This document is a Request for Bids (RFB) issued by the City of Woodstock, Georgia for the installation of a well pump and construction of a treatment building along Revere Drive. The project includes the installation of a well pump, treatment building, water main piping and valves, electrical/controls, chemical feed systems, SMART system, erosion control, fenced enclosure, grassing, and related appurtenances. The well has already been drilled, and the riser pipe has been installed. Bids are due on January 23, 2024 by 10:00 a.m. EST. A pre-bid conference and site visit will be held on January 4, 2024 at 3:00 p.m. The contract will be awarded in February 2024.
The City intends to award to a single contractor. Pricing should be itemized, and the contract will be awarded to the lowest responsive, responsible bidder. The contractor shall submit a progress payment request after thirty (30) days for the completed work, and the City will retain 5% of each payment as retainage. The contractor must provide bid bonds, performance and payment bonds, and required insurance prior to contract execution.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12453 Highway 92, Woodstock, GA 30188 770‐592‐6000 ∙ www.woodstockga.gov
REQUEST FOR BIDS
For
REVERE ST GROUNDWATER WELL SITE
RFB NUMBER
2024 – 06
RELEASED:
December 14, 2023
DUE:
January 23, 2024 10:00 A.M. EST
For all questions about this RFB contact:
Martyn Detz Purchasing Coordinator 770‐592‐6000 Ext 1205 https://vrapp.vendorregistry.com/Vendor/Register/Index/woodstock‐city‐ga‐vendor‐registration
RFB Number 2024 – 06 Page 2
TABLE OF CONTENTS
1.0 PURPOSE OF SOLICITATION
1.1 PURPOSE OF BID
1.2 RFB SUBMISSION
1.3 SCHEDULE OVERVIEW
1.4 PRE‐BID / SITE VISIT
1.5 RFB COSTS
1.6 RFB QUESTIONS/COMMUNICATIONS
1.7 RFB AMENDMENTS
1.8 NON‐COLLUSION AFFIDAVIT
1.9 COMPLIANCE WITH LAWS
1.10 BID & AWARD BASIS
1.11 REQUIRED BONDS AND INSURANCE
1.12 TIME OF COMPLETION AND LIQUIDATED DAMAGES
1.13 TAXES, FEES, CODE COMPLIANCE AND LICENSING
1.14 REFERENCES AND PROPRIETARY INFORMATION
1.15 ILLEGAL IMMIGRATION REFORM AND ENFORCEMENT ACT OF 2011
1.16 ANTI‐BOYCOTT OF ISRAEL
2.0 SCOPE OF WORK
2.1 TYPE OF GOOD/SERVICE AND OBJECTIVES:
2.2 PROJECT GENERAL NOTES
2.2.1 ENVIRONMENTAL REQUIREMENTS
2.2.2 MEASURES AND WEIGHTS
2.2.3 BUILDINGS AND SHANTIES
2.3 BRAND NAME
2.4 DELIVERY TIME
2.5 AWARD AND PRICING INFORMATION
2.6 PAYMENT TO CONTRACTOR AND RETAINAGE
3.0 BID FORMAT
4.0 OTHER ITEMS
4.1 TERMS AND CONDITIONS
4.2 REJECTION OF BIDS/CANCELLATION OF RFB
4.3 BID WITHDRAWAL
4.4 MISCELLANEOUS
EXHIBIT A CONTRACTOR INFORMATION FORM
EXHIBIT B E‐VERIFY AFFIDAVIT WITH INSTRUCTIONS
EXHIBIT C BID PROPOSAL FORM
EXHIBIT D ITEMIZED PRICING SHEET
EXHIBIT E SITE PLANS
EXHIBIT F TECHNICAL SPECIFICATIONS
EXHIBIT G CONTRACT
EXHIBIT H VENDOR CONFLICT OF INTEREST
RFB Number 2024 – 06 Page 3
1.0 PURPOSE OF SOLICITATION
1.1 Purpose of Bid
The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of installation of a well pump and construction of a treatment building along Revere Drive. This includes but is not limited to installation of a well pump, treatment building, water main piping and valves, electrical/controls, chemical feed systems, SMART system, erosion control, fenced enclosure, grassing and related appurtenances, hereinafter referred to as the “Project”. The well has already been drilled and the riser pipe has been installed; the riser pipe will need to be extended during installation.
1.2 RFB Submission
Interested parties must submit proposals electronically through Vendor Registry to the City of Woodstock, Georgia by the due date for their proposals to be considered. Vendor Registry can be found directly at https://vrapp.vendorregistry.com/Vendor/Register/Index/woodstock‐city‐ ga‐vendor‐registration or by visiting the City of Woodstock’s website.
Fax and e‐mail responses are not acceptable.
Responses to this RFB will be accepted until 10:00 a.m. (EST) on January 23, 2024 through
Vendor Registry.
The City of Woodstock, Georgia reserves the right to reject any and all responses resulting from this RFB. Late responses will not be accepted. If company response is sent or routed to City offices, the submission requirement has not been met and any such response will not be evaluated and will be disqualified from consideration.
1.3 Schedule Overview
This Request for Bids is scheduled as follows:
December 14, 2023
January 4, 2024, 3:00 P.M.
January 11, 2024, 5:00 P.M.
January 16, 2024, 5:00 P.M.
Release of RFB
Pre‐bid/ Site Meeting
Question Deadline
Responses Posted
January 23, 2024, 10:00 A.M. Bids Due Date
January 23, 2024, 10:01 A.M. Public Opening
February 2024 RFB and Contract Award
RFB Number 2024 – 06 Page 4
1.4 Pre‐Bid / Site Visit
A pre‐bid conference / site visit (not mandatory) for all bidders will be held at the job site located at 502 Revere Street on January 4th at 3:00 pm.
1.5 RFB Costs
All costs incurred in the preparation and presentation of responses to the RFB shall be completely absorbed by the RFB respondent. All documents submitted as part of the RFB will become property of the City. Requests for specific material to be returned will be considered. Any material submitted that is confidential must be clearly marked as such.
1.6 RFB Questions/Communications
All questions about this RFB and submission requirements must be submitted in writing through Vendor Registry. The City’s representative listed in this section will serve as the primary contact for this RFB.
Martyn Detz
Purchasing Coordinator
12453 Highway 92
Woodstock, Georgia 30188
770‐592‐6000 ext. 1205 https://vrapp.vendorregistry.com/Vendor/Register/Index/woodstock‐city‐ga‐vendor‐ registration
Any unauthorized contact shall not be responded to and may result in the disqualification of the responder’s submittal. Answers to questions submitted via Vendor Registry will be communicated to respondents via Vendor Registry.
Communications by companies, its agents, employees, and/or representatives regarding its bids or intention to submit a bid in response to this RFB with any employee, agent, or representative of the City of Woodstock, other than the representative listed in Section 1.5, may be considered inappropriate communications.
If any such inappropriate communications are deemed to hinder, influence and/or alter the competitive bid process, the City, in an effort to ensure a fair and equitable review and selection process, reserves the right to decline consideration of the offender’s sealed bid.
1.7 RFB Amendments
It is the responsibility of respondents to check Vendor Registry or the Georgia Procurement
Registry for RFB information and addendums.
RFB Number 2024 – 06 Page 5
1.8 Non‐Collusion Affidavit
By submitting a bid, the respondent represents and warrants that no official or employee of the City has an interest, directly or indirectly, in the bid or in the final contract award. The respondent further understands bids will be rejected if there is any evidence of collusion with another respondent.
Respondent certifies that this qualification, offer, or bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a qualification, offer, or bid for the same materials, supplies, services, or equipment and is in all respects fair and without collusion or fraud. Respondent understands collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. Respondent agrees to abide by all conditions of this qualification, offer, or bid.
Furthermore, the respondent certifies that the firm has not divulged to, discussed or compared his bid with other respondents and has not colluded with any other respondent or parties to this bid whatsoever. Also, respondent certifies, and in the case of a joint bid each party thereto certifies as to his/her own organization, that in connection with this bid:
Any prices and/or cost data submitted have been arrived at independently, without consultation, communication, or agreement, for the purpose of restricting competition, as to any matter relating to such prices and or cost data, with any other respondent or with any competitor;
Any prices and/or cost data quoted for this bid have not been knowingly disclosed by the respondent and shall not knowingly be disclosed by the respondent prior to the scheduled opening directly or indirectly to any other respondent or to any competitor;
No attempt has been made or shall be made by the qualifier to induce any other person or firm to submit a bid for the purpose of restricting competition;
The only person or persons interested in this bid, principal/principals is/are named therein and that no person other than therein mentioned has any interest in his bid or in the contract to be entered into; and
No person or agency has employed or retained to solicit or secure this contract upon an agreement or understanding for a commission, percentage, brokerage, or established commercial agencies maintained by the Purchaser for the purpose of doing business
1.9 Compliance with Laws
Respondents agree to be bound by applicable Federal, State and Local laws, regulations and directives.
RFB Number 2024 – 06 Page 6
1.10 Bid & Award Basis
The City reserves the right to accept or reject any and all bids or any or parts of a bid wherein its judgment, it will be in the best interest of the City; waive any technicalities/informalities in the RFB document and bid process; and to qualify and award any or all of this contract in any manner in which the City, acting in the sole and exclusive exercise of its discretion, deems to be in the City’s best interest. If no acceptable bid is received, the City also reserves the right to re‐ solicit bids, at its sole discretion.
1.11 Required Bonds and Insurance
No bid may be withdrawn for a period of sixty (60) days after time has been called on the date of opening.
All bids must be accompanied by a certified check or bid bond of a reputable bonding company authorized to do business in the State of Georgia, in an amount equal to at least five percent
(5%) of the total amount of the bid.
Upon the award of this RFB, the contractor shall provide the City with:
A 100% project value performance and payment bonds pursuant to O.C.G.A. § 36‐91‐70 and 90.
Worker’s Compensation – Statutory (for the State of Georgia and the State of domicile of the Contractor).
Manufacturers’ and Contractor’s Liability, covering operations performed by or for the
Contractor, with limits of not less than Bodily Injury – $500,000/$1,000,000. Property
Damage ‐ $500,000.
Contractor Liability, covering liability of others assumed by the Contractor elsewhere in the contract under “Hold Harmless” Agreements or similar assumptions of liability.
Evidence of required bonds and insurance shall be presented prior to the execution of the
Contract. The Bonding Company must be licensed to do business in the State of Georgia, licensed to do business by the Georgia Secretary of State, authorized to do business in Georgia by the Georgia Insurance Department, listed in the Department of the Treasury’s Publication of
Companies Holding Certificates of Authority as Acceptable Surety of Federal Bonds and as
Acceptable Reinsuring Companies and have an A.M. Best rating of A‐, Class VI or Higher.
Insurance policies to be carried under the agreement shall not be changed or canceled without prior written notification to the City of Woodstock, Georgia.
RFB Number 2024 – 06 Page 7
1.12 Time of Completion and Liquidated Damages
Bidder hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" of the City and to fully complete the project within ninety (90) consecutive calendar days; bidder further agrees to pay as liquidated damages the sum of $250 per each consecutive calendar day that the Contractor shall be in default after the date stipulated in the Contract for completing work.
1.13 Taxes, Fees, Code Compliance and Licensing
The firm shall be responsible for the payment of any required taxes or fees associated with the execution of this contract. The firm shall also be responsible for compliance with all applicable codes and statutes.
1.14 References and Proprietary Information
Submission of a bid authorizes the City to make inquiries concerning the respondent and its officers to any persons or firms deemed appropriate by the City. Any proprietary information that the respondent does not want disclosed to the public shall be so identified on each page in which it is found. Data or information so identified will be used by the City solely for the purpose of evaluation and contract negotiations only.
1.15 Illegal Immigration Reform and Enforcement Act of 2011
By providing a qualification or bid, qualifier/bidder certifies that he/she is in compliance with
O.C.G.A. § 13‐10‐90 and 91, et seq. No qualification or bid will be considered by the City unless it is accompanied with a signed, notarized affidavit (EXHIBIT B) from the qualifier/bidder attesting to the following:
a) The affiant has registered with and is authorized to use and uses the federal work authorization program
b) The user identification number and date of authorization for the affiant; and
c) The affiant will continue to use the federal work authorization program throughout the contract period; and
The affiant will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the same information required in subparagraphs (a), (b) and (c) of this paragraph.
1.16 Anti‐Boycott of Israel
By signing and submitting this bid and pursuant to O.C.G.A. § 50‐5‐85, respondent/bidder certifies that it is not currently engaged in, and agrees that for the duration of this agreement, it will not engage in a boycott of Israel.
RFB Number 2024 – 06 Page 8
2.0 SCOPE OF WORK
2.1 Type of Good/Service and Objectives:
The City of Woodstock, Georgia, herein referred to as the City, is accepting bids from qualified contractors for the purpose of installation of a well pump and construction of a treatment building along Revere Drive. This includes but is not limited to installation of a well pump, treatment building, water main piping and valves, electrical/controls, chemical feed systems, SMART system, erosion control, fenced enclosure, grassing and related appurtenances, hereinafter referred to as the “Project”. The well has already been drilled and the riser pipe has been installed; the riser pipe will need to be extended during installation.
The contractor shall be responsible for furnishing all materials, labor, and equipment.
The work to be completed consists of the below listed goods and services which shall meet or exceed the specification below:
‐ Well Pump and Installation
‐ Treatment Building
‐ Water Main piping and Valves
‐ Electrical and controls
‐ Chemical Feed systems
‐ SMART System
‐ Perimeter Fenced Enclosure and Gate
‐ Erosion control and Grassing
‐ Access Drive
‐ Work hours are from 7 am to 7 pm Monday – Saturday; 12 – 6 pm on Sundays
‐ Shall conform to federal, state, and local requirements and regulations.
2.2 Project General Notes
See Exhibit E engineer drawing for full details on the project general notes and maintenance of traffic guidelines.
‐ On sheet 10, “Pipe Transition Detail,” it says see detail page 12. That is for the Thrust Blocks details and table on sheet 12. The connection of the 4 to the 16 would be a standard tap.
‐ On sheet 13, there is a note on the CMU Wall Construction Detail that says, “Paint to be coordinated with the City.” The exterior walls of the well houses have painted board and batten cover just like your other well houses. The City picks the color of the paint.
See Exhibit F for full list of technical specifications.
See Exhibit G for a draft of the contract.
RFB Number 2024 – 06 Page 9
The new well has been pretested for performance. The current water rate is 85 gpm.
See Exhibit I for tables from testing.
Water can be provided via a nearly fire hydrant.
For City of Woodstock Standard development Regulations see – http://library.municode.com/ga/woodstock/codes/land_development_code
There are no geo‐technical reports available to the contractor.
No requirements for underground electrical. Use underground rated cables and mark above the wire run with tape.
No building permits or fees required.
On Site testing of the soil compaction is required.
The City has already paid for the 3 phase power from GA Power Co.
Copies of Specifications and Construction Drawings may be obtained from Rindt‐McDuff Associates, Inc. (Gainesville office). The Information for Bidders, Drawings, and Specifications may be examined or requested from the below mentioned contact:
Rindt‐McDuff Associates, Inc.
445 Bradford Street NW Gainesville, GA 30501 Phone: (770) 531‐5109 Fax: (770) 531‐5112 Email: brindt@rindt.com Contact: Brian Rindt, P.E.
2.2.1 Environmental Requirements
Reference Clean Air and Water Acts.
A. Air Pollution
1. The CONTRACTOR shall be responsible for any necessary burning permits.
B. Stream Pollution
1. Conduct all work in such a manner as to prevent stream siltation.
2. No discharges for untreated or partially treated wastewater to streams is allowed.
RFB Number 2024 – 06 Page 10
2.2.2 Measures and Weights
To aid the ENGINEER in determining all quantities, the CONTRACTOR shall, whenever so requested, provide scales, equipment, and assistance for weighing or for measuring any of the materials.
It is understood and agreed that a "ton" shall mean the short ton of two thousand (2,000) pounds. Weights and measures of quantity for payment will be the actual weight or actual measure, and no special or trade or so‐termed customary allowances will be made, nor will any material which is lost or misplaced be included for payment.
2.2.3 Buildings and Shanties
No shanties, camps, or buildings for the housing of men employed on the WORK shall be erected on land owned or leased by the OWNER without written permission of the OWNER. Should permission be asked and granted, the CONTRACTOR must comply with all Local and County regulations regarding the construction and maintenance of such buildings.
2.2.4 Construction Clearing
Whole clearing of construction rights‐of‐way, easements, or construction sites will not be allowed. Clearing shall be minimized, and the CONTRACTOR shall make every effort to save trees, shrubs and bushes that are within the construction limits. Timber which is cut shall remain the property of the land owner where the cutting occurred.
All trees within the working easements shown on the CONTRACT DOCUMENTS are property of the existing land owners. If the property owner wishes to keep the timber, the CONTRACTORS shall cut the timber in reasonable lengths and stack such timber on OWNER's property. If the property owner does not wish to keep the timber, the timber shall become the property of the CONTRACTOR and shall be removed from the site and disposed of at the CONTRACTOR's expense. All stumps, rubbish, and other material, not suitable as timber, shall be removed from the site at the CONTRACTOR's expense.
We do not plan on keeping the timber from this site.
2.3 Brand Name
Unless otherwise specified, the items in this bid have been identified, described, and referenced by a brand name or trade name/mark that is intended to be descriptive, but not restrictive, and is used to indicate the quality and characteristics of products that may be offered.
Other products may be considered for award if such products are clearly identified in the bid and are determined by the City to meet its needs in all respects. It shall be the responsibility of the bidder(s), including the bidder whose product is referenced, to indicate the brand name and model or series number of the product offered and to furnish with their bid such specifications, catalog pages, brochures, or other data that will provide an adequate basis for determining the quality and functional capabilities of the product offered.
RFB Number 2024 – 06 Page 11
However, the City may elect to purchase brand name products or services when the goods comprise a major brand system, program, or service previously selected by the City and due to operation effectiveness, future enhancements or additions, or maintenance and storage of spare parts preclude the mixing of brands, manufactures, etc.
Any information provided should be properly labeled. The City reserves the right to request product demonstrations and/or samples from any bidders prior to bid award. Failure to provide the requested data or product demonstrations and/or samples may be considered valid justification for rejection of bid.
2.4 Delivery Time
This is a time sensitive project. All work must be completed within 180 days after a notice to proceed has been issued, pending any unnatural weather occurrence.
The contractor shall coordinate construction dates and times with the City of Woodstock, Georgia Public Works Director.
Available work hours shall be in accordance with City ordinance; Shall conform to federal, state and local requirements and regulations.
2.5 Award and Pricing Information
The City intends to award to a single Contractor. The City may award the entire project or portions of the project to a single Contractor.
Pricing should be itemized for the project. The Bid Proposal Form and Itemized Pricing Sheet in Exhibit D must be completed and returned with bid submittal.
Pricing shall be valid for a period of 60 days after submission date.
The Contract will be awarded to the lowest, responsive, responsible Bidder as determined by the review committee and as approved by City Council.
2.6 Payment to Contractor and Retainage
All work must be approved prior to the release of payment.
The Contractor shall submit a progress payment request after thirty (30) days for the completed work. The City shall make a progress payment to the Contractor on the basis of a duly certified and approved progress payment for the work performed during the thirty (30) days under this contract, but to insure the proper performance of this Contract, the City shall retain five percent (5%) of the amount of each pay app as retainage if such work is satisfactory and completed on schedule as determined with the City.
3.0 BID FORMAT
1. Exhibit A: Contractor Information Sheet ‐ If the firm has branch offices, state the office that will have management responsibility for the work to be carried out.
RFB Number 2024 – 06 Page 12
2. Completed Exhibit B: E‐Verify Affidavit with Instructions.
3. Pricing should be itemized as specified on the pricing sheet for the City in Exhibit D. The Bid Proposal Form and Lump Sum Pricing Sheet must be completed and returned with bid submittal.
4. A copy of the firm’s Public Liability Insurance, Workers’ Compensation and Commercial General Liability Insurance.
5. Annotated list of references (with addresses and telephone numbers).
6. Copy of Georgia Business License
7. Bid bonds (5% of total bid amount)
a. 100% project value performance and payment bond (pending contract award)
A clear, concise bid in the specified bid format is requested with all the necessary information included. Responses to this RFB will be accepted until 10:00 a.m. (EST) on January 23, 2024 through Vendor Registry. Bids will be publicly opened and read aloud virtually via GoTo
Meetings on January 23, 2024, 10:01 A.M.
4.0 OTHER ITEMS
4.1 Terms and Conditions
1. The City of Woodstock, Georgia hereby requests bids for the goods and services inclusive of the services requested in the RFB.
2. City of Woodstock, Georgia reserves the right to evaluate the firm’s bids. Only those firms who, in the opinion of the City, meet the minimum necessary bids will have their price and contract/agreement evaluated.
3. All bids, fee schedules and other documents furnished to the City of Woodstock, Georgia are subject to the Georgia Open Records Act.
4. Termination: The contract will be subject to the terms and conditions included in the
Service Agreement. The City of Woodstock, Georgia reserves the right to cancel the agreement with cause, due to nonperformance and/or violation of contract terms.
5. The City shall be notified of business name change(s) in writing within thirty (30) days of changes.
6. The City shall be notified and approve of key personnel change(s) in writing prior to any changes.
4.2 Rejection of Bids/Cancellation of RFB
The City of Woodstock, Georgia reserves the right to reject any or all bids, to waive any irregularity or informality in a bid, and to accept or reject any item or combination of items, when to do so would be to the advantage of the City.
RFB Number 2024 – 06 Page 13
It is also within the right of the City to reject bids that do not contain all elements and information requested in this document. The City reserves the right to cancel this RFB at any time. The City will not be liable for any cost/losses incurred by the Offerors throughout this process.
4.3 Bid Withdrawal
A submitted bid may be withdrawn prior to the due date by a written request to the City representative listed in Section 1.5. A request to withdraw a bid must be signed by an authorized individual of the submitting company.
4.4 Miscellaneous
This RFB and any agreements related thereto must comply, inter alia, with all City laws and charters and are subject to all requisite City approvals including, but not limited to, City
Management and City Council.
The City reserves the right to release modifications to this RFB or supplements to it from time to time. Firms are responsible for periodically checking Vendor Registry or the Georgia
Procurement Registry for such modifications or supplements.
This Section Intentionally Left Blank
RFB Number 2024 – 06 Page 14
EXHIBIT A CONTRACTOR INFORMATION FORM
See following page.
City of Woodstock
12453 Hwy 92 • Woodstock, GA • 30188 • 770-592-6000 • www.woodstockga.gov
CONTRACTOR INFORMATION
Firm Name:
Contact Person:
Firm Address:
Phone:
Fax:
Email:
With this packet, please also provide a W-9 and Certificate of Insurance for the company/firm.
Signature – Authorized Officer or Agent Date http://www.woodstockga.gov/
RFB Number 2024 – 06 Page 15
EXHIBIT B E‐VERIFY AFFIDAVIT WITH INSTRUCTIONS
See following page(s).
INSTRUCTIONS
CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13- 10-91, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Woodstock, Georgia (the “City”) has registered with and is participating in a federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.
Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontract who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Contractor
Name of Project Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on __________________, 201____ in ________________ (city), ______ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
Subscribed and Sworn before me this the________ day of _______________, 201____, Notary Public My Commission Expires INSTRUCTIONS ONLY - C
OM
PLE
TE
FOLLOWING PAGE
E-Verify/Company ID Issued by the E-Verify Program
Date E-Verify/Company ID was issued by E-Verify
Contractor's Company/Firm Name
Name of project or type of service provided
City of Woodstock, Georgia http://www.woodstockga.gov/ welchcl Highlight welchcl Highlight
CONTRACTOR AFFIDAVIT AND AGREEMENT
By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13- 10-91, stating affirmatively that the individual, firm, or corporation which is contracting with the City of Woodstock, Georgia (the “City”) has registered with and is participating in a federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91.
Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontract who present an affidavit to the contractor with the information required by O.C.G.A. § 13-10-91(b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:
Federal Work Authorization User Identification Number
Date of Authorization
Name of Contractor
Name of Project
Name of Public Employer
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on _______________, 202____ in ________________ (city), _________ (state).
Signature of Authorized Officer or Agent
Printed Name and Title of Authorized Officer or Agent
Subscribed and Sworn before me this the________ day of _______________, 202____, Notary Public My Commission Expires http://www.woodstockga.gov/
RFB Number 2024 – 06 Page 16
EXHIBIT C BID PROPOSAL FORM
Proposal of_________________________ (hereinafter called "Bidder") a contractor organized and existing under the laws of the State of ______________ , * an individual, a corporation, or a partnership doing business as __________________________.
TO: City of Woodstock, Georgia (Hereinafter referred to as "City")
The Bidder, in compliance with your invitation for bids for the work as described in Section 2.0 of
RFB 2024 – 06
THE REVERE PRODUCTION WELL AND TREATMENT BUILDING
having examined the scope of work with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the scope of work of the proposed Project, including the availability of materials and labor, hereby proposes to furnish all labor, materials, and supplies, and to construct the Project in accordance with the Contract Documents, within the time set forth herein, and at the prices stated in the bid submission. These prices are to cover all expenses incurred in performing the work required under this Contract, of which this bid is a part.
Amount shall be shown in figures. The prices in the bid submittal shall include all labor, materials, removal, overhead, profit, insurance, etc., to cover the finished work of the project as stated in the contract.
Total Price: $ _____________________________
Bidder hereby agrees to commence work under this Contract on or before a date to be specified in a written "Notice to Proceed" of the City and to fully complete the Project within ONE‐HUNDRED AND
EIGHTY (180) consecutive calendar days; bidder further agrees to pay as liquidated damages the sum of $250 per each consecutive calendar day that the Contractor shall be in default after the date stipulated in the contract for completing the work.
Bidder understands that the City reserves the right to reject any or all bids and to waive any informalities in the bidding.
The Bidder agrees that this bid shall be good and may not be withdrawn for a period of 60 calendar days after the scheduled closing time for receiving bids.
RFB Number 2024 – 06 Page 17
The Bidder declares that he understands that the quantities shown on the bid are subject to adjustment by either increase or decrease, and that should the quantities of any of the items of work be increased, the undersigned proposes to do the additional work at the unit prices stated herein; and should the quantities be decreased, he also understands that payment will be made on actual quantities at the unit price bid and will make no claim for anticipated profits for any decrease in the quantities and that actual quantities will be determined upon completion of work, at which time adjustment will be made to the Contract amount by direct increase or decrease.
The full name and residence of persons or parties interested in the foregoing bids, as principals, are named as follows:
The____ day of_______________ , 20____ .
Signature:
Printed:
Title:
RFB Number 2024 – 06 Page 18
EXHIBIT D LUMP SUM PRICING SHEET
Please use ‘Exhibit D’ as provided in a separate document file.
WELL SITE LUMP SUM BID
No. Description Quantity Units Unit Price Total Price
Temporary Erosion Control in accordance with construction plans, including but not limited to: Silt Fence (Type C), Riprap Check Dams (Cd), Straw Mulch Stabilization (Dsl), Temporary Grassing (Ds2), Construction Exits (Co) and Temporary Grassing.
1 LS $___________ $___________
2 Well Pump and Installation 1 LS $___________ $___________
3 Treatment Building 1 LS $___________ $___________
4 Water Main Piping and Valves 1 LS $___________ $___________
5 Electrical and Controls 1 LS $___________ $___________
6 Chemical Feed Systems 1 LS $___________ $___________
7 SMART System 1 LS $___________ $___________
8 Perimeter Fenced Enclosure and Gate 1 LS $___________ $___________
9 Erosion Control and Grassing (Ds3) 1 LS $___________ $___________
10 Access Drive 1 LS $___________ $___________
All else for a complete installation as shown on the plans 1 LS
LUMP SUM AMOUNT: $
LUMP SUM AMOUNT AMOUNT (IN WORDS):
LUMP SUM ALLOWANCE AMOUNTS
The Bidder shall include in the sum of all lump sum bids the lump sum allowances identified below.
Payment will be in accordance with the General Conditions. Any unused balance of the allowances shall revert to the Owner upon completion of the project.
No. Description Quantity Unit Lump Sum Price
(in figures) Total Price (in figures)
1 Allowance for correction of unforeseen utility conflicts and utility relocation.
As determined by Owner
N.A. $25,000 $25,000
2 Allowance for Owner initiated miscellaneous work.
As determined by Owner
N.A. $25,000 $25,000
TOTAL BID AMOUNT: $
TOTAL BID AMOUNT (IN WORDS):
Note: Payment will only be made for the items, listed within the Bid Schedule. Bidder/Contractors shall include any/all costs for work incidental to a pay item within the applicable pay items. For any/all work for which a specific pay item is not provided, the bidder/contractor shall distribute the costs for such among the items for which payment is allowed. After the Contract is awarded, the Contractor shall only be paid for the pay items listed. Failure of a bidder/contractor to include/ distribute any/all costs for the complete work within the items listed shall not be considered sufficient reason for additional payment to the Contractor.
BIDDER hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" from the OWNER and to fully complete WORK within a total construction time of 150 consecutive calendar days for the date specified in this "Notice to Proceed". BIDDER acknowledges receipt of the following addenda:
Addenda No. Date Received
BIDDER agrees to perform all of the construction of the project complete with appurtenances and accessory work described in the Specifications and shown on the Drawings for the above scheduled price.
BIDDER agrees that their bid shall be good and may not be withdrawn for a period of 60 calendar days after the scheduled closing time for receiving bids.
Upon receipt of the written notice of the acceptance of this bid, BIDDER will execute the formal Contract attached within ten (10) days and deliver a surety bond or bonds, as required by the General Conditions.
The bid security attached in the sum of five (5%) percent of the total bid is to become the property of the OWNER in the event the Contract and bond are not executed within the time set forth, as liquidated damages for the delay and additional expense to the OWNER caused thereby.
Respectfully Submitted: Name:
Address:
FEDERAL TAX NO. OR.:
SOCIAL SECURITY NO.
Signature (Principal):
Title:
Date:
ATTEST:
Signature:
Corporate Secretary/Partner/Notary (SEAL)
Name:
(Please type)
NOTE: Attest for a corporation must be by the corporate secretary; for a partnership by another partner; for an individual by a Notary.
RFB Number 2024 – 06 Page 19
EXHIBIT E SITE PLANS
ARNOLD MILL ROAD
WASHINGTON AVE
RU
BE
S
CR
EE
K
INDEPENDENCE WAY
R E
V E
R E
D R
IV
E
H E
R
IT
A G
E R
O W
COLONY CT
N E
E S
E R
O A
D
EDINBURGH LANE
GRAND OAKS DR
MELROSE CIR
WAVERLY PL
GRAND OAKS LN
GRAND OAKS DR
JEFFERSON DR
HAMILTON DR
N E
E S
E R
O A
D
MIDDLETON PASS
ROKEBY DR
POTOMAC CT
M :\P ro je ct s\
\r2
7-ci ty o f w oo ds to ck ge ne ra l s er vi ce s\ w el l n o.
(r ev er e si te )\D ra w in gs
\R
-1
C ov er .d w g
5/
/2
:3
8p m e le br on
DRAWING INDEX
SHEET DESCRIPTION
COVER
EXISTING CONDITIONS
SITE PLAN
GRADING PLAN
HYDRAULIC GRADE
MECHANICAL PROFILE
MECHANICAL PLAN
EROSION CONTROL PLAN
ES &PC PLAN DETAILS
MECHANICAL DETAILS
MECHANICAL DETAILS
CONSTRUCTION DETAILS
CONSTRUCTION DETAILS
CONSTRUCTION DETAILS
ELECTRICAL PLAN AND NOTES
ELECTRICAL PLAN AND NOTES
CONTACTS
OWNER/DEVELOPER: CIVIL ENGINEER:
CONSTRUCTION PLANS FOR PERMITTING
24 HR CONTACT:
MIKE STONEBRIDGE
(770) 592-6250
RMA CONTACT:
BRIAN RINDT
770-361-6535
FOR
CITY OF WOODSTOCK, GEORGIA
LOCATED IN CHEROKEE COUNTY, GEORGIA
LAND LOT(S): 1063
DISTRICT 15th
CONSTRUCTION PLANS
DISTURBED AREA = 0.11 ACRES
SITE MAP
N.T.S.
N
LOCATION MAP
N.T.S.
Sheet No.
LAND SURVEYOR:
UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON THE PLANS AND THE EXISTING UTILITY LINES THAT ARE SHOWN ARE APPROXIMATE LOCATIONS ONLY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES HAVING UTILITIES WITHIN OR
ADJACENT TO THE WORK AREA. THE CONTRACTOR SHALL COORDINATE CLOSELY WITH THESE
UTILITY COMPANIES AS NECESSARY REGARDING MODIFICATIONS TO EXISTING SYSTEMS OR
ADAPTATIONS FOR NEW SERVICE CONNECTIONS. ANY DEVIATIONS FROM THE NEW UTILITY DESIGN LOCATIONS SHOWN IN THESE PLANS SHALL BE REPORTED TO THE PROJECT ENGINEER PRIOR TO CONSTRUCTION. ANY AND ALL DAMAGE TO EXISTING UTILITY LINES RESULTING FROM CONTRACTOR
NEGLIGENCE SHALL BE REPAIRED SOLELY AT CONTRACTOR EXPENSE.
UTILITY DISCLAIMER
WELL NO. 6 REVERE DRIVE - PUMP HOUSE
POWER:
SITE
www.RINDT.com
334 Cherokee Street - Marietta, Ga. 30060 Phone: (770) 427-8123
IE: 872.08
IE: 872.51
W
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
28"Ø 15"Ø
27"Ø
WALL
W
ALL
CONCRETE SWALE
36" CMP
GRAVEL
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
878870
R
EV
ER
E
D R
IV
E
' R
/W
2 @ 10"Ø
Toe
MCE
Toe 24"Ø
TREES TO BE
REMOVED (TYP.)
LIMITS OF
DISTURBANCE
CONTRACTOR TO
PROTECT EXISTING
WATER SERVICES
CONTRACTOR TO REPLACE ANY
GRAVEL TO EXISTING CONDITIONS
LIMITS OF
DISTURBANCE
UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON THE PLANS AND THE EXISTING UTILITY LINES THAT ARE SHOWN ARE APPROXIMATE LOCATIONS ONLY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES HAVING UTILITIES WITHIN OR
ADJACENT TO THE WORK AREA. THE CONTRACTOR SHALL COORDINATE CLOSELY WITH THESE
UTILITY COMPANIES AS NECESSARY REGARDING MODIFICATIONS TO EXISTING SYSTEMS OR
ADAPTATIONS FOR NEW SERVICE CONNECTIONS. ANY DEVIATIONS FROM THE NEW UTILITY DESIGN LOCATIONS SHOWN IN THESE PLANS SHALL BE REPORTED TO THE PROJECT ENGINEER PRIOR TO CONSTRUCTION. ANY AND ALL DAMAGE TO EXISTING UTILITY LINES RESULTING FROM CONTRACTOR
NEGLIGENCE SHALL BE REPAIRED SOLELY AT CONTRACTOR EXPENSE.
UTILITY DISCLAIMER
RINDT-M
CDUFF ASSO
CIATES
N
GRAPHIC SCALE
( IN FEET )
1 inch = ft.10
10 5 10 20 40 Pr oj ec t N o:
Sheet No.
C he ck ed
D es ig n:
D ra w n:
Sc al e:
R
-1
/8
/2
D at e:
M :\P ro je ct s\
\r2
7-ci ty o f w oo ds to ck ge ne ra l s er vi ce s\ w el l n o.
(re ve re s ite
)\D ra w in gs \R
-1
D es ig n.
dw g
5/
/2
:3 9p m e le br on
N o.
R ev is io ns D at e
R
-1
D es ig n.
dw g
In iti al
PR
O
D U
C
TI
O N
W
EL
LS
A
N D
T R
EA
TM
EN
T
BU
IL
D
IN
G S
C
IT
Y O
F W
O O
D
ST
O C
K ww w.
RI
ND
T.
co m
4 C he ro ke e S tre et
- M ar iet ta, G a.
Ph on e:
(7
) 4
-8
AA
B
BA
R BA
R
1" =1
0'
EX
IS
TI
N G
C O
N D
IT
IO
N S
D
EM
O
LI
TI
O N
P
LA
N
WSK-D1 PRODUCTION WELL
N:1491637.6995 E:2195569.9350
ELEVATION: 867.0
A. PROTECTION:
1. PERFORM DEMOLITION SO AS TO PREVENT DAMAGE TO ADJACENT
IMPROVEMENTS AND TREES TO REMAIN.
2. PROTECT NEW OR EXISTING WORK FROM DAMAGE DURING DEMOLITION
OPERATIONS.
3. PROTECT EXISTING SITE APPURTENANCES AND LANDSCAPING TO REMAIN.
4. DAMAGES: WITHOUT COST TO THE OWNER AND WITHOUT DELAY, REPAIR ANY
DAMAGES CAUSED TO FACILITIES TO REMAIN.
5. CONTRACTOR TO MAINTAIN ONE LANE OF TRAFFIC AT ALL TIMES.
6. CONTRACTOR TO ESTABLISH TEMPORARY SUPPORT FOR EXISTING UTILITIES
AND MAINTAIN IT THROUGHOUT CONSTRUCTION AS NEEDED.
7. CONTRACTOR TO MAINTAIN UTILITY SERVICE DURING CONSTRUCTION, WITH
MINIMAL INTERRUPTION.
8. CONTRACTOR TO BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGED CURB
OR DRIVEWAYS DURING CONSTRUCTION.
B. REMOVAL & DISPOSAL OF DEMOLISHED MATERIALS:
1. ALL DEMOLISHED OR REMOVED ITEMS AND MATERIALS SHALL BE CONSIDERED
SCRAP EXCEPT FOR THOSE INDICATED TO REMAIN, THOSE INDICATED TO BE
REINSTALLED, THOSE INDICATED TO BE SALVAGED, AND HISTORICAL ITEMS.
2. CONSTRUCTION OR ITEMS INDICATED TO REMAIN SHALL BE PROTECTED
AGAINST DAMAGE DURING DEMOLITION OPERATIONS.
3. PROMPTLY DISPOSE OF MATERIALS RESULTING FROM DEMOLITION
OPERATIONS. DO NOT ALLOW MATERIALS TO ACCUMULATE ON SITE.
4. TRANSPORT MATERIALS RESULTING FROM DEMOLITION OPERATIONS AND
LEGALLY DISPOSE OF OFF-SITE.
5. OFF-SITE DISPOSAL LOCATION SHALL NOT BE WITHIN ONE-HALF MILE OF ANY
PORTION OF THE PROJECT SITE OR WITHIN SIGHT OF THE PROJECT SITE.
6. DO NOT BURN REMOVED MATERIALS ON PROJECT SITE.
7. REMOVE EXISTING VEGETATION AS REQUIRED.
C. POLLUTION CONTROLS:
1. CONTROL THE SPREAD OF DUST AND DIRT WITH PRACTICAL MEANS.
2. OBSERVE ENVIRONMENTAL PROTECTION REGULATIONS.
3. DO NOT ALLOW WATER USAGE THAT RESULTS IN FREEZING OR FLOODING.
4. DO NOT ALLOW ADJACENT IMPROVEMENTS TO REMAIN TO BECOME SOILED BY
DEMOLITION OPERATIONS.
D. CLEANING:
1. REMOVE TOOLS AND EQUIPMENT. DISPOSE OF SCRAP.
2. LEAVE EXTERIOR AREAS FREE OF DEBRIS.
3. CLEAN SOIL, SMUDGES, AND DUST FROM SURFACES TO REMAIN.
4. RETURN STRUCTURES AND SURFACES TO REMAIN TO CONDITION EXISTING
PRIOR TO COMMENCEMENT OF DEMOLITION.
DEMOLITION NOTES
SOIL SERIES
W
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
WALL
W
ALL
CONCRETE SWALE
36" CMP
GRAVEL
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
R
EV
ER
E
D R
IV
E
' R
/W
16" DIP
4" DIP
4" DIP
X X
XXX
X X
X X
X X
X
X X X X
X
16" DIP
4" DIP
TAP INTO EXISTING
WATER MAIN
6' CHAIN LINK FENCE
FENCE GATE
FENCE GATE
4" GATE VALVE
4" X 16" MJ REDUCER (TYP.)
SEE DETAIL PAGE 10
2" DIP DRAIN TO DAYLIGHT
(BOTTOM OF 16" PIPE)
2" DIP BLOWOFF
TO DAYLIGHT
THRUST BLOCK (TYP.)
SEE DETAIL PAGE 12
2" GATE VALVE
2" GATE VALVE
WELL SHED (SEE DETAIL SHEET 13)
4" DIP BLOW OFF
6" PVC DRAIN
4" D
IP
RINDT-M
CDUFF ASSO
CIATES
N
Pr oj ec t N o:
Sheet No.
C he ck ed
D es ig n:
D ra w n:
Sc al e:
R
-1
/8
/2
D at e:
M :\P ro je ct s\
\r2
7-ci ty o f w oo ds to ck ge ne ra l s er vi ce s\ w el l n o.
(re ve re s ite
)\D ra w in gs \R
-1
D es ig n.
dw g
5/
/2
:3 9p m e le br on
N o.
R ev is io ns D at e
R
-1
D es ig n.
dw g
In iti al
PR
O
D U
C
TI
O N
W
EL
LS
A
N D
T R
EA
TM
EN
T
BU
IL
D
IN
G S
C
IT
Y O
F W
O O
D
ST
O C
K ww w.
RI
ND
T.
co m
4 C he ro ke e S tre et
- M ar iet ta, G a.
Ph on e:
(7
) 4
-8
AA
B
AA
B BA
R
1" =1
0'
SI
TE
P
LA
N
UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON THE PLANS AND THE EXISTING UTILITY LINES THAT ARE SHOWN ARE APPROXIMATE LOCATIONS ONLY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES HAVING UTILITIES WITHIN OR
ADJACENT TO THE WORK AREA. THE CONTRACTOR SHALL COORDINATE CLOSELY WITH THESE
UTILITY COMPANIES AS NECESSARY REGARDING MODIFICATIONS TO EXISTING SYSTEMS OR
ADAPTATIONS FOR NEW SERVICE CONNECTIONS. ANY DEVIATIONS FROM THE NEW UTILITY DESIGN LOCATIONS SHOWN IN THESE PLANS SHALL BE REPORTED TO THE PROJECT ENGINEER PRIOR TO CONSTRUCTION. ANY AND ALL DAMAGE TO EXISTING UTILITY LINES RESULTING FROM CONTRACTOR
NEGLIGENCE SHALL BE REPAIRED SOLELY AT CONTRACTOR EXPENSE.
UTILITY DISCLAIMER
1. CONTRACTOR TO MAINTAIN AT LEAST ONE LANE OF TRAFFIC AT ALL TIMES.
CONTRACTOR TO REOPEN ALL LANES AFTER WORK HOURS, PLATED OR OTHERWISE. IF
ALL LANES CANNOT BE REOPENED, CONTRACTOR SHALL PLACE VARIABLE MESSAGE
SIGNS ON BOTH SIDES OF LANE CLOSURE AND ALERT DCDOT.
2. ALL CONCRETE FORMWORK AND REINFORCING BARS TO BE INSPECTED BY THE FIELD
REPRESENTATIVE IN CONJUNCTION WITH THE CONTRACTOR'S REPRESENTATIVE BEFORE
CONCRETE IS POURED.
3. CONTRACTOR TO ESTABLISH TEMPORARY SUPPORT FOR EXISTING UTILITIES AND
MAINTAIN IT THROUGHOUT CONSTRUCTION.
4. CONTRACTOR TO MAINTAIN UTILITY SERVICES DURING CONSTRUCTION, WITH MINIMAL
INTERRUPTION.
5. CONTRACTOR TO BE RESPONSIBLE FOR THE PROTECTION AND NECESSARY REPAIR OF
ANY DAMAGED CURB OR DRIVEWAYS DURING CONSTRUCTION.
6. CONTRACTOR TO COORDINATE WITH CONFLICTING UTILITIES AND PAY FOR ANY
RELOCATION EXPENSES AS PART OF THIS CONTRACT.
7. CONTRACTOR TO USE A PROFESSIONAL SURVEYOR TO STAKE OUT PROJECT.
8. ALL BURIED PIPES TO BE INSPECTED BY THE ENGINEER PRIOR TO COVER.
9. ALL CONCRETE SHALL BE CLASS C, 3,000 PSI AT 28 DAYS COMPRESSIVE STRENGTH
WITH A MAXIMUM SLUMP OF 4" UNLESS NOTED OTHERWISE. ALL EXPOSED CONCRETE TO
HAVE A FINE BROOM FINISH.
10. ALL MATERIALS SHALL BE NEW UNLESS USED/SALVAGED MATERIALS ARE AUTHORIZED
BY THE OWNER.
11. NECESSARY BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER TRAFFIC CONTROL
METHODS AS MAY BE NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC,
SHALL BE PROVIDED AND MAINTAINED THROUGHOUT THE CONSTRUCTION PROCESS.
SITE NOTES
SITE PIPING NOTES
WELL HOUSE
15' X 20'
GRAPHIC SCALE
( IN FEET )
1 inch = ft.10
10 5 10 20 40
W
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
O H
E
WALL
W
ALL
CONCRETE SWALE
36" CMP
GRAVEL
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
878870
R
EV
ER
E
D R
IV
E
' R
/W
16" DIP
4" DIP
4" DIP
X X
XXX
X
X X
X X
X
X
X X X X
X
16" DIP
4" DIP
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
4" D
IP
RINDT-M
CDUFF ASSO
CIATES
N
Pr oj ec t N o:
Sheet No.
C he ck ed
D es ig n:
D ra w n:
Sc al e:
R
-1
/8
/2
D at e:
M :\P ro je ct s\
\r2
7-ci ty o f w oo ds to ck ge ne ra l s er vi ce s\ w el l n o.
(re ve re s ite
)\D ra w in gs \R
-1
D es ig n.
dw g
5/
/2
:3 9p m e le br on
N o.
R ev is io ns D at e
R
-1
D es ig n.
dw g
In iti al
PR
O
D U
C
TI
O N
W
EL
LS
A
N D
T R
EA
TM
EN
T
BU
IL
D
IN
G S
C
IT
Y O
F W
O O
D
ST
O C
K ww w.
RI
ND
T.
co m
4 C he ro ke e S tre et
- M ar iet ta, G a.
Ph on e:
(7
) 4
-8
AA
B
AA
B BA
R
1" =1
0' G
R
AD
IN
G
P
LA
N
UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON THE PLANS AND THE EXISTING UTILITY LINES THAT ARE SHOWN ARE APPROXIMATE LOCATIONS ONLY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES HAVING UTILITIES WITHIN OR
ADJACENT TO THE WORK AREA. THE CONTRACTOR SHALL COORDINATE CLOSELY WITH THESE
UTILITY COMPANIES AS NECESSARY REGARDING MODIFICATIONS TO EXISTING SYSTEMS OR
ADAPTATIONS FOR NEW SERVICE CONNECTIONS. ANY DEVIATIONS FROM THE NEW UTILITY DESIGN LOCATIONS SHOWN IN THESE PLANS SHALL BE REPORTED TO THE PROJECT ENGINEER PRIOR TO CONSTRUCTION. ANY AND ALL DAMAGE TO EXISTING UTILITY LINES RESULTING FROM CONTRACTOR
NEGLIGENCE SHALL BE REPAIRED SOLELY AT CONTRACTOR EXPENSE.
UTILITY DISCLAIMER
GENERAL GRADING NOTES
WELL HOUSE
15' X 20'
GRAPHIC SCALE
( IN FEET )
1 inch = ft.10
STATIC WATER LEVEL = 6.7'
BELOW TOP OF CASING
DRAW DOWN WATER LEVEL = 78'
BELOW TOP OF CASING
WELL WSK-D1
TOP OF CASING ELEVATION = 878.0
EXISTING GRADE ELEVATION = 876.0
12" DIA. BOREHOLE
82' DEPTH
82' OF 8" STEEL CASING
SUBMERSIBLE TURBINE PUMP
PUMP TOP AT ELEV. 780
SUBMERSIBLE LEVEL TRANSMITTER AT ELEV. 785
BOTTOM OF WELL ELEVATION = 376.0
8" BORE HOLE FROM 82 TO 300 FT
AVERAGE MAXIMUM WATER
SYSTEM PRESSURE = 1242
AVERAGE MINIMUM WATER
SYSTEM PRESSURE = 1229
6" BORE HOLE FROM 300 - 500 FT
Pr oj ec t N o:
Sheet No.
C he ck ed
D es ig n:
D ra w n:
Sc al e:
R
-1
/8
/2
D at e:
M :\P ro je ct s\
\r2
7-ci ty o f w oo ds to ck ge ne ra l s er vi ce s\ w el l n o.
(re ve re s ite
)\D ra w in gs \R
-1
D es ig n.
dw g
5/
/2
:3 9p m e le br on
N o.
R ev is io ns D at e
R
-1
D es ig n.
dw g
In iti al
PR
O
D U
C
TI
O N
W
EL
LS
A
N D
T R
EA
TM
EN
T
BU
IL
D
IN
G S
C
IT
Y O
F W
O O
D
ST
O C
K ww w.
RI
ND
T.
co m
4 C he ro ke e S tre et
- M ar iet ta, G a.
Ph on e:
(7
) 4
-8
AA
B
AA
B BA
R
AS
S
H O
W N
H
YD
R
AU
LI
C
G R
AD
E
UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON THE PLANS AND THE EXISTING UTILITY LINES THAT ARE SHOWN ARE APPROXIMATE LOCATIONS ONLY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES HAVING UTILITIES WITHIN OR
ADJACENT TO THE WORK AREA. THE CONTRACTOR SHALL COORDINATE CLOSELY WITH THESE
UTILITY COMPANIES AS NECESSARY REGARDING MODIFICATIONS TO EXISTING SYSTEMS OR
ADAPTATIONS FOR NEW SERVICE CONNECTIONS. ANY DEVIATIONS FROM THE NEW UTILITY DESIGN LOCATIONS SHOWN IN THESE PLANS SHALL BE REPORTED TO THE PROJECT ENGINEER PRIOR TO CONSTRUCTION. ANY AND ALL DAMAGE TO EXISTING UTILITY LINES RESULTING FROM CONTRACTOR
NEGLIGENCE SHALL BE REPAIRED SOLELY AT CONTRACTOR EXPENSE.
UTILITY DISCLAIMER
VERTICAL SCALE: 1" = 30'
HORIZONTAL SCALE: N.T.S.
PROVIDED BY EMERY & GARRET GROUNDWATER INVESTIGATIONS
UTILITY HEATER
12" SQ. WALL FAN
12" ABOVE F.F.
SHELVES
CHEMICAL PUMP
12"x12"
DRAIN
INLET
CHLORINE
ANALYZER LEVEL
MONITOR
ELEC. PANELS
FLOURIDE CAUSTIC
10' WIDE ROLL
UP DOOR
G
2" DIP
SHELVES
M CVG D
6" HDPE PIPE DRAIN TO
DAYLIGHT W/ SCREEN 6" DIP BLOW OFF TO
DAYLIGHT W/ SCREEN
4" DIP PIPE
TO CITY
PRESSURE
GAUGE
GATE
VALVE TURBINE
METER
SILENT
CHECK
VALVE
DIAPHRAGM
VALVE
GATE
VALVE
CHLORINECHLORINE
4' X 4' CONCRETE
LANDING
FROM WELL
SAMPLE
TAP
4" DIP 4" DIP
TAP
Pr oj ec t N o:
Sheet No.
C he ck ed
D es ig n:
D ra w n:
Sc al e:
R
-1
/8
/2
D at e:
M :\P ro je ct s\
\r2
7-ci ty o f w oo ds to ck ge ne ra l s er vi ce s\ w el l n o.
(re ve re s ite
)\D ra w in gs \R
-1
D es ig n.
dw g
5/
/2
:3 9p m e le br on
N o.
R ev is io ns D at e
R
-1
D es ig n.
dw g
In iti al
PR
O
D U
C
TI
O N
W
EL
LS
A
N D
T R
EA
TM
EN
T
BU
IL
D
IN
G S
C
IT
Y O
F W
O O
D
ST
O C
K ww w.
RI
ND
T.
co m
4 C he ro ke e S tre et
- M ar iet ta, G a.
Ph on e:
(7
) 4
-8
AA
B
AA
B BA
R
3/ 4"
=1
M
EC
H
AN
IC
AL
P
LA
N
UTILITIES MAY EXIST WHICH ARE NOT SHOWN ON THE PLANS AND THE EXISTING UTILITY LINES THAT ARE SHOWN ARE APPROXIMATE LOCATIONS ONLY. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING
UTILITY LINE LOCATIONS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ALSO BE
RESPONSIBLE FOR COORDINATING WITH ALL UTILITY COMPANIES HAVING UTILITIES WITHIN OR
ADJACENT TO THE WORK AREA. THE CONTRACTOR SHALL COORDINATE CLOSELY WITH THESE
UTILITY COMPANIES AS NECESSARY REGARDING MODIFICATIONS TO EXISTING SYSTEMS OR
ADAPTATIONS FOR NEW SERVICE CONNECTIONS. ANY DEVIATIONS FROM THE NEW UTILITY DESIGN LOCATIONS SHOWN IN THESE PLANS SHALL BE REPORTED TO THE PROJECT ENGINEER PRIOR TO CONSTRUCTION. ANY AND ALL DAMAGE TO EXISTING UTILITY LINES RESULTING FROM CONTRACTOR
NEGLIGENCE SHALL BE REPAIRED SOLELY AT CONTRACTOR EXPENSE.
UTILITY DISCLAIMER
NOTES:
1. STATIC PRESSURE @ WELL HOUSE PIPE (AT F.F.E.): 148-156 PSI
2. THE…