This Addendum #1 document is issued by the Iowa Department of Administrative Services for Request for Bids (RFB) 930300-02 regarding the kitchen grease pit replacement at North Central Correctional Facility in Rockwell City, Iowa. The project scope includes pumping and cleaning the existing grease interceptor, abandoning it in place with sand fill, saw cutting a section of the patrol road, providing jersey barriers to maintain road access, installing a new 1,000-gallon grease interceptor on a concrete base pad with necessary connections, and meeting OSHA excavation requirements. The grease waste system may remain offline for a maximum of three days. The pre-bid meeting was held on September 26, 2023, via Microsoft Teams video conference, with attendees including representatives from McGough Construction, North Central Correctional Facility, Shive Hattery Inc., and various subcontractors and suppliers. Bids are due October 10, 2023, at 2:00 PM through the IMPACS Electronic Procurement System, with bid opening scheduled for 3:00 PM the same day via conference call. The project schedule includes contract issuance in October 2023, submittals from November 2023 through January 2024, construction from March 2024 through May 2024, and closeout in June 2024. A pull-plan session will be conducted with the successful bidder to finalize the construction schedule.

The project cost opinion is $211,250, though actual bids may vary. Bidders must submit bids with 5% bid security and shall reference section 00 0116 for the submittal checklist, including non-discrimination clause information and contractor targeted small business enterprise pre-bid contract information. The apparent low bidder must submit a subcontractor and supplier list within 48 hours of bid opening. Contractors will execute a modified ConsensusDocs 802 agreement and must provide project-specific certificates of insurance and payment and performance bonds prior to contract execution. Site rules include mandatory onsite supervision, daily logs, background checks for all workers, PREA training completion, tool and material inventory, restricted cellphone use, no smoking or vaping, and work hours of 7:00 AM to 4:00 PM. Questions and substitution requests were due in writing by October 3, 2023, at 10:00 AM, and this addendum was issued on October 5, 2023. All project management will be conducted through Procore at no cost to the contractor, with submittals, invoicing, RFIs, and other documents also utilizing Docusign.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 for RFB930300-02

Project Name: DOC NCCF Kitchen Grease Pit Replacement

RFB #: 930300-02

DAS Project #: 9303.00

Date: 10/5/2023

Bids Due: October 10, 2023 at 2:00 p.m.

Pre-Bid Meeting Minutes and Sign-In Sheet Included

General Notes:

• The cost opinion for the project is $211,250.

END OF ADDENDUM

State of Iowa - Department of Administrative Services 109 SE 13th St.

Des Moines, Iowa 50319 P: (515) 281-7260

Project: 9303.00 DOC NCCF Kitchen Grease Pit Replacement 313 Lanedale

Rockwell City, Iowa 50579 P: 712-297-7521

RFB Pre-Bid Minutes: Meeting #1

Meeting Date Sep 26, 2023 Meeting Time 11:00 AM - 12:00 PM Central Time (US & Canada)

Meeting Location Video Conferencing Link https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OG NhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/ 0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a5 4b-41d5-46ef-82bc-8260ef04c509%22%7d

Overview Meeting to allow prospective bidders to visit the site, when possible, and learn more about the project.

Notes

Attachments

Scheduled Attendees

Name Company Phone Number Email Attendance

Adam Douglas McGough Construction adam.douglas@mcgough.com Present

Jon Handley McGough Construction P: (515) 805-3987 jon.handley@mcgough.com Present

Jonathan Peters McGough Construction jon.peters@mcgough.com Present

Kurtis Bednarik North Central Correctional Facility P: (712) 297-7521 kurtis.bednarik@iowa.gov Present

Tim Motl North Central Correctional Facility P: (712) 297-7521 timothy.motl@iowa.gov Present

Chris Bauer Shive Hattery Inc. P: (515) 223-8104 cbauer@shive-hattery.com For Distribution Only

James Trower State of Iowa - Department of Administrative Services james.trower@iowa.gov Conference

Introduction

No. Mtg Origin Title Assignment Due Date Priority Status

1.1 1 Introductions Open

Description Attendees

Official Documented Meeting Minutes Attendance:

Scott Pedersen(Nels Pedersen Co Inc.)

Jack Riley(Riley Armstrong) Mark Wills(Midstate Plumbing Heating and Cooling) Mike Riley(Riley Armstrong) Marcus Kizer(Minturn Inc) Kyle Lansen(Shive-Hattery)

Project Overview

State of Iowa - Department of Administrative Services Page 1 of 4 Printed On: Oct 3, 2023 12:29 PM CDT https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OGNhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a54b-41d5-46ef-82bc-8260ef04c509%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OGNhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a54b-41d5-46ef-82bc-8260ef04c509%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OGNhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a54b-41d5-46ef-82bc-8260ef04c509%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OGNhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a54b-41d5-46ef-82bc-8260ef04c509%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OGNhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a54b-41d5-46ef-82bc-8260ef04c509%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OGNhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a54b-41d5-46ef-82bc-8260ef04c509%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTkzM2UwMWUtNTFlMi00OGNhLWEzOGUtZTA2OTNiNzEyZGU1%40thread.v2/0?context=%7b%22Tid%22%3a%22c6c429d4-d18c-4ab8-a9a8-f0c82d33f945%22%2c%22Oid%22%3a%221429a54b-41d5-46ef-82bc-8260ef04c509%22%7d

2.1 1 Project Description Open

Description

• Base bid - Pump, clean, and fill the existing grease interceptor with sand and abandon in-place. Saw cut a section of the patrol road to make room for the new grease interceptor and provide jersey barriers for the duration of the project so the road can remain open until the concrete is replaced by the contractor. Provide a new 1,000 gallon grease interceptor that is anchored to a new concrete base pad and make all necessary connections. The grease waste system may only be down for a maximum of 3 days.

Official Documented Meeting Minutes The contractor will be responsible to meet the OSHA requirements for the excavation.

2.2 1 Project Schedule Open

Description

• Contract(s) Issued: October 2023

• Submittals: November 2023 to January 2024

• Construction: March 2024 May 2024

• Closeout: June 2024

A pull-plan session will be held with the successful bid package contractors to finalize the construction schedule.

State Holidays: New Year's Day, Martin Luther King Day, Memorial Day, 4th of July, Labor Day, Veterans Day, Thanksgiving and day after Thanksgiving, Christmas Day

2.3 1 Site Rules Open

Description

• Onsite supervision by Prime Contractor is required at all times when work by that contractor or their subcontractors/suppliers is taking place.

• Contractors shall provide daily logs for each day they are on site.

• Construction progress meeting will be established once construction starts.

• It is of the utmost importance to show respect and courtesy to all staff at all times.

• Clean all debris, materials, and bring all finishes back to existing conditions in the area they were working in prior to moving to the next area.

• No smoking, vaping or smokeless tobacco use onsite.

• Temporary facilities to be provided by the contractor.

• Demolished equipment to be removed by the contractor

• Tool control - All tools and materials brought into the facility must be inventoried at the start of construction.

• Cell phones - Only 1 cellphone is permitted for the onsite foreman.

• Background checks - All workers onsite will require a background check. Send each worker's date of birth, driver's license number, and social security number to Jon Handley to process.

• PREA - All onsite workers must complete PREA training prior to coming to the site. A link to the training can be sent via email.

• Work hours - 7:00 AM to 4:00 PM

• View Specification 01 1200 - Contract Summary for more information.

RFB Overview

Meeting #1 - RFB Pre-Bid Project: 9303.00 DOC NCCF Kitchen Grease Pit Replacement

State of Iowa - Department of Administrative Services Page 2 of 4 Printed On: Oct 3, 2023 12:29 PM CDT

3.1 1 Bid Submission Open

Description

• Bids are due 10/10/23 at 2:00 PM

• The Bid shall be submitted to the Issuing Officer through the IMPACS Electronic Procurement System.

o Link and information is in the project manual o Contractors will need to register prior to bidding o Bidders will need to register regardless of whether it has already done business with the State of Iowa.

o Bidders should complete the registration process and ensure the ability to log in as soon as possible to ensure Bids can be submitted on the due date.

o Please make sure the electronic documents submitted contain any required signatures. Digital signatures will be accepted.

• Bid Opening will be held via conference call on 10/10/23 at 3:00 PM

• Contractor shall reference section 00 0116 for the bid submittal checklist o Bid Proposal Information o Non Discrimination Clause Information o Contractor Targeted Small Business Enterprise Pre-Bid Contract Information o Bid Security – 5% of total Bid amount

• Apparent low bidder will be required to submit subcontractor/supplier list 48hrs after the bid opening

3.2 1 Bid Schedule Open

Description

• Questions/Substitutions Due in Writing to Construction.Procurement@iowa.gov: 10/3/23 at 10:00 AM

• Addendum Issued: 10/5/23

• Bids Due: 10/10/23 at 2:00 PM

• Tentative NOI Issued:10/11/23

3.3 1 Administrative Details Open

Description

• Contractors will sign a modified ConsensusDocs 802. Example in the project manual.

• Project-specific Certificate of Insurance must be provided prior to contract execution. Follow example in the project manual and limits in the 802.

• Project-specific P&P bonds must be provided prior to contract execution.

• Successful contractor must turn in their list of subcontractors and suppliers within 48 hours of the bid.

• DAS will provide tax exempt certificates upon request.

• Procore will be used for all project management, at no cost to the trade contractor.

o Submittals, Invoicing, RFIs, ASIs, PRs, RFQs o Contracts, Change Orders and Certificates of Substantial and Final Completion will also use Docusign

• Contractor Schedule of Values shall be broken out as specified in the project manual.

o SOV must contain a closeout line item for at least 1% of the total contract value.

o This line item can only be invoiced once the certificate of final completion has been signed by all parties.

State of Iowa - Department of Administrative Services Page 3 of 4 Printed On: Oct 3, 2023 12:29 PM CDT mailto:Construction.Procurement@iowa.gov:

3.4 1 Pre-Bid Site Visits Open

Description {Add details}

Questions

4.1 1 Questions Open

Description Submit all questions in writing to construction.procurement@iowa.gov.

These meeting minutes are believed to be an accurate reflection of those items discussed and the conclusions that were reached during the referenced meeting.

Please contact State of Iowa - Department of Administrative Services if there are any discrepancies or questions with the content of these minutes.

State of Iowa - Department of Administrative Services Page 4 of 4 Printed On: Oct 3, 2023 12:29 PM CDT