RFB 26.627 Bid Sheet.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Count Station Maintenance
Solicitation number
RFB 605 2600000627 1
Issued by
Kentucky

About this file

This is a bid sheet for RFB 2600000627, a Count Station Maintenance project in Kentucky involving 12 districts organized into four bidding regions. The project encompasses 26 line items covering infrastructure installation and maintenance work, including conduit and cable installation (ranging from 40 to 8,000 linear feet depending on the item), electrical service and cabinet installation, junction box placement (ranging from 2 to 12 units), sensor installation, pole and post installation, trenching and backfill work, and lane/shoulder closures. Vendors are not required to bid all regions but must submit bids for all line items within any selected region to be considered for award. The four regions are structured as Region 1 (Districts 1-4), Region 2 (District 5), Region 3 (Districts 6-7), and Region 4 (Districts 8-12). A response time metric in calendar days is required for each region.

The bid sheet requires vendors to provide unit prices and extended prices for each line item within their selected regions. Notable line items include 1,400 linear feet of saw slot and fill work, 16 lane closures, 12 piezoelectric sensors, and various pole and cabinet installations. The sheet includes space for total price calculations by region and appears designed to allow flexibility in regional participation while maintaining consistent pricing across all line items within a chosen region.

View the file

Other files

File Type Posted
District Map.pdf PDF
Final_RFB_605_2600000627_1_SO_FORM.PDF PDF
Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFB 2600000627 Bid Sheet
Vendors do not have to bid all regions however shall bid all lines within the region to be considered for award.
District 1District 2District 3District 4District 5District 6District 7District 8District 9District 10District 11District 12
ItemDescriptionUnitQuantityUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended PriceUnit PriceExtended Price
1Furnish, Bore and Jack Pipe – 2 InchLIN FT50
2Furnish and Install Conduit 1¼ InchLIN FT400
3Furnish and Install Conduit 2 InchLIN FT200
4Furnish and Install Electrical ServiceEACH2
5Furnish and Install Galvanized Steel CabinetEACH2
6Install Pad Mount CabinetEACH2
7Install Pole Mount CabinetEACH2
8Furnish and Install Junction Box 10x8x4EACH2
9Furnish and Install Junction Box Type AEACH12
10Furnish and Install Junction Box Type BEACH12
11Saw Slot and FillLIN FT1400
12Furnish, Install and Remove Lane ClosureEACH16
13Furnish, Install and Remove Shoulder ClosureEACH8
14Furnish and Install Piezoelectric SensorEACH12
15Install Piezoelectric SensorEACH12
16Furnish and Install 35’ Wooden PoleEACH2
17Excavate Trench and BackfillLIN FT600
18Furnish and Install Cable No. 14/1 PairLIN FT400
19Furnish and Install Loop WireLIN FT8000
20Furnish and Install Ground WireLIN FT40
21Furnish and Install Wood PostEACH6
22Remove and Replace SidewalkSQYD1
23Loop TestEACH1
24POLE 40 FT MTG HTEACH1
25Transformer BaseEACH1
26Pole BaseEACH1
TOTALS
TOTALResponse Time (calendar days)
REGION 1 (Districts 1, 2, 3, 4)
REGION 2 (District 5)
REGION 3 (Districts 6, 7)
REGION 4 (Districts 8, 9, 10, 11, 12)