RFB FY 26 Wildlife-friendly fencing on Conservation Grazing Units.pdf

PDF 1 MB Posted

Attached to
Wildlife-friendly fencing on Conservation Grazing Units
Solicitation number
RFB-0000000033
Issued by
San Mateo County, California

About this file

This is a Request for Bid (RFB) issued by the Midpeninsula Regional Open Space District for wildlife-friendly fencing construction across four open space preserves in San Mateo County, California. The project involves constructing approximately 722 feet of fencing at Lobitos Grazing Unit, 5,565 feet of fencing at October Farms Grazing Unit, 2,371 feet of fencing at Cloverdale Ranch Grazing Unit, and 6,134 feet of fencing at Big Dipper-Mindego Grazing Unit. The fencing will be 5-wire, wildlife-friendly livestock perimeter and cross fences, including gate installations and corral replacements. Bids are due by 2:00 pm on July 31, 2025, with a mandatory pre-bid meeting and site visit scheduled for July 17, 2025. The contract is anticipated to be awarded on August 13, 2025, with work to be completed by November 15, 2025.

The project budget is approximately $399,968, which includes general conditions, mobilization, materials, construction, clean-up, overhead, and profit. A Class C-13 Fencing Contractor license is required, and bidders must submit a 10% bid guarantee. The district will award the contract to the lowest responsible bidder, with considerations including qualifications, licensing, ability to perform work within the specified schedule and budget, proposed fees, and experience completing similar work. Bidders must also comply with prevailing wage requirements, California Department of Industrial Relations registration, and provide certificates of reported compliance from the California Air Resources Board.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Package – ISSUED FOR BID

Wildlife-friendly fencing on Conservation Grazing Units

Purisima Creek Redwoods Open Space Preserve Cloverdale Ranch Open Space Preserve Skyline Ridge Open Space Preserve

San Mateo County, California

Date: July 2, 2025

BID PACKAGE CONTENTS

A. Project Narrative

B. Bidding Documents

1. Invitation to Bid

2. Instructions to Bidders

3. Location Map of Bid Opening

C. Bid Forms

1. Bid Proposal Form

2. List of Subcontractors

3. Noncollusion Affidavit

4. Bid Bond

D. Contract Documents

1. Form of Agreement - at time of execution, Agreement will include:

• Exhibit A: Agreement Scope of Services (Contractor Bid Proposal Form)

2. General Conditions of the Agreement

• Exhibit 1: Labor and Materials Payment Bond

• Exhibit 2: Performance Bond

• Exhibit 3: Worker’s Compensation Certificate

• Exhibit 4: Proposed Change Order Request Template

• Exhibit 5: Change Order Template

3. Supplemental Conditions of the Agreement

• Att A: Wildlife Friendly Livestock Fence Specifications

• Att B: Project Area Maps

• Att C: Safe Use of Equipment in Wildlands

• Att D: Guidelines for working at Cloverdale Ranch

• Att E: Integrated Pest Management Program BMPs

• Att F: District Construction and Demolition Waste Diversion Policy

Intentionally Left Blank

A. PROJECT NARRATIVE

Project Description

This solicitation is for the construction of livestock fence on four (4) District Open Space Preserves.

Project Location

The properties are located in Midpeninsula Regional Open Space District’s Purisima Creek Redwoods Open Space Preserve, Cloverdale Ranch Open Space Preserve, Skyline Ridge Open Space Preserve, and Russian Ridge Open Space Preserve outside of Half Moon Bay, CA and Woodside, CA.

Project Schedule

Project Bids are due by 2:00 pm, Thursday, July 31, 2025. Award of Contract is anticipated to occur on Wednesday, August 13, 2025. No work may commence until contractor has met all pre-construction submittal requirements and received a Notice to Proceed. The project cannot extend beyond November 15, 2025.

Project Budget

Estimated total cost of the project is approximately $399,968. This total includes the cost of general conditions, mobilization(s), materials, construction, clean- up, overhead, and profit.

B. BIDDING DOCUMENTS

1. INVITATION TO BID

Notice Is Hereby Given that the Midpeninsula Regional Open Space District will receive bids for the furnishing of all labor, materials, and services required for the following designated scope of work on or before 2:00 p.m. on July 31, 2025 at its Administrative Office, 5050 El Camino Real, Los Altos, CA.

a. Project:

1) Lobitos Grazing Unit perimeter fence. Construct ~722 feet of 5-wire, wildlife-friendly cross fence and a corral replacement at Purisima Creek Redwoods Open Space Preserve.

2) October Farms Grazing Unit perimeter fence. Construct ~5,565 feet of 5-wire, wildlife-friendly perimeter fence and a corral replacement at Purisima Creek Redwoods Open Space Preserve.

3) Cloverdale Ranch Grazing Unit cross fence. Construct ~2,371 feet of 5-wire, wildlife-friendly cross fence at Cloverdale Ranch Open Space Preserve.

4) Big Dipper-Mindego Grazing Unit cross fence. Construct ~6,134 feet of 5-wire, wildlife-friendly cross fence and a corral replacement at Skyline Ridge Open Space Preserve.

b. Scope of Work:

1. Lobitos Grazing Unit perimeter fence. Construction of approximately 722 feet of 5-wire, wildlife-friendly livestock perimeter fence and the installation of one (1) 14-foot-wide medium-duty pipe gate.

2. October Farms Grazing Unit perimeter fence. Construction of approximately 5,565 feet of 5-wire, wildlife-friendly livestock perimeter fence, the installation of four (4) 14-foot-wide medium-duty pipe gates, and the installation of one (1) 16-foot-wide heavy duty pipe gate. Presently, there is about 5,565 feet of old barbed wire fencing that will be removed and disposed of as part of this project. Mechanical brush removal of up to 5,565 linear feet may be required to allow for fence construction. Costs for this are to be included in contractors bid.

3. Cloverdale Ranch Grazing Unit cross fence. Construction of approximately 2,371 feet of 5-wire, wildlife-friendly livestock perimeter fence and the installation of three

(3) 14-foot-wide medium-duty pipe gates. Mechanical riparian vegetation removal of up to 257 linear feet may be required to allow for fence construction. Costs for this are to be included in contractors bid.

4. Big Dipper-Mindego Grazing Unit cross fence. Construction of approximately 6,134 feet of 5-wire, wildlife-friendly livestock cross fence and the installation of four (4) 14-foot-wide medium-duty pipe gates. Presently, there is about 2,762 feet of old barbed wire fencing that will be removed and disposed of as part of this project. Costs for this are to be included in contractors bid.

All work must be performed in accordance with the Contract Documents, including, without limitation:

Fence specifications for all wildlife-friendly fencing in accordance with Section E, Project Scope Documents, Attachment A.

Project maps showing fencing locations in accordance with Section E, Project Scope Documents, Attachment B.

Welding, grinding, mechanical brush removal and other operations that could start a fire can only be performed in in accordance with the requirements set forth in Section E, Project Scope Documents, Attachment C: Safe Use of Equipment in Wildlands.

For work performed at Cloverdale Ranch Grazing Unit, Contractor must adhere to the requirements contained in Section E, Project Scope Documents, Attachment D: Guidelines for working at Cloverdale Ranch.

In addition, vegetation removal must follow best management practices set forth in Section E, Project Scope Documents Attachment E: Integrated Pest Management Program BMPs. Width of mechanical brush removal may not exceed 12 feet from fence centerline, unless authorized in advance by a District Representative.

c. License Requirement:

Class C-13 Fencing Contractor

2. INSTRUCTIONS TO BIDDERS

a. BID PACKAGE AVAILABILITY The District utilizes BidNet Direct for notification of their public bidding opportunities. Bid packages are available on the BidNet website which can be found here. BidNet is free, however you must register to view the bid package.

The District’s website www.openspace.org also lists current bidding opportunities. Once you are on the site, hover over What We Do, then click on the drop down, Bids & Proposals, click the project you are interested in, and you will be redirected to BidNet Direct.

The Bid Proposal shall be made in accordance with the Bid Package instructions and only on the Bid Package documents.

For additional information, contact Matthew Shapero, Conservation Grazing Program Manager, mshapero@openspace.org, (650) 625-6510.

b. MANDATORY PRE-BID MEETING There is a mandatory pre-bid meeting and site visit. ALL BIDDERS MUST ATTEND the site visit on July 17, 2025, at 8:00 am. You must register to attend the site visit no later than 3:00 pm July 14 2025. To register email Matthew Shapero, mshapero@openspace.org or call (650) 625-6510. You must register to receive directions to the meeting location and to be notified of any changes or weather delays.

The pre-bid meeting and site visit should take approximately four hours and there will be uneven terrain to cover. Please wear appropriate dress and shoes for hiking. Please bring water to keep hydrated.

c. TENTATIVE PROJECT SCHEDULE

July 2, 2025 Request for Bids posted on BidNet Direct July 17, 2025 Mandatory Pre-bid meeting and site visit July 21, 2025 Written questions due July 24, 2025 Answers due July 31, 2024 2:00 pm Bids Due August 13, 2025 Contract awarded 7:00 pm Board meeting August 14, 2025 Written notice of award of contract August 31, 2025 Bonds and Insurance due September 1, 2025 Notice to Proceed issued and Construction kick-off meeting November 15, 2025 Construction completed December 1, 2025 Walk-through, sign-off, closeout

d. BID PROPOSAL GENERAL REQUIREMENTS Prior to submitting their proposal, the Bidder shall thoroughly examine the Contract Documents and shall participate in the mandatory pre-bid meeting and site visit to understand the site conditions and scope of work. Any questions, concerns, errors, or ambiguities noted by the Bidder during said examination shall immediately be called to the attention of the District Representative prior to submission of a bid. The District will issue addenda with interpretation of the cited questions, concern, error or ambiguity. No subsequent claim for extra work will be allowed on account of claimed misunderstanding of the meaning or intent of the Contract Documents, site conditions, or any other documents included in this Bid Package if the item occasioning the claim appeared in, or was inferable from, said documents or from site investigations mandated for bidding purposes.

Examination of Site. Attention is directed to Bidder’s obligation to examine the Work site; compare the site with the Plans and Specifications; determine any site variation that affects the Bid; and investigate the conditions of existing clearances, restrictions, or limitations that affect access to the Work. Bidder’s failure to do any and all of the above shall not be a basis for claim of additional monies or extension of time.

Examination of Contract Documents. Bidder shall examine the Contract Documents to verify that there are no missing pages or sheets and shall obtain and examine any and all missing material prior to submitting the Bid.

Contract Documents Addenda. Explanations or interpretations will be made by District in the form of addenda to the documents and published on Periscope. Oral explanations and interpretations made prior to the Bid opening shall not be binding. All questions to the District must be made by the General Contractor. No questions from proposed Subcontractors will be received.

The final Addendum will be furnished no less than 72 hours prior to the opening of Bid Proposals.

Addenda must be referred to by number and date on the Bid Proposal form. It is the Bidder’s obligation to consider all addenda before submitting a Bid Proposal.

Form and Delivery. The Bid Proposal must be submitted on the Bid Proposal form supplied with these instructions. Alterations to the printed text are not permitted. Every blank on the enclosed Bid Proposal form should be filled out completely (or provided in another format). Either cross out or insert “N/A” in the blanks that are not applicable. Bid Proposals containing blanks may be disqualified, at the District’s sole discretion.

The Bid Proposal (with all forms in Section C. Bid Forms completed) must be hand-delivered, or delivered via mail or commercial courier, in a sealed envelope addressed as follows:

ATTENTION Matthew Shapero

Wildlife-friendly fencing on Conservation Grazing Units

Midpeninsula Regional Open Space District 5050 El Camino Real Los Altos, CA 94022-1404

BIDS ARE DUE ON OR BEFORE 2:00 PM on July 31, 2025.

Bid Proposal Opening Information. Sealed Bid Proposals shall be publicly opened at the District office at 5050 El Camino Real, Los Altos CA 94022 at 2:00 p.m. on July 31, 2025. The District shall make every effort to observe normal public bid opening rules and follow established procedures as best as possible. Any Bid Proposal not delivered before the time set for the opening of bids will be returned unopened. Incomplete Bid Proposals may result in bid rejection, in District’s sole discretion. A notice of apparent low bid will be distributed as soon as practical after the bid opening. Bid Proposals are expected to be presented to the Board of Directors of the District at their regular meeting on August 28, 2024. The Board will take formal action at that time to determine whether, and to whom, to award the contract.

e. BID SUBMITTAL Bidders shall execute and submit the attached Bid Proposal form. Each Bid Proposal must give the full business name and address of the Bidder and be signed by him/her. Bid Proposals by corporations must identify the legal name of the corporation, be signed by an authorized officer of the corporation, and include a corporate resolution conferring such authorization. Bid Proposals by partnerships must provide the full name of all partners and must be signed by one of the partners.

After the signature, the Bid Proposal shall designate the position of the person signing.

The following forms are to be executed and submitted by Bidders with their Bid. Bid Proposals must include the following:

Attachment 1: Bid Proposal Attachment 2: List of Subcontractors Attachment 3: Non-collusion Affidavit Attachment 4: Bid Bond

f. BID NON-REVOCABLE In consideration of District’s reliance on and investigation and consideration of the Bid Proposal of the undersigned, the undersigned agrees that such Bid shall be irrevocable and shall not be withdrawn for sixty (60) calendar days following the Bid opening even though an award is made to another Bidder. Thereafter, such Bid shall be automatically relieved.

g. BID GUARANTEE No Bid will be considered unless accompanied by a guarantee in the amount of ten percent (10%) of the Total Base Bid, which shall be one of the following: (a) a Bid Bond supplied in the enclosed Bid Form written by an admitted surety satisfactory to the District in its sole discretion, (b) a certified or cashier’s check made payable to the District, or (c) a cash deposit. In the event a successful Bidder fails to satisfy all conditions for accepting the award within the stated time limits, the District may declare the Bidder’s Bid Guarantee in default. Bidder acknowledges that the amount of actual damages the District would suffer in such event is extremely difficult and impractical to determine at this time by reason of the uncertainties, lapse of time, expense and loss of likely bidders resulting from the probable need to re-advertise and call for new bids. Bidder agrees that if a default occurs, the amount of such Bid Guarantee shall be kept by the District as liquidated damages and agrees that the District may then award the work to any other bidder or may call for new bids. All Bid Guarantees will be held until after an award is made, an Agreement fully executed, and required bonds and proof of insurance provided for the Work, at which time they will be returned.

h. NONCOLLUSION AFFIDAVIT No bid will be considered unless accompanied by a fully executed Non-collusion Affidavit, which is supplied with these instructions.

i. CERTIFICATES OF REPORTED COMPLIANCE

Contractors must provide Certificate(s) of Reported Compliance (CRCs) from the California Air Resources Board for the fleet selected for the Contract and all listed Subcontractors, or detailed explanation demonstrating that the fleet(s) is/are exempt from such regulations, prior to Contract award. Contractors are encouraged to submit CRCs with their bids.

j. LICENSE REQUIREMENTS Under California Business and Professions Code §7000 through § 7145, commonly known as the “Contractor’s License Law”, Contractor must possess an appropriate license that is current and valid at the commencement of and throughout the Term of the Agreement for the Work. The License required for this Agreement is Class B-General Building Contractor or C-13 Fencing Contractor . All subcontractors must possess an appropriate license that is current and valid at the commencement of and throughout the Term of the Agreement.

k. INELIGIBLE CONTRACTORS No contractor or subcontractor who is ineligible to Bid on a public works project pursuant to Section 1777.1 or 1777.7 of the Labor Code may Bid or work on the Project.

l. BOND AND INSURANCE REQUIREMENTS The successful Bidder shall obtain and maintain in full force, workers compensation insurance (California Labor Code §§ 1860 & 1861) and commercial general liability and automobile insurance as further described in the Agreement. Bond and Insurance requirements are further described in the Agreement.

m. PREVAILING WAGES As required by law, the Contractor shall pay all workers California prevailing wages for each trade or classification on the job during the term of this project. These rates include employer payments for health and welfare, pension, vacation, travel time, subsistence pay and apprenticeship or training. Prevailing wage information can be found at the following website:

http://www.dir.ca.gov/dlsr/DpreWageDetermination.htm.

Pursuant to recent legislation (“SB 854”), effective January 2015, contractors and subcontractors listed on bid proposals must be registered with the California Department of Industrial Relations (DIR) in order to be eligible to work on public works projects (Cal. Lab. Code §§ 1725.5, 1771.1).

Work performed on public works projects is subject to compliance monitoring and enforcement by the DIR. All contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner. More information can be found at the following website:

http://www.dir.ca.gov/Public-Works/PublicWorks.html.

n. NON-DISCRIMINATION The successful Bidder and its subcontractors must comply with all applicable state and federal equal employment opportunity and affirmative action laws throughout the term of the Contract.

o. RESPONSIBLE BIDDER It is the intention of the District to award the contract to the responsible Bidder with the lowest responsive Bid. Public Contract Code §1103 defines “responsible bidder” as “a bidder who has demonstrated the attributes of trustworthiness, as well as quality, fitness, capacity and experience to satisfactorily perform the Contract.” This includes the ability to complete projects on time, specifically when working on multiple projects concurrently. A bidder that is determined by the District not to be responsible due to a failure to meet these requirements shall have his/her Bid disqualified.

p. RESPONSIVE PROPOSAL The District will award the contract to the lowest responsible bidder submitting a responsive proposal based on the information contained in the bid. The lowest bid shall be the lowest bid price on the Total Base Bid. District may contact firms to clarify information contained in their proposal.

The District reserves the right to reject any or all proposals and to waive any conditions or formalities.

Every blank on the enclosed Bid Proposal form should be filled out completely (or provided in another format). Either cross out or insert “N/A” in the blanks that are not applicable. Bid Proposals containing blanks may be disqualified.

Before contract is awarded the District may, at its discretion, require from the bidders’ further evidence of qualification, ability to perform, and financial responsibility, and may consider such evidence in making the decision on the award of such proposed contract. In addition, District may require that Contractor submit a complete disclosure of contractor’s staffing level, current and anticipated workload, and affirm that they can meet all project requirements and have the personnel and equipment to complete the project within the budget and schedule stipulated in the Contract Documents. Notwithstanding Contractor’s affirmation that they can meet the project requirements, if District, in their review of Contractor’s past performance, finds documented evidence of inability to meet project schedule or cost requirements, District will have cause to reject the Bid.

Criteria for a responsive proposal from a responsible bidder include but are not limited to the following requirements:

Qualifications and appropriate licensing of assigned personnel & listed subcontractors Ability to perform work within the specified project schedule and budget Proposed fee and overall cost effectiveness of the bid Experience completing similar work

q. RIGHT TO REJECT BIDS The District reserves the right to reject any or all Bid Proposals, to waive any informality, minor technical defect, or irregularity in Bid Proposals, and to accept or reject any items of a Bid Proposal. The District, at its discretion, may reject as incomplete any bid which is in any way conditional, includes exceptions, alterations or omissions, or includes reservations to the terms of the Bid Proposal form, drawings, specifications, or other contract documents. The District reserves the right to reject any and all bids. District will reject bids from any contractor for whom there is documented evidence of project schedule delays and cost overruns and / or documented inability to meet project performance requirements.

r. WITHDRAWAL OF BIDS Bid Proposals may be withdrawn prior to the opening only by a signed, written notice received by the District Representative prior to the commencement of the Bid Proposal opening.

s. BID PROTESTS A bidder who intends to protest the apparent low bid must submit the protest to the District project manager within five (5) working days after the District’s issuance of the Memorandum of the Bid Opening, excluding Saturdays, Sundays and District holidays. The Memorandum of the Bid Opening is normally issued by District staff on the day of the Bid Opening to all bidders, identifying the apparent low bidder.

a. The bid protest must be a complete written statement detailing the basis for the protest, including reference to specific facts, portions of the bid or contract documents, or reference to specific statutes, that form the basis for the protest. The protest must be signed by the party filing the protest. Failure to give written notice by Close of Business on the fifth working day following issuance of the Memorandum of the Bid Opening shall waive the right to protest.

b. Notification by personal delivery, overnight courier, email and/or facsimile is sufficient.

If the written protest is sent by facsimile, Protesting Bidder must provide a FAX (facsimile) number and verify that the pages were all received by the District project manager.

c. The protest may be withdrawn at any time while under consideration by the District.

d. Review by District

The District project manager will notify the apparent low bidder of the bid protest.

The District will afford the apparent low bidder the opportunity to submit a response to the written protest.

The District will review timely protests prior to awarding the contract. The District is not required to hold an administrative hearing to consider a bid protest but may do so at the sole option of the Assistant General Manager, or if otherwise legally required. The AGM or his/her designee shall consider the merits of any timely protests and make a final determination thereon.

t. BASIS OF CONTRACT AWARD Definitions:

(a) The Total Base Bid is the contractor’s Bid for all items listed in the Bid Proposal.

(b) For a definition of Responsible Bidder, see Instructions to Bidders, Item o.

The contract will be awarded to the lowest Responsible Bidder, as defined above under Responsive Proposal considering the following factors:

(a) If the lowest Total Base Bid is equal to or less than the Project Budget (as stated in Instructions to Bidders), the contract will be awarded to that Bidder.

(b) If the lowest Total Base Bid is greater than the Project Budget, that Bidder may be awarded the contract, or, all Bids may be rejected, at the sole discretion of the District;

(c) In the event of a tied low bid, the award would be based on a coin toss or equivalent random selection process.

(d) The District reserves the right to reject any or all of the Bids at its sole discretion.

Incorrect Totals. In the event a computational error for any bid item results in an incorrect extended total for that item, the submitted base bid total will be adjusted to reflect the corrected amount as the product of the estimated quantity and the unit cost. In the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid, and the amount entered as the base bid on the Bid Proposal form, the actual total of the itemized or unit prices shown on the Bid Schedule for the base bid will be deemed the base bid price.

Likewise, in the event of a discrepancy between the actual total of the itemized or unit prices shown on the Bid Schedule for any bid alternate, and the amount entered for the alternate on the Bid Proposal form, the actual total of the itemized prices shown on the Bid Schedule for that alternate will be deemed the alternate price. Nothing in this provision is intended to prevent a bidder from requesting to withdraw its bid for material error under Public Contract Code § 5100 et seq.

u. NOTICE OF AWARD Immediately after Board action, the District Representative will notify the Contractor in writing of award of the contract. Contractor shall provide District Representative a Labor and Materials Payment Bond, Performance Bond, Proof of Insurance, and signed Agreement within ten (10) calendar days of Award of Contract.

3. LOCATION MAP OF BID OPENING

C. BID FORMS

1. BID PROPOSAL FORM

(To be executed by Bidder and Submitted)

Project Name:

Location:

Wildlife-friendly fencing on Conservation Grazing Units

Purisima Creek Redwoods, Cloverdale Ranch, and Skyline Ridge Open Space Preserves

Scope of Work:

1) Lobitos Grazing Unit perimeter fence. Construct ~722 feet of 5-wire, wildlife-friendly cross fence and a corral replacement at Purisima Creek Redwoods Open Space Preserve.

2) October Farms Grazing Unit perimeter fence. Construct ~5,565 feet of 5-wire, wildlife-friendly perimeter fence and a corral replacement at Purisima Creek Redwoods Open Space Preserve.

3) Cloverdale Ranch Grazing Unit cross fence. Construct ~2,371 feet of 5-wire, wildlife-friendly cross fence at Cloverdale Ranch Open Space Preserve.

4) Big Dipper-Mindego Grazing Unit cross fence. Construct

~6,134 feet of 5-wire, wildlife-friendly cross fence and a corral replacement at Skyline Ridge Open Space Preserve.

District Representative:

Matthew Shapero Midpeninsula Regional Open Space District 5050 El Camino Real Los Altos, CA 94022

(650) 625-6510

The undersigned has carefully examined the site conditions for the Work, attended the Mandatory Pre-Bid Meeting, reviewed all documents in the Bid Package, including the Drawings, Plans and Specifications, accepts all terms and conditions of the Agreement, and has reviewed the following Addenda (fill in blanks below as appropriate to the number of Addenda issued for the project):

Addendum No. , dated , 20 , Addendum No. , dated , 20 , Addendum No. , dated , 20 .

a. BASE BID

Bid Proposal will be evaluated based on Total Base Bid. District may opt to award additional work based on unit pricing submitted herein.

Item No.

Item Description QTY. Unit Unit Price Extension

GC General Conditions, Safety, Site Supervision & Insurance; Refer to General and Supplemental Conditions.

1 LS

A Site Preparation.

Mobilization/Demobilization

1 LS

SUBTOTAL GC & A

B Construction of livestock fencing and gates

QTY. Unit Unit Price Extension

1.1 Lobitos: construction of fencing

and gate

1 LS $ $

1.2 October Farms: removal of existing

barbed wire fence and gates, vegetation removal, construction of fencing and gates

1 LS $ $

1.3 Cloverdale Ranch: vegetation

removal, construction of fencing and gates

1 LS $ $

1.4 Big Dipper/Mindego: removal of

existing barbed wire fence and gates, construction of fencing and gates

1 LS $ $

SUBTOTAL B

TOTAL BASE BID (Sum of Subtotal GC & A and Subtotal B)

Proposed Completion of the Work on site, including Remediation, Demolition, Clean up & Restoration.

November 15, 2025

b. EXPERIENCE

List three recently (within last 5 years) completed jobs of comparable scope, the contract amount, names, and telephone numbers of contract officers. Use additional sheets as necessary.

Job/Project Name

Owner Year Contract Amt $

Contact Phone

Wetted Channel? Y / N Bio-monitor? Y / N

Contact Phone

Contact Phone

c. NONCOLLUSION CERTIFICATION. The undersigned has executed and hereby submits the Noncollusion Affidavit (Attachment 3), in accordance with Public Contracts Code Section 7106.

d. BID GUARANTEE. No Bid will be considered unless accompanied by a guarantee in the amount of ten percent (10%) of the Total Base Bid), which shall be either a BID BOND (Attachment 4) written by an admitted surety satisfactory to District in its sole discretion, a certified or cashier's check made payable to District, or a cash deposit. In the event a successful bidder fails to satisfy all conditions for accepting the award (i.e. executed Agreement, provision of required bonds and proof of insurance) within the stated time limits, District may declare the bidder's Bid Guarantee in default. Bidder acknowledges that the amount of actual damages District would suffer in such event is extremely difficult and impractical to determine at this time by reason of the uncertainties, lapse of time, expense and loss of likely bidders resulting from the probable need to re-advertise and call for new bids. Bidder agrees that the amount of such Bid Guarantee shall be kept by District as liquidated damages and agrees that District may then award the work to any other bidder or may call for new bids. All Bid Guarantees will be held until after an award is made, an Agreement entered into, and required bonds and proof of insurance provided, at which time they will be returned.

e. DISCLOSURE. The names of all persons financially interested in this Bid Proposal are as follows:

If Bidder, or any partner of Bidder, is a corporation, provide the legal name of the corporation, the state of its incorporation and the name and address of the President and of the Secretary. If Bidder is a partnership, provide name of the firm and names and addresses of all individual co-partners. Use additional sheets as necessary. If Bidder is an individual, provide the first and last name and address.

Name of Corporation:

State of Incorporation:_______________________________________________________

Name of Officer/ShareholderTitleAddress

Name of Bidder(s)/Partner(s) (If not a corporation)

f. WITHDRAWAL OF BIDS. Bids may be withdrawn prior to the opening of bids only by a signed, written notice received by District Representative prior to the commencement of the bid opening. In consideration of District's reliance on and consideration of this Bid Proposal, the undersigned agrees that such Bid Proposal shall be irrevocable upon opening and shall not be withdrawn for sixty (60) calendar days following the bid opening even though award may be made to another bidder. Thereafter, such bid shall be automatically relieved.

I make the above Bid and declare under penalty of perjury that the statements made in this Bid Proposal are true and correct.

FULLY EXECUTED at , City State on ___________________

Signature1 Title

1 An authorized person for the Bidder must sign this Bid Proposal. If the Bidder is a partnership, a general partner must sign. If the Bidder is a corporation, an authorized officer of the corporation must sign and a corporate resolution conferring such authority must be provided.

Name (please type or print)

Federal Employer I.D. Number

License Type

License Number Expiration Date

Name of Firm

Mailing Address

City State Zip

Phone (Bus) Phone (Cell)

Email

2. LIST OF SUBCONTRACTORS

(To be executed by Bidder and Submitted with Bid)

Contractor must set forth the name, address, phone number, type and cost of work, and proof of required license for each subcontractor who will perform work or render services in any amount exceeding one-half percent (1/2%) of the total bid according to provisions of the California Public Contract Code §4100 through §4113. Each subcontractor must be licensed by the State of California Department of Consumer Affairs for the portion of work they perform in accordance with Contractor's License Law. Please attach as many sheets as necessary.

Company Name:

Contact:

Phone Number:

Type of Work:

Cost of Work:

Required License:

DIR #:

Address:

Phone Number:

Type of Work:

Cost of Work:

Address:

Phone Number:

Type of Work:

Cost of Work:

3. NONCOLLUSION AFFIDAVIT

TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID

The undersigned declares:

I am the __________________________ [title] of _____________________________________ [business name], the party making the foregoing bid.

The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or to refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, to effectuate a collusive or sham bid, and has not paid and will not pay, any person or entity for such purpose.

Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder.

This declaration is intended to comply with California Public Contract Code § 7106 and Title 23 U.S.C § 112.

I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on _______________ [date], at __________________________________ [city], _______ [state].

s/________________________________________

Name [print]

4. BID BOND

(Note: Bidder must use this form if Bid Guarantee is a Bond)

KNOW ALL PERSONS BY THESE PRESENTS THAT [name of Bidder] (hereinafter Principal), as Principal, and [name of Surety] , a corporation organized and doing business under and by virtue of the laws of the State of and duly licensed for the purpose of making, guarantying or becoming sole surety upon bonds or undertakings required or authorized by the laws of the State of California, as Surety, are held and firmly bound unto the Midpeninsula Regional Open Space District, a California Special District, (hereinafter called the Obligee) in the just and full sum of Dollars ($ ) lawful money of the United States of America, for the payment of which we hereby bind ourselves and each of our successors and assigns, jointly and severally, firmly by these presents.

THE CONDITION OF THIS OBLIGATION IS SUCH THAT, WHEREAS, the Principal is about to hand in to the Obligee a Bid for the project known as Wildlife-friendly fencing on Conservation Grazing Units in accordance with the Contract Documents filed in the office of the Obligee and under the notice inviting proposals therefor.

NOW, THEREFORE, if the Bid as submitted by said Principal shall be accepted, and the contract for such work or supplies be awarded to the Principal, and the said Principal shall fail, neglect or refuse to enter into a contract to perform said work or deliver said supplies, and furnish good and sufficient bond and proof of insurance therefore, then the amount of this bond shall be declared to be forfeited to the Obligee, Midpeninsula Regional Open Space District.

IN WITNESS WHEREOF, Principal and Surety have caused these presents to be duly signed and sealed this day of , 2024.

Signature of Principal Signature of Surety

Attorney-in-Fact

State of California, County of

On before me, (insert name and title of the officer) personally appeared who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.

I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.

WITNESS my hand and official seal.

Signature Seal

D. AGREEMENT FORMS

Notice to Bidders:

Documents in the following section are not to be submitted with Bid Proposal. They will be signed and submitted at time of Award of Contract.

Attachment A

MROSD Wildlife-Friendly Fencing Specifications

Attachment B-1

Project Area Map (Lobitos Perimeter Fence)

Attachment B-2

Project Area Map (October Farms Perimeter Fence)

Attachment B-3

Project Area Map (Cloverdale Ranch Cross Fence)

Attachment B-4

Project Area Map (Big Dipper-Mindego Cross Fence)

Attachment C

Safe Use of Equipment in Wildlands

Attachment D

Guidelines for working at Cloverdale Ranch

Attachment E

IPM Program Best Management Practices

Attachment F

District Construction and Demolition Waste Diversion Policy