Revised - RFP Water Transportation Services - Route F1.docx

DOCX document 827 KB Posted

Attached to
RFP 103A-18 Water Transportation Services - Route F1
Solicitation number
BD-19-1206-40000-40000-30005
Issued by
Suffolk County, Massachusetts

About this file

This document is a Request for Proposals (RFP) issued by the Massachusetts Bay Transportation Authority (MBTA) for the maintenance and operations of its Route F1 Hingham Ferry service. The scope of services includes the provision of passenger ferry vessels, maintenance and operation of the contractor-supplied vessels, ticket sales, fare collection, and certain facility maintenance activities. The contractor will provide all crews, supplies, and maintenance personnel, facilities, materials, and equipment to meet the requirements of the specifications. Proposals must be submitted electronically via CommBuys by August 27, 2018. The contract term is for a base period of 55 months, starting November 1, 2018, with up to five one-year renewal options.

The RFP details the compensation structure, which includes a fixed cost per trip paid to the contractor, as well as reimbursement for fuel costs. The MBTA will retain all passenger revenue. The RFP includes requirements for safety procedures, training and drills, navigational safety, criminal background checks, and an anti-drug and alcohol misuse prevention program. Bidders must demonstrate relevant experience and financial capacity to perform the required services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MASSACHUSETTS

BAY

TRANSPORTATION

AUTHORITY

REQUEST FOR PROPOSALS (RFP)

NON-FEDERAL FUNDED

RFP#: 103A-18

COMMBUYS#: BD-19-1206-40000-40000-30005

WATER TRANSPORTATION SERVICES ROUTE F1 HINGHAM – ROWES WHARF

Date Issued: August 3, 2018

RFP: 103A-18

CommBuys Bid #: 103A-18 - 5 - Project Name: Water Transportation Services Contents

1.INTRODUCTION5
1.1Overview5
1.2Definitions and Terms5
2.SCOPE OF WORK6
2.1Passenger Service Routes and Schedules6
2.2Passenger Ferry Vessels8
2.3Docks and Facilities15
2.4General Maintenance Requirements21
2.5Ticketing, Fares and Revenue Collection26
2.6Personnel29
2.7Expenses30
2.8Compensation30
2.9Safety and Security33
2.10Policies and Procedures38
2.11Permits and Licenses39
2.12Reporting Requirements39
2.13Management and Operations Plan39
2.14Marketing Plan40
2.15Qualifications40
2.16Service Changes41
2.17Improvement Proposals42
2.18Change in Law Notice43
2.19Force Account Work43
2.20Transition44
2.21Expected Contract Duration45
3.BIDDERS INSTRUCTIONS AND PROCUREMENT PROCESS46
3.1Bid Conference46
3.2Procurement Method46
3.3RFP Calendar and Delivery Instructions47
3.4Examination of RFP47
3.5Rules of Contact48
3.6Clarifications of Specifications, Questions and Answers48
3.7RFP Addendum49
3.8MBTA Standard Contract and Terms & Conditions49
3.9Confidentiality / Public Information Act Disclosure Requests49
3.10Business Conduct50
3.11Collusion51
3.12Prices51
3.13Acceptance Period51
3.14Pre-Contractual Expenses51
3.15Tax Exemption51
3.16Insurance51
3.17Disadvantaged Business Enterprise (DBE) Goal52
4.SUBMISSION RESPONSE52
4.1Response Submissions52
4.2Power of Attorney53
4.3Acceptance of Response53
4.4Validity of Response53
4.5Incomplete Response53
5.MBTA POLICIES53
5.1Small, Minority, Women, and Other Disadvantaged Businesses53
6.SELECTION PROCESS AND EVALUATION53
6.1Response Opening and Confidentiality53
6.2Responsiveness Review and Basis of Award53
6.3Evaluation and Notification54
6.4Pass/Fail Evaluation54
6.5Technical Response and Evaluation55
6.6Price Proposal Evaluation56
6.7Basis of Award: Best – Value Proposal56
6.8Successful Bidder57
6.9MBTA Reserved57
6.10Appeal / Protest Procedures58
7.CONTRACT STRUCTURE58
Enclosure 1 – Bid Cover Letter60
Form A: Pre-Award Bidder Evaluation Data Form62
Form D: DBE Letter of Intent64
Form E: Schedule of Participation by Disadvantaged Business Enterprises67
8.MBTA STANDARD CONTRACT AND TERMS AND CONDITIONS INSTRUCTIONS FOR VENDORS69
8.1MBTA Standard Contract Instructions (Section 9.0)69
8.2MBTA Standard Terms & Conditions Instructions Section 9.069
9.Massachusetts Bay Transportation Authority Standard Contract70
9.1Standard Terms and Conditions1
10.Attachments9

Attn: Bidder/s Amendment to Request for Proposals (RFP) # 103A-18 RFP Description: Water Transportation Services

Dear Madam/Sir, The MBTA is issuing an amendment for CommBuys bid number BD-19-1206-40000-40000-30005. This document shall be considered the revised and complete RFP for Route F1, replacing the original RFP document. The following clerical and administrative changes have been made:

· New bid due date

· Elimination of notarized response requirement

· Elimination of original copies requirement

· Signature requirement on Attachment H (Cell Phone Policy)

· Revised Attachment M (Submission Checklist)

· Elimination of Attachment O

· Additional acknowledgement language in Attachment P (SOP for Emergency Notifications)

· Elimination of total capacity estimates

Respectfully, Eric Welsh

Massachusetts Bay Transportation Authority

RFP #

Attn: Bidder/s Request for Proposals (RFP) # 103A-18 RFP Description: Water Transportation Services

Dear Madam/Sir, The Massachusetts Bay Transportation Authority (“MBTA” or “Authority”), a corporate and a political subdivision of the Commonwealth of Massachusetts, existing pursuit to Mass. Gen. Laws, ch 161A (as amended) invites Bidders to participate in the competitive bid for Operations and Maintenance of Route F1 The Scope of Work is outlined below in Section 2 All formal communication with the MBTA during the bidding period shall be only through the designated point of contact.

The MBTA’s designated point of contact for this solicitation will be:

Eric Welsh Massachusetts Bay Transportation Authority 10 Park Plaza, Room 2810 Boston, MA 02116 Email: ewelsh@MBTA.com The RFP shall be launched through CommBuys. The RFP proposals must be submitted electronically via CommBuys no later than Monday August 27, 2018 by 12:00PM EDT, in full compliance with this RFP including but not limited to Section A, General Instructions to Bidders. This RFP shall remain in force until the execution of the Contract, or until modified or cancelled by the MBTA.

Respectfully, Eric Welsh

Massachusetts Bay Transportation Authority

RFP #

INTRODUCTION

Overview The Massachusetts Bay Transportation Authority (“MBTA” or “Authority”) seeks proposals for the maintenance and operations of its Route F1. The scope of services includes provision of vessels (see Section 2.2.1), and maintenance and operation of the Contractor-supplied vessels to provide the scheduled service described in Sections 2.1.1 and 2.1.3.

The Contractor is also responsible for ticket sales (Section 2.4.2), fare collection (Section 2.4.6) and certain facility maintenance activities (Section 2.3.2) as well as all other items described in these technical specifications. Contractor will provide all crews (Section 2.5.1) and supplies – including fuel, for vessel operation, and all maintenance personnel, facilities, materials and equipment to meet the requirements of these specifications.

Definitions and Terms ADA – Americans with Disability Act Agreement – See Contract Authority – See MBTA Bidder – See Offeror BPDA – Boston Planning and Development Agency Compensation – The subsidy paid to the Operator.

Contract – The written agreement executed by the Authority and the Contractor, setting forth the obligations of the parties thereunder.

Contractor – The individual, firm, partnership, corporation or combination thereof, private, municipal or public, including joint ventures, which, as an independent Contractor, has entered into a Contract with the Authority.

DCR – Department of Conservation and Recreation Expenses – Shall mean outflows or other using up of assets or incurrences of liabilities (or a combination of both) from delivering services on this contract. Expenses shall be allowed subject to complying with generally accepted accounting principles (GAAP) and Federal and State laws and regulations. This includes expenses being ordinary, necessary and consistent with generally accepted prudent business practices in the conduct of a competitive business and arm’s – length bargaining.

Fixed Cost per Trip – The cost to provide a one-way trip, from dock to dock, between two terminals identified for ferry service within the Offeror’s proposal. This cost should include all costs to operate the service, even those that are not trip specific, allocated evenly to all revenue trips operated in the service period. The Fixed Cost per Trip will also include the annual Fixed Operator Management Fee, divided by the number of trips operated in that year. The Authority has the sole right to change the number of trips. Any additions or reductions of service will adjust the compensation to the Contractor accordingly.

Fixed Operator Management Fee – The fee the Authority will pay the contractor to run the number of trips as shown in the RFP.

Hewitt’s Cove Marina – The docking facility located at Hewitt’s Cove Marina at Shipyard Drive on Lincoln Street in Hingham, MA.

Long Wharf – The docking facility situated at the south side of Long Wharf, Boston, situated between Long Wharf and Central Wharf, parallel to Old Atlantic Avenue.

MBTA – Massachusetts Bay Transportation Authority also called “The Authority”.

MassDOT – Massachusetts Department of Transportation Offeror – An individual, firm, partnership, corporation, or combination thereof, submitting a proposal. Also called a “Bidder”.

Operator – See Contractor Peak Hours – The following service hours: 6:00am – 9:00 am and 3:30 pm – 6:40 pm.

Revenue – All passenger revenue received.

F1 - Hingham Ferry – The MBTA ferry service operating between the Hewitt’s Cove Marina in Hingham, MA and Rowes Wharf in Boston, MA.

Rowes Wharf – The docking facility located at Rowes Wharf on Atlantic Avenue in Boston.

Subsidy – The payment by the Authority to the Operator equal to the “Fixed Cost per Trip” multiplied by the number of trips operated, plus any reimbursement provided for fuel.

Total Annual Operating Expenses – Proposer’s estimate of annual operating expenses for the service. The Authority will have no liability for costs which may be incurred by the Contractor in excess of this amount.

Total Proposal Price – The combined proposal price for Years 1, 2, 3, 4 and 5, including the 90-day transition period.

SCOPE OF WORK

Passenger Service Routes and Schedules Route Descriptions The passenger ferry routes are as follows, and as depicted in Figure 1.

F1 - Hingham Ferry:
Hewitt’s Cove, Hingham – Rowes Wharf, Boston

Figure 1: Route Map

Offerors acknowledge by submission of their proposals that they are familiar with the physical conditions and navigational constraints at the existing docking facilities for the services on which they are proposing.

Route Schedules The operator shall provide ferry service per the schedule set by the Authority. This service operates from Hewitt’s Cove Marina in Hingham to Rowes Wharf in Boston according to the schedule included in Attachment N.

Days of Service Contractor is required to operate this service five (5) days per week, Monday through Friday.

Service is not required on the following holidays:

MBTA Water Transportation Services Route F1: Hingham – Rowes Warf Page 68

· New Year's Day

· Memorial Day

· Independence Day (4th of July)

· Labor Day

· Thanksgiving Day

· Christmas Day

The operator agrees that it will comply and cooperate with all agreements between the MBTA and other operators or third parties.

Passenger Ferry Vessels Contractor shall provide passenger ferry vessels, as described in the following sections. Enough vessels must be provided to meet the service schedules described in Section 2.1.2.

At all times during the MBTA service hours, the operator shall provide a backup vessel meeting the vessel requirements in Section 2.2.1. The operator must immediately notify the Operations Control Center (OCC) of any service failures and anticipated service delays and/or impacts (see Section 2.9.1). Every reasonable effort must be made to notify passengers at terminals of service delays or cancellations in a timely manner. In the event of vessel failure service must be restored as soon possible.

Minimum /Maximum Vessel Requirements for Scheduled Service Vessel capacity minimums must be achieved to meet projected ridership demand and schedule, as specified here. The passenger carrying capacity minimums are based on estimated projections of ridership expected during the contract period, and do not represent a guarantee of future passenger counts. Backup vessels must be available to meet operating requirements as outlined here.

Enough vessels must be provided to meet the schedule described in Section 2.1.2, but at a minimum:

· Four vessels with a minimum capacity of 350 passengers, and/or maximum capacity of 410 passengers.

· One back-up vessel with minimum capacity of 350 passengers The Authority reserves the right, but not the obligation, to inspect any and all vessels to ensure compliance with minimum requirements, and to reject any vessel not in compliance, at any time.

All vessels to be used with the delivery of this service must be in Boston, MA on or before ten (10) days prior to the start of service.

Vessel Performance Characteristics All vessels proposed for service must be capable of completing the scheduled trips in the times specified below, while complying with all State and local speed, wake and wash requirements. These times apply year round, under all normal operating conditions, including summer season trips with increased recreational and excursion traffic.

The vessels shall be configured such that they are capable of loading and unloading passengers in five (5) minutes during peak periods to maintain schedule.

Dock to dock travel times shall be no greater than:

· 30-35 minutes in peak periods – when wake restriction near Spectacle Island not in effect

· 35-40 minutes in peak periods – when wake restriction near Spectacle Island in effect

· 45 minutes in off-peak periods.

Average trip time of all vessels combined during peak periods, on any given day, year round, must not exceed:

· 34 minutes – when wake restriction in the vicinity of Spectacle Island not in effect

· 37 minutes – when wake restriction in the vicinity of Spectacle Island in effect General Vessel Requirements All operator-supplied vessels proposed for service must:

· Be in good operating condition with clean interiors and exteriors.

· Be able to accommodate all passengers inside of heated passenger areas.

· All vessels must accommodate a minimum of 80% of the maximum passenger capacity in fixed, upholstered seating.

· All vessels must provide tables for a minimum of 10% of the seats.

· Be equipped with WiFi for passenger use.

· Be equipped with operable windows or air conditioning.

· Be equipped with one life preserver per passenger.

· Provide on board public access to cardiopulmonary resuscitation equipment and Automated External Defibrillator (AED). The Captain must be licensed in CPR and AED equipment use. All equipment must be properly maintained according to manufacturer standards. Current CPR guidelines must be followed as required by the United States Coast Guard.

· Comply with all applicable United States Coast Guard, and Department of Homeland Security requirements. All vessels must comply with all applicable United States Coast Guard and Department of Homeland Security requirements. With regard to 33 CFR, Chapter 1, Subchapter H, Part 104 --- Maritime Security – Vessels, operator will provide the MBTA with a current letter from the Coast Guard Commanding Officer, Marine Safety Center, acknowledging approval of a Vessel Security Plan and any approved revisions or amendments thereto, for each vessel proposed for this service. Approval letter(s) will be provided to the MBTA 10 days prior to the start of service and updated annually.

· Have average interior operating noise levels less than 75 Dbs (decibels). Statements attesting to decibel readings must be submitted for each vessel proposed for service.

· Be equipped to meet all requirements of the MBTA cell phone policy, included in Attachment H.

· All vessels must comply with State and Local speed, wake and wash limits at all times of contract duration.

· To follow the guiding principles of the MBTA’s Environmental Management Policy, the Operator shall use lower sulfur fuel for Operator-owned vessels wherever possible.

Vessel Accessibility Requirements All vessels must comply with all applicable accessibility requirements at the time of the contract award, including conformance with all Federal Americans with Disabilities Act (ADA), State Massachusetts Architectural Access Board (MAAB), local and any other applicable regulations.

All vessels must be equipped with rest room facilities, including as required by ADA and MAAB at the time of contract award.

The operator is responsible for compliance with all applicable current and future Coast Guard, Federal, state and local guidelines, statutes and regulations for accessible service. All Offerors are encouraged to obtain the most current guidelines, statues and regulations from each agency (ADA, MAAB, Coast Guard, federal, state and local). Failure by the operator to comply with all current and future Coast Guard, Federal, state and local guidelines, statues and regulations for accessible service may, at the sole discretion of the Authority, result in penalties and/or termination of the contract per terms of the final Contract (see sample in Attachment O). All costs associated with vessel modifications to achieve full compliance with said accessibility requirements shall be borne by the operator and are not subject to reimbursement by the Authority.

A copy of relevant federal access codes can be obtained from the United States Architectural and Transportation Barriers Compliance Board (ATBCB or Access board). A copy of MAAB regulations may be obtained from the Massachusetts State House Bookstore.

The freeboard height provided at designated landings at all docking facilities will be between 4.0 and 4.5 feet. Vessel loading points must be between 4.0 and 5.0 feet. If the Offeror proposes to operate a higher freeboard vessel, such as a bow-loaded vessel, which may have a freeboard of up to 8.0 feet, the Offeror shall be responsible for dock modifications to achieve required accessibility standards.

At a minimum, the Authority will require ramp access at dockside facilities, and a bridgeplate to span the gap between the boarding platform and vessel (bridgeplate to be kept onboard the vessel).

All proposed dock modifications will require the review and approval of both the MBTA, and if applicable, the dock owner of record. No modifications shall be made to MBTA property without the MBTA’s written approval.

Operator-supplied vessels shall have signage that relates safety information for passengers with hearing and/or vision impairments.

Vessel Dimensions Vessel dimensions and maneuvering capabilities must allow for safe and efficient docking at the designated terminal locations at all tide conditions.

Offerors acknowledge by submission of their proposal that they are familiar with the physical conditions and navigational constraints at the existing docking facilities for the services on which they are proposing.

Offerors also certify that the proposed vessels can operate safely and efficiently at these berthing facilities and meet all requirements of this specification.

Draft of all vessels, when fully loaded, shall be shallow enough to operate where required for the ferry service during all tide conditions.

Egress/Access from each vessel must be from an area which is a minimum of 3 feet wide. Boarding platforms must have a minimum turning radius of 60-inches. There must be egress/access areas on both sides of the boat.

The MBTA reserves the right, but not the obligation to inspect any and all vessels to ensure compliance with the minimum requirements and to reject any vessel not in compliance, at any time.

Docking facilities are located at:

· Hewitt’s Cove Marina – Hingham, MA

· Rowes Wharf – Boston, MA Vessel Maintenance The Contractor shall maintain the vessels used under this contract in first class operating condition, maintaining the speed, safety and efficiency and in accordance with applicable codes, laws and regulations prior to and throughout the contract period.

Workmanship shall conform in all respects with best marine industry practices to assure peak vessel performance. The deferral of maintenance, service, repairs, inspections and tests will not be accepted. Passenger areas shall be kept clean and in good repair at all times in passenger service. The Contractor shall service, inspect, maintain and clean equipment to such that they are able to satisfy the requirements of the Authority’s Ferry schedule.

GPS Tracking Operator shall provide GPS tracking of its vessels in a format compatible with the Authority’s online reporting system, TRMS, for reporting of on time performance. The Authority will provide the GPS tracking unit for installation by the Operator. Operator shall maintain the units, including all recurring costs, throughout the contract term.

Maintenance Management System - Wheelhouse The Operator will utilize the Authority’s Maintenance Management System (MMS) to record and document all maintenance, labor, and parts usage on the passenger vessels used in Authority service and any other Authority-owned assets that are maintained by the Operator. The Authority is currently using Wheelhouse as its MMS.

The Authority shall be the owner and administrator of the service’s subscription, but the Operator shall be responsible for all costs associated with maintaining the information related to the assets operated and/or maintained by the Operator for the Authority’s ferry service throughout the contract term. The Authority shall have the right to assign user accounts to employees of the Authority, Authority contractors, and any other appropriate users at the Authority’s sole discretion.

The MBTA shall have full 24/7 user access to the MMS including the ability to perform all functions as would the highest level user of the MMS for the Operator (e.g. data input, data download, report generation, etc.).

All data reported in this system must have the ability to be sorted by task, part number, date, employee performing work, hours, location, repeat failures as defined by part number, task, or equipment ID and supervisor. The work order must define the work scope, action taken (example: replace, repair), time to accomplish task and amount of material consumed to perform task (if applicable). Free form text cannot be accepted to close a work order. The system shall be maintained such that sufficient detail is attached to each record to document the description of a failure and the corrective action taken. All data entered into the MMS pertaining to the Authority’s vessels shall be the property of the Authority.

All changes to MMS administration, program upgrades, and required use will be utilized by the Operator in accordance with all current and future MBTA practices and procedures. Operator shall not make any alterations to the setup, functionality or other configuration of the system without MBTA approval.

Within 60 days of the NTP, Operator shall update the MMS with all vessel information, maintenance requirements, maintenance intervals, spare part requirements, manuals, schematics and other information for the assets operated and/or maintained by the Operator for the Authority’s ferry service, as required by the Authority.

Reports from the MMS shall be provided to the Authority as requested.

Required Technical Proposal Submittals In response to the requirements of Section 2.2, Offerors must provide the following as part of their Technical Proposal:

SUBMIT:Vessel List (Attachment B)
SUBMIT:Vessel Information Sheets (Attachment C)
SUBMIT:Proposed Vessel Utilization Form (Attachment D)
SUBMIT:Vessel Fuel Consumption Form (Attachment E)
SUBMIT:Vessel History Data Sheets (Attachment F) for each Operator-supplied vessel proposed to be used for the term of this contract. The data shall include the following information at a minimum:

· Vessel name.

· Vessel age.

· Passenger capacity.

· Anticipated remaining service life of the vessel.

· Type of power plant.

· Number of hours logged on each engine to date.

· Date of the most recent routine maintenance repair.

· Date of the most recent major vessel maintenance repair.

· Date of the most recent external hull maintenance above the water line.

· Date of the most recent internal or external hull maintenance below the water line.

· Date of most recent marine survey of the vessel.

· For new vessels to be constructed, the proposer shall submit the following information:

· Vessel make.

· Vessel model.

· Passenger capacity.

· Type of power plant.

· Vessel construction schedule including confirmation of proposed delivery date by shipbuilder.

SUBMIT: Non-Contingent Proof of Vessel Availability – Offerors must submit with their Technical Proposal, proof of vessel availability for the entire base term defined in Section 1.7. Proof of availability for the optional term will be required at such time as the Authority and the selected operator agree to exercise the optional term. Proof of availability shall consist of one of the following:

For vessels owned by Offeror:

Proof of ownership, including, but not limited to current, up to date Coast Guard Certificate of Inspection.

For vessels leased/chartered by Offeror:

Current, up to date Coast Guard Certificate of Inspection to establish the current owner, AND

A non-contingent letter of intent from the current owner, stating it has agreed to lease the subject vessel(s) to the Offeror for the entire contract period, if the Offeror is awarded the contract.

For vessels being purchased by Offeror:

Current, up to date Coast Guard Certificate of Inspection to establish the current owner, AND

Signed, non-contingent letter of intent from vessel owner, manufacturer or dealer indicating that the Offeror will take delivery of the subject vessel(s) in Boston, Massachusetts no later than ten (10) days prior to the start of service if the Offeror is awarded the contract.

SUBMIT:Statements attesting to decibel readings for each proposed vessel
SUBMIT:Vessel Maintenance Plan and Schedule – describes the daily, monthly, and yearly maintenance requirements for each vessel proposed to be used during the term of the contract. The maintenance program should reflect the current status of the vessel’s condition as stated in the Vessel History Data Sheet and shall incorporate all tasks, policies, and procedures, including staffing, to be put in place by the Contractor to comply with the maintenance standards required by these technical specifications, and all maintenance requirements of applicable regulatory agencies. The VMP shall, at a minimum, include the following:

· All servicing tasks;

· All inspection tasks;

· All maintenance tasks;

· All cleaning tasks, including re-stocking vessel supplies;

· Defect and repair policies and procedures; and

· Proposed workflow to complete all required tasks.

· Method for ensuring that all maintenance information is properly entered into the Maintenance Management System (see Section 2.3.4.4).

The VMP shall comply with the requirements for an “Inspection, Testing and Maintenance Plan” set forth by USCG as it pertains to the inspection and maintenance of Sub Chapter T vessels.

The above data for each vessel shall be updated and submitted to the Authority before the start of the contract’s base term and updated by the operator with the current information by January 1st of each year during the term of this contract.

Docks and Facilities The Operator shall provide, perform and include in the contract scope and contract price: the contract services described in this section and as otherwise required to safely and reliably operate the contracted ferry services. Operator shall maintain all vessels, support systems, property and associated equipment in a safe and reliable conditional at all times. No additional payments will be made by the Authority at any time throughout the duration of the contract for these services.

Maintenance Facility The Operator will be responsible for providing, operating and maintaining its own maintenance facility, which must be within 30 miles of the service area. The Operator shall identify in its Technical Proposal, the location and a general description of the maintenance facility as well as a proposed Maintenance Plan for all service vessels.

The Operator must provide proper means for sewage and hazardous material disposal, compliant with all applicable federal, state and local regulations.

Docking Facilities The Contractor shall fulfill the obligations of the Authority’s docking agreements at the following locations:

· Hingham – Hewitt’s Cove Marina

· Rowes Wharf – Rowes Wharf Associates Requirements of each agreement will be incorporated into the contract at the time of execution. Refer to the contract for required terms. Assignment of docking and layover space at any terminal is at the sole discretion of the Authority. The Authority reserves the right to change docking and layover assignments at any time.

The Authority will provide docking space during operating hours only. Any vessels not providing MBTA service, at the discretion of the Authority, shall be charged for docking space at any MBTA-owned or MBTA-leased facility. Right to use, and assignment of docking and layover space at any terminal is at the sole discretion of the Authority.

Due to the limited amount of dock space at both Hewitt’s Cove and Rowes Wharf, the Authority cannot guarantee the Operator layover berths. When available, an operator using a berth for layover purposes is responsible for providing and paying for their own utilities.

The Authority will provide docking space Monday through Friday, during operating hours only, as shown in Figure 2.

Figure 2: Route F1 Dock Space Availability Hewitt’s Cove, Hingham

Berth(s)
Berthing
Layover
1
Available year round; during operating hours only
maximum total 5 vessels, including all MBTA services (F1 and F2H)
4
Available September through May; during operating hours only
Berth 4 at Hewitt’s Cove is the primary location for passenger loading and unloading. No daytime or evening layover is permitted at this berth.

During the summer months – approximately Memorial Day through Labor Day – berth 4 may be used by the DEM or its contractors for the provision of the Harbor Island Service

Rowes Wharf, Boston

Berth(s)
Berthing
Layover
10
Available year round,

total 200 linear feet Available during operating hours only.

Available during operating hours only.

Berth 11 at Rowes Wharf is the primary location for passenger loading and unloading. No daytime or evening layover is permitted at this berth

General Dock Maintenance The Operator is responsible for maintaining all components of the docking facilities as specified herein or as specified in the associated sublease agreement including, but not limited to, non-skid surfaces on all walking areas and maintenance of safety equipment. Operator shall assume all obligations, duties, terms, and the conditions of the Authority’s dock agreements for the docking facilities utilized for the ferry route operated. Requirements of each agreement will be incorporated into the contract at the time of execution. Docking facilities include all floating docks, barges, gangways and ramps.

At all docks used by the Operator:

· Trash Removal – Operator will remove rubbish and debris daily.

· Snow Removal – Operator will be responsible for snow removal from all pedestrian walkways.

· Power Sweep Docks – in May and September of each year, Operator shall perform a complete power sweep of the docks.

· Maintain Non-Skid Surfaces – The Operator shall maintain non-skid surfaces on all walking areas of docks in May of each contract year. Non-skid treatment and safety paint shall be applied annually.

· Schedule Updates – Operator will post and maintain MBTA-issued service schedules and customer service information at all docks served by its route.

· Safety and Support Equipment – Operator shall maintain safety and support equipment and perform minor safety-related and passenger amenity maintenance, such as replacement of burnt out light bulbs other minor repairs.

· Passenger Amenity Maintenance – Operator shall maintain all passenger amenities on the dock area, including landscaping and maintenance of canopies and curtain panels, or other minor repairs.

· Curtain panels which receive temporary repairs shall be permanently repaired within a time period mutually agreed upon by the Authority and the Operator. Long term repairs shall retain an appearance equal to or better than the appearance prior to the damage, or shall be replaced with new.

· Utilities – The Operator will be responsible for any utilities used by its vessels, including shore power, water and sewer.

· Operator shall be responsible for maintaining and safeguarding all cables, hoses, and accessories for shore power, water and sewer connections.

· The Operator will be responsible for any utilities used by its vessels, including shore power, water and sewer.

· Operator shall perform additional maintenance activities detailed in Section 2.3.2.2 for the Authority-owned floating barge dock at Hingham.

· Major repairs will be the responsibility of the MBTA, unless assigned to the operator as Force Account work (see Section 2.18).

Hingham Dock Preventive Maintenance The Contractor will furnish all labor, personnel, material, replacement parts, components, tools, equipment, and supplies to provide and perform full and complete preventive maintenance, inspection/testing and repairs on the Authority’s floating barge and gangway system at the Hingham Intermodal Center. Operator may be required to perform major repairs as force account work (see Section 2.18).

The Contractor shall maintain the Authority’s floating barge and gangway dock system under this contract in a condition equal to or better than the condition documented in the receiving inspection (see Section 2.3.2.3). Contractor shall complete all preventive maintenance recommendations of the OEM and best practices, and shall ensure that the Authority’s floating barge and gangway dock system is maintained in accordance with applicable codes, laws and regulations prior to and throughout the contract period. Contractor shall maintain the floating barge and gangway system in a manner that ensures the safety of the Authority’s ferry customers.

All workmanship associated with the maintenance, service, repairs, inspections and tests shall be consistently of the highest quality. Workmanship shall conform in all respects with OEM and marine industry practices to assure peak performance and to protect the docks and gangway system from premature deterioration. The deferral of maintenance, service, repairs, inspections and tests will not be accepted.

The Authority shall have the right to stop, alter or in any way affect the progress of the Contractor’s work on Authority-owned assets if they are not being performed in strict accordance with the contract requirements and obligations. The Authority reserves and if need be, shall exercise this right without incurring any additional costs or claims at any time throughout the duration of the contract.

The Contractor shall fully comply with the terms and conditions of any manufacturer’s warranty. Operator shall cooperate with the Authority regarding the fulfillment of any warranty obligations, and shall provide the Authority with any information or support services necessary for the administration of any such warranty. The Contractor shall provide this service at no additional cost to the Authority.

Delivery and Re-Delivery Inspections During the term of the contract the Authority-owned floating barge dock and gangway system at Hewitt’s Cove, Hingham will be subject to, at a minimum, two surveys:

· Delivery Inspection – To be conducted at the start of the operating contract and will establish a benchmark of the existing condition as received by the Contractor. Will also verify the quantity and type of spare parts provided by the Authority.

· Re-Delivery Inspection – To be conducted at the conclusion of the next contract award period, one month prior to the expiration of the contract/re-delivery to the MBTA. This inspection will verify whether the condition is satisfactory and similar to the condition identified during the Delivery Inspection, less normal wear and tear.

The following will apply:

1. The Contractor will be responsible for the correction of deficient conditions found during the Re-Delivery Inspection. This shall be limited to items that were Contractor’s responsibility during the contract term.

2. The Contractor shall pay for the floating barge and gangway system to be surveyed by an independent third party licensed surveyor selected by the MBTA. The surveys will be conducted in the presence of the Contractor and the MBTA and/or its representative. As-found conditions will be verified, agreed upon, and signed by all attending representatives.

3. The floating docks and barges, will be inspected in the water only.

4. All installed and spares inventory equipment shall be inspected and inventoried to confirm satisfactory condition and existence.

Monthly Dock Condition Report Once per month the Operator shall submit to the Authority a Dock Condition Report in a format mutually agreed upon by the Authority and the Operator. The report shall include all docks used by the Operator in providing the contracted service, regardless of ownership. At a minimum, the report shall include for each dock:

· Surface condition

· Visible structural damage

· Freeboard height

· Condition of vessel interfaces (bow loading section, bumpers/fenders, ramps, etc.)

· Inventory (cables, hoses, ramps, appliances, other devices or equipment) Hingham Intermodal Center Overview Maintenance The Hingham Intermodal Facility and associated dock/gangway system will be utilized by Routes F1 and F2H. The operator of Route F1 shall be the primary party responsible for maintenance of the dock and landscaping, whereas the operator of Route F2H will be the primary party responsible for maintenance of the Intermodal Facility building. The Route F1 Operator shall perform the following maintenance activities at the Hingham Intermodal Facility:

· Dock Maintenance – Operator shall perform the dock maintenance activities specified in Section 2.3.2.

· Grass Cutting and Weeding – The Operator shall mow, cut grass and weed the entire planted area immediately outside the Hingham Intermodal Center and adjacent to all pedestrian walkways leading from the street and to the Intermodal Center and the docks located at Hewitt’s Cove Marina in Hingham. “Weeding” shall mean cutting down high growth and uprooting significant low growth and removing all leaves and debris.

· Spread Mulch – Bark much must be spread in all landscaped areas in the customer drop-off area. On or before May 15 of each year of this Service Agreement, Operator will provide a report attesting to the completion of the mulching at the Hingham location. Should subsequent inspection by the MBTA staff determine that the mulching was not performed, Operator will be assessed a fine of no less than $100 per day, from May 15 to the day Operator cures such contract violation.

Shared Facilities Contractor should be aware that some facilities used by Route F1 are shared with other MBTA contracted operators, particularly in Hingham. The Authority has endeavored to develop an equitable division of assets and responsibilities between operators, as defined in Attachment G. Per the requirements of the Authority’s Work in Harmony policy, the Operator will work in harmony with any other contracted operator of the Authority, and other users of the facilities, including other agencies and their contractors.

Required Technical Proposal Submittals In response to the requirements of Section 2.3, Offerors must provide the following as part of their Technical Proposal:

SUBMIT:Maintenance facility location and general description. Should include overview of facility size, layout, equipment, capabilities and capacity for maintenance of the vessels proposed for the Authority’s ferry services.
SUBMIT:Facility and Dock Maintenance Plan - describes the daily, monthly, and yearly maintenance requirements for each facility or dock used during the term of the contract for which the Operator has responsibility per the terms of this RFP. The maintenance program should reflect the current condition and shall incorporate all tasks, policies, and procedures, including staffing, to be put in place by the Contractor to comply with the maintenance standards required by these technical specifications, and all maintenance requirements of applicable regulatory agencies. The plan shall, at a minimum, include the following:

· All inspection, servicing, maintenance, cleaning and other tasks required by the contract.

The Facility and Dock Maintenance Plan shall be updated and submitted to the Authority before the start of the contract’s base term and updated by the operator with the current information by January 1st of each year during the term of this contract.

General Maintenance Requirements Seasonal Preparation Plans Within 30 days of Contract Award, Contract, and again as indicated below, the Operator shall submit to the Authority a seasonal preparation plan for vessels and all facilities and docks that are maintained and used by the Operator on the Authority’s service. Each plan shall include at a minimum:

· Maintenance activities and Timeline

· Parts and materials required, and timeline for their procurement Seasonal Preparation plans shall be submitted annually as follows:

· Winter Preparation Plans: Labor Day

· Summer Preparation Plans: March 31 The Authority shall provide their comments or concurrence within 30 days. The Operator shall implement activities set out in the mutually agreed upon plan on the timeline included in the plan. All routine activities under these plans shall be included in the Offeror’s cost proposal.

Winter Preparation Plans Operator shall establish and provide a Snow Removal Plan to the MBTA for approval no later than Labor Day of each Agreement Year. The plan shall identify labor, equipment, materials, management, repair facilities, chronological station assignments, initial starting points, back-up contractors, important names and phone numbers, and preseason activities. The plan shall include a strategy for effectively utilizing the Contractor’s labor resources during storm events. The plan shall also identify responsibilities in operations, maintenance and customer service areas. All preseason activities shall be performed by November 15th of each year in the contract term.

Winter Preparation Plans shall include, at a minimum:

Vessels:

· Maintenance, testing and activation of heating systems

· Procurement of and/or mobilization of winter tools and materials (shovels, de-icers, or other winter specific parts and materials)

· Winterization and/or storage of vessel parts and components not in use or prone to freezing in the winter

· Installation of matting on the docks to remove rock salt and ice melt from passenger’s feet.

Docks:

· Procurement of and/or mobilization of winter tools and materials (shovels, de-icers, or other winter specific parts and materials).

Summer Preparation Plans Summer Preparation Plans shall include, at a minimum:

Vessels:

· Maintenance and testing of air conditioning and ventilation system

· Modification of engine coolant blends if necessary Docks:

· Preparations for power washing and painting of the non-skid surfaces.

Capital Projects Plan Within sixty (60) days of Notice to Proceed, Contractor shall submit to the Authority a rolling 5-year capital maintenance plan that will keep the Authority Owned assets used in this contract in a state of good repair. The plan shall be updated annually by September 1 to be included in the Authority’s Capital Improvement Plan annual budget request. The Authority shall be responsible for obtaining funding for these projects. Contractor may be required to carry out these projects as force account work (see Section 2.18) once funding becomes available.

Capital projects are defined as overhaul, remanufacture, or replacement of major parts or components at the end of their useful life, or overhaul interval. Ongoing preventive maintenance is not considered a capital project. Repair or replacement of a part or component that experiences a catastrophic failure or requires premature capital work will not be paid for by the MBTA unless the Contractor has properly performed all OEM required maintenance, and documented such maintenance in the Authority’s MMS (see Section 2.3.4.4).

Authority Access Authority shall have access to premises, vessels, storage containers, terminal and maintenance facilities, equipment and work sites used by the Operator as follows:

· Authority owned/leased – without requiring advance notice

· Operator-owned & used in provision of the Authority’s ferry service – with 24 hours’ notice.

Alterations to Authority-Owned Assets The Contractor shall not make changes, alteration, modifications, etc. to the Authority vessels, docks or associated components without prior written approval of the Authority.

1. All approved changes, alterations or modifications to the service vessels and equipment configuration shall result in documented, controlled, uniform, and traceable systems on the vessels, inventories, and work equipment.

2. All such changes shall be documented by an Engineering Change Notice (ECN) as described below. The change shall be approved by the Authority in advance of Contractor conducting any work. The ECN shall include at least:

· Service vessel or equipment affected;

· Purpose of change;

· Schedule;

· Changes to original or current:

· parts books,

· drawings, prints, and schematics,

· inventory,

· inspection and repair forms;

· Detailed description of the work, including:

· detailed, stepbystep instructions

· material,

· tools,

· disposal of removed items,

· industrial safety and environmental precautions;

· Updating of vehicle configuration files;

· Procedures for functional testing and inspection of the finished work;

· Instructions for transportation crews.

· Benefits anticipated from the change.

Work performed under the ECN shall be reviewed and approved by the MBTA.

Contractor may test changes to the service vessel or equipment configuration. All tests shall be documented by an ECN. Such tests shall be clearly identified on the equipment being tested. Any and all ECNs must include modifying pool spares and new material, including small renewal parts.

Required Technical Proposal Submittals In response to the requirements of Section 2.3, Offerors must provide the following as part of their Technical Proposal:

SUBMIT: Maintenance Management Plan – The Offeror must submit a plan for MBTA approval of maintenance for the vessels, facilities and docks to be used in the service. This plan will be updated and submitted annually to the MBTA for approval after the contract has been awarded. The plan must include at a minimum:

· General description and location of maintenance facilities attesting that the requirements will be met.

· Resumes of key maintenance personnel

· Minimum qualifications/certifications for all tasks requiring expertise or certification in specific areas. These areas include but not limited to AC, welding, pipefitting, electrical/electronic repair.

· Inspection and preventive maintenance procedures.

· Regular Maintenance, inspection cycles and seasonal maintenance cycle. The seasonal cycle shall prepare all service vessels, support systems, property and equipment for winter and summer operating conditions.

· Description of emergency service procedures. The Operator must include the plan for the backup vessel substitution to avoid delays in operations. Back up vessel must be able to be put into service within 4 hours of breakdown notification.

· Inventory of maintenance products or evidence of availability of parts to illustrate Offeror’s ability to perform unusual repairs which may be required to get primary vessels back in service as soon as possible. A min/max inventory of all components must be submitted and approved by the MBTA and maintained by the Operator. The MBTA reserves the right to amend the min/max inventory levels at any time at the sole discretion of the MBTA. Include standard maintenance inventory, as well as parts which may be maintained for all other vessel operating systems, including engine rebuilds and/or engine replacement. The list should include vendor(s) names and addresses, part numbers and estimated usage.

If Offeror does not intend to maintain significant inventory of parts or other maintenance equipment, the availability of these parts from suppliers/distributors must be indicated.

· Annual Capital Improvement Recommendations for MBTA-owned assets, e.g. floating barge and gangway dock system, including cost proposals and specifications.

Ticketing, Fares and Revenue Collection Passenger Fares As of July, 1, 2018, passenger fares are as shown below, and as available on the MBTA website. The MBTA has the sole right to make any and all changes to the fare structure. In the event that the Authority increases fares at any time during the term of the contract, the Operator will be required to collect the increased fares, effective the first day of the increase.

Figure 3: Passenger Fares

Ticket Sales Locations The Operator will provide ticket sales on as follows:

Hingham:

The MBTA will make one window available for ticket sales at the Hingham Intermodal from 6:00am to 7:40pm Monday thru Friday. Please note that this space may be shared. The operator may provide peak period ticket sales on board, or at its own ticket location during the peak period.

Operator must provide onboard ticket sales for all off peak trips from Hingham to Boston between the hours of 12:00 pm and 2:45 pm.

Rowes Wharf:

Services can be provided in a Boston ticket Office or kiosk located at Rowes Wharf by one individual, between the hours of 10:00 pm and 8:30 pm. It is the Operator’s responsibility to make arrangements with Rowes Wharf Associates/Equity Office for the Boston ticket office or kiosk location. All costs associated with operation of a Boston ticket office or kiosk will be incurred by the Operator.

The Operator must provide for onboard ticket sales for all trips operated from Boston to Hingham when a ticket office or kiosk is not open. If a Boston ticket office or kiosk is not provided, the Operator must provide for onboard ticket sales during all operating hours.

Tickets and Passes The Authority will supply all tickets, passes and mobile ticketing apps. The Operator must not use any other ticket supply without the prior authorization of the MBTA. The operator will work with the MBTA to implement any changes to electronic fare media, including the Automatic Fare Collection (AFC) 2.0 system which is currently scheduled for installation starting as early as 2019. The Operator shall cooperate with the Authority in the event of any and all changes to ticket sales, costs, or distribution procedures.

Revenue All fare revenue will be retained by the Authority. Operator will deposit all fare revenue in an MBTA-designated bank account, classified…