This is Addendum #2 to Request for Bids (RFB) 927940-04 issued by the Iowa Department of Administrative Services for the WRC Decentralization Phase 4 and Fire Alarm Phase 3 project at the Woodward Resource Center. The addendum clarifies that the bid submission deadline remains Thursday, June 4, 2026, at 2:00 PM, correcting an error in Addendum #1. The project encompasses replacing steam and chilled water systems with new air handler units, replacing fire alarm systems, performing elevator repairs, and installing fire suppression systems in Linden Court Buildings A, B, C, and D. Prospective bidders must acknowledge receipt of this addendum in the IMPACS electronic procurement system to avoid disqualification. The addendum addresses questions raised during the pre-bid meeting, including clarifications on responsibility for removing security cameras and identifying active wiring (facility responsibility), provision of photographs of space above ACT ceiling tiles and roof locations for ductwork routing at Building D, and clarification that pipe demolition in the Linden tunnel is not included in the current project scope. Specific work responsibilities are delineated: BP 23-1 is responsible for foundations of ductwork supports and equipment pads, while BP 09-1 handles grading and remaining concrete work.

The addendum modifies the original bidding documents dated March 27, 2026, and includes changes to electrical drawings, specifically to Drawing 00-E012 (Electrical Site Plan – Linden Court), which now requires the furnishing and installation of a new main breaker rating plug capable of adjustment from 0.95 to set the trip setting to 1900A. Two attachments are provided: photographs of the space above the ACT ceiling and documentation of the ductwork routing location for the air handler unit serving Building D. Bidders must review full-size drawings available through IMPACS and acknowledge receipt of all addenda as part of the certification requirements for proposal submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 2 for RFB927940-04

Project Name: WRC Decentralization Phase 4 & Fire Alarm Phase 3 (9279.40 & 9279.41) Bid Issuance #4

DAS RFB #: 927940-04

DAS Project #: 9279.40 & 9279.41 Date: 5/29/2026

CLARIFICATION:

Addendum #1 incorrectly changed the bid date. The bid date will remain the same Thursday June 4th, 2026 at 2:00 pm.

Bids Due: June 4, 2026, at 2:00pm

TO: PROSPECTIVE BIDDERS:

THIS ADDENDUM FORMS A PART OF THE BIDDING AND CONTRACT DOCUMENTS AND MODIFIES THE BIDDING DOCUMENTS DATED 03-27-2026, WITH AMENDMENTS AND ADDITIONS NOTED BELOW. THIS

ADDENDUM SUPERSEDES AND SUPPLEMENTS ALL PORTIONS OF THE ORIGINAL BIDDING AND

CONTRACT DOCUMENTS WITH WHICH IT CONFLICTS. ACKNOWLEDGE RECEIPT OF THIS ADDENDUM

IN THE IMPACS ELECTRONIC PROCUREMENT SYSTEM. FAILURE TO DO SO MAY DISQUALIFY THE

BIDDER.

QUESTIONS AND ANSWERS FROM PRE-BID MEETING

Q1. Who will be removing the security cameras and making sure the wiring is not active?

A1. The facility will handle this work.

Q2. Are there any pictures of the space above the ACT tiles?

A2. Yes, please see attachments.

Q3. Is the grading and concrete work for the units all included under BP 23-1?

A3. No, BP 23-1 is responsible for the foundations of the ductwork supports and equipment pads. BP 09-1 is responsible for grading and the remaining concrete work.

Q4. Are there any pictures of the roof at Building D where the new ductwork will be routed?

A4. Yes, please see attachments.

Q5. Is the pipe demolition in the Linden tunnel included under BP 23-1?

A5. Currently not part of this project.

CHANGES TO DRAWINGS

DRAWINGS:

• 00-E012 – ELECTRICAL SITE PLAN – LINDEN COURT

o ADD to keynote 00-E001 “FURNISH AND INSTALL NEW MAIN BREAKER RATING PLUG. PLUG TO

BE CAPABLE OF ADJUSTMENT OF 0.95 TO SET THE TRIP SETTING TO 1900A.”

ATTACHMENTS

1. Photos for above the ACT ceiling.

2. Location where ductwork is routed for the AHU for building D.