AND DETAIL D2/P107 FOR
MORE INFORMATION.
S02 BASE BID. ROUT AND SEAL CONCRETE CRACK IN DOUBLE TEE
TOPPING SLAB. SEE DETAIL C4/S500 FOR MORE INFORMATION.
S03 BASE BID. NEW TRAFFIC SURFACE MEMBRANE COATING. 4'-0" IN
TOTAL WIDTH, 3'-8" WIDTH ON HORIZONTAL SURFACE WITH 4"
EXTENSION UP THE FACE OF THE WALL. SEE DETAIL A4/S500
FOR MORE INFORMATION.
S04 BASE BID. DOUBLE TEE FLANGE JOINT REPAIR BETWEEN
DOUBLE TEE FLANGES AT SPECIFIED LOCATIONS. SEE DETAIL
B4/S500 FOR MORE INFORMATION.
S06 BASE BID. APPROXIMATELY 6 SQUARE FEET OF HORIZONTAL
PATCHING. SEE DETAIL A2/S500 FOR MORE INFORMATION.
RE-INSTALL EXISTING BOLLARD.
NOTE: ALL WORK ON THIS SHEET
TO BE INCLUDED IN BASE BID
14 13.3 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1
A
A.2
B
C
D
E
F
C.5
16'-0" 7'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
S01
S04
S02S03
S03
S02S02
S02S02
S05
TYP
S02
S03 S02
S04
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
SLOPE
DOWN
D O
W N
F R
O M
P A
R T
IA
L T
O P
U P
F R
O M
L E
V E
L
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :3
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
L E
V E
L
F R
A M
IN
G
P L A
N
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S107
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
LEVEL 5 FRAMING PLAN
15'
KEYNOTES
KEY NOTE
S01 BASE BID. CONCRETE REMOVAL AND PATCHING AS REQUIRED FOR
STORM DRAIN REPLACEMENT. ASSUME 13 SQUARE FEET OF
PATCHING PER LOCATION, ACTUAL REQUIREMENT MAY VARY. SEE
MECHANICAL DRAWINGS AND DETAIL D2/P107 FOR MORE
INFORMATION.
S02 BASE BID. ROUT AND SEAL CONCRETE CRACK IN DOUBLE TEE
TOPPING SLAB. SEE DETAIL C4/S500 FOR MORE INFORMATION.
S03 BASE BID. NEW TRAFFIC SURFACE MEMBRANE COATING. 4'-0" IN
TOTAL WIDTH, 3'-8" WIDTH ON HORIZONTAL SURFACE WITH 4"
EXTENSION UP THE FACE OF THE WALL. SEE DETAIL A4/S500 FOR
MORE INFORMATION.
S04 BASE BID. DOUBLE TEE FLANGE JOINT REPAIR BETWEEN DOUBLE
TEE FLANGES AT SPECIFIED LOCATIONS. SEE DETAIL B4/S500 FOR
MORE INFORMATION.
S05 BASE BID. APPROXIMATELY 1 SQUARE FEET OF HORIZONTAL
PATCHING. SEE DETAIL A2/S500 FOR MORE INFORMATION.
14 13 12 11 10 9 8 7 6 5 4 3 2 1.7 1.6 1.1 1
A
B
C
D
E
F
C.5
23'-5 1/2" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 7'-5 1/2" 2'-8" 10'-10" 2'-6"
TYP
S02
S03
3'-8"
SLOPE
DOWN
U P
F R
O M
L E
V E
L
LEVEL 5
LEVEL 4
LEVEL 3
LEVEL 2
LEVEL 1
LEVEL A
LEVEL B
A
C
E G
R A
N D
S T
E D
E S
M O
IN
E
S S
T
ISOMETRIC
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :3
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
P A
R T
IA
L T
O P
L E
V E
L F
R A
M
IN
G P
L A
N C
O N
S T
R U
C T
IO
N
A C
B
C R
M
/2
/2
S108
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
0TRUE NORTH
NORTH
PLAN
1" = 10'-0"A6
PARTIAL TOP LEVEL FRAMING PLAN
15'
KEYNOTES
KEY NOTE
S02 BASE BID. ROUT AND SEAL CONCRETE CRACK IN DOUBLE TEE
TOPPING SLAB. SEE DETAIL C4/S500 FOR MORE INFORMATION.
S03 BASE BID. NEW TRAFFIC SURFACE MEMBRANE COATING. 4'-0"
IN TOTAL WIDTH, 3'-8" WIDTH ON HORIZONTAL SURFACE WITH 4"
EXTENSION UP THE FACE OF THE WALL. SEE DETAIL A4/S500
FOR MORE INFORMATION.
10 FT2 PATCHING ON BEAM
20 FT2 PATCHING ON
UNDERSIDE OF UPPER STAIR
16 FT2 PATCHING ON UPPER BEAM
ALL STAIR WORK IS TO
BE IN FUTURE PHASE
28 FT2 PATCHING ON
UNDERSIDE OF STAIR
12 FT2 PATCHING ON
UNDERSIDE OF STAIR
8 FT2 PATCHING ON
UNDERSIDE OF LANDING
3 FT2 PATCHING
ON UPPER BEAM
ALL STAIR WORK IS TO
BE IN FUTURE PHASE
4 FT2 PATCHING ON
UNDERSIDE OF STAIR
16 FT2 PATCHING ON
UNDERSIDE OF STAIR
24 FT2 PATCHING
ON UPPER BEAM
ALL STAIR WORK IS TO
BE IN FUTURE PHASE
48 FT2 PATCHING ON
UNDERSIDE OF STAIR
23 FT2 PATCHING ON
UNDERSIDE OF STAIR
STAIR TREAD PATCHING
ALL STAIR WORK IS TO
BE IN FUTURE PHASE
STAIR TREAD PATCHING
22 FT2 PATCHING ON
UNDERSIDE OF STAIR
48 FT2 PATCHING ON
UNDERSIDE OF STAIR
3 FT2 PATCHING
ON BEAM
TOUCHUP GALVANIZED
PAINT ON ALL WELDS
ALL STAIR WORK IS
ALTERNATE BID
20 FT2 PATCHING ON
UNDERSIDE OF STAIR
48 FT2 PATCHING ON
UNDERSIDE OF STAIR
1 FT2 PATCHING
ON BEAM
ALL STAIR WORK IS TO
BE IN FUTURE PHASE
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :3
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
S T
A
IR
E L E
V A
T
IO
N P
H O
T O
S C
O N
S T
R U
C T
IO
N
A C
B
C R
M
/2
/2
S200
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
01" = 0'-6"A3
LEVEL B STAIR
9" 01" = 0'-6"C3
LEVEL A STAIR
9" 01" = 0'-6"E3
LEVEL 1 STAIR
9"
01" = 0'-6"A5
LEVEL 2 STAIR
9" 01" = 0'-6"C5
LEVEL 3 STAIR
9" 01" = 0'-6"E5
LEVEL 4 STAIR
9"
TO BE INCLUDED IN FUTURE PHASE
2" SLOPED TOPPING AT
DOUBLE TEE ENDS
PRECAST
INVERTED TEE
BEAM
NEOPRENE
BEARING PAD
PRECAST CORBEL
PRECAST COLUMN
A B
B A
REPAIRS
1. REMOVE UNSOUND CONCRETE AND ALL PREVIOUS PATCHING
MATERIAL FROM INVERTED TEE BEAM, CORBEL, AND COLUMN.
2" SLOPED TOPPING AND COATING ON DRIVING SURFACE
ABOVE MAY NEED TO BE REMOVED TO ACCESS AREAS OF
DETERIORATION. SHORING OF DOUBLE TEES IS REQUIRED,
SHORING DESIGN TO BE REVIEWED BY ENGINEER OF RECORD.
2. SANDBLAST EXPOSED STEEL.
3. REVIEW CONDITION OF EXPOSED STEEL. ADDITIONAL
REINFORCING OR REPLACEMENT BAR MAY BE NEEDED IF
EXISTING STEEL IS CORRODED TOO EXTENSIVELY. CONSULT
ENGINEER OF RECORD. CONTRACTOR TO CARRY ALLOWANCE
FOR POSSIBLE REINFORCEMENT REPLACEMENT.
4. COAT EXPOSED STEEL STRUCTURAL MEMBERS AND/OR REBAR
WITH ZINC-RICH COATING. REFER TO SPEC FOR PRODUCTS.
5. NOTIFY DESIGN PROFESSIONAL FOR OBSERVATION PRIOR TO
PATCHING.
6. PATCH REPAIR LOCATIONS WITH CORROSION RESISTANT
CONCRETE PATCH MATERIAL. REFER TO SPEC FOR
PRODUCTS.
9. APPLY WATERPROOFING MEMBRANE TO ELEVATED SLABS
PER SPECIFICATIONS, EXTEND 3" BEYOND EDGE OF PATCH,
DO NOT APPLY MEMBRANE TO SLAB-ON-GRADE
NOTE THAT ANY PAVEMENT MARKINGS THAT ARE COVERED
WITH MEMBRANE MUST BE REAPPLIED AND ARE INCIDENTAL
TO THIS WORK ITEM
5.00° TYP1
M
IN
3" TYP
8. INSTALL CONCRETE PATCHING MATERIAL PER
SPECIFICATIONS
SECTION
SPALLED
CONCRETE
AREA
PLAN
1. 5° ANGLED SAW CUT AROUND PERIMETER, MIN DEPTH = 1",
CORNERS SHALL BE 90°, AVOID REENTRANT CORNERS
2. REMOVE LOOSE CONCRETE WITHIN SAW CUT,
MIN DEPTH = 1", DO NOT CUT REINFORCEMENT
3. WHERE REBAR IS EXPOSED, MIN DEPTH = 1" BEYOND REBAR
4. CLEAN REBAR TO SHINY METAL WITH WIRE WHEEL, CLEAN
CAVITY WITH BROOM AND COMPRESSED AIR
5. APPLY ZINC-RICH EPOXY PRIMER TO REBAR PER
SPECIFICATIONS
6. NOTIFY DESIGN PROFESSIONAL FOR OBSERVATION PRIOR
TO PATCHING
SINGLE/DOUBLE TEE STEM SECTION (1) SAW CUT AROUND PERIMETER, MAX DEPTH = 1/2",
CORNERS SHALL BE 90°, AVOID REENTRANT
CORNERS
(2) REMOVE LOOSE CONCRETE WITHIN SAW CUT, MAX
DEPTH = 1/2"
(3) WHERE REBAR OR PT TENDONS ARE EXPOSED, MIN
DEPTH = 1" BEYOND REBAR OR TENDON
(4) CLEAN REBAR AND/OR TENDONS TO SHINY METAL
WITH WIRE WHEEL, CLEAN CAVITY WITH BROOM AND
COMPRESSED AIR
(5) APPLY ZINC-RICH EPOXY PRIMER TO REBAR AND/OR
TENDONS PER SPECIFICATIONS
(6) PREPARE PATCH SURFACE PER MANUFACTURER
INSTRUCTIONS
(7) NOTIFY DESIGN PROFESSIONAL FOR OBSERVATION
PRIOR TO PATCHING
(8) INSTALL AND CURE CONCRETE PATCHING MATERIAL
REBAR OR
PT TENDON
M
IN
1/2" MIN
4"+/-
EXTEND MEMBRANE LAYERS 4"
UP ADJACENT SURFACES
NEW MEMBRANE SYSTEM
1. PROVIDE MOCKUP PER SPECIFICATIONS
2. SHOT BLAST TO PREPARE FOR MEMBRANE
ADHESION PER MANUFACTURER.
RECOMMENDATIONS, WATER BLAST WHERE SHOT
BLASTING IS NOT POSSIBLE.
3. WIPE EXISTING SURFACES WITH XYLENE OR PRIME
AS RECOMMENDED BY MANUFACTURER.
4. APPLY NEW MEMBRANE SYSTEM, SEE
SPECIFICATIONS FOR MIL THICKNESS AND SAND
PLACEMENT, COLOR SUBJECT TO OWNER
APPROVAL.
5. ALL MEMBRANE EDGES SHALL BE TAPED TO
PROVIDE STRAIGHT AND SHARP LINES
6. RESTRIPE PARKING STALLS PRIOR TO ALLOWING
TRAFFIC ON MEMBRANE.
7. INSTALL CONCRETE PATCHING MATERIAL PER
SPECIFICATIONS
NOTE: EXISTING JOINTS SHALL CONTINUE
THROUGH SPALL REPAIRS
PLAN/SECTION
SPALLED
CONCRETE
AREA
ELEVATION/PLAN
1. 5° ANGLED SAW CUT AROUND PERIMETER, MIN DEPTH = 1/2",
CORNERS SHALL BE 90°, AVOID REENTRANT CORNERS
2. REMOVE LOOSE CONCRETE WITHIN SAW CUT,
MAX DEPTH = 1/2"
3. WHERE REBAR IS EXPOSED AT OVERHEAD SPALLS, MIN
DEPTH = 1" BEYOND REBAR. WHERE REBAR IS EXPOSED AT
VERTICAL SPALLS, DO NOT REMOVE CONCRETE BEYOND BAR
4. CLEAN REBAR TO SHINY METAL WITH WIRE WHEEL, CLEAN
CAVITY WITH BROOM AND COMPRESSED AIR
5. APPLY ZINC-RICH EPOXY PRIMER TO REBAR PER
SPECIFICATIONS
6. NOTIFY DESIGN PROFESSIONAL FOR OBSERVATION PRIOR
TO PATCHING
5.00° TYP
M
IN
1. CAREFULLY CUT EXISTING MEMBRANE DIRECTLY
ABOVE JOINT FACES AS NEEDED/IF REQUIRED,
REMOVE JOINT SEALANT.
2. NOTIFY DESIGN PROFESSIONAL IF WELD TIES ARE
BROKEN OR DAMAGED.
3. CLEAN FACES OF JOINT AND REMOVE DEBRIS
4. PRIME PREPARED FACE OF JOINT PER JOINT
SEALANT MANUFACTURER.
5. INSTALL NEW BACKER ROD PER SPECIFICATIONS.
6. FILL JOINT WITH SEALANT, FINISH FLUSH WHERE
MEMBRANE WILL BE APPLIED, OTHERWISE FINISH
CONCAVE.
7. APPLY 9" MEMBRANE STRIP CENTERED ON JOINT
PER DETAILS
CLOSED CELL BACKER
ROD, DIAMETER 1/4"
WIDER THAN JOINT
MEMBRANE JOINT SEALANT
WELD TIE
FLANGE PLATE
X
2X
PLAN
SECTION
/2
1/2"
1. ROUT CRACK 1/2" DEEP x 1/2" WIDE
2. CLEAN JOINT AND PRIME PER
MANUFACTURER INSTRUCTIONS
3. FILL CRACK WITH SEALANT PER
SPECIFICATIONS, FINISH CONCAVE
TO CONCRETE SURFACE, EXCEPT
FINISH FLUSH WHERE MEMBRANE
WILL BE APPLIED
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:1 :3
P
M
A u to d e s k D o c s /2
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g /2
-S
I D
A S
C
C P a rk in g R a m p C o n c re te
P ip in g -C e n t.
rv t
D E
T A
IL
S
C O
N S
T R
U C
T
IO
N
A C
B
C R
M
/2
/2
S500
.0
D A
S C
C P
A R
K
IN
G R
A M
P C
O N
C R
E T
E A
N D
P
IP
IN
G
R E
P A
IR
D E
P A
R T
M E
N T
O F
A D
M
IN
IS
T
R A
T
IV
E S
E R
V
IC
E S
E A
S T
G R
A N
D A
N D
P E
N N
S Y
L V
A N
IA
A
V E
N U
E
D E
S M
O
IN
E S
IO
W A
01/2" = 1'-0"A3
INVERTED TEE AND CORBEL REPAIR DETAIL
3'
01 1/2" = 1'-0"A2
HORIZONTAL CONCRETE SPALL REPAIR
1' 01/4" = 1'-0"E2
DOUBLE TEE STEM CONCRETE SPALL REPAIR
6'
01" = 1'-0"A4
NEW MEMBRANE
1'-6"
01 1/2" = 1'-0"C2
VERTICAL/OVERHEAD CONCRETE SPALL REPAIR
1'
06" = 1'-0"B4
SLAB SEALANT REPLACEMENT
3" 06" = 1'-0"C4
CONCRETE CRACK REPAIR
3"
M
1. UNLESS NOTED OTHERWISE: LIGHT LINES DENOTE EXISTING
PIPING, OR EQUIPMENT WHICH IS TO REMAIN. BOLD LINES
INDICATE NEW WORK TO BE INSTALLED UNDER THIS
CONTRACT.
2. PLUMBING SHOWN IS IN SCHEMATIC FORM. NOT ALL RISERS
AND DROPS ARE SHOWN. PROVIDE OFFSETS AS REQUIRED
TO MEET SPACE REQUIREMENTS AND TO AVOID
INTERFERENCE WITH OTHER TRADES. THE CONTRACTOR
SHALL PROVIDE COMPLETE FULLY FUNCTIONAL SYSTEMS.
3. PROVIDE ACCESSIBLE ISOLATION VALVES AT ALL BRANCH
CONNECTIONS TO MAINS AND PIPING FIXTURE GROUPS.
COORDINATE VALVE LOCATIONS WITH ACCESSIBLE CEILINGS.
4. REFER TO PLUMBING FIXTURE ROUGH-IN SCHEDULE FOR
CONNECTION SIZES AT INDIVIDUAL FIXTURES.
5. PROVIDE WATER HAMMER ARRESTORS FOR EACH NEW
PLUMBING FIXTURE OR GROUP OF FIXTURES. SIZE AND
LOCATION REQUIREMENTS SHALL BE AS PER PDI STANDARD
PDI-WH-201.
6. ALL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED TO
BE EASILY ACCESSIBLE.
7. PLUMBING WORK SHALL BE COORDINATED WITH OTHER
TRADES, INCLUDING BUT NOT LIMITED TO DUCTWORK,
ELECTRICAL EQUIPMENT, PIPING AND FIRE PROTECTION.
SPACE ABOVE CEILING IS LIMITED AND SHALL BE
COORDINATED WITH OTHER TRADES.
8. ALL WORK WITHIN THE CONTRACT DOCUMENTS, WHICH
INCLUDE THIS DRAWING, SHALL BE COMPLETED IN A SAFE
WORKMANLIKE MANNER AND IN ACCORDANCE WITH ALL
APPLICABLE STATE, LOCAL AND NATIONAL CODES,
REGULATIONS AND ORDINANCES. IF ANY CONFLICTS ARISE
BETWEEN THE CONTRACT DOCUMENTS AND THE
APPLICABLE CODES, REGULATIONS OR ORDINANCE, THE
CONTRACTOR SHALL BE RESPONSIBLE TO HAVE ALL WORK
CONFORM TO THE STRICTER OF SAID REQUIREMENTS.
9. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL
PERMITS AND INSPECTIONS AS REQUIRED FOR ELECTRICAL,
FIRE PROTECTION, PLUMBING, MECHANICAL AND BACKFLOW
PREVENTION INSTALLATIONS. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE BOTH A
COMPLETE AND COMPLIANT INSTALLATION AS MAY BE
DETERMINED BY THE AUTHORITY(S) HAVING JURISDICTION.
10. CONTRACTOR SHALL NOT PROCURE OR FABRICATE ANY
PIPING, DUCTWORK OR OTHER EQUIPMENT WITHOUT FIRST
VERIFYING ALL DIMENSIONS AND CONDITIONS WHETHER
CURRENTLY EXISTING OR NOT. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR ALL WORK, INCLUDING ANY REQUIRED
REWORK.
11. MAINTAIN ALL MANUFACTURER RECOMMENDED EQUIPMENT
SERVICE AND SAFETY CLEARANCES. DO NOT LOCATE ANY
EQUIPMENT OR RUN MATERIALS ABOVE ANY ELECTRICAL
PANELS OR SWITCHGEAR. MAINTAIN ALL NFPA/NEC CODE
REQUIRED CLEARANCES.
12. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING, SCHEDULING AND SEQUENCING OF THEIR
WORK WITH ALL OTHER TRADES. PROVIDE OFFSETS,
EASEMENTS, OR RELOCATE TO AVOID CONFLICTS WITH
WORK OF OTHER TRADES. FURNISH SUFFICIENT RESOURCES
TO MEET ALL PROJECT MILESTONES AND DEADLINES.
13. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE WATERTIGHT AND WEATHER-PROOF INTEGRITY OF
ROOFS, WALLS AND FLOORS DURING CONSTRUCTION. EACH
TRADE SHALL LOCATE/DIMENSION/COORDINATE THEIR ROOF,
FLOOR AND WALL OPENINGS WITH THE GENERAL
CONTRACTOR (GC) OR CONSTRUCTION MANAGER.
14. PROTECT NEW WORK FROM DAMAGE OR
DECONTAMINATION. PROVIDE TEMPORARY PROTECTIVE
CAPPING OR TAPED POLYETHYLENE ENCLOSURES OVER
OPEN DUCTWORK AND PIPING ENDS AND EQUIPMENT.
CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING
MECHANICAL SYSTEMS PRIOR TO PLACING THEM IN SERVICE.
15. IN A NEAT AND WORKMANLIKE MANNER: PATCH ANY
REMAINING OPENINGS AND FILL EXCESSIVE GAPS; REWORK
AND REFINISH TO MATCH ADJACENT STRUCTURES; FLASH
AND SEAL ALL MECHANICAL AND ELECTRICAL PENETRATIONS
THRU WALLS, CEILINGS AND FLOORS WITH METAL
FRAMEWORK OR ESCUTCHEONS. ALL OPENINGS SHALL BE
PROPERLY SEALED SO AS TO MEET FIRE RATING NEEDS.
PLUMBING
1. THIS DRAWING DIAGRAMMATICALLY REPRESENTS THE
LAYOUT OF EXISTING CONDITIONS WITH MAJOR PLUMBING
COMPONENTS. THEY ARE NOT INTENDED TO SHOW
ACCESSORIES OR INCIDENTALS COMMON TO EQUIPMENT
INDICATED, THOUGH THESE ITEMS ARE TO BE REMOVED,
ACCESSIBILITY TO DEMOLITION ITEMS SHALL NOT BE
INFERRED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR
FIELD VERIFICATION OF BUILDING AND EXISTING CONDITIONS,
PRIOR TO BID SUBMISSION.
2. SOME ORIGINAL/EXISTING PIPING, FITTINGS, AND EQUIPMENT
IS WRAPPED WITH ASBESTOS INSULATION. ASBESTOS TO BE
REMOVED UNDER A SEPARATE, CONCURRENT CONTRACT
PRIOR TO DEMOLITION WORK.
3. EXISTING PIPING PENETRATIONS VACATED/REVEALED
DURING DEMOLITION AND REMODEL SHALL BE INFILLED AND
FINISHED TO MATCH EXISTING. IF MATERIALS FOR REPAIR TO
MATCH EXISTING ARE NOT AVAILABLE (IE GLAZED WALL TILE),
GROUT ABANDONED PENETRATION FULL AND FINISH FLUSH.
PRIOR APPROVAL OF THE OWNER MUST BE OBTAINED
BEFORE ANY PROPOSED NON-SIMILAR FINISH WORK BEGINS.
4. DISCONNECT AND REMOVE ALL PREVIOUSLY ABANDONED
PIPING WITHIN THE PROJECT AREA. REMOVE
EXISTING/ABANDONED HANGERS AND SUPPORTS IF DEEMED
NOT REUSABLE.
5. ALL PIPING SHOWN IS BASED ON ORIGINAL DRAWINGS AND
LIMITED SITE OBSERVATIONS. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR VERIFYING ALL EXISTING CONDITIONS
PRIOR TO COMMENCING WORK.
6. ALL PIPING ASSOCIATED WITH EXISTING SYSTEMS SHALL BE
DEMOLISHED. NO PIPING SHALL BE ABANDONED.
7. CONTRACTOR SHALL BE RESPONSIBLE FOR DRAINING PIPING
SYSTEMS TO BE CUT, CAPPED OR REMOVED. DISCHARGE
FROM SUCH SYSTEMS SHALL BE APPROPRIATELY DISPOSED
OF PER FEDERAL, STATE AND LOCAL REQUIREMENTS.
8. CONTRACTOR SHALL REMOVE ALL CONTROLS WITHIN THE
PROJECT AREA NOT ASSOCIATED WITH NEW SYSTEMS'
REQUIREMENTS AND PATCH REMAINING OPENINGS.
COORDINATE WITH CONTROLS VENDOR.
9. DISCONNECT AND REMOVE ALL ACCESSORIES AND
CONTROLS (INCLUDING PNEUMATIC CONTROL TUBING,
CONDUIT/WIREMOLD AND WIRING) ASSOCIATED WITH
COMPONENTS OF EXISTING SYSTEM INDICATED TO BE
DEMOLISHED.
10. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER
FOR ANY EQUIPMENT THE BUILDING AND GROUNDS
DEPARTMENT MAY WISH TO RETAIN AFTER REMOVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSAL OF ALL
REMOVED AND/OR DEMOLISHED EQUIPMENT THE OWNER
CHOOSES NOT TO RETAIN.
11. COORDINATE WITH GENERAL CONTRACTOR FOR FLOOR,
WALL AND ROOF PATCHING REQUIRED DUE TO
PENETRATIONS RESULTING FROM DEMOLITION OF EXISTING
AND INSTALLATION OF NEW EQUIPMENT AND COMPONENTS.
12. CONTRACTOR IS RESPONSIBLE TO VERIFY ACTUAL NUMBER
AND LOCATION OF SYSTEMS AND COMPONENTS TO BE
DEMOLISHED AND REMOVED.
13. OWNER SHALL HAVE FIRST SALVAGE RIGHTS TO ALL
REMOVED EQUIPMENT AND MATERIALS. UNLESS NOTED
OTHERWISE, CONTRACTOR SHALL BE RESPONSIBLE FOR
PROPER AND TIMELY DISPOSAL OF ALL CONSTRUCTION
DEBRIS INCLUDING BUT NOT LIMITED TO EQUIPMENT AND
MATERIALS NOT CLAIMED BY OWNER TO AN EPA APPROVED,
ENVIRONMENTALLY RESPONSIBLE, RECYCLE FACILITY OR
LANDFILL.
14. TO MINIMIZE DISRUPTIONS, COORDINATE ALL DEMOLITION
WITH OWNER, GENERAL CONTRACTOR, OR CONSTRUCTION
MANAGER BEFORE SHUTTING DOWN ANY UTILITY OR SIMILAR
SYSTEM. SHUTDOWNS FOR UTILITIES OR SIMILAR SYSTEMS
SHALL BE REQUESTED WELL IN ADVANCE PER THE
SPECIFICATION.
15. ALL WORK WITHIN THE CONTRACT DOCUMENTS, WHICH
INCLUDE THIS DRAWING, SHALL BE COMPLETED IN A SAFE
WORKMANLIKE MANNER AND IN ACCORDANCE WITH ALL
APPLICABLE STATE, LOCAL AND NATIONAL CODES,
REGULATIONS AND ORDINANCES. IF ANY CONFLICTS ARISE
BETWEEN THE CONTRACT DOCUMENTS AND THE APPLICABLE
CODES, REGULATIONS OR ORDINANCE, THE CONTRACTOR
SHALL BE RESPONSIBLE TO HAVE ALL WORK CONFORM TO
THE STRICTER OF SAID REQUIREMENTS.
16. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL
PERMITS AND INSPECTIONS AS REQUIRED. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO PROVIDE BOTH A
COMPLETE AND COMPLIANT INSTALLATION AS MAY BE
DETERMINED BY THE AUTHORITY(S) HAVING JURISDICTION.
17. CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
THE WATERTIGHT AND WEATHER-PROOF INTEGRITY OF
ROOFS, WALLS AND FLOORS DURING CONSTRUCTION. EACH
TRADE SHALL LOCATE/DIMENSION/COORDINATE THEIR ROOF,
FLOOR AND WALL OPENINGS WITH THE GENERAL
CONTRACTOR (GC) OR CONSTRUCTION MANAGER.
PLUMBING DEMOLITION
PIPE SIZE AND SYSTEM TAG (DIAMETER)
1/4" / 12"
PIPE SLOPE TAG
PIPE INVERT ELEVATION TAG
EXISTING TO REMAIN
TO BE DEMOLISHED
DOMESTIC COLD WATER
NATURAL GAS
SANITARY SEWER
SANITARY VENT
STORM DRAINAGE
STORM DRAINAGE-OVERFLOW
DOMESTIC WATER METER
BALANCING VALVE
BALL VALVE
CHECK VALVE
THREE WAY VALVE
PRESSURE REDUCING VALVE
SOLENOID VALVE
BUTTERFLY VALVE
I.E. 100'-0 27/64"
2" CW
OST
ST
V
SAN
NG
CW
SAN
ELBOW UP
ELBOW DOWN
PIPE OFFSET UP
PIPE OFFSET DOWN
PIPE TEE TURNED UP
PIPE TEE TURNED DOWN
PIPE TEE
PIPE CAP
PIPE UNION
PIPE TRANSITION
KEYNOTE
CAP EXISTING PIPE
NEW CONNECTION INTO EXISTING PIPE
DETAIL NUMBER
SHEET NUMBER ON
WHICH THE DETAIL
RESIDES
THERMOMETER
A
G
S
ANCHOR
GUIDE
SUPPORT
PRESSURE GAUGE
6" CW UP
6" HW DN
PLUMBING SYMBOLS LEGEND
SAN
SYMBOLS
& AND
@ AT
# NUMBER or POUND
A
ACU AIR CONDITIONING UNIT
AD AREA DRAIN
ADJ ADJUSTABLE/ADJACENT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
AMB AMBIENT
AP ACCESS PANEL
APPROX APPROXIMATE(LY)
AR ACID-RESISTANT
AS AIR SEPARATOR
ASSY ASSEMBLY
ATM ATMOSPHERE
AUX AUXILIARY
AV ACID VENT
AVG AVERAGE
AW ACID WASTE
B
BAS BUILDING AUTOMATION SYSTEM
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BOP BOTTOM OF PIPE
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C
C COMPRESSOR (AIR)
CAL CALIBRATE
CAP CAPACITY
CCR CONCENTRIC REDUCER
CCW COUNTER CLOCKWISE
CIP CAST IRON PUMP
CIRC CIRCULATING
CISP CAST IRON SOIL PIPE
CL CENTER LINE
CLG CEILING
CLR CLEAR(ANCE)
CLW CLOCKWISE
CO CLEANOUT
COND CONDENSATE
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACTOR
COORD COORDINATE
CP CIRC PUMP
CSS CLINICAL SERVICE SINK
CT COOLING TOWER
CTRL CONTROL
CU COPPER
CU FT CUBIC FEET
CU IN CUBIC INCH
D
°/DEG DEGREE
°C DEGREES CELSIUS
°F DEGREES FAHRENHEIT
DB DRY BULB
DDC DIRECT DIGITAL CONTROLS
DEMO DEMOLITION
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGRAM
DIP DUCTILE IRON PIPE
DN DOWN
DR DRAIN
DV DRAIN VALVE
DW DISHWASHER
DWG DRAWING
DWV DRAIN WASTE & VENT
E
EA EACH
ECCR ECCENTRIC REDUCER
EER ENERGY EFFICIENCY RATIO
EEW EMERGENCY EYE WASH
EF ENERGY FACTOR
ELEV ELEVATION
ELEC ELECTRICAL
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ES EMERGENCY SHOWER / EYE WASH
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FPT FEMALE PIPE THREAD
FS FLOOR SINK
FSEC FOOD SERVICE EQUIPMENT CONTRACTOR
FTHD FOOT HEAD OR PRESSURE DROP
FW FEEDWATER
FWP FIRE WATER PUMP
G
G GAS
GA GAUGE
GAL GALLON
GC GENERAL CONTRACTOR
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GV GREASE VENT
GWH GAS FIRED WATER HEATER
H
H&CW HOT AND COLD WATER
HB HOSE BIBB
HG MERCURY
HORIZ HORIZONTAL
HP HORSEPOWER
HVAC HEATING, VENTILATION, AIR CONDITIONING
HZ HERTZ (FREQUENCY)
I
ID INSIDE DIAMETER
IE INVERT ELEVATION
IN INCHES
IN WC INCHES (WATER COLUMN)
INS INSULATION
INSTR INSTRUMENT
IP IRON PIPE
IPS IRON PIPE SIZE
ISO ISOMETRIC
J
JS JANITOR'S SINK
K
K KELVIN
KW KILOWATT
KWH KILOWATT HOUR
L
LAV LAVATORY
LB(S) POUND(S)
LWT LEAVING WATER TEMPERATURE
M
MAINT MAINTENANCE
MAX MAXIMUM
MBH BRITISH THERMAL UNIT (1000/HR)
MC MECHANICAL CONTRACTOR
MCC MOTOR CONTROL CENTER
MCA MINIMUM CIRCUIT AMPS
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM OR MINUTE
MISC MISCELLANEOUS
MOV MOTOR OPERATED VALVE
MPT MALE PIPE THREAD
N
NA NOT APPLICABLE
NC NORMALLY CLOSED
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOM NOMINAL
NPT NATIONAL PIPE THREAD
NTS NOT TO SCALE
O
OD OUTER DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OFOI OWNER FURNISHED OWNER INSTALLED
ORD OVERFLOW ROOF DRAIN
OST OVERFLOW STORM
P
PG PRESSURE GAUGE OR PROPYLENE GLYCOL
PH PHASE
PLBG PLUMBING
PRV PRESSURE RELIEF VALVE OR PRESSURE
REGULATING VALVE
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GAUGE
R
RD ROOF DRAIN
RECIRC RECIRCULATE(ING)
REFR REFRIGERATION
REQD REQUIRED
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
S
SCH SCHEDULE
SCHM SCHEMATIC
SEER SEASONAL ENERGY EFFICIENCY RATIO
SF SQUARE FEET
SHT SHEET
SK SINK
SP SUMP PUMP OR STATIC PRESSURE
SPEC SPECIFICATION(S)
SQ IN SQUARE INCH
SS STAINLESS STEEL
STBY STANDBY
STD STANDARD
STL STEEL
SUCT SUCTION
SV SAFETY VALVE
SYS SYSTEM
SRV SAFETY RELIEF VALVE
T
T THERMOSTAT
TCC TEMPERATURE CONTROL CONTRACTOR
TD TRENCH DRAIN
TEFC TOTALLY ENCLOSED FAN COOLED
TEMP TEMPERATURE OR TEMPORARY
THRU THROUGH
TOP TOP OF PIPE
TP TOTAL PRESSURE
TYP TYPICAL
U
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
UR URINAL
UTIL UTILITY
V
VAC VACUUM
VBX VALVE BOX
VD VOLUME DAMPER
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THRU ROOF
W
W/ WITH
W/O WITHOUT
WB WET BULB
WC WATER CLOSET
WH WATER HEATER OR WALL HYDRANT
WHA WATER HAMMER…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .