RFB924900-01 - DOC MPCF Front Steps Repair - Drawings.pdf
PDF 4 MB Posted
- Attached to
- DOC MPCF Front Steps Repair
- Solicitation number
- RFB924900-01
- Issued by
- Harrison County, Iowa
About this file
This document is a comprehensive set of architectural, structural, mechanical, plumbing, and electrical construction drawings for the DOC MPCF (Department of Corrections Mount Pleasant Correctional Facility) Front Steps Repair project in Mount Pleasant, Iowa. The project involves renovation and repair of the front entrance staircase and landing of the facility's administration building, located on the non-secure side. Specific work includes removing damaged concrete slab topping, stairs, louvers, railings, light fixtures, and light poles, and replacing them with new components. The project will also involve repairing existing stone, tuckpointing stone joints, cleaning stone, installing a new sump pump and area drain, and replacing deteriorated steel framing members.
The drawings, dated April 26, 2023, with project number 2142203500, detail the comprehensive scope of work across multiple disciplines. The project site is at 1200 E. Washington St. in Mount Pleasant, and the drawings include detailed plans for site layout, structural modifications, mechanical system changes, plumbing installations, and electrical updates. The design incorporates new concrete stairs, guardrails, light poles, and louvers, with careful attention to maintaining the existing architectural aesthetic while improving functionality and safety. The project appears to be funded by the State of Iowa's Department of Administrative Services (DAS) and is designed to address structural and aesthetic deterioration of the facility's main entrance area.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
SHEET INDEX CERTIFICATIONS
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:5 :5
A
M
A u to d e s k D o c s /2
I D
A S
D
O C
M P
C F
F ro n t
S te p s R e p a ir
/2 -A
-2 -C e n t.
rv t
DOC MPCF FRONT STEPS REPAIR
STATE OF IOWA
1200 E. WASHINGTON ST., MT. PLEASANT, IA 52641
G000
D O
C M
P C
F F
R O
N T
S T
E P
S R
E P
A
IR
S T
A T
E O
F I O
W A
C L
IE
N T
P R
O J E
C T
N U
M B
E R
.0
E
W
A S
H
IN
G T
O N
S T
M
T P
L E
A S
A N
T
IA
P R
O J E
C T
N U
M B
E R
IS
S
U E
D F
O R
C
O N
S T
R U
C T
IO
N
P R
O J E
C T
I S
S U
E D
A T
E .2
.2
SHEET LIST
SHEET NAME
GENERAL
G000 COVER SHEET
CIVIL
C101 SITE PLAN
STRUCTURAL
S000 STRUCTURAL GENERAL INFORMATION AND SPECIAL
INSPECTIONS
S100 PLAN VIEWS
S500 DETAILS
ARCHITECTURAL
A101 FIRST FLOOR PLAN
A500 PHOTOGRAPHS
PLUMBING
P000 PLUMBING GENERAL INFORMATION
P101 PLUMBING PLANS
MECHANICAL
M000 MECHANICAL GENERAL INFORMATION
M201 MECHANICAL HVAC PLANS
ELECTRICAL
E101 ELECTRICAL PLAN
NOT TO SCALEC4
FACILITY IMAGE
01/2" = 1'-0"
VIEW OF ENTRANCE LOOKING SOUTHWEST
I HEREBY CERTIFY THAT THE PORTION OF THIS TECHNICAL
SUBMISSION DESCRIBED BELOW WAS PREPARED BY ME OR UNDER
MY DIRECT SUPERVISION AND RESPONSIBLE CHARGE. I AM A DULY
LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF IOWA.
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
PRINTED OR TYPED NAME
SIGNATURE
MY LICENSE RENEWAL DATE IS JUNE 30,
DATE
ARCHITECT
LICENSE NUMBER
Phillip J. Parrott
ALL A & G SHEETS
03601
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Tyson L. Scheidecker
ALL M & P SHEETS
21691
MECHANICAL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Edin Smailovic
ALL E SHEETS
21953
ELECTRICAL ENGINEER
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Christopher R. Marvin
ALL S SHEETS
P27417
STRUCTURAL ENGINEER
NOT TO SCALEA6
SITE LOCATION
SITE LOCATION
CONTRACTOR
PARKING LOCATION
PUBLIC AND VISITOR PARKING LOCATION
TEMPORARY PUBLIC ENTRANCE INTO
BUILDING DURING CONSTRUCTION PROJECT.
PROJECT DESCRIPTION:
RENOVATION AND REPAIRS OF THE STAIR & ENTRANCE LANDING
LEADING TO THE MT. PLEASANT CORRECTIONAL FACILITY (MPCF)
ADMINISTRATION BUILDING. THIS PROJECT IS LOCATED ON THE NON-
SECURE SIDE OF THE FACILITY.
WORK INCLUDES BUT NOT LIMITED TO:
• REMOVAL OF DAMAGED SLAB TOPPING, CONCRETE STAIRS,
LOUVERS, RAILINGS, LIGHT FIXTURES & LIGHT POLES.
• REPLACEMENT OF CONCRETE MASONRY WITH MATCHING STONE
CLADDING.
• REPAIR OF EXISTING STONE.
• TUCKPOINTING OF STONE JOINTS.
• CLEANING OF EXISTING STONE.
• INSTALLING NEW SUMP PUMP WITH PIT.
• INSTALLING NEW AREA DRAIN IN AREA WELL.
• INSTALLING NEW CONCRETE STAIR.
• INSTALLING NEW LOUVERS.
• INSTALLING NEW RAILINGS.
• INSTALLING NEW LIGHT POLES & FIXTURES.
• REPLACEMENT OF DETERIORATED STEEL FRAMING MEMBERS.
• PAINTING OF EXISTING AND NEW STEEL MEMBERS.
PAGES, SHEETS OR DIVISIONS COVERED BY THIS SEAL
MY LICENSE RENEWAL DATE IS DECEMBER 31,
I HEREBY CERTIFY THAT THIS ENGINEERING DOCUMENT WAS
PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I
AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF IOWA.
PRINTED OR TYPED NAME
SIGNATURE DATE
LICENSE NUMBER
Christopher R. Bauer
ALL C SHEETS
19737
CIVIL ENGINEER
DAS PROJECT NUMBER: 9249.00
- DAS PROJECT NUMBER: 9249.00
CONTRACTOR
STAGING LOCATION
ADA ENTRANCE
AND ELEVATOR
5-2-2023
5-2-2023
5-2-2023
5-2-2023
5-2-2023
REMOVE AND REPLACE
EXISTING SIDEWALK
TO MINIMUM EXTENTS
SHOWN ON DRAWINGS
LANDSCAPING AND EDGING
BLOCKS TO BE REMOVED AND
REPLACED BY FACILITY (TYP)
REMOVE SOD, STOCKPILE
TOPSOIL AND IMPORT FILL SOIL
TO PROVIDE POSITIVE DRAINAGE
AWAY FROM BUILDING
INSTALL TEMPORARY
CONSTRUCTION FENCE AROUND
ALL AREAS OF WORK (TYP)
" 24
LANDSCAPING
SIDEWALK
SI
D
EW
AL
K
ASPHALT
ASPHALT
(TUNNEL)
AREA WELL
R=4.00'
R=4 .00
LANDING AND PCC STEPS,
REFER TO ARCHITECTURAL
AND STRUCTURAL
COORDINATE DUMPSTER LOCATION
WITH CONSTRUCTION MANAGER. THERE
WILL BE ADDITIONAL DUMPSTERS IN
THIS GENERAL AREA FOR SEPARATE
PROJECTS THAT SHALL NOT BE USED
BY THIS PROJECT. CONTRACTOR SHALL
COORDINATE LOCATION AND ACCESS
TO DUMPSTERS BY OTHER PROJECTS.
MAINTAIN ACCESS TO
ELEVATOR ENTRANCE
ELEVATION ALONG
WALL TO BE 0.1'
LOWER THAN OPENING
STRAIGHT GRADE FROM
BUILDING TO EDGE OF
PAVEMENT, MINIMUM 1%
17.99'
30.20'
PROTECT EXISTING
SHRUBS (TYP)
HYDROSEED (TYP).
SEE SITE
RESTORATION NOTES.
PUBLIC ACCESS POINT DURING
CONSTRUCTION. MUST BE MAINTAINED
FREE OF ANY CONSTRUCTION DEBRIS
AND/OR EQUIPMENT.
FACILITY TO INSTALL SIGN
(NON-ADA) FOR PUBLIC ACCESS
FACILITY TO INSTALL SIGN
(ADA) FOR PUBLIC ACCESS
FACILITY TO PLACE BARRIER TO
CLOSE SIDEWALK WITH ARROW
TO NEW MAIN SIDEWALK TO BE
USED FOR ACCESS
INSTALL CONSTRUCTION
ACCESS GATE IN TEMPORARY
FENCE AS REQUIRED
MAINTAIN ACCESS TO
ELEVATOR ENTRANCE
A
B C D E F HG
W
ES
TO
W
N P
KW
Y, S U
IT
E
W
ES
T D
ES
M
O
IN
ES
, I
O W
A
5.
3.
S
H
IV
E- H
AT
TE
R Y.
C O
M
Pr in te d:
D R
AW
N
B Y
AP
PR
O
VE
D B
Y
IS
SU
ED
F
O R
IS
SU
E D
AT
E
FI
EL
D B
O O
K:
PR
O
JE
C
T N
U M
BE
R
P:
\P ro je ct s\
DM
\2
0\ De liv er ab le s\ Dr aw in gs \1
_C ivi l\C
SI
TE
P
LA
N.
dw g
5/ 2/
0:
:5
AM
C101
SI
TE
P
LA
N
KA
L
C R
B
C O
N
ST
R U
C
TI
O N
4.
.2
D O
C M
PC
F
FR
O
N T
ST
EP
S R
EP
AI
R
ST
AT
E O
F
IO
W A
E . W
AS
H
IN
G
TO
N
S T.
, M T.
P
LE
AS
AN
T, IA
N O
R
TH
PAVEMENT GENERAL NOTES
1. ALL PROPOSED PAVEMENT PATCHES ARE APPROXIMATE AND SHOULD BE CONSIDERED MINIMUM REMOVAL EXTENTS. EXTEND AND ADJUST PAVEMENT PATCHES AS REQUIRED BY CONSTRUCTION WITH PRIOR APPROVAL BY
CONSTRUCTION MANAGER.
2. ALL SLOPES IN PAVEMENT SHALL BE UNIFORM TO AVOID PONDING. ANY PONDING ON PAVEMENT PATCHES
OR ADJACENT TO PATCHES WILL BE CONSIDERED UNACCEPTABLE AND SHALL BE REPLACED.
3. USE TYPE "A" COMPACTION ON SUBGRADE AND SUBBASE, TYPE "A" COMPACTION PER IOWA DOT STANDARD
SPECIFICATION FOR HIGHWAY AND BRIDGE CONSTRUCTION.
SURFACE RESTORATION NOTES
1. CONTRACTOR TO REMOVE, STOCKPILE, AND REPLACE A MINIMUM OF 6" OF EXISTING TOPSOIL FOR ALL
DISTURBED AREAS.
2. SCARIFY AREAS TO RECEIVE TOPSOIL TO A MINIMUM DEPTH OF 4". REMOVE ALL STONES, WOOD AND OTHER
DEBRIS LARGER THAN 2" FROM AREAS TO RECEIVE TOPSOIL. DO NOT COMPACT TOPSOIL.
3. FINISH GRADE AND PREPARE FOR SEEDING ALL AREAS DISTURBED BY CONSTRUCTION TO WITHIN +/- 0.10
FEET OF EXISTING GRADES.
4. EXISTING FACILITIES (CURBS, PAVEMENT, UTILITIES, ETC.) THAT ARE TO REMAIN AND DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED OR REPLACED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE
OWNER.
SITE WORK TECHNICAL SPECIFICATIONS
THE MOST RECENT EDITION OF THE IOWA STATEWIDE URBAN DESIGN AND SPECIFICATIONS (SUDAS) SHALL APPLY TO ALL SITE WORK PERFORMED ON THIS PROJECT EXCEPT AS MODIFIED HEREIN. MEASUREMENT AND PAYMENT SECTIONS AND ADDITIONAL COMPENSATION REFERENCES SHALL NOT APPLY TO THIS PROJECT AS IT IS A LUMP
SUM BID .
CONTRACTOR SHALL SUBMIT SHOP DRAWING SUBMITTALS FOR ALL PROPOSED PRODUCTS.
A. CONCRETE PAVING:
CONCRETE: MATERIALS AND MIXING FOR ALL CONCRETE WORK, UNLESS OTHERWISE SPECIFIED, SHALL CONFORM TO IOWA DOT SPECIFICATIONS, SECTIONS 2301.03 THROUGH 2301.06, 2301.13 AND 2301.28 FOR
AIR-ENTRAINED TYPE C-4 MIX WITH TYPE I CEMENT
FLY ASH (CONTRACTOR'S OPTION) - ASTM C618, TYPE C, NOT TO EXCEED 15% OF CEMENTITIOUS MATERIAL.
COARSE AGGREGATE DURABILITY SHALL BE CLASS III, 3/4" MAX.
COMPRESSIVE STRENGTH: 2800 PSI @ 7 DAYS AND 4000 PSI @ 28 DAYS
SLUMP: 3" ± 1".
AIR CONTENT: 7.0% ± 1.0%
WATER/CEMENT RATIO: NOT TO EXCEED 0.53
FINISH: MATCH EXISTING FINISH FOR ROADWAY AND SIDEWALK PATCHING.
TESTING - ONE SET OF TEST CYLINDERS REQUIRED FOR EACH 100 C.Y. OR PORTION THEREOF, OF CONCRETE POURED PER WORK LOCATION. CONCRETE TESTING TO BE DONE AND PAID FOR BY OWNER. CONTRACTOR SHALL COORDINATE AND SCHEDULE ALL REQUIRED TESTING AND GEOTECHNICAL WORK WITH CONSTRUCTION
MANAGER.
SURFACE CURING: CONTRACTOR SHALL APPLY WHITE PIGMENT LIQUID CURING COMPOUND IN A FINE SPRAY TO FORM CONTINUOUS UNIFORM FILM AFTER FINISHING AND SURFACE MOISTURE HAS DISAPPEARED, OR WITHIN 30
MINUTES AFTER FORMS ARE REQUIRED.
SUBMIT CONCRETE MIX DESIGN FOR APPROVAL.
COLD WEATHER CONCRETE: WHEN THE ATMOSPHERIC AIR TEMPERATURE MAY BE EXPECTED TO DROP BELOW 40°F AT THE TIME CONCRETE IS DELIVERED TO THE WORK SITE, DURING PLACEMENT, OR AT ANY TIME DURING CURING PERIOD, CONCRETE SHALL BE MIXED, PLACED, AND PROTECTED IN ACCORDANCE WITH ACI STANDARD 306, "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING." IT IS THE OWNERS PREFERENCE TO AVOID COLD WEATHER CONCRETE FOR THIS PROJECT AND PROVIDE TEMPORARY GRANULAR SURFACING FOR
SIDEWALK AND PAVING AS REQUIRED.
B. SITE RESTORATION
HYDRAULIC SEEDING: ALL DISTURBED AREAS ON THE SITE NOT TO BE PAVED OR LANDSCAPED SHALL RECEIVE HYDRAULIC SEEDING. HYDRAULIC SEEDING MATERIALS AND INSTALLATION SHALL MEET SUDAS SPECIFICATIONS.
CONTRACTOR IS RESPONSIBLE FOR PREPARING SEEDBED, APPLYING HYDRAULIC SEEDING, AND FIRST AND
SECOND APPLICATIONS OF FERTILIZER. OWNER TO PROVIDE TEMPORARY WATERING.
SEED MIXTURE: SUDAS TYPE 1 SEED MIXTURE (PERMANENT LAWN MIXTURE) OR APPROVED EQUAL.
C. TOPSOIL
STRIP, STOCKPILE, AND RESPREAD EXISTING TOPSOIL IN ALL AREAS TO BE SEEDED. THE DEPTH OF TOPSOIL SHALL BE A MINIMUM OF 6" AFTER NATURAL SETTLEMENT AND SHALL CONFORM SMOOTHLY TO THE ADJACENT LINES, GRADES, AND ELEVATIONS. PROVIDE ADDITIONAL TOPSOIL IF EXISTING TOPSOIL IS NOT PROPERLY
HANDLED AND PROTECTED.
NOTE: FACILITY ELEVATOR SHALL NOT BE USED
BY CONTRACTORS FOR MATERIAL HANDLING
AND REMOVAL OF DEMOLITION MATERIAL.
UTILIZE EAST STAIRS, OPENING FROM NORTH
STAIR DEMO OR ACCESS THROUGH LOUVERS.
1. CODES:
A. INTERNATIONAL BUILDING CODE (IBC) 2018
B. AMERICAN CONCRETE INSTITUTE - BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE (ACI 318)
C. AMERICAN CONCRETE INSTITUTE - BUILDING CODE REQUIREMENTS FOR MASONRY
STRUCTURES (ACI 530)
D. AMERICAN INSTITUTE OF STEEL CONSTRUCTION - SPECIFICATION FOR STRUCTURAL
STEEL BUILDINGS (AISC 360)
ALLOWABLE STRENGTH DESIGN (ASD)
E. AMERICAN SOCIETY OF CIVIL ENGINEERS AND STRUCTURAL ENGINEERING INSTITUTE
(ASCE/SEI 7) - MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
F. AMERICAN WELDING SOCIETY D1.1
2. DESIGN LOADS PER THE 2018 IBC (RISK CATEGORY II)
A. DEAD LOADS
STRUCTURE SELF WEIGHT AS SHOWN
CEILING, MEP & FP 10 PSF
ROOFING SYSTEM 10 PSF
B. LIVE LOADS
TYPICAL ROOF LIVE LOAD - 20 PSF
TYPICAL FLOOR LIVE LOADS (REDUCIBLE PER IBC 1607.10)
CORRIDORS 100 PSF
STAIRS STRUCTURE (UNREDUCIBLE) 100 PSF
STAIR TREADS 300 LBS OR 100 PSF
MECHANICAL ROOMS (UNREDUCIBLE) 150 PSF
C. ROOF SNOW LOAD
GROUND SNOW LOAD, Pg 20 PSF FLAT ROOF SNOW LOAD, Pf 20 PSF SNOW EXPOSURE FACTOR, Ce 1.0 SNOW IMPORTANCE FACTOR, Is 1.0 THERMAL FACTOR, Ct 1.2
D. DEFLECTION CRITERIA
a. FLOOR LIVE LOAD L/360
3. SOILS INFORMATION BASED ON ASSUMED SOILS PER IBC 2018, TABLE 1806.2 "PRESUMPTIVE
LOAD-BEARING VALUES".
NET ALLOWABLE SOIL BEARING PRESSURES:
SPREAD FOOTINGS 1500 PSF
CONTINUOUS WALL FOOTINGS 1500 PSF
DESIGN INFORMATION
1. THE GENERAL STRUCTURAL NOTES ARE INTENDED TO SUPPLEMENT THE DRAWINGS AND
SPECIFICATIONS. SHOULD CONFLICTS EXIST BETWEEN THESE DRAWINGS AND THE
SPECIFICATIONS NOTIFY THE ENGINEER OF ANY SUCH CONFLICTS.
2. STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION WITH ALL PROJECT DRAWINGS AND
SPECIFICATIONS. REFER TO ALL DRAWINGS FOR THE COORDINATION OF THE WORK IN THIS
PROJECT.
3. THE INTENT OF THESE PLANS AND NOTES IS TO PRESENT THE PROJECT REQUIREMENTS.
MAJOR DETAILS HAVE BEEN SHOWN ON THE DRAWINGS. HOWEVER, CERTAIN MINOR DETAILS
MUST BE WORKED OUT IN THE FIELD OR SHOP DRAWING PROCESS BY THE CONTRACTOR.
4. UNLESS NOTED OTHERWISE, DETAILS SHOWN ON DRAWINGS ARE TO BE CONSIDERED TYPICAL
FOR ALL SIMILAR CONDITIONS.
5. THE STRUCTURE IS DESIGNED TO BE STABLE AND SELF-SUPPORTING AFTER THE BUILDING IS
FULLY ERECTED A ND ALL CONNECTIONS ARE COMPLETED. UNLESS NOTED OTHERWISE, THE
DRAWINGS DO NOT INDICATE THE MEANS AND METHODS OF CONSTRUCTION. IT IS SOLELY THE
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE ERECTION PROCEDURE AND SEQUENCING
TO ENSURE THE SAFETY OF THE BUILDING AND ITS COMPONENT PARTS DURING ERECTION.
THIS INCLUDES THE ADDITION TEMPORARY BRACING, GUYS AND TIE-DOWNS NECESSARY FOR
THE ERECTION PROCESS.
6. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO FOLLOW THE APPLICABLE SAFETY CODES
AND REGULATIONS DURING ALL PHASES OF CONSTRUCTION.
7. CONTRACTOR'S CONSTRUCTION AND ERECTION SEQUENCE SHALL CONSIDER THE EFFECTS OF
THERMAL MOVEMENTS OF THE STRUCTURAL ELEMENTS DURING THE CONSTRUCTION PERIOD.
8. EXISTING CONDITIONS:
A. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL DIMENSIONS AND CONDITIONS
RELATING TO EXISTING CONSTRUCTION AND EXISTING SERVICES ON SITE. THE
CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND LOCATIONS OF EXISTING COLUMNS,
WALLS, OPENINGS, ETC, WITH THE DRAWINGS PRIOR TO PROCEEDING WITH THE WORK.
ANY DISCREPANCIES WITH THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE
ARCHITECT AND ENGINEER BEFORE PROCEEDING WITH THE AFFECTED PART OF THE
WORK.
B. DURING CONSTRUCTION THE CONTRACTOR MAY ENCOUNTER EXISTING CONDITIONS WHICH
ARE NOT KNOWN OR ARE AT VARIANCE WITH PROJECT DOCUMENTATION (DISCOVERY).
SUCH CONDITIONS MAY INTERFERE WITH THE NEW CONSTRUCTION OR REQUIRE
PROTECTION AND/OR SUPPORT OF EXISTING WORK DURING CONSTRUCTION. IT MAY ALSO
CONSIST OF DAMAGED OR DETERIORATION OF STRUCTURAL MATERIALS OR COMPONENTS
WHICH COULD JEOPARDIZE THE STRUCTURAL INTEGRITY OF THE BUILDING(S). THE
CONTRACTOR SHALL NOTIFY THE ENGINEER OF ALL DISCOVERIES WHICH MAY INTERFERE
WITH THE PROPER EXECUTION OF THE WORK OR JEOPARDIZE THE STRUCTURAL INTEGRITY
OF THE BUILDING(S) PRIOR TO PROCEEDING WITH THE WORK RELATED TO SUCH
DISCOVERIES.
C. DURING THE CONSTRUCTION PROCESS, IT SHALL BE SOLELY THE CONTRACTOR'S
RESPONSIBILITY TO MAINTAIN THE INTEGRITY OF THE EXISTING STRUCTURE AND TO
PROTECT IT FROM DAMAGE ANY PORTIONS THAT ARE TO REMAIN.
D. CONTRACTOR SHALL INVESTIGATE THE SITE DURING EARTHWORK OPERATIONS FOR FILL
MATERIAL OR BURIED STRUCTURES. IMMEDIATELY, NOTIFY THE ENGINEER IF ANY SUCH
MATERIALS OR STRUCTURES ARE DISCOVERED.
9. STRUCTURAL COORDINATION
A. ELECTRICAL LOADS, OPENINGS AND SUPPORT FRAMING ARE SHOWN FOR BIDDING
PURPOSES ONLY. CONTRACTOR SHALL OBTAIN APPROVAL OF THE ELECTRICAL
CONTRACTOR BEFORE PROCEEDING WITH SUCH PORTION OF THE WORK.
B. THE CONTRACTOR SHALL VERIFY THE SIZE AND LOCATION OF ALL OPENINGS, HOLES AND
SLEEVES THROUGH FOUNDATIONS AND OTHER STRUCTURAL ELEMENTS WITH THE
ELECTRICAL CONTRACTOR. NO OPENINGS SHALL PASS THROUGH STRUCTURAL MEMBERS
UNLESS SHOWN ON THE DRAWINGS OR APPROVED BY THE ENGINEER.
C. EXCESS COST DUE TO VARIATION IN THE STRUCTURE TO ACCOMMODATE A SUBSTITUTION
OR ALTERNATE MANUFACTURER(S) FROM THE LISTED BASIS OF DESIGN SHALL BE BORNE
BY THE CONTRACTOR.
10. BEFORE SUBMITTING A BID, EACH BIDDER SHALL VISIT THE SITE AND BECOME FULLY
ACQUAINTED WITH THE EXISTING CONDITIONS, CONSTRUCTION REQUIREMENTS,
RESTRICTIONS, QUANTITIES AND EQUIPMENT NECESSARY TO COMPLETE THE WORK. THE BID
SHALL INCLUDE ALL ITEMS REQUIRED TO COMPLETE THE WORK WITHIN THE EXISTING
CONDITIONS. DISRUPTION OF THE OWNERS NORMAL ACTIVITIES AROUND THE CONSTRUCTION
SITE SHALL BE KEPT TO A MINIMUM.
11. THE COST OF ADDITIONAL DESIGN WORK DUE TO ERRORS AND OMISSIONS BY THE
CONTRACTOR DURING CONSTRUCTION SHALL BE BORNE BY THE RESPONSIBLE CONTRACTOR.
12. ANY ENGINEERING DESIGN PROVIDED BY OTHER AND SUBMITTED FOR REVIEW OR RECORD
SHALL BEAR THE STAMP AND SIGNATURE OF A PROFESSIONAL STRUCTURAL ENGINEER
REGISTERED IN THE STATE WHERE THE PROJECT EXISTS.
13. CONTRACTOR SHALL COORDINATE WORK SCHEDULES WITH THE OWNER TO ESTABLISH
CONSTRUCTION SEQUENCING AROUND ANY OCCUPIED AREAS. CONTRACTOR SHALL NOT
PROCEED TO OCCUPIED AREAS UNTIL AUTHORIZED BY THE OWNER.
14. ALL ELEMENTS AND SURFACES DAMAGED BY DEMOLITION, BUT NOT SCHEDULED FOR REMOVAL
SHALL BE REPAIRED AND REFINISHED TO MATCH THE ADJACENT SURFACES AT NO ADDITIONAL
COST TO THE OWNER.
15. CONTRACTOR SHALL REMOVE ALL DEBRIS AND WASTE MATERIALS RESULTING FROM
CONSTRUCTION FROM THE SITE, UNLESS NOTED OTHERWISE.
16. CONTRACTOR SHALL MINIMIZE CREATION OF DUST, DIRT AND WINDBORNE DEBRIS FROM
BLOWING ACROSS THE SITE AND ONTO ADJACENT SITES.
17. CONTRACTOR SHALL COVER ANY EXTERIOR OPENING WITH TEMPORARY CLOSURES WHEN NOT
WORKING ON SITE TO PROTECT THE INTERIOR SPACES FROM WEATHER, INSECTS, RODENTS
AND INTRUDERS.
GENERAL NOTES
1. ALL CONCRETE SHALL CONFORM TO THE LATEST REQUIREMENTS OF THE AMERICAN
CONCRETE INSTITUTES PUBLICATIONS: ACI 301, ACI 305.1, ACI 306.1, ACI 315, AND ACI 318
UNLESS NOTED OTHERWISE.
2. CONCRETE COMPRESSIVE STRENGTH (28 DAY)(F'c)
FOUNDATION WALLS 4000 PSI
SLAB ON GRADE 4000 PSI
ELEVATED STAIRS 4000 PSI
3. CONCRETE REINFORCEMENT STANDARDS:
DEFORMED BARS ASTM A615 Fy = 60 KSI WELDED WIRE REINFORCEMENT (WWR) ASTM A1064 Fy = 65 KSI
SYNTHETIC MACRO FIBER REINFORCING ASTM C1116
EPOXY COATED REINFORCING ASTM A775 Fy = 60 KSI
4. ALL CONCRETE SHALL BE STONE AGGREGATE UNLESS NOTED OTHERWISE. SUBMIT MIX DESIGN
AND DOCUMENTATION FOR APPROVAL PER ACI 318.
5. REINFORCEMENT PROTECTION
A. CONCRETE PLACED AGAINST EARTH - 3"
B. CONCRETE PLACED IN FORMS BUT EXPOSED TO WEATHER OR EARTH:
a. BARS #5 AND SMALLER - 1 1/2"
b. BARS LARGER THAN #5 - 2"
C. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH GROUND:
a. SLABS, WALLS, AND JOISTS - 3/4"
b. BEAMS, COLUMNS - 1 1/2"
6. WHERE REQUIRED, DOWELS SHALL MATCH THE SIZE, NUMBER AND SPACING OF THE MAIN
REINFORCING UNLESS NOTED OTHERWISE.
7. ALL SPLICES, STANDARD HOOKS, AND DEVELOPMENT LENGTHS TO BE PER THE REFERENCED
EDITION OF ACI 318. MAKE BARS CONTINUOUS AROUND CORNERS. ALL SPLICES SHALL BE BY
CONTACT LAP.
8. ALL SPLICES SHALL BE A CLASS "B" TENSION SPLICE AS DEFINED IN ACI 318. PROVIDE LAP
SPLICES LENGTHS AS FOLLOWS:
LAP SPLICE LENGTHS GIVEN, ASSUME CLEAR SPACING BETWEEN BARS OF 2 BAR DIAMETERS,
AND A MINIMUM CLEAR COVER OF 1 BAR DIAMETER. TOP BARS ARE DEFINED AS HORIZONTAL
BARS WITH MORE THAN 12" ON FRESH CONCRETE BENEATH THE BARS.
9. WALLS AND GRADE BEAMS SHALL NOT HAVE JOINTS IN A HORIZONTAL PLANE, UNLESS
APPROVED BY THE ENGINEER.
10. CONSTRUCTION JOINTS IN STRUCTURAL CONCRETE WORK MUST BE MADE AT CENTER OF
SPAN OR AT CENTER OF SUPPORT WITH VERTICAL BULKHEADS AND HORIZONTAL KEYS,
UNLESS OTHERWISE SHOWN.
11. THERE SHALL BE NO ADDITIONAL OPENINGS LARGER THAN 10" IN CONCRETE WALLS AND SLABS
NOT SHOWN. REFER TO CONCRETE OPENING DETAIL FOR ADDITIONAL REINFORCEMENT
AROUND OPENINGS.
12. REINFORCING STEEL SHALL BE SECURELY FASTENED INTO FORMS PRIOR TO POURING
CONCRETE. WET SETTING OF REINFORCING STEEL WILL NOT BE ACCEPTED PER ACI.
13. CONCRETE MIX - FOUNDATION WALLS
COARSE AGGREGATE 100% PASSING 1" SIEVE
FINE AGGREGATE 100% PASSING 3/8" SIEVE
WATER/CEMENT RATIO 0.45
SLUMP (NO WATER REDUCER) 4" +/- 1"
SLUMP (WITH WATER REDUCER) 4" TO 8"
AIR CONTENT 6% +/- 1.5%
14. CONCRETE MIX - SLAB ON GRADE - INTERIOR
COARSE AGGREGATE 100% PASSING 1" SIEVE
FINE AGGREGATE 100% PASSING 3/8" SIEVE
WATER/CEMENT RATIO 0.5
SLUMP (WITH WATER REDUCER) 4" TO 6"
AIR CONTENT LESS THAN 3%
15. CONCRETE MIX - ELEVATED STAIRS
COARSE AGGREGATE 100% PASSING 3/4" SIEVE
FINE AGGREGATE 100% PASSING NO.8 SIEVE
WATER/CEMENT RATIO 0.45
SLUMP (WITH WATER REDUCER) 4" TO 6"
AIR CONTENT 6% +/- 1.5%
BAR SIZE
#3
#4
#5
#6
#7
#8
#9
#10
#11
TYPICAL
19"
25"
31"
37"
54"
62"
70"
79"
87"
TOP BARS
25"
33"
41"
49"
71"
81"
91"
102"
114"
4000 PSI
CAST-IN-PLACE CONCRETE
1. STRUCTURAL STEEL SHALL CONFORM TO THE REFERENCED EDITION OF THE AISC
"SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS".
2. STRUCTURAL STEEL MATERIAL STANDARDS
WIDE FLANGE SECTIONS ASTM A992 Fy = 50 KSI ANGLES, CHANNELS & PLATES ASTM A36 Fy = 36 KSI SQUARE AND RECTANGULAR HSS ASTM A500, GR C Fy = 50 KSI ROUND HSS ASTM A500, GR C Fy = 46 KSI STANDARD PIPE SECTIONS ASTM A53, GR B Fy = 35 KSI
3. STRUCTURAL STEEL CONNECTION STANDARDS:
HIGH STRENGTH BOLTS ASTM F3125 GRADE A325
HEAVY HEX NUT ASTM A563
WASHERS ASTM F436
ANCHOR RODS ASTM F1554 GRADE 36
WELDING ELECTRODES (CARBON STEEL) AWS 5.1, E70XX
4. WELDING SHALL BE IN ACCORDANCE WITH STRUCTURAL WELDING CODE, AWS D1.1, LATEST
EDITION, AND SHALL BE PERFORMED BY CERTIFIED WELDERS ONLY USING PROPER
ELECTRODES FOR MATERIAL BEING WELDED. PROVIDE WELD SIZE IN ACCORDANCE WITH AISC
SPECIFICATIONS, BUT NOT LESS THAN 3/16" FILLET, CONTINUOUS UNLESS OTHERWISE NOTED.
5. ALL HIGH STRENGTH BOLTS SHALL BE INSTALLED IN ACCORDANCE WITH RCSC -
"SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS." SEE DRAWINGS
FOR BOLTS SIZES. USE 3/4" DIAMETER, A325 BOLTS UNLESS NOTED OTHERWISE.
6. ALL BOLTED CONNECTIONS ARE BEARING TYPE, UNLESS INDICATED AS TENSION CONTROLLED
(TC) OR SLIP CRITICAL (SC). PROVIDE STANDARD HOLES FOR BEARING TYPE CONNECTION
WHICH ARE 1/16" WIDER DIAMETER THAN THE BOLT.
7. ALL EXTERIOR EXPOSURE STEEL FRAMING, STEEL LINTEL ASSEMBLIES, BRICK RELIEF ANGLES
AND CONNECTORS SHALL BE HOT DIPPED GALVANIZED. ITEMS INDICATED TO BE GALVANIZED
SHALL BE HOT-DIP GALVANIZED IN COMPLIANCE WITH ASTM A123.
8. AFTER FABRICATION, ALL STEEL SHALL BE CLEANED OF ALL RUST, LOOSE MILL SCALE AND
OTHER FOREIGN MATERIALS. STEEL SHALL BE HAND TOOLED CLEANED (SSPC-SP2) OR POWER
TOOL CLEANED (SSPC-SP3).
9. ALL STRUCTURAL STEEL WILL HAVE ONE COAT OF FABRICATOR'S STANDARD LEAD AND
CHROMATE-FREE RUST INHIBITIVE PRIMER APPLIED PRIOR TO DELIVERY TO THE JOB SITE
UNLESS NOTED OTHERWISE. ALL AREAS OF STRUCTURAL STEEL MEMBERS IN WHICH THE
PRIMER COATED SURFACE IS DAMAGED DURING CONSTRUCTION SHALL BE TOUCHED UP WITH
MATCHING PRIMER.
10. THERE SHALL BE NO FIELD CUTTING OF STRUCTURAL STEEL MEMBERS FOR THE WORK OF
OTHER TRADES WITHOUT PRIOR WRITTEN APPROVAL OF THE STRUCTURAL ENGINEER OF
RECORD.
11. CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORES, GUYS, BRACES AND OTHER
SUPPORTS DURING ERECTION TO KEEP STRUCTURAL STEEL SECURE, PLUMB AND IN
ALIGNMENT AGAINST TEMPORARY CONSTRUCTION LOADS AND LOADS EQUAL TO DESIGN
LOADS. REMOVE ALL TEMPORARY SUPPORTS WHEN PERMANENT STRUCTURAL STEEL
FRAMING AND CONNECTIONS ARE COMPLETED.
12. MAINTAIN ERECTION TOLERANCES OF STRUCTURAL STEEL WITHIN AISC 303, "CODE OF
STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES."
13. DO NOT ENLARGE MISALIGNED BOLT HOLES BY BURNING OR THERMAL CUTTING. REAM HOLES
THAT MUST BE ENLARGED TO INSTALL BOLTS.
STRUCTURAL STEEL
1. CONRACTOR SHALL SUBMIT FOR REVIEW AND APPROVAL THE FOLLOWING SUBMITTALS FOR
EACH MATERIAL INDICATED BELOW.
2. CONCRETE REINFORCING
A. SUBMIT CONCRETE REINFORCEMENT SHOP DRAWINGS IN ACCORDANCE WITH ACI 315 FOR
APPROVAL.
a. DETAIL BARS IN ACCORDANCE WITH "ACI DETAILING MANUAL", PUBLICATION SP-66 AND
THE LATEST EDITION OF ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED
CONCRETE".
3. CAST-IN-PLACE CONCRETE
A. SUBMIT CONCRETE MIX DESIGNS FOR EACH APPLICATION LOCATION INDICATED IN THE
DRAWINGS.
B. SUBMIT SHOP DRAWING OF EMBEDDED STEEL ELEMENTS AND CONNECTIONS.
4. CONCRETE UNIT MASONRY
A. SUBMIT CONCRETE MASONRY UNIT PRODUCT DATA, INDICATING COMPRESSIVE STRENGTH
OF UNITS, MORTAR AND GROUT.
B. SUBMIT SHOP DRAWINGS WITH PLANS AND ELEVATIONS INDICATING CONTROL JOINTS AND
STEEL REINFORCING TO BE INSTALLED IN WALL. INDICATE SIZE, LOCATIONS, BAR LENGTHS
AND SPLICING LENGTHS.
5. STRUCTURAL STEEL
A. STRUCTURAL STEEL SHOP DRAWINGS SHOWING COMPLETE DIMENSIONS, DETAILS, SIZES,
AND GRADES OF STEEL MEMBERS AND CONNECTIONS, SIZE, TYPE, AND NUMBER OF
WELDS SHALL BE PREPARED AND SUBMITTED FOR APPROVAL PRIOR TO FABRICATION OF
STEEL COMPONENTS.
B. STRUCTURAL STEEL SHOP DRAWINGS SHALL BE DETAILED IN COMPLIANCE WITH THE AISC
"DETAILING FOR STEEL CONSTRUCTION". STRUCTURAL STEEL SHALL BE FABRICATED AND
ERECTED IN COMPLIANCE WITH AISC 360 - "SPECIFICATION FOR STRUCTURAL STEEL
BUILDINGS."
SUBMITTALS
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P K
W Y
S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Autodesk Revit 2022
/1
/2
:4 :2
P
M
A u to d e s k D o c s /2
I D
A S
D
O C
M P
C F
F ro n t
S te p s R e p a ir
/2 -S
-2 -C e n t.
rv t
S T
R U
C T
U R
A L
G E
N E
R A
L
IN
F O
R M
A T
IO
N
A N
D S
P E
C
IA
L
IN
S P
E C
T
IO
N S
C O
N S
T R
U C
T
IO
N
C R
M
C R
M
.2
.2
S000
D O
C M
P C
F F
R O
N T
S T
E P
S R
E P
A
IR
S T
A T
E O
F I
O W
A
D A
S P
R O
J E
C T
N U
M B
E R
.0
E
W
A S
H
IN
G T
O N
S T
M
T
P L E
A S
A N
T
IA
7. The contractor is responsible for testing services that are required for material submittals and that not part of the special inspections program (e.g. aggregate tests, concrete mix designs, testing of controlled fill, materials, etc.).
6. The special inspection and quality assurance program does not relieve the contractor of his or her responsibility to perform quality control.
5. When deficiencies are identified, the contractor must take corrective actions to comply with the contract documents or remedy the deficiencies as directed by the registered design professional.
4. The contractor must cooperate with the inspections and testing agencies. Safe access must be provided to all inspection and test to be performed. This may require the contractor to provide scaffolding, ladders or lifts.
3. The contractor is responsible for scheduling inspections and tests. Sufficient notice and lead time must be allowed for the inspection and testing to be performed without impending construction operations.
2. Pre-construction meeting is to be conducted by the contractor with meeting minutes to be taken and distributed to all members attending.
Meeting minutes to include a sign-in sheet for all parties.
1. The Contractor is responsible for scheduling a pre-construction meeting (scheduled at least 5 business days before start of construction).
Meeting should include all responsible parties (A/E, SI's, Field Inspector). Meeting is for entire project, not phase of work.
CONTRACTOR'S RESPONSIBILITY REGARDING INSPECTIONS
6. Each Contractor responsible for the construction or fabrication of a system or component described above must submit a Statement of Responsibility.
X
5. Description of Wind Force-Resisting components subject to Special Inspection of Wind Resistance:
X
4. Description of main Wind Force-Resisting System subject to Special Inspection for Wind Resistance:
3. Statement for Special Inspection for Wind Resistance Required (Y/N): X
2. Wind Exposure Category: X
1. Nominal Design Wind Speed, Vasd = X
Quality Assurance Plan for Wind Requirements:
6. Each Contractor responsible for the construction and fabrication of a system or component described above must submit a Statement of Responsibility.
X
5. Description of additional Seismic Systems and components requiring Special Inspections and testing:
X
4. Description of Designated Seismic Systems subject to Special Inspections and testing for Seismic Resistance:
X
3. Description of Seismic-Force Resisting System subject to Special Inspection and testing for Seismic Resistance:
2. Statement of Special Inspections for Seismic Resistance required (Y/N): X
1. Seismic Design Category: X
Quality Assurance for Seismic Resistance:
QUALITY ASSURANCE PLAN
EDI-EIFS EIFS Third Party Inspector
Exterior Design Institute (EDI) Certification
NICET-GET Geotechnical Engineering Technician - Level I, II, III & IV
NICET-ST Soils Technician - Levels I, II, III & IV
NICET-CT Concrete Technician - Levels I, II, III, & IV
National Institute of Certification in Engineering Technologies (NICET)
ICC-PCSI Prestressed Concrete Special Inspector
ICC-SWSI Structural Steel and Welding Special Inspector
ICC-RCSI Reinforced Concrete Special Inspector
ICC-SFSI Spray-Applied Fireproofing Special Inspector
ICC-SMSI Structural Masonry Special Inspector
International Code Council (ICC) Certification
ASNT Non-Destructive Testing Technician - Level II or III
American Society of Non-Destructive Testing (ASNT) Inspection
AWS/AISC-SSI Certified Structural Steel Inspector
AWS-CWI Certified Welding Inspector
American Welding Society (AWS) Certification
ACI-STT Strength Testing Technician
ACI-LTT Laboratory Testing Technician - Grade 1 & 2
ACI-CCI Concrete Construction Inspector
ACI-CFTT Concrete Field Testing Technician - Grade 1
American Concrete Institute (ACI) Certification
EIT Engineer-In-Training - A graduate engineer who has passed the Fundaments of Engineering examination
PE/GE Geotechnical Engineer - A licensed PE specializing in soil mechanics and foundations
PE/SE Structural Engineer - A licensed SE or PE specializing in the design of building structure
When the Registered Design Professional in Responsible Charge deems it appropriate that the individual performing a stipulated test or inspection have a specific certification or license as indicated below, such designations shall appear below the Agent on the Schedule.
Key for Minimum Qualifications of Inspection Agents:
The qualifications of all personnel performing Special Inspection and testing activities are subject to the approval of the Building Official. The credentials of all Inspectors and testing technicians shall be provided if requested.
QUALIFICATIONS OF INSPECTORS AND TESTING TECHNICIANS
Interim reports shall be submitted to the Building Official and the Registered Design Professional in Responsible Charge. A Final Report of Special Inspections documenting completion of all required Special Inspections, testing and corrections of any discrepancies noted in the inspections shall be submitted prior to issuance of a Certificate of Use and Occupancy. Job site safety and means and methods of construction are solely the responsibility of the Contractor.
The Special Inspection Coordinator shall keep records of all inspections and shall furnish inspection reports to the Building Official and the Registered Design Professional in Responsible Charge. Discovered discrepancies shall be brought to the immediate attention of the Contractor for correction. If such discrepancies are not corrected, the discrepancies shall be brought to the attention of the Building Official and the Registered Design Professional in Responsible Charge. The Special Inspection program does not relieve the Contractor of his or her responsibilities.
[ ] Architectural [ ] Other
[X] Structural [ ] Mechanical / Electrical / Plumbing
This Statement of Special Inspections is submitted as a condition for permit issuance in accordance with the Special Inspection and Structural Testing requirements of the Building Code. It includes a schedule of Special Inspection services applicable to the structural components of this project. If applicable, it includes Requirements for Seismic Resistance and/or Requirements for Wind Resistance. This Statement of Special Inspections Encompasses the following disciplines:
STATEMENT OF SPECIAL INSPECTIONS
Field Inspection Continuous ICC-RCSI
11. Perform floor flatness and/or levelness testing (ASTM E1155) for all slab-on-grade and elevated slabs per specification.
ACI-CCI
10. Concrete strength testing and verification of compliance with construction documents
Field testing and review of laboratory reports
Periodic
ICC-RCSI
9. Inspection of formwork for shape, lines, location and dimensions
Field Inspection Periodic ACI-CCI
ICC-RCSI
8. Inspection for maintenance of specified curing temperature and techniques
Field Inspection Periodic ACI-CCI
ICC-RCSI
Field Inspection Continuous ACI-CCI
7. Inspect placement of concrete. Verify that concrete conveyance and depositing avoids segregation or contamination. Verify that concrete is properly consolidated.
ACI-STT
Field Inspection Continuous ACI-CFTT
6. Test concrete compressive strength (ASTM C31 & C39), slump (ASTM C143), air-content (ASTM C231 or C173) and temperature (ASTM C1064).
ICC-RCSI
Field Inspection Periodic ACI-CCI
5. Review concrete batch tickets and verify compliance with approved mix design. Verify that water added at the site does not exceed that allowed by the mix design
ICC-RCSI
Field Inspection ACI-CCI
Periodic or as required by the research report issued by an approved source
4. Inspection of anchors and reinforcing steel post-installed in hardened concrete: Per research reports including verification of anchor type, anchor dimensions, hole dimensions, hole cleaning procedures, anchor spacing, edge distances, concrete minimum thickness, anchor embedment and tightening torque
Field Inspection Periodic
3. Inspect size, positioning and embedment of anchor rods. Inspect concrete placement and consolidation around anchors
c. Shear reinforcement Continuous
Continuous
b. Reinforcing steel resisting flexural and axial forces in intermediate and special moment frames, boundary elements of special concrete structural walls and shear reinforcement
a. Verification of weldability of steel other than
ASTM A707
Periodic
2. Reinforcing steel welding Field Inspection
ICC-RCSI
ACI-CCI
1. Inspect size, spacing, cover, positioning and grade of reinforcing steel. Verify that reinforcing bars are free of form oil or other deleterious materials.
Inspect bar laps and mechanical splices. Verify that bars are adequately tied and supported of chairs or bolsters.
Field Inspection Periodic
CONCRETE CONSTRUCTION SERVICE EXTENT AGENT
Field Inspection Periodic
11. Open web steel joist. Inspect installation, field welding, and bridging of joist is in conformance with approved submittal.
Field Inspection Periodic
10. Cold-formed steel trusses spanning 60 feet or greater: Verify temporary and permanent restraint/bracing are installed in accordance with the approved truss submittal package
9. Connection of cold-formed steel deck to supporting structure: Inspect welding and side-lap fastening of metal roof and floor deck is in conformance with approved submittal.
Field Inspection Periodic
8. Material verification of cold-formed steel deck:
Identification markings
Field Inspection Periodic
7. Inspection of steel elements of composite construction prior to concrete placement: Inspect size, number, positioning and welding of shear connectors. Inspect studs for full 360 degree flash.
Ping test all shear connectors with a 3 lb. hammer.
Bend test all questionable studs to 15 degrees.
Field Inspection and testing Periodic
Periodic at all bolted connections
c. Inspection tasks After Bolting (Perform tasks for each bolted connection in accordance with QA tasks listed in AISC 360, Table N5.6-3)
2) Snug-tight joints Periodic
e) Calibrated wrench Continuous
d) Turn-of-nut without matching markings Continuous
c) Twist-off type tension control bolt Continuous
b) Direct tension indicator Continuous
a) Turn-of-nut with matching markings Continuous
1) Pre-tensioned and slip-critical joints
b. Inspection tasks During Bolting (Observe the QA tasks listed in AISC 360, Table N5.6-2)
Periodic at all bolted connections
Periodic at all bolted connections
a. Inspection tasks Prior to Bolting (Observe, or perform tasks for each bolted connection, in accordance with QA tasks listed in AISC 360, Table N5.6-1)
6. Structural steel bolting: Field Inspection
4) Fabricator's NDT reports when fabricator performs NDT
Verify reports Each submittal
Periodic
3) Welded joints subject to fatigue when required by AISC 360, Appendix 3, Table A-3.2
Field radiographic or Ultrasonic testing
2) Thermally cut surfaces of access holes when material t > 2"
Field magnetic Particle or Penetrant testing
Periodic
1) Complete penetration welds Field ultrasonic testing - 100% Periodic
d. Nondestructive testing (NDT) of welded joints:
Field Inspection Periodic at all welded joints
c. Inspection tasks After Welding (Observe, or perform for each welded joint or member, the QA tasks listed in AISC 360, Table N5.4-3)
Field Inspection Periodic at all welded joints
b. Inspection tasks During Welding (Observe, or perform for each welded joint or member, the QA tasks listed in AISC 360, Table N5.4-2)
a. Inspection tasks Prior to Welding (Observe, or perform for each welded joint or member, the QA tasks listed in AISC 360, Table N5.4-1)
Field Inspection Periodic at all welded joints
5. Structural steel welding:
Field Inspection Periodic
4. Verify member locations, braces, stiffeners, and application of joint details at each connection comply with construction documents
Field Inspection Periodic
3. Embedments: Verify diameter, grade, type, length, embedment. See Concrete Construction for anchors
ICC-SWSI
Field Inspection Periodic AWS/AISC-SSI
2. Material verification. Review certified mill test reports and identification markings on wide-flange shapes, high-strength bolts, nuts, and welding electrodes
ICC-SWSI
1. Fabricator Certification AISC Certified fabricator required by specification
Each submittal AWS/AISC-SSI
STEEL CONSTRUCTION SERVICE EXTENT AGENT
A
B C x 9(
E) x 9(
E) x 9(
E) x 9(
E)
28'-6 1/4"
10'-0 3/4" 9'-4 3/4" 9'-0 3/4"
/8
/2
/8
/8
/2
/8
TW
IS
T J A C K
TW
IS
T J A C K
TW
IS
T J A C K
F.V.
7'-3 1/2"
F.V.
7'-8 1/2"
F.V.
1'-8 1/4"
S04
S05
S06
S05
S06
T/SLAB (E) = 100'-0"
F.V.
91"
B4 S500
A4 S500
S08
A
B C
5" 8'-8 1/2"
/2
/4
/2
/8
/8
S01S01
SLOPE
DOWN
10'-0 3/4" 9'-4 3/4"
HSS12x4x3/8
SLOPE
DOWN
T/SLAB
S03
S03
S07
S07
S07
S07
S02
S02
C3 S500
109' - 9 1/4" F.V.
F.V.
91"
C4 S500
A
B C
SD01
SD03
SD03
10'-0 3/4" 9'-4 3/4" 9'-1 1/2"
/8
/8
SD03
SD03
SD01
SD04SD04
HSS8x4x1/4(D)
SD02
SD02
SD02
SLOPE
DOWN
SD05
SD06
SD07
S06S06
(BELOW)
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P K
W Y
S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Autodesk Revit 2022
/1
/2
:4 :4
P
M
A u to d e s k D o c s /2
I D
A S
D
O C
M P
C F
F ro n t
S te p s R e p a ir
/2 -S
-2 -C e n t.
rv t
P L A
N V
IE
W
S
C O
N S
T R
U C
T
IO
N
C R
M
C R
M
.2
.2
S100
D O
C M
P C
F F
R O
N T
S T
E P
S R
E P
A
IR
S T
A T
E O
F I
O W
A
D A
S P
R O
J E
C T
N U
M B
E R
.0
E
W
A S
H
IN
G T
O N
S T
M
T
P L E
A S
A N
T
IA
TRUE NORTH
NORTH
PLAN
1/4" = 1'-0"C5
FOUNDATION PLAN
6'
KEYNOTES
KEY NOTE
S01 NEW CONCRETE COATING, SEE DETAIL A3/S500 FOR MORE INFORMATION.
S02 NEW GUARDRAIL, SEE ARCH DRAWINGS FOR MORE INFORMATION.
BASEPLATE PER DETAIL B3/S500.
S03 PATCH UNDERSIDE OF SLAB OVERHANG AS REQ'D, REMOVE LOOSE
CONCRETE DOWN TO SOLID CONCRETE AND PATCH WITH CONCRETE REPAIR
MORTAR AS REQ'D.
S04 CUT HOLE THROUGH EXISTING DUCTWORK TO INSTALL TWIST JACK. SEAL
HOLE PER MECH DWGS.
S05 NEW 5" CONCRETE SLAB W/ #4 AT 18" OC ON 6" COMPACTED GRANULAR FILL.
SEE DETAIL A4/S500 FOR ATTACHMENT TO EXISTING CONCRETE SLAB.
COORDINATE W/ MECH CONTRACTOR FOR AMOUNT OF SLAB REMOVAL AND
REPLACEMENT.
S06 EXISTING CONCRETE SLAB, TO REMAIN. DEMO AS REQ'D TO INSTALL NEW
SUMP PIT AND DRAIN LINES, SEE MECH DRAWINGS FOR MORE INFORMATION.
S07 NEW SURFACE MOUNTED LIGHT POLE, SEE ELEC DRAWINGS FOR MORE
INFORMATION.
S08 CLEAN EXISTING ANGLE LINTEL TO BE FREE OF RUST AND PAINT WITH
ZINC-RICH PAINT.
TRUE NORTH
NORTH
PLAN
1/4" = 1'-0"F5
MAIN ENTRANCE FRAMING PLAN
6'0
TRUE NORTH
NORTH
PLAN
1/4" = 1'-0"A5
MAIN ENTRANCE DEMOLITION PLAN
6'
DEMOLITION KEYNOTES
KEY NOTE
SD01 REMOVE ANY LOOSE AND DELAMINATED EXISTING MEMBRANE.
PROTECT EXISTING BUILDING AND DOOR OPENING, TO REMAIN, TO
PREVENT DAMAGE FROM CLEANING.
SD02 REMOVE EXISTING GUARDRAIL AND FILL IN OPENINGS LEFT
BEHIND. SEE DETAIL A2/S500 FOR MORE INFORMATION.
SD03 REMOVE EXISTING LIGHTS AROUND PORCH. DISCONNECT
ELECTRICAL AND PATCH PATIO PENETRATIONS.
SD04 DEMOLISH EXISTING CONCRETE STAIRS, SAWCUT ALL EDGES
PRIOR TO REMOVING STAIRS. PROTECT EXISTING FUEL TANK, SEE
ARCHITECTURAL DRAWINGS FOR MORE INFO.
SD05 DEMOLISH EXISTING SUPPORT TUBE AND ANGLE IN MECHANICAL
ROOM BELOW.
SD06 REMOVE AND REINSTALL EXISTING THRESHOLD FOR PROPER
DOOR SEAL.
SD07 SEE A500 IN ARCHITECTURAL DRAWINGS FOR ADDITIONAL
DEMOLITION REQUIREMENTS.
1. PROVIDE MOCKUP PER SPECIFICATIONS
2. EXISTING COATING TO REMAIN UNLESS DAMAGED OR
DELAMINATED. CONTRACTOR SHALL REMOVE DELAMINATED
AREAS OF EXISTING COATING IN DELAMINATED AREAS AND
APPLY FULL SYSTEM PER SPECIFICATIONS. THIS WORK IS
INCIDENTAL TO THIS WORK ITEM.
3. SHOT BLAST TO PREPARE SURFACE FOR COATING ADHESION
PER MANUFACTURER RECOMMENDATIONS, WATER BLAST
WHERE SHOT BLASTING IS NOT POSSIBLE. CONTRACTOR SHALL
PROTECT ADJACENT WORK TO REMAIN FROM DAMAGE DURING
PROCESS.
4. WIPE EXISTING COATING SURFACES WITH XYLENE OR PRIME AS
RECOMMENDED BY MANUFACTURER.
5. APPLY REPLACEMENT COATING SYSTEM. SEE SPECIFICATIONS
FOR MIL THICKNESS AND SAND PLACEMENT, COLOR SUBJECT
TO OWNER APPROVAL.
6. ALL COATING EDGES SHALL BE TAPED TO PROVIDE STRAIGHT
AND SHARP LINES.
APPLY COATING DOWN AT ALL
SLAB EDGES AND COVER ALL
EXISTING COATING
NEW COATING SYSTEM
EXISTING COATING
RETURN COATING BACK UNDER
SLAB OVERHANG MINIMUM 6" OR
UNTIL FACE OF WALL
FILL HOLE WITH CONCRETE REPAIR MORTAR
AFTER REMOVAL OF EXISTING RAILING
T/WALL
103'-6"
#5 BARS @ 12" OC
#4 NOSING BAR
#5 @ 12" OC
T/SLAB
(SEE PLAN)
T/WALL
108'-11" F.V.
SITE PAVING -
SEE CIVIL DWGS
#5 DOWELS @ 12" OC, TYPICAL ALL
(4) WALLS SUPPORTING STAIRS
6"
1" TYP
M A
X
R
IS
E R
11" MAX
TREAD
3" C
LR
EXISTING FOUNDATION, TO REMAIN
EXISTING FOUNDATION,
TO REMAIN
EXISTING FLOOR SLAB, TO REMAIN
EXISTING FLOOR SLAB,
TO REMAIN
APPLY COATING TO NEW STAIR
6"
T/SLAB (E)
100'-0"
DRILL AND EPOXY ALL
DOWELS w/ SIMPSON
SET-3G OR APPROV.
EQUIV. (6" MIN EMBED)
1/2" ISOLATION JOINT AND
SEALANT, SEALANT TO HAVE
SMOOTH TOP IN PREPARATION
FOR COATING
/2
/2
1 1/2" 5" 1 1/2"
4" 4"
HSS2x2x1/4 POST
1/2" Ø SIMPSON TITEN
HD ANCHOR (4" EMBED)
PL1/2x8x0'-8"
3/16
EXISTING SLAB-ON-
GRADE PER PLAN
#4X2'-0" DOWEL AT 2'-0"
O.C.
DRILL AND GROUT 4" INTO
EXISTING SLAB
SLAB-ON-GRADE
PER PLAN
CLR
1 1/2"
F.V.
1'-0 1/4"
(2) #5xCONT. HORIZONTAL BARS AND #5 AT 12" OC
VERTICAL BARS, DRILL AND EPOXY INTO EXISTING
CONCRETE w/ HILTI HY200 (4 1/2" EMBED)
(2) #5xCONT. HORIZONTAL BARS AND #5 AT 12" OC
VERTICAL BARS, DRILL AND EPOXY INTO EXISTING
CONCRETE w/ HILTI HY200 (4 1/2" EMBED), STOP
REINFORCING AT EXISTING CMU PIER AND
RESUME REINFORCEMENT AFTER CMU PIER
WATERSTOP, CONTINUOUS UP SIDES
EXISTING FOUNDATION WALL, TO REMAIN
3/4" CHAMFER, TYP
COORD. T/WALL w/ MECH. LOUVER DRAWING 1"
F.V.
8"
BEARING
104'-5" F.V.
A
A
TUBE PER PLAN, GALV, LSH, SHIM
AS REQ'D w/ PL1/4x7x11 TO
ACHIEVE PROPER BEARING
ELEVATION OF EXTERIOR GRATING
1/2" Ø TITEN HD (OR APPR. EQUIV.)
w/ 1 1/2" MIN EMBED
EXISTING CONCRETE WALL
/2
SECTION A-A:
TUBE PER PLAN, GALV., LSH
L2x2x1/4, GALV, HOLD ANGLE
1" SHORT OF BEARING LEDGE
3/16 3-12
STAGGERED
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P K
W Y
S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Autodesk Revit 2022
/1
/2
:4 :0
P
M
A u to d e s k D o c s /2
I D
A S
D
O C
M P
C F
F ro n t
S te p s
R e p a ir
/2 -S
-2 -C e n t.
rv t
D E
T A
IL
S
C O
N S
T R
U C
T
IO
N
C R
M
C R
M
.2
.2
S500
D O
C M
P C
F F
R O
N T
S T
E P
S R
E P
A
IR
S T
A T
E O
F I
O W
A
D A
S P
R O
J E
C T
N U
M B
E R
.0
E
W
A S
H
IN
G T
O N
S T
M
T
P L E
A S
A N
T
IA
01" = 1'-0"A3
REPLACEMENT COATING DETAIL
1'-6"
01" = 1'-0"A2
EXISTING RAILING INSTALLATION DETAIL
1'-6"
01" = 1'-0"C3
CONCRETE STAIR REPLACEMENT DETAIL
1'-6"
01 1/2" = 1'-0"B3
RAILING BASEPLATE
1'
01" = 1'-0"A4
DOWELED SLAB CONNECTION
1'-6" 01" = 1'-0"B4
LOUVER FOUNDATION WALL DETAIL
1'-6" 01" = 1'-0"C4
LOUVER LINTEL BEARING DETAIL
1'-6"
M
B C
C
A
A3 A101
G3 A101
NEW LOUVER
GENERATOR
ROOM
EXISTING FUEL
STORAGE
NEW CONCRETE STAIR, SEE STRUCTURAL
FOR ADDITIONAL INFORMATION
NEW LOUVER OVER EXISTING DAMPER (TOP)
EXISTING DAMPER BELOW BEAM TO REMAIN
NEW SIDEWALK, SEE CIVIL FOR
ADDITIONAL INFORMATION
EXISTING EMERGENCY
GENERATOR
1 2
5 4
EXISTING DOOR AND FRAME
EXISTING OPENING
AND CURB
NEW AREA DRAIN, SEE
MECHANICAL FOR
ADDITIONAL INFORMATION
EXISTING AREA
WELL, COVERED
WITH A GRATE
EXISTING DAMPER
SHEET A101
NEW COLUMN, SEE
STRUCTURAL FOR ADDITIONAL
INFORMATION, SEAL JOINT
BETWEEN COLUMNS AND
DUCT, SEE MECHANICAL FOR
INFORMATION ON DUCT
EXISTING CONCRETE
WALLS, CONFIRM
DIMENSIONS
A
B C
C
A
A3 A101
G3 A101
E Q
/4
/2
/4
/2
19'-10 1/2" 8'-8 1/2"
NEW METAL
HANDRAIL, 36"
FROM TREAD LINE
TO TOP OF RAILING
NEW METAL
GUARDRAIL
E Q
D2 A101
A2 A101
A2 A101
D2 A101
LANDING
SEE GENERAL NOTE 3
NEW LIGHT POLE
AND FIXTURE
NEW LIGHT POLE
AND FIXTURE
NEW LIGHT POLE
AND FIXTURE
NEW LIGHT POLE
AND FIXTURE
NEW METAL
GUARDRAIL
EXISTING
BUILDING
NEW COATING ON STAIRS
SEAL JOINT
AT BUILDING
EXISTING ALUMINUM
ENTRANCE AND
STOREFRONT
REMOVE THRESHOLD TO
INSTALL NEW COATING ON
SLAB, REINSTALL THRESHOLD IN
A FILL BED OF SEALANT
EXTEND HANDRAIL
1'-0" BEYOND FIRST
RISER
1'-0"1
RETURN HANDRAIL BACK TO
GUARDRAIL VERTICAL
A B C
109' - 9 1/4"
MAIN LEVEL
AREA WELL
EXISTING STONE NEW STONE CLADDING
(HATCHED AREA)
EXISTING GRATE,
REMOVE TO
PAINT, REINSTALL
NEW STEEL BEAM AND ANGLE,
SEE STRUCTURAL FOR
ADDITIONAL INFORMATION,
PAINT BEAM
EXISTING DAMPER TO REMAIN
EXISTING FIBER OPTICS
CONNECTION PANEL
NEW PREFINISHED
SHEET METAL OVER
EXISTING PANEL
NEW LOUVER, SEE MECHANICAL
FOR ADDITIONAL INFORMATION
NEW CONCRETE STAIRS,
SEE STRUCTURAL FOR
ADDITIONAL INFORMATION
NEW LIGHT POLE AND FIXTURE
NEW METAL GUARDRAIL
EXISTING LANDING
SLAB W/ NEW COATING
EXISTING STONE
NEW METAL GUARDRAIL
GRADE AT WALL
FACE OF BUILDING WALL
SEAL JOINT BETWEEN
NEW BEAM AND DAMPER
SEAL JOINT BETWEEN
DAMPER AND WALL
A2 A101
F2 A101
SIM.
F1 A101
SIM.
E2 A101
GUARDRAIL VERTICAL
HANDRAIL EXTENSION,
EXTEND 1'-0" BEYOND THE
BOTTOM RISER
NEW PIPE PENETRATION,
SEE PLUMBING
SEAL AROUND
PENETRATION WITH
BACKER ROD AND SEALANT
10'-0" LONG, 22 GA. PREFINISH
METAL DRIP, SECURE TO
SLAB AT 12" O.C., CENTER ON
AREA WELL
109' - 9 1/4"
MAIN LEVEL
NEW METAL GUARDRAIL
B2
A101 TYPICAL AT
LIGHT POLES
EXISTING STONE
NEW CONCRETE STAIRS,
SEE STRUCTURAL FOR
ADDITIONAL INFORMATIONNEW METAL GUARDRAIL
NEW METAL HANDRAIL
NEW LIGHT POLE AND FIXTURE
EDGE OF LANDING SLAB
EXISTING STONE
EDGE OF LANDING SLAB
AyABC
109' - 9 1/4"
MAIN LEVEL
NEW CONCRETE CURB
PREFINISHED
SHEET METAL
ENCLOSURE PANEL
NEW LOUVER, SEE
MECHANICAL FOR
ADDITIONAL INFORMATION
A2 A101
EXISTING STONE
NEW STONE CLADDING
(HATCHED AREA)
NEW CONCRETE STAIRS,
SEE STRUCTURAL FOR
ADDITIONAL INFORMATION
EXISTING STONE
EXISTING STONE
EXISTING FACE BRICK
F2 A101
G2 A101
G1 A101
F1 A101
EDGE OF LANDING SLAB
FACE OF EXISTING BUILDING WALL
NEW LIGHT POLE
AND FIXTURE
HANDRAIL EXTENSION
GUARDRAIL VERTICAL
GENERAL NOTES - FLOOR PLAN:
1. VERIFY EXISTING CONDITIONS, NOTIFY
ARCHITECT OF ANY DISCREPANCIES
2. AT PENETRATIONS THROUGH STONE, REMOVE
REMAINING MATERIAL, CLEAN JOINT, INSTALL
BACKER ROD AND NEW SEALANT TO MAKE
JOINT WATERTIGHT.
3. REMOVE LOOSE AND DAMAGED COATING ON
LANDING SLAB AND EDGE. PREPARE SURFACE
FOR NEW COATING. LEVEL AND FILL VOIDS IN
SURFACE AND ON THE EDGE. LEVELING AND
PATCHING MATERIALS TO BE COMPARABLE
WITH COATING.
4. NEW COATING ON LANDING, STAIR AND SLAB
EDGE INCLUDES PRIMER, BASE COAT,
INTERMEDIATE COAT AND TOP COAT WITH
AGGREGATES.
5. ALL STONE JOINTS TO BE REPOINTED.
DAMAGED MORTAR REMOVED AND NEW
MORTAR INSTALLED. SEE A500 FOR
PHOTOGRAPHS.
6. HANDRAILS ON STAIR TO BE 3'-0" ABOVE STAIR
NOSING LINE AND EXTEND AT TOP AND BOTTOM
OF STAIR 1'-0". AT THE EXTENSION RETURN
HANDRAIL TO THE VERTICAL OF THE GUARDRAIL
EXPANSION JOINT, SEE DETAIL
FLOOR PLAN SYMBOLS LEGEND
CONTROL JOINT
VANTAGE POINT OF PHOTOGRAPH
(APPROXIMATE) SEE SHEET A500
UNLESS NOTED OTHERWISE
E.J.
C.J.
BEAM TO BE REMOVED AND
REPLACED, SEE
STRUCTURAL FOR
ADDITIONAL INFORMATION
EXISTING DAMPER AND SHEET
METAL PANEL TO REMAIN
EXISTING AREA WELL
CONCRETE WALL
SEAL JOINT BETWEEN
SHEET METAL AND WALL
SEAL JOINT BETWEEN
DAMPER AND WALL
SEAL JOINT BETWEEN NEW BEAM AND WALL
3 1/2" 3" 3 1/2"
/2
/2
/2
LIGHT POLE (3" x 3")
2" x 3" STEEL TUBE VERTICALS
2" x 3" STEEL TUBE TOP
RAIL
1 1/4" x 1 1/4"" STEEL BAR
VERTICALS @ 5" O.C.
1/2" x 1 1/2" STEEL BAR
BOTTOM RAIL
METAL COVER
OVER BASEPLATE
ALL CONNECTIONS
FULLY WELDED
EDGE OF SLAB
ALL STEEL TO
BE GALVANIZED
PAINT RAILING BLACK
EDGE OF SLAB
COVER OVER BASEPLATE
LIGHT POLE
GUARDRAIL
EDGE OF STAIR
HANDRAIL - 1 1/4"
STEEL PIPE
HANDRAIL BRACKET
+3'-0" ABOVE LANDING
AND STAIRS
3" X 3" STEEL TUBE POST
1'-0"
/2
/2
2"
/4
BASEPLATE W/ COVER
@ LANDING, SEE
STRUCTURAL
FACE OF BUILDING
3"
EDGE OF LANDING
2"x3" GALVANIZED
STEEL TUBE
HORIZONTAL RAIL BELOW
CHAMFER EDGE OF SLAB
NEW CONCRETE
CURB
NEW LOUVER
NEW ALUMINUM
SUBSILL
SEALANT AND
BACKER ROD
EXISTING
FACE BRICK
SEALANT AND
BACKER ROD
NEW LOUVER
EXISTING
FACE BRICK
NEW LOUVER
SEALANT AND
BACKER ROD
SEALANT
NEW LOUVER
EXISTING PIER
TREATED WOOD
BLOCKING
5/8" PLYWOOD
SHEATHING
SELF-ADHERING
WATERPROOF MEMBRANE PREFINISHED
METAL ENCLOSURE
SEALANT
NEW STEEL BEAM,
SEE STRUCTURAL
PAINT
NEW LOUVER,
SEE MECHANICAL
NEW ALUMINUM
SUBSILL
SEALANT AND
BACKER ROD
EXISTING GRATE
STEEL ANGLE TO
SUPPORT GRATE,
SEE STRUCTURAL
PAINT
EXISTING LOUVER
SEALANT
SEALANT
A P
P R
O V
E D
B Y
D R
A W
N B
Y
IS
S
U E
D F
O R
IS
S
U E
D A
T E
P R
O J E
C T
N U
M B
E R
F
IE
L D
B O
O K
W
E S
T O
W N
P A
R K
W A
Y S
U
IT
E
W E
S T
D E
S M
O
IN
E S
IA
.2
.8
S
H
IV
E -H
A T
T E
R Y
.C O
M
BA D E
FC G
H
BA D E FC G H
Revit VersionRevit Version
/2
/2
:5 :4
A
M
A u to d e s k D o c s /2
I D
A S
D
O C
M P
C F
F ro n t
S te p s R e p a ir
/2 -A
-2 -C e n t.
rv t
F
IR
S T
F L O
O R
P L A
N
C O
N S
T R
U C
T
IO
N
F ie ld B o o k
P J P
Z C
G
.2
.2
A101
D O
C M
P C
F F
R O
N T
S T
E P
S R
E P
A
IR
S T
A T
E O
F I O
W A
C L
IE
N T
P R
O J E
C T
N U
M B
E R
.0
E
W
A S
H
IN
G T
O N
S T
M
T P
L E
A S
A N
T
IA
NORTH
01/8" = 1'-0"F6
LOWER LEVEL FLOOR PLAN
12'
NORTH
01/8" = 1'-0"D6
MAIN LEVEL FLOOR PLAN
12'
01/4" = 1'-0"A3
EAST ELEVATION
01/4" = 1'-0"C3
NORTH ELEVATION
01/4" = 1'-0"G3
WEST ELEVATION
NOT TO SCALEA6
EAST SIDE AREA WELL
03/4" = 1'-0"B2
RAILING AT LIGHT POLE
2' 01" = 1'-0"D2
RAILING AT STAIR
1'-6"03" = 1'-0"A2
END RAILING VERTICAL
6"
03" = 1'-0"G2
LOUVER SILL
03" = 1'-0"G1
LOUVER HEAD
03" = 1'-0"F1
LOUVER JAMB
03" = 1'-0"F2
LOUVER JAMB AT MULLION
03" = 1'-0"E2
LOUVER SILL AT STEEL BEAM
6"
ALL STONE JOINTS TO BE REPOINTED
SEE PHOTOGRAPHS ON A500 FOR
CONDITION OF STONE JOINTS
CLEAN ALL STONE
REMOVE LOOSE MATERIAL,
CUT OUT REMAINING MORTAR
TO A DEPTH OF 3/4", AND
TUCKPOINT ALL STONE
JOINTS
REMOVE ROOF STRUCTURE
EXISTING CONCRETE
CURB TO REMAIN
REPAIR STONE AROUND
PENETRATION, SEAL JOINT
PATCH EDGE OF SLAB
DRILL OUT BOLT TO A DEPTH
OF 3/4", PATCH HOLE, TYPICAL
FOR ALL LOCATIONS
EXISTING BUILDING
EXISTING FIBER
OPTICS CONNECTION
PANEL TO REMAIN
REMOVE PORTION OF
THE METAL PANEL
EXISTING PORTION
OF METAL PANEL
BEHIND AND BELOW
FIBER OPTIC PANEL
TO REMAIN
EXISTING CURB TO REMAIN
REPLACE DAMAGED STONE
REMOVE LOOSE MATERIAL,
CUT OUT REMAINING MORTAR
TO A DEPTH OF 3/4", AND
TUCKPOINT ALL STONE
JOINTS
REMOVE WOODEN ROOF STRUCTURE
EXISTING ACCESS BOX,
RESET LEVEL, PAINT
SEAL AROUND PENETRATION
PATCH HOLES IN STONE
REPAIR STONE AT JAMB
SEAL AROUND PENETRATION
PATCH HOLE IN EDGE OF CONCRETE
PATCH HOLE IN CONCRETE
CLEAN ALL STONE
REMOVE LOOSE MATERIAL,
CUT OUT REMAINING MORTAR
TO A DEPTH OF 3/4", AND
TUCKPOINT ALL STONE
JOINTS
REPAIR EDGE OF SLAB
GENERATOR EXHAUST PIPE
REMOVE SEALANT, INSTALL NEW
HEAT RESISTANT SEALANT
AROUND PENETRATION
REMOVE FORIEGN
SUBSTANCE FROM STONE
REMOVE COATING
SPLATTERS FROM STONE
REMOVE RAILING IN
ITS ENTIRETY
REPAIR ENTIRE
FACE OF STONE
CLEAN ALL STONE
REMOVE LOOSE MATERIAL,
CUT OUT REMAINING MORTAR
TO A DEPTH OF 3/4", AND
TUCKPOINT ALL STONE
JOINTS
EXISTING ALUMINUM ENTRANCE
DOORS & SIDELIPES
REMOVE RAILING
IN ITS ENTIRETY
STEPS TO BE REMOVED
SEE STRUCTURAL FOR
ADDITIONAL INFORMATION
REMOVE BLOCKS
AND INSTALL NEW
STONE CLADDING
REPLACE DAMAGED STONE
REMOVE LOOSE MATERIAL,
CUT OUT REMAINING MORTAR
TO A DEPTH OF 3/4", AND
TUCKPOINT ALL STONE
JOINTS
REPAIR CONCRETE PATCH
REMOVE ALL RAILING
IN ITS ENTIRETY
REMOVE LIGHT POLE,
ALL 4
REMOVE RAILING
IN ITS ENTIRETY
STEPS TO BE
REMOVED AND
REPLACED WITH NEW
CONCRETE STEPS
SEE STRUCTURE FOR
ADDITIONAL
INFORMATION
SEE CIVIL FOR
INFORMATION ON THE
EXISTING SIDEWALK
REMOVE BLOCKS
AND INSTALL NEW
STO…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .