Addendum No. 1 for the DHS IMHI Storage Bldg Roof Replacement project was issued by the State of Iowa Department of Administrative Services (DAS) on January 23, 2023, for Project #9247.00. The addendum provides clarification on two key technical questions regarding ridge cap materials and metal flashing, and includes minutes from the pre-bid meeting held on January 12, 2023. The project involves removing multiple layers of shingles (including asbestos shingles), removing abandoned roof equipment, replacing flashing, and assessing roof underlayment for potential replacement at the Independence Mental Health Institution storage building. Bids are due on January 27, 2023, at 2:00 PM, with a tentative Notice of Intent to be issued on February 3, 2023, and construction planned for April-May 2023.
The pre-bid meeting minutes outline specific site rules, including mandatory onsite supervision, daily logging, bi-weekly progress meetings, and strict adherence to facility protocols. Administrative details specify that contractors will sign a modified ConsensusDocs 802, provide project-specific insurance and performance bonds, and use Procore for project management at no cost. The Schedule of Values must include a 1% closeout line item that can only be invoiced after final completion certification. Contractors must submit their list of subcontractors and suppliers within 48 hours of bidding, and all questions should be submitted in writing to the procurement email address provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project #9247.00 Addendum #01 Page 1 of 6
ADDENDUM NO. 1
Date: 01/23/2023
Project Name: DHS IMHI Storage Bldg Roof Replacement
DAS RFB #: 924700 01
DAS Project #: 9247.00
BIDS DUE: 01/27/2023
The original Project Manual and Drawings for the project noted above are amended as noted in this
Addendum. Included in this Addendum are Specification, Architectural, & Engineering items.
Please review all sheets and incorporate them into your set of Contract Documents.
The receipt of this Addendum shall be acknowledged by inserting its number and date in the space provided on the Bid Form.
This Addendum consists of:
General Items:
1. Questions received through DAS Procurement:
Q1. Ridge Cap: Is the ridge cap to be a matching asphalt shingle ridge cap (as indicated in the drawings) or metal flashing as stated in paragraph 2.4 page 07 03113-2 in the project manual?
The pictures on the drawings indicate the ridge cap currently on the building is a shingle ridge cap.
A1. Ridge cap is to be matching asphalt shingle ridge cap.
Q2. Metal Flashing: Are the metal flashings to be prefinished aluminum or 20 gauge galvanized? Paragraph 2.4 page 07 03113-2 in the project manual states: A. Metal Flashing:
Prefinished aluminum, see section 07 6200. Paragraph 2.1 page 07 6200-1 states: A. General:
"Furnish sheet metal in minimum 20-gauge".... "Unless otherwise noted, all sheet metal shall be galvanized."
A2. Flashings can be either galvanized 20 gauge or prefinished aluminum but need to be consistent throughout the project (i.e. no mix/match).
2. Meeting minutes from RFB Pre-Proposal Meeting held on 01/12/2023 (4 Pages).
State of Iowa - Department of Administrative Services 109 SE 13th St.
Des Moines, Iowa 50319 P: (515) 281-7260
Project: 9247.00 DHS IMHI Storage Bldg Roof Replacement 2277 Iowa Ave
Independence, Iowa 50644 P: 319-334-5306
RFB Pre-Bid Minutes: Meeting #1
Meeting Date Jan 12, 2023 Meeting Time 11:00 AM - 12:00 PM Central Time (US & Canada)
Meeting Location 2277 Iowa Ave Independence, Iowa 50644 Video Conferencing Link https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZTg4NzBkMjgtNTQ4Yy00ZWF mLTljYWUtOWE0ODZmOGYxMzFh%40thread.v2/0 ?context=%7b%22Tid%22%3a%22705e7dc3-c582- 4519-a026- 3a1c9fd5fc88%22%2c%22Oid%22%3a%2232fc077 f-7c0c-4059-94f0-09beb0a16bf6%22%7d
Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.
Notes
Attachments
Scheduled Attendees
Name Company Phone Number Email Attendance
Jarrad Boever Boyd Jones Construction Company
P: (515) 318-8340 jboever@boydjones.biz Present
Andrew Paleczny Boyd Jones Construction Company
P: (402) 553-1804 apaleczny@boydjones.biz Present
Michael Nolan Horizon Architecture michael@horizon-architecture.com For Distribution Only
Mike Cook Independence Mental Health Institution mcook@dhs.state.ia.us Present
Doug Carper State of Iowa - Department of Administrative Services douglas.carper@iowa.gov Present
Introduction
No. Mtg Origin Title Assignment Due Date Priority Status
1.1 1 Introductions Open
Description DAS - Owner Representative
• Douglas Carper (Owners Rep)
Boyd Jones - Construction Manager
• Andrew Paleczny (Project Manager)
• Jarrad Boever (Project Engineer)
DOC NCF CRC Facility
• Mike Cook (Plant Operations Manager)
State of Iowa - Department of Administrative Services Page 1 of 4 Printed On: Jan 23, 2023 02:34 PM CST
Official Documented Meeting Minutes Also in attendance:
• Andy Hines - ECCO Midwest, Inc.
• Scott Keeley - Up Top Roofing
• Saul Sosa - Up Top Roofing
• Aaron Carlson - Freed Construction
• Zach Ryan - Black Hawk Roof Company
• Travis Haas - Advanced Environmental
• Lena Michalek - Horizon Architecture
Project Overview
2.1 1 Project Description Open
Description
• Multiple layers of shingles need removed (Abatement will remove asbestos shingles, contractor to remove remaining wood shingles (unit cost)
• Remove abandoned equipment on the roof (Roof Hatch, Lightning Protection System)
• Remove and replace flashing
• Cupolas to remain in place during demolition
• Asses roof underlayment to determine extent of replacement
• Abatement will be getting taken care of by the facility but we will expect the contractor to work with the abatement company on scheduling.
• Base bid - Roof Replacement
• Unit prices - Demolition (Per Square)
• Unit prices - Tongue and Groove decking (Per Foot)
Official Documented Meeting Minutes Boyd Jones, OR and Facility discussed abatement more and decided that a RFQ will probably be the best route to go. We will get this drafted up but will wait till we have a contractor selected to send this out to bid.
2.2 1 Project Schedule Open
Description
• Contract(s) Issued: February 03, 2023
• Submittals: March
• Construction: April - May
• Closeout: June
State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day
Meeting #1 - RFB Pre-Bid Project: 9247.00 DHS IMHI Storage Bldg Roof Replacement
State of Iowa - Department of Administrative Services Page 2 of 4 Printed On: Jan 23, 2023 02:34 PM CST
2.3 1 Site Rules Open
Description
• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.
• Contractors shall provide daily logs for each day they are on site. These can be sent out weekly.
• Bi Weekly construction progress meeting will be established once construction starts.
• It is of the utmost importance to show respect and courtesy to all staff at all times.
• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.
• No smoking, vaping or smokeless tobacco use onsite.
Site Specific Rules:
• Temporary facilities
• Tool control
• Cell phones
• Work hours - No Restrictions
• View Specification 01 1200 - Contract Summary for more information.
RFB Overview
3.1 1 Bid Submission Open
Description
• Bids are due 2:00pm on Friday January 27th, 2023.
• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.
o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.
o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.
o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.
• Bid Opening will be held via conference call at 3:00pm on Friday January 27th, 2023.
• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount
• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening
3.2 1 Bid Schedule Open
Description
• Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov:
• Addendum Issued: None
• Bids Due: 2:00pm on Friday January 27th, 2023.
• Tentative NOI Issued: Friday February 3rd, 2023.
State of Iowa - Department of Administrative Services Page 3 of 4 Printed On: Jan 23, 2023 02:34 PM CST
3.3 1 Administrative Details Open
Description
• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.
• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.
• Project-specific P&P bonds must be provided prior to contract execution.
• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.
• DAS will provide tax exempt certificates upon request.
• Procore will be used for all project management, at no cost to the trade contractor.
o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign
• Contractor Schedule of Values shall be broken out as specified in the project manual.
o SOV must contain a closeout line item for at least 1% of the total contract value.
o This line item can only be invoiced once the certificate of final completion has been signed by all parties.
3.4 1 Pre-Bid Site Visits Open
Questions
4.1 1 Questions Open
Description Submit all questions in writing to construction.procurement@iowa.gov.
These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.
Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.
State of Iowa - Department of Administrative Services Page 4 of 4 Printed On: Jan 23, 2023 02:34 PM CST
Project #9247.00 Addendum #01 Page 6 of 6
END OF ADDENDUM NO. 1
File details come from the government source that posted it. Updated .