This document is Addendum #1 for Request for Bid (RFB-2025-25) issued by Schenectady County Purchasing Department for the SUNY SCCC CST Building Lobby and Bathroom Renovations HVAC Contract. The addendum provides clarification for bidders regarding temperature control systems and requirements for the project. Specifically, the mechanical contractor (MC) is instructed to include radiant panel and convector controls as part of the mechanical bid, as shown on drawing M601, with exhaust fans to be controlled by the electrician via light switches. The mechanical contractor will also be responsible for temporary heat if required, as specified in Section 2300505-1, part 1.6.
The addendum is dated 02/26/2025 and is part of the contract documents for the renovation project at SUNY Schenectady County Community College. Bidders are required to acknowledge receipt of this addendum on their bid form. The document indicates that additional information has been posted on Bidnet and provided to plan holders, addressing a request for more information from potential temperature control contractors who initially stated there was insufficient detail to provide a quote. The addendum aims to provide clarity and additional guidance for bidders preparing their submissions for the HVAC contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schenectady County Purchasing Department
ADDENDUM
RFB-2025-25 Addendum #1 Issued by Schenectady County 02/26/2025 Page 1 of 1
620 State St.-2nd Floor Schenectady, NY 12305 purchasing@schenectadycountyny.gov 518.388.4240
RFB-2025-25
SUNY SCCC CST BUILDING LOBBY AND BATHROOM RENOVATIONS –
HVAC CONTRACT
C2 DESIGN GROUP
Date: 02/26/2025
The purpose of this addendum is to provide detailed information to all Bidders. This addendum is hereby included in and made part of the Contract Documents, whether or not attached thereto.
Receipt of this Addendum must be acknowledged on the bid form.
The following documents is hereby included in the documents posted on Bidnet and provided to plan holders:
CONTENTS/ RESPONSE TO QUESTIONS/ REFERENCE TO ATTACHMENTS
General Bid RFI’s:
1. In the Specs it calls for MC to carry all temperature control systems complete. I have reach out to many temperature control contractors and they say not enough info to quote. Please advise. Also says MC to carry temp heat. Is temp heat going to be needed for this project?
a. Answer: Include radiant panel and convector controls as part of the mechanical bid as shown on drawing M601. Exhaust fans will be controlled form the light switch by the electrician. Temporary heat to be per Spec. Section 2300505-1, part 1.6, and is the responsibility of the mechanical contractor if required.
Please acknowledge this addendum on your bid form.
END OF ADDENDUM #1