Revised_Specs,_proposal_form,_31_23_00,_Earthwork,_31_23_00_&_Gabion_Baskets,_31_37_10.pdf

PDF 1 MB Posted

Attached to
CLASS 2 LANDFILL PARTIAL CLOSURE
Solicitation number
RFP #27027
Issued by
Greenville County, South Carolina

About this file

This is a proposal form and technical specifications document for Greenville County, South Carolina's Class 2 Landfill Partial Closure construction project at the Twin Chimneys Landfill. The project scope includes construction of a stormwater pond, subgrade preparation, structural fill for a perimeter berm, a stone access road, and erosion control measures including silt fence, erosion control blankets, seeding, and gabion baskets. The work requires approximately 301,000 cubic yards of excavation, with 112,000 cubic yards of structural fill, 184,000 cubic yards of stockpiled soil, 4,000 cubic yards of weathered rock, and 2,000 cubic yards of competent rock. Additional line items include 10,000 square yards of access road geotextile, 6,700 tons of access road stone, 82,250 square yards of erosion control blanket, 3 gabion baskets, 1,180 linear feet of silt fence, 4 silt fence outlets, and 30 acres of seeding. Proposals were due November 16, 2026 at 3:00 p.m., with substantial completion required within 210 calendar days of the Notice to Proceed. Award was tentatively scheduled for November 30, 2026, with contract negotiations from November 30 through December 18, 2026 and Notice to Proceed anticipated by December 18, 2026.

Pricing must be submitted on the provided proposal forms with unit prices for most items and lump sum pricing for bonds, insurance, mobilization, demobilization, construction quality control, survey and control, and the sediment basin. The contractor is responsible for verifying all quantities independently and must engage a South Carolina-licensed independent soils laboratory for construction quality control testing and a South Carolina-licensed surveyor for survey and as-built documentation. Bid bonds must equal 5% of the bid price, and a performance and payment bond for the total bid price is due within fifteen working days of award. Insurance requirements include comprehensive general liability of $1,000,000 per occurrence and $2,000,000 aggregate, automobile liability of $1,000,000 per occurrence, and statutory workers' compensation. Evaluation will be based on six equally weighted criteria: responsiveness to the RFP, experience and past performance, project approach and schedule, pricing, equipment, and references. The contract documents incorporate EJCDC C-700 (2018) and C-800 standards, with provisions for equitable adjustment if differing site conditions are encountered. Payment terms are firm and based on payment in thirty days.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HDR Project No. 10404585 Greenville County October 2026 Twin Chimneys Class 2 Landfill Partial Closure Issued for Proposals

PROPOSAL FORM

00 42 13 - 1

SECTION 00 42 13

PROPOSAL FORM

PROJECT IDENTIFICATION: Twin Chimneys Class 2 Landfill Partial Closure

THIS PROPOSAL IS SUBMITTED TO: Mr. Robert Brewer, Director, Procurement Services Division, Greenville County, hereinafter referred to as OWNER.

1. PROPOSAL PRICE

A. The Base Proposal Schedule in the following section outlines all major components of the Work required to complete the project as specified. The Base Proposal Total indicated in numbers and in words at the end of the Base Proposal Schedule, shall be used for determination of the successful Proposer.

B. The Proposer is directed to Base Proposal Schedule and Measurement and Basis for Payment for a narrative description of each item in the Base Proposal Schedule.

C. The quantities outlined below represent an approximation as estimated by the Engineer. All quantities depicted in the Base Proposal Schedule, represent in-place, constructed quantities (as constructed in the proposed Work). The Proposer is responsible for verifying quantities for bidding. Engineer’s estimated quantities are provided for informational purposes only and are not to be relied upon as the sole basis for the Proposal.

D. Lump sum line items will constitute the total payment for the Work.

E. Unit price items will be measured and payment will be for the actual quantity.

In the event the Owner desires to modify the quantity (reduce or increase) of work for one or more lump sum Proposal Schedule line items during construction, the general basis for establishing the corresponding change in contract price will be to divide the lump sum bid price by the Engineer’s estimated quantity, thereby yielding a unit price by which to modify the line item total price. Other methods for price adjustment may be considered at the Owner’s and Engineer’s discretion.

2. BASE PROPOSAL SCHEDULE

A. PROPOSER will complete the Work in accordance with the Contract Documents for the following prices:

Item

Description

Estimated

Quantity

Units

Payment

Total Cost

1. Bonds, Insurance, Mobilization, and Demobilization 1 LS LS $_____________

2. Construction Quality Control 1 LS LS $_____________

3. Survey and Control 1 LS LS $_____________

4. Earthwork

4a. Structural Fill 112,000 CY $_________/CY $_____________

4b. Stockpile Soil 184,000 CY $_________/CY $_____________

Addendum No. 1 - Issued October 30, 2026

PROPOSAL FORM

00 42 13 - 2

Item

Description

Estimated

Quantity

Units

Payment

Total Cost

4c. Weathered Rock 4,000 CY $_________/CY $_____________

4d Competent Rock 2,000 CY $_________/CY $_____________

5. Sediment Basin 1 LS LS $_____________

6. Access Road – Geotextile 10,000 SY $_________/SY $_____________

7. Access Road – Stone 6,700 TON $_________/TON $_____________

8. Erosion Control Blanket 82,250 SY $_________/SY $_____________

9. Gabion Basket 3 EA $_________/EA $_____________

10. Silt Fence 1,180 LF $_________/LF $_____________

11. Silt Fence Outlet 4 EA $_________/EA $_____________

12. Seeding 30 AC $_________/AC $_____________

TOTAL BASE PROPOSAL PRICE IN NUMBERS $

IN WORDS

3. MEASUREMENT AND BASIS FOR PAYMENT

The line items below provide further description of the Work listed in the Proposal Schedule. Some of the line items include approximate quantities as estimated by the ENGINEER. The CONTRACTOR shall not rely on the quantities given but shall instead estimate all quantities independently as required to complete the Proposal. The price associated with each Lump Sum item shall be the full compensation paid for the Work described, regardless of the ENGINEER’s or CONTRACTOR’s estimated quantity. For Lump Sum items, no claim shall be made by the CONTRACTOR for deviations between the CONTRACTOR's estimated quantity and the actual quantity required to complete the Work described.

A. Base Proposal Schedule:

1. BONDS, INSURANCE, AND MOBILIZATION: This Work shall consist of securing the appropriate bonds and insurance policies for the Project, and performance of preparatory construction operations, including the movement of personnel and equipment to the Project site, safety equipment and other facilities to begin work on a substantial phase of the Contract. Payment for this item will be made on a Lump Sum basis, wherein no measurement will be made. The Lump Sum price proposed shall be full compensation for performing the Work specified and the furnishing of all materials, labor, tools, equipment, and incidentals necessary to mobilize and subsequently demobilize.

1. CONSTRUCTION QUALITY CONTROL: This Work shall consist of testing of the structural fill for the sediment basin and perimeter berm. Payment for this item shall be made on a lump sum basis.

2. SURVEY AND CONTROL: This Work shall consist of all survey and control work required by the Contract Documents. This includes establishment of appropriate local site benchmarks, baseline (initial conditions) survey, stakeout of elevation and positional information required to complete the construction, obtaining all survey information required

PROPOSAL FORM

00 42 13 - 3 to compile Record (As-Built) survey as required by the Contract Documents. Payment for this item shall be made on a lump sum basis.

3. EARTHWORK: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to excavate, fill, haul, and stockpile material. The quantities for each are for planning purposes and may not reflect the actual quantity. This item includes excavation of 301,000 CY of material. Payment will be made on a unit price basis wherein measurement will be made by electronic survey before and after.

3a. Structural Fill: This work shall consist of excavation and placement of approximately 112,000 CY of the excavated material to be used as structural fill for the berm/road and stormwater pond. Testing in accordance with specification 31 23 00.

3b. Miscellaneous Soil: This work shall consist of excavation and stockpiling of soil that is not used for structural fill. The locations of the stockpiles are shown on drawing 21G-

01. Compaction of the stockpile to be “tracked in”.

3c. Weathered Rock: This work shall consist of excavate weathered rock encountered then haul and stockpile the rock in the designated rock stockpile show on drawing 21G-01 near the cellular tower. Refer to specification 31 23 00 for the definition of weathered rock.

3d. Competent Rock: This work shall consist of excavate competent rock encountered then haul and stockpile the rock in the designated rock stockpile show on drawing 21G-01 near the cellular tower. Refer to specification 31 23 00 for the definition of weathered rock.

4. SEDIMENT BASIN: This Work shall consist of furnishing all materials, labor, equipment, and appurtenances necessary for the installation of the sediment basin that includes skimmer/riser/barrel structure, apron outlet emergency spillway and baffles. The skimmer will be provided by the Owner. Contractor to install the skimmer. The excavation, grading, seeding, erosion control blanket are not part of this line item. Payment for this item will be made on a Lump Sum basis, wherein no measurement will be made.

5. ACCESS ROAD – GEOTEXTILE: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to install geotextile for the access road on the perimeter berm. Payment will be made on a unit price basis wherein measurement will be made.

6. ACCESS ROAD – STONE: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to install stone on the access road on the perimeter berm. Payment will be made on a unit price basis wherein measurement will be made by truck tickets.

7. EROSION CONTROL MATTING: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to install erosion control matting on disturbed slopes and channels and in areas directed by the engineer. Payment will be made on a unit price basis wherein measurement will be made.

8. GABION BASKET: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to install gabion baskets per Contract Documents.

Payment will be made on a unit price basis wherein measurement will be made.

9. SILT FENCE: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to install silt fence per Contract Documents. Payment will be made on a unit price basis wherein measurement will be made.

10. SILT FENCE OUTLETS: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to install silt fence outlets per Contract Documents. Payment will be made on a unit price basis wherein measurement will be made.

11. SEEDING: This Work shall consist of furnishing all necessary materials, equipment, labor, and appurtenances necessary to provide permanent seeding on disturbed areas and in

PROPOSAL FORM

00 42 13 - 4 areas directed by the engineer. Payment will be made on a unit price basis wherein measurement will be made.

4. UNIT PRICE DEVIATIONS

The PROPOSER is responsible for providing Unit Prices consistent with typical industry norms for the Work described. Unit Prices which appear inconsistent with typical prices for similar Work shall be justified by the PROPOSER at the request of the ENGINEER. Providing Unit Prices which do not reasonable reflect the Work described, either high or low, which are not justified satisfactorily to the ENGINEER, may deem the PROPOSER non-responsive and invalidate their Proposal.

5. COMPLETION

PROPOSER agrees that the Work will be substantially completed and ready for final payment in accordance with the General Conditions.

PROPOSER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.

6. ATTACHED DOCUMENTS

Required Proposal Security in the form of _______________________.

7. ADDRESS FOR COMMUNICATIONS

Communications concerning this Proposal shall be addressed to:

Contact Name: ____________________________________________

Contact Email address: _________________________________________

Contact Telephone Number: _____________________________________

SUBMITTED on ________________________________________, 20___.

If BIDDER is:

An Individual

By_____________________________________________________ (SEAL) (Individual's name)

Doing business as:

Business address: __________________________________

PROPOSAL FORM

00 42 13 - 5

A Partnership

By_____________________________________________________(SEAL) (Firm name)

(General partner)

Business address: ____________________________

A Corporation

By_____________________________________________________ (SEAL) (Corporation name)

(State of incorporation)

By_____________________________________________________ (SEAL) (Name of person authorized to sign)

(Title)

(Corporate Seal)

Attest ________________________________________________________________________________

(Secretary)

Business address: _____________________________________________

A Joint Venture

By_____________________________________________________ (SEAL) (Name)

Business address:

By____________________________________________ (SEAL) (Name)

Business address: _________________________________

PROPOSAL FORM

00 42 13 - 6

Date of Qualification / License in South Carolina to do business is _____________________.

NOTE: Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above.

END OF SECTION

EARTHWORK

31 23 00 - 1

SECTION 31 23 00

EARTHWORK

PART 1 - 0BGENERAL

1.1 3BSUMMARY

A. 15BSection Includes:

1. Earthwork.

B. 16BRelated Specification Sections include but are not necessarily limited to:

1. Section 01 30 00 – Special Conditions.

2. Section 01 45 29 – Testing Laboratory Services

3. Section 31 32 19 – Geotextiles.

1.2 4BQUALITY ASSURANCE

A. 17BReferenced Standards:

1. ASTM International (ASTM):

a. C33, Standard Specification for Concrete Aggregates.

b. D698, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ftP

P).

c. D1557, Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ftP

P(2,700 kN-m/m)).

d. D2487, Standard Classification of Soils for Engineering Purposes (Unified Soil Classification System

e. D3786, Standard Test Method for Bursting Strength of Textile Fabrics--Diaphragm Bursting Strength Tester Method.

f. D4632, Standard Test Method for Grab Breaking Load and Elongation of Geotextiles.

g. D6938, Standard Test Method for In Place Density and Water Content of Soil and Soil Aggregate by Nuclear Methods (Shallow Depth).

B. CONTRACTOR to hire an independent soils laboratory (CQC Consultant) to conduct the specified tests to assure that all work complies with this Specification.

1.3 5BDEFINITIONS

A. Cohesive Soils: Soils which do not crumble and are plastic when moist. These soils include clayey silt, sandy clay, silty clay, clay and organic clay.

B. 2Cohesionless Soils: Granular soils, such as gravel and clean sand whose strength depends on friction between particles.

C. 23Excavation: Classified as common excavation, rock excavation, or unclassified excavation in accordance with the following definitions:

1. Common (Soil) Excavation: Defined as the excavation of all materials that can be excavated, transported, and unloaded using heavy ripping equipment and wheel tractor-scrapers with pusher tractors; or that can be excavated and dumped into place or loaded onto hauling equipment by excavators equipped with attachments (shovel, bucket, backhoe, dragline, or clam shell) appropriate to the material type, character, and nature of the materials.

2. Weathered Rock Excavation: Defined as the excavation of compacted material that require the use of a ripper by a Caterpillar D9 (or equivalent) and/or hydraulic hammering (minimum of 7,000 lb. hammer).

3. Competent Rock Excavation: Defined as the excavation of all hard, compacted, or cemented materials that cannot be removed by a Caterpillar D9 (or equivalent) and/or

EARTHWORK

31 23 00 - 2 hydraulic hammering (minimum of 7,000 lb hammer) that requires blasting. CONTRACTOR is responsible for obtaining all necessary permits for blasting. The excavation of isolated boulders or rock fragments larger than 2 cubic yard is not considered competent

D. When rock is encountered demonstrate it’s presence to the satisfaction of the ENGINEER and then strip free of earth for survey. Employ an independent surveyor to determine rock quantities and obtain approval of quantity to be removed from ENGINEER before beginning removal operations.

1. In computing the volumetric content of rock excavation for payment, the pay lines shall be taken from rock surface to proposed subgrade.

E. 27BSoils Engineer

1. Provided and paid for by the Contractor as part of Construction Quality Control (CQC).

Refer to Specification Section 01 30 00 and 01 45 29.

1.4 6BSUBMITTALS

A. 28BShop Drawings:

1. See Specification Section 01 33 00 for requirements for the mechanics and administration of the submittal process.

2. Product data including:

a. Acknowledgement that product submitted meets requirements of this specification.

3. Testing

a. Submit test results of materials for proposed use.

B. Miscellaneous;

1. Reports

a. Refer to 01 45 29.

b. Field Reports from the Soils Engineer.

c. Soils test results throughout construction.

d. Test results of in-place materials prepared by a Professional Engineer licensed in South Carolina.

2. Survey:

a. Refer to 01 30 00.

b. As-built survey of final site conditions

c. Before and after survey of rock.

PART 2 - 1BPRODUCTS

2.1 7BMATERIALS

A. 29BStructural Fill:

a. Selected material, from on-site excavation, recommended by Soils Engineer and approved by Engineer.

b. Moisture Content: As determined by Soils Engineer to achieve the compaction requirements.

c. Free of organic matter, frozen material and debris.

d. Free of stones greater than 4 IN diameter.

B. 30BGeotextile:

1. Refer to Specification 31 32 19.

EARTHWORK

31 23 00 - 3

PART 3 - 2BEXECUTION

3.1 8BPROTECTION

A. 31BProtect existing surface within the work area as follows:

1. Provide barricades, coverings, or other types of protection necessary to prevent damage to existing items indicated to remain in place.

2. Protect and maintain existing structures (groundwater monitoring wells, landfill gas monitoring wells, landfill gas extraction wells, landfill gas pipes, stormwater culverts).

a. If disturbed or destroyed, replace at own expense to full satisfaction of Owner and controlling agency.

3. Verify location of utilities.

a. Omission or inclusion of utility items does not constitute nonexistence or definite location.

b. Locate existing structures. Verify with Owner.

c. Take necessary precautions to protect existing utilities from damage due to any construction activity.

d. Repair damages to utility items at own expense.

e. In case of damage, notify Owner at once so required protective measures may be taken.

4. Maintain free of damage structures and access roads not indicated to be removed.

a. Any item known or unknown or not properly located that is inadvertently damaged shall be repaired to original condition.

b. All repairs to be made and paid for by Contractor.

5. Provide full access to fire hydrants, access roads, and other points as designated by Owner to prevent serious interruption of site operations.

6. Maintain stockpiles and excavations in such a manner to prevent inconvenience or damage to structures on-site or on adjoining property.

7. Avoid surcharge or excavation procedures which can result in heaving, caving, or slides.

B. Salvageable Items: Carefully remove items to be salvaged, and store on Owner's premises unless otherwise directed.

C. Dispose of waste materials in the landfill.

1. Burning, as a means of waste disposal, is not permitted.

3.2 9BSITE GRADING

A. The work includes all operations in connection with excavation, borrow, construction of fills and embankments, rough grading, and disposal of excess materials in connection with the preparation of the site(s) for construction.

B. Excavation and Grading:

1. The excavation classifications for this project is soil and rock.

2. Perform as required by the Contract Drawings.

3. Contract Drawings may indicate both existing grade and finished grade required for construction of Project.

a. Stake all structures, piping and roads and establish their elevations.

b. Perform other layout work required.

4. Preparation of ground surface for embankments or fills:

a. Before fill is started, scarify to a minimum depth of 6 IN in all proposed embankment and fill areas.

EARTHWORK

31 23 00 - 4

b. Where ground surface is steeper than one vertical to four horizontal, plow surface in a manner to bench and break up surface so that fill material will bind with existing surface.

5. Protection of finish grade:

a. During construction, shape and drain embankment and excavations.

b. Maintain drainage at all times.

c. Protect graded areas against action of elements prior to acceptance of work.

d. Reestablish grade where settlement or erosion occurs.

C. Borrow:

1. Borrow material from the excavation area.

2. Provide necessary amount of fill compacted to density equal to that indicated in this Specification.

3. Fill material to be approved by Soils Engineer and Engineer prior to placement.

D. Construct embankments and fills as required by the Contract Drawings:

1. Construct embankments and fills at locations and to lines of grade indicated.

a. Completed fill shall correspond to shape of typical cross section or contour indicated regardless of method used to show shape, size, and extent of line and grade of completed work.

2. Provide approved fill material which is free from roots, organic matter, trash, frozen material, and stones having maximum dimension greater than 4 IN.

a. Ensure that stones larger than 4 IN are not placed in upper 6 IN of fill or embankment.

b. Do not place material in layers greater than 8 IN loose thickness.

c. Place layers horizontally and compact each layer prior to placing additional fill.

3. Compact by sheepsfoot, pneumatic rollers, vibrators, or by other equipment as required to obtain specified density.

a. Control moisture for each layer necessary to meet requirements of compaction.

E. Grading Tolerances: 0.1± FT.

3.3 10BROCK EXCAVATION

A. All rock excavation at the site shall be performed under the rock excavation definition.

1. This classification shall include solid ledge rock in its natural location that requires systematic quarrying, drilling and/or blasting for its removal and also boulders that exceed 1 CY in volume.

3.4 11BUSE OF EXPLOSIVES

A. Blasting of rock shall be approved by Engineer.

B. The use of explosives shall be limited to the magnitude and location of the charge that will not cause damage to adjacent existing construction and utilities through shock vibrations or other stress loadings.

1. Provide adequate blanket protection to ensure that there will not be fragments of rock or other debris flying through the air when discharging explosives.

2. Any damage to existing construction or other features caused by blasting operations to be repaired and paid for by Contractor.

C. Where explosives and blasting are used, comply with all laws and ordinances of municipal, state and Federal agencies relating to the use of explosives.

1. Use qualified personnel for blasting and take proper precautions to protect persons property or the work from damage or injury from blast or explosion.

EARTHWORK

31 23 00 - 5

2. Conduct preblast survey in the company of the Engineer to aid in determining any damage caused by blasting.

3.5 12BFIELD QUALITY CONTROL

A. Include in Construction Quality Control line item the cost of testing services indicated herein as being performed by the Soils Engineer.

B. Moisture density relations, to be established by the Soils Engineer required for all materials to be compacted.

C. Extent of compaction testing of all structural fill will be as necessary to assure compliance with this specification.

D. Give minimum of 48 HR advance notice to Engineer when ready for compaction or subgrade testing and inspection.

E. Should any compaction density test or subgrade inspection fail to meet specification requirements, perform corrective work as necessary.

F. Contractor to pay for all costs associated with corrective work and retesting resulting from failing compaction density tests.

3.6 13BCOMPACTION DENSITY REQUIREMENTS

A. Obtain approval from Soils Engineer with regard to suitability of soils and acceptable subgrade prior to subsequent operations.

B. Remove frozen, loose, wet, or soft material and replace with approved material as directed by Soils Engineer.

C. Provide water and dewatering system necessary to successfully complete compaction and construction requirements. Refer to 01 30 00 for water sources.

D. Perform testing at a minimum frequency of 1 passing test per 400 cubic yards placed.

E. 5Assure by results of testing that compaction densities comply with the following requirements:

1. Cohesive Soils: 95 percent (moisture within +- 3% of optimum moisture) per ASTM D1557.

2. Cohesionless Soils: 95 percent (moisture within +- 3% of optimum moisture) per ASTM D1557.

3.7 14BSPECIAL REQUIREMENTS

A. Erosion Control:

1. Conduct work to minimize erosion of site.

2. Construct stilling areas to settle and detain eroded material.

3. Remove eroded material washed away from the work area.

GABION BASKETS

31 37 10 - 1

SECTION 31 37 10

GABION BASKETS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Work covered in this special provision shall include furnishing, assembling, filling and backfilling woven galvanized wire mesh gabion baskets with rock as specified to the dimensions, lines and grades shown on the plans. Work covered by this specification includes, but is not limited to, excavation; furnishing and placing stone bedding; furnishing and placing geotextile fabric; furnishing, assembling and placing wire mesh baskets;

furnishing stone material; filling baskets with stone material; and backfilling in accordance with this specification.

2. Gabions shall consist of rectangular wire mesh formed containers filled with rock and shall be furnished as baskets as shown on the Drawings. Gabion mesh will conform to one of the following types:

a. Woven mesh—Non-raveling, double twisted, hexagonal wire mesh consisting of two wires twisted together in two 180-degree turns.

b. Welded mesh—Welded-wire mesh with a uniform square or rectangular pattern and a resistance weld at each intersection. The welded wire connections shall conform to the requirements of ASTM A 185, including wire smaller than W1.2 (0.124 in.), except that the welded connections shall have a minimum average shear strength of 70% and minimum shear strength of 60% of the minimum ultimate tensile strength of the wire.

B. Related Specifications include but are not necessarily limited to:

1. Section 31 23 00 – Earthwork.

2. Section 31 32 19 – Geotextiles.

1.2 QUALITY ASSURANCE

A. Reference Standards (America Society For Testing and Materials) ASTM latest edition:

1. ASTM A313 / A313M - 10e1 Standard Specification for Stainless Steel Spring Wire

2. ASTM A370 - 10 Standard Test Methods and Definitions for Mechanical Testing of Steel Product

3. ASTM A641 / A641M - 09a Standard Specification for Zinc-Coated (Galvanized) Carbon Steel Wire

4. ASTM A764 - 07 Standard Specification for Metallic Coated Carbon Steel Wire, Coated at Size and Drawn to Size for Mechanical Springs

5. ASTM A975 - 97(2003) Standard Specification for Double-Twisted Hexagonal Mesh Gabions and Revet Mattresses (Metallic-Coated Steel Wire or Metallic-Coated Steel Wire With Poly(Vinyl Chloride) (PVC) Coating)

6. ASTM B117 - 09 Standard Practice for Operating Salt Spray (Fog) Apparatus

7. ASTM D412 - 06ae2 Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers—Tension

8. ASTM D746 - 07 Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact

9. ASTM D792 - 08 Standard Test Methods for Density and Specific Gravity (Relative Density) of Plastics by Displacement

10. ASTM D2240 - 05(2010) Standard Test Method for Rubber Property-Durometer Hardness

GABION BASKETS

31 37 10 - 2

1.3 SUBMITTALS

A. Submit manufacturer’s product data including installation instructions and manufacturer’s shop drawings including section layout.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Wire (Zinc Coated): all tests on the wire mesh must be performed prior to manufacturing the mesh.

1. Tensile strength: both the wire used for the manufacture of gabions and the selvedge wire, shall have a tensile strength of 54,000 to 75,000 psi, in accordance with ASTM A641-09a (latest revision).

2. Elongations: the test must be carried out on a sample at least 12 in. long. Elongation shall not be less than 12% in accordance with ASTM A370-10.

3. Zinc Coating: minimum quantities of zinc according to ASTM A641-09a, Class III soft temper coating.

4. Adhesion of zinc coating: the adhesion of the zinc coating to the wire shall be such that, when the wire is wrapped six turns around a mandrel having four times the diameter of the wire, it does not flake or crack when rubbing it with the bare fingers, in accordance with ASTM A641-09a.

B. Steel Mesh Properties:

1. Mesh Tensile Strength shall have a minimum strength of 3,500 lb/ft when tested in accordance with ASTM A975 section 13.1.1.

2. Punch Test Resistance shall have a minimum resistance of 6,000 lb when tested in accordance with ASTM A975 section 13.1.4.

3. Connection to selvedges shall have a minimum resistance of 1,400 lb/ft when tested in accordance with ASTM A975.

C. Overlapping Fasteners:

1. Overlapping stainless steel fasteners may be used in lieu of selvedge wire for basket assembly and installation. The spacing of the fasteners during all phases of the assembly and installation shall be in accordance with spacing based on 1,400 lb/ft pull apart resistance for galvanized mesh when tested in accordance with ASTM A975 section 13.1.2, with a nominal spacing of 4 inches, and not to exceed 6 inches.

2. Overlapping stainless steel fasteners may be used in lieu of selvedge wire for basket assembly and installation. The spacing of the fasteners during all phases of the assembly and installation shall be in accordance with spacing based on 1,200 lbs. pull apart resistance for PVC coated mesh and with a nominal spacing of 4 inches, and not to exceed 6 inches.

D. Stainless Steel Galvanized Fasteners: Diameter 0.120inch, according to ASTM A313, Type 302 Class I.

1. Tensile strength: 230,000 to 273,000 psi in accordance with ASTM A764-07.

E. Proper installation of rings: A properly formed hog ring fastener shall have a nominal overlap of one (1) inch after closure

F. Tolerances:

1. Wire: Zinc coating, in accordance with ASTM A641-09a, Class III soft temper coating

2. Gabion sizes: +/- 5% on the length, width, and height.

3. Mesh opening: Tolerances on the hexagonal, double twisted wire mesh opening shall not exceed +/- 10% on the nominal D values.

GABION BASKETS

31 37 10 - 3

G. Rock Fill: Rocks shall be between 4 inches and 8 inches. The range in sizes may allow for a variation of 5% oversize and/or 5% undersize rock, provided it is not placed on the gabion exposed surface.

H. Geotextile Fabrics: Refer to 31 32 19.

2.2 FABRICATION

A. Gabions shall be manufactured and shipped with all components mechanically connected at the production facility. The front, base, back and lid of the gabions shall be woven into a single unit.

The ends and diaphragm(s) shall be factory connected to the base. All perimeter edges of the mesh forming the basket and top, or lid, shall be selvedge with wire having a larger diameter.

B. The gabion is divided into cells by means of diaphragms positioned at approximately 3 foot centers. The diaphragms shall be secured in position to the base so that no additional lacing is necessary at the jobsite.

PART 3 - EXECUTION

3.1 CONSTRUCTION METHODS

A. Foundation Preparation: Excavate area to receive gabions to elevations as indicated on the drawings,.

1. Maintain the foundation in a dry condition.

2. Install the Geotextile fabric in accordance with Section 31 32 19 Geotextile fabrics shall be placed between the gabion baskets and the bedding stone and the surrounding soil.

B. Assembly: Gabions are supplied folded flat and packed in bundles. The units are assembled individually by erecting the sides, ends, and diaphragms, ensuring that all panels are in the correct position, and the tops of all sides are aligned. The four corners shall be connected first, followed by the internal diaphragms to the outside walls. All connections should use lacing wire or fasteners as previously described.

C. Fastening: The procedure for using selvedge wire consists of cutting a sufficient length of wire, and first looping and/or twisting the lacing wire to the wire mesh. Proceed to lace with alternating double and single loops through every mesh opening approximately every 6 inches pulling each loop tight and finally securing the end of the lacing wire to the wire mesh by looping and/or twisting.

1. The use of fasteners shall be in accordance with the manufacturer’s recommendations as specified above.

D. Installation: After assembly, the gabion baskets are carried to their final position and are securely joined together along the vertical and top edges of their contact surfaces using the same connecting procedure(s) described above.

1. Stagger the vertical joints between the gabions of adjacent rows and layers by a half of a cell length.

E. Filling: Baskets shall be filled with rock as specified above. During the filling operation some manual stone placement is required to minimize voids. The rock filling shall be placed in lifts of 12 inches maximum, with a minimum of 2 lifts per gabion or mattress. It is also recommended to slightly overfill the baskets by 1 to 2 inches to allow for settlement of the rock. The exposed faces of vertical structures may be carefully hand placed to give a neat, flat, and compact appearance.

1. The cells shall be filled in stages so that local deformation may be avoided. That is, at no time shall any cell be filled to a depth exceeding 1-foot higher than the adjoining cells.

Behind gabion walls, compact the backfill material simultaneously to the same level as the filled gabions. All backfill must be in accordance with Section 31 23 00.

F. Lid Closing: Once the gabions baskets are completely full, the lids will be pulled tight until the lid meets the perimeter edges of the basket. A tool such as a lid closer can be used. The lid must

GABION BASKETS

31 37 10 - 4 then be tightly laced and/or fastened along all edges, ends and tops of diaphragm(s) in the same manner as described earlier.

G. Mesh Cutting and Folding: Where shown on the drawings or otherwise directed by the Engineer, the basket mesh shall be cut, folded and fastened together to suit existing site conditions. The mesh must be cleanly cut and surplus mesh either folded back or overlapped so that it can be securely fastened together with lacing wire or fasteners in the manner described earlier. Any reshaped gabions shall be assembled, installed, filled and closed as specified in the previous sections.

00 42 13 Proposal Form_AD01
31 23 00 Earthwork_AD01
31 37 10 Gabion Baskets_AD01

File details come from the government source that posted it. Updated .