Revised SOW - Hennipen Canal Debris Removal.docx
DOCX document 45 KB Posted
- Solicitation number
- 21-422DNR-REALT-B-22025
- Issued by
- Boone County, Illinois
About this file
This document is a Scope of Work and Project Requirements from the Illinois Department of Natural Resources for a small purchase procurement opportunity. The project involves the removal of tree debris from around Aqueduct #7 of the Hennepin Canal State Trail in Bureau County, Illinois. The contractor will be required to clear the blockage of debris, place it in a designated pile, restore the access area, and seed and install erosion blanket on the disturbed areas. The contract term is through June 30, 2021.
The procurement requires compliance with Illinois prevailing wage laws, certified payroll reporting, the Small Business Set-Aside Program, and apprenticeship-in-training requirements when applicable. Contractors must provide proof of general liability, auto liability, and workers' compensation insurance. A performance bond and labor/material payment bond may be required if the project cost exceeds $50,000. The contract will be awarded to the lowest responsive and responsible bidder, and the Department reserves the right to reject any or all bids.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Matton access draft maps2.pdf | ||
| VENDOR QUESTIONS AND ANSWERS~2.docx | DOCX document | |
| AQ7 Meeting location.PNG | PNG image | |
| Aqueduct 7 photos.docx | DOCX document | |
| Matton access draft maps.pdf | ||
| 1SMALL CONSTRUCTION BID FORM~26.docx | DOCX document | |
| Standard CertificationsV.18.1~59.doc | DOC document | |
| 1Standard Terms and Conditions1~4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ILLINOIS DEPARTMENT OF NATURAL RESOURCES
SMALL PURCHASE PROCUREMENT
SCOPE OF WORK & PROJECT REQUIREMENTS
Date: April 12, 2021 File# 1-21-018
LOCATION: Hennepin Canal State Trail, 16006 875 East St, Sheffield, Bureau County, IL
PROJECT TITLE: Aqueduct #7 tree debris removal
PROJECT NARRATIVE:
Hennepin Canal has aqueduct that carry the canal water over drainage ditches and streams. These drainage ditches and streams bring debris from large rain events. This debris gets deposited or collects around the piers of the aqueducts. In 2019, a heavy rain event deposited a large amount of tree debris down the stream and blocked part of Aqueduct 7 drainage ways. It has allowed more debris to collect on this original blockage. The blockage needs to be removed so it doesn’t back up water from the stream and flood upstream property.
SCOPE OF WORK:
The contractor is to clear the blockage of tree debris from in front and under Aqueduct 7 to provide a clear path for water in the stream. The contractor will place that debris in a pile outside of the drainage way. The location of the pile is shown on the attached drawing.
The contractor will access IDNR property by use of a temporary easement as shown on attached drawing. The contractor will have to remove and pile any downed trees and the stumps as part of the access route in the pile. The contractor will restore any damaged area and field back to pre-construction grade/elevation. They will need to seed and install erosion blanket back on disturbed area outside of the ag field.
Copy of temporary easement will be supplied after award. The attached map shows easement route.
ATTACHMENTS:
The following documents are included:
1) Access Draft Maps (2)
2) Aqueduct #7 photos
PROJECT SPECIFICATIONS & REQUIREMENTS:
| A. | Project Specifications: |
| 1) | The road to the access is part township/City and private. Contractor will need to get permission from township /city to access any heavy loads or any weight limits. |
| B. | Project Instructions and Notes: |
| 1) | Coordination of Work Activities: |
All work activities and entry to the site must be coordinated with the site superintendent.
2) Contractor’s Licensing and/or Certifications:
Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency. This includes, but is not limited to: N/A
| C. | Project Requirements: |
| 1) | Project Meeting |
| PROJECT MEETING TO BE HELD: YES |_| NO |X| | |
| MANDATORY ATTENDANCE: YES |_| NO |X| |
| 2) | Duration |
| Bids shall be good for ninety (90) calendar days after the Bid Opening Date. |
3) Prevailing Wage Rates
This contract [or agreement] calls for the construction of a “public work,” within the meaning of the Illinois Prevailing Wage Act, 820 ILCS 130/.01 et seq. (“the Act”). The Act requires contractors and subcontractors to pay laborers, workers and mechanics performing services on public works projects no less than the current “prevailing rate of wages” (hourly cash wages plus amount for fringe benefits) in the county where the work is performed. The Illinois Department of Labor (IDOL) publishes the prevailing wage rates on its website at http://labor.illinois.gov/. IDOL revises the prevailing wage rates and the contractor/subcontractor has an obligation to check the IDOL’s web site for revisions to prevailing wage rates. For information regarding current prevailing wage rates, please refer to IDOL’s website. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage requirements and notice and record keeping duties.
Certified Payroll, The Vendor and each subcontractor who participate in public works shall be in accordance with 820 ILCS 130/5
Make and keep, for a period of not less than 3 years from the date of the last payment made before January 1, 2014 (the effective date of Public Act 98-328) and for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
2. No later than the 15th day of each calendar month file a certified payroll for the immediately preceding month with the public body in charge of the project
EMPLOYMENT OF PUBLIC WORKERS ON PUBLIC WORKS: In a period of excessive unemployment rates, State contractors (1) constructing or building any public works or (2) cleaning-up and disposing on-site of hazardous waste, and that clean-up or on-site disposal is funded or financed in whole or in part with State funds or funds administered by the State, are required to employ at least 90% Illinois laborers on such project. For projects involving clean-up and on-site disposal of hazardous waste, emergency response or immediate removal activities are excluded. This requirement applies to all labor whether skilled, semi-skilled or unskilled, whether manual or non- manual.
A period of excessive unemployment rates is defined as any month immediately following two consecutive calendar months during which the level of unemployment in the State of Illinois has exceeded 5% as measured by the United States Bureau of Labor Statistics in its monthly publication of employment and unemployment figures.
Any public works project financed in whole or in part by federal funds administered by the State of Illinois is covered under the provisions of this requirement, to the extent permitted by any applicable federal law or regulation. 30 ILCS 570.
Contractors may receive an exception from this requirement by submitting a request and supporting documents certifying that Illinois laborers are either not available or are incapable of performing the particular type of work involved. The certification must: (a) be submitted to the agency within the first quarter of the Contract Term; (b) provide sufficient support that demonstrates the exception is met; (c) be signed by an authorized signatory of the contractor; and (d) be approved by the agency.
| 4) | Certified Payroll |
| State law 820 ILCS 130/5 requires all contractors and sub-contractors working on state | |
| construction projects to submit certified payroll records to the Department of Natural | |
| Resources. The payroll records must include all workers employed by contractors on the | |
| project. |
In accordance with 820 ILCS 130/5, the contractor and sub-contractor(s) shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.
No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.
5) Small Business Set-Aside The Contractor awarded the project must be registered as a small business, as required by the Small Business Set-Aside Program. (For complete requirements, to become registered, or to certify your business is in the Small Business Set-Aside Program, visit the Illinois Procurement Gateway (IPG) at https://ipg.vendorreg.com/ or call (217) 782-1270.
6) Apprenticeship-in-Training When applicable, the contractor and all subcontractors must be participants in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor or subcontractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/.
| 7) | Subcontractors |
| The Contractor shall identify the names of all subcontractors to be utilized by them in the | |
| performance of this contract, together with the anticipated amount of money that each | |
| subcontractor is expected to receive pursuant to this contract. Pursuant to Illinois Procurement | |
| Code (30 ILCS 500/1-15-108), a person or entity is not a “subcontractor” if that person only | |
| Provides goods or supplies that are incidental to the performance of a contract by a person | |
| who has a contract subject to the Code. |
| 8) | Insurance |
| Contractor shall, at all times during the term of this contract and any renewals or extensions, maintain and provide a Certificate of Insurance naming the State as an additionally insured for all required bonds and insurance. Certificates may not be modified or canceled until at least thirty (30) days’ notice has been provided to the State. Contractor shall provide: (a) General Commercial Liability insurance in the amount of $1,000,000 per occurrence (Combined Single Limit Bodily Injury and Property Damage) and $2,000,000 Annual Aggregate; (b) Auto Liability, including Hired Auto and Non-owned Auto (Combined Single Limit Bodily Injury and Property Damage), in amount of $1,000,000 per occurrence; and (c) Worker’s Compensation Insurance in the amount required by law. Insurance shall not limit Contractor’s obligation to indemnify, defend, or settle any claims. |
9) Performance Bond/Labor and Material Payment Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, shall be required if the project cost exceeds $50,000. Each bond shall be in the full amount of the contract. The bond must be from a surety licensed to do business within the State of Illinois and acceptable to IDNR.
10) Minority Contractor Opportunity Initiative The State requires a fee of $15 to cover Expenses related to the administration of the Minority Contractor Opportunity Initiative. Any Vendor awarded a contract under Section 20-10, 20-15, 20-25 or 20-30 of the Illinois Procurement Code (30 ILCS 500) of $1000 or more is required to pay a fee of $15. The Comptroller shall deduct the fee from the first check issued to the Vendor under the contract and deposit the fee in the Comptroller’s Administrative Fund.
11) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.
12) Utilities Before starting excavation, establish location and extent of underground utilities occurring in the work area. Contractor shall contact Joint Utility Locating Information for Excavators (J.U.L.I.E.) 800-892-0123.
13) Highway Permits The Contractor is responsible for contacting the appropriate County Superintendent(s) of Highways and/or other appropriate local officials concerning the proposed work activities on the project as they may relate to use of the County and local road system. Coordination of any activities of concern to the County or Township shall be the responsibility of the Contractor. Special attention shall be given to load limits and seasonal restrictions.
14) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.
| 15) | Steel Products |
| Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/). |
16) Specified Materials Bids shall be based on providing all products exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, offer an “equal” product and provide proof of its capabilities to meet the project specifications or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.
17) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.
18) Warranties The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of one year from the goods acceptance date.
19) Change Orders Change order shall be defined as a change in a contract term, other than as specifically provided for in the contract, which authorizes or necessitates any increase or decrease in the cost of the contract or the time for completion. A change order shall be executed by the State agency and vendor evidencing the change. All changes shall be approved by the CPO, or designee, and be accompanied by a written determination that the circumstances said to necessitate the change in performance were not reasonably foreseeable at the time the contract was signed and the change is germane to the original contract as signed. Change orders that increase or decrease the cost of a contract or an estimated contract by a total of $10,000 or more or the time of completion by more than 30 days shall be published on the Illinois Procurement Bulletin, pursuant to Section 15-25 of the Code and documented pursuant to Section 33E-9 of the Criminal Code of 2012, in advance of execution of the change order.
20) Inducement Resolution All or a portion of this project may be paid or reimbursed from the proceeds of tax-exempt bonds subsequently issued by the State.
21) Payment Payments, including late payment charges, will be paid in accord with the State Prompt Payment Act and rules when applicable, 30 ILCS 540/; 74 III. Adm. Code 900. This shall be the Contractor’s sole remedy for late payments by the State. Payment terms contained in Contractor’s invoice(s) shall have no force or effect.
| 22) | Contract Award |
| Contract award will be made to the lowest, responsible, responsive bidder. The Department of Natural Resources reserves the right to reject any or all bids. |
| 23) | Term of Contract |
| All work shall be completed by June 30, 2021. |
24) Bid Submittal Bids may be submitted electronically on BidBuy or by submitting the attached Bid Form to the INFORMATION CONTACT listed in the BidBuy solicitation.
| 25) | Bid Submittal Date and Time |
| Refer to the BIDBUY solicitation for the bid date and time. |
26) Questions
ALL QUESTIONS PERTAINING TO THE SCOPE OF WORK OR THE BIDBUY PROCEDURES, MUST
BE DIRECTED TO THE INFORMATION CONTACT LISTED IN THE BIDBUY SOLICITATION. ALL QUESTIONS MUST BE SUBMITTED IN WRITING NO LATER THAN THREE (3) BUSINESS DAYS BEFORE THE BID DUE DATE.