This document is a set of design plans and specifications for a new food service equipment installation at the Ben Hill Innovation Center in Ben Hill County, Georgia. The project involves the design and installation of new food service equipment, including a walk-in cooler/freezer, various prep and cooking equipment, and associated plumbing, electrical, and HVAC work. The plans specify the quantities, types, and locations of the new equipment, as well as the responsibilities of the various contractors involved, such as the kitchen equipment contractor, plumbing contractor, electrical contractor, and HVAC contractor.
The design documents provide detailed technical information about the project, including plumbing and electrical rough-in requirements, gas manifold details, exhaust hood specifications, and other special conditions. No specific pricing, funding, or procurement terms are included in the documents. The project timeline and award date are not provided, but the documents are dated September 9, 2022, indicating this is a recent solicitation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEW FOOD SERVICE EQUIPMENT
EXISTING EQUIPMENT RELOCATED/REUSED
EXISTING EQUIPMENT REMOVED/DISPOSED
OWNER PROVIDED
VENDOR PROVIDED
DESIGNED BY
GENERAL
UNION/PREVAILING WAGE
DELIVERIES
CRANE FOR ROOF EQUIPMENT
PENETRATIONS THROUGH ROOF
CORE DRILLING
GENERAL WALL FINISHES
GENERAL PLUMBING
GAS SHUT-OFF VALVE
PLUMBING INTERCONNECTIONS
DRAIN LINES
GREASE INTERCEPTOR
WATER TEMPERING KIT
MOUNTING FAUCETS
WATER FILTER
GENERAL ELECTRIC
DISCONNECTS/DEVICES
ELECTRICAL INTERCONNECTIONS
CORD AND PLUGS
TABLE LIMIT SWITCH
WALK-IN ITEM 1
REMOTE REFRIGERATION
APPROX. REFRIGERATION RUN
CONTROL WIRING
HANGING LIGHTS
DRAIN LINES
HEAT TRACE
INSULATION OF DRAIN LINES
SEALING PENETRATIONS
EXHAUST HOOD ITEM 34 & 35
SYSTEM CONTROLS
EXHAUST DUCT
EXHAUST FAN
MUA DUCT
MUA FAN
FIRE SUPPRESSION SYSTEM
HANGING THE HOOD
S/S WALL CLADDING
INTERCONNECTIONS
FAN BALANCE
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
TBD
TBD
TBD
ARCHITECT/ INT. DESIGNER
KITCHEN EQUIPMENT CONSULTANT
GENERAL CONTRACTOR
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
PLUMBING CONSULTANT
ELECTRICAL CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
TBD
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
KITCHEN EQUIPMENT CONSULTANT
SUPPLIED BY INSTALLED BY
KITCHEN EQUIPMENT CONTRACTOR KITCHEN EQUIPMENT CONTRACTOR
OWNER OWNER
OWNEROWNER
OWNER OWNER
VENDOR VENDOR
GENERAL CONTRACTOR GENERAL CONTRACTOR
GENERAL CONTRACTOR GENERAL CONTRACTOR
GENERAL CONTRACTOR GENERAL CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
PLUMBING CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR
ELECTRICAL CONTRACTOR ELECTRICAL CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
PLUMBING CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR KITCHEN EQUIPMENT CONTRACTOR
HVAC CONTRACTOR HVAC CONTRACTOR
ELECTRICAL CONTRACTOR ELECTRICAL CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
KITCHEN EQUIPMENT CONTRACTOR
HVAC CONSULTANT
KITCHEN EQUIPMENT CONTRACTOR KITCHEN EQUIPMENT CONTRACTOR
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-0.0
September 9, 2022
K. RILEY
M. HUHN
COVER SHEET
B e n H il l
In n o v a ti o n
C e n te r
TYPE OF CONSTRUCTION:
PROJECT DESCRIPTION / OBJECTIVE:
PROJECT TIMELINE:
DESIGN OBJECTIVE & CHALLENGES ABBREVIATIONS
A
AFC
AFF
BTC
BTU
By Vendor
DFA
EC
Existing to Remain Existing to Relocate Future
HP
KEC
KW
NEW
NIKEC
PC
TOH
TOW
V
VFY
OWNER
ARCHITECT GENERAL CONTRACTOR
MECHANICAL ENGINEER
KITCHEN EQUIPMENT CONTRACTOR
DRAWING INDEXPROJECT TEAM
NEW - CONSTRUCTION
CLARK FOOD SERVICE EQUIPMENT
ABOVE FINISHED FLOOR
AMPERAGE
ABOVE FINISHED CEILING
ABOVE FINISHED FLOOR
BRANCH TO CONNECTION
BRITISH THERMAL UNIT
SUPPLIED BY VENDOR AND SOURCED BY END USER
DOWN FROM ABOVE
ELECTRICAL CONTRACTOR
EXISTING EQUIPMENT THAT WILL REMAIN IN ITS CURRENT LOCATION
EXISTING EQUIPMENT THAT WILL BE MOVED TO A NEW LOCATION
EQUIPMENT NOT CURRENTLY BEING INSTALLED BUT PLANNED FOR FUTURE USE
HORSEPOWER
KITCHEN EQUIPMENT CONSULTANT/CONTRACTOR
KILOWATTS
NEW EQUIPMENT TO BE SUPPLIED BY THE KITCHEN EQUIPMENT CONTRACTOR
NOT IN KITCHEN EQUIPMENT CONTRACT
PLUMBING CONTRACTOR
TOP OF HOOD
TOP OF WALK-IN BOX
VOLTAGE
VERIFY
INTERIOR DESIGNER
PROJECT MANAGER
OPERATOR
Ben Hill Innovation Center
BEN HILL COUNTY DEVELOPMENT
JASON DUNN
(229) 349-5476
JASONDUNN@FBCDA.NET
KRISTA RILEY
(717) 575-2953
KRILEY@CFSE.BIZ
N/A TBD
TBD
N/A
N/A
N/A
Sheet Number Sheet Name Sheet Issue Date Set Issue Date
QF-0.0 COVER SHEET September 9, 2022 September 9, 2022
QF-1.1 KITCHEN FLOOR PLAN September 9, 2022 September 9, 2022
QF-2.1 ELEVATIONS September 9, 2022 September 9, 2022
QF-3.1 ISOMETRICS September 9, 2022 September 9, 2022
QF-4.1 PLUMBING ROUGH-INS September 9, 2022 September 9, 2022
QF-5.1 ELECTRICAL ROUGH-INS September 9, 2022 September 9, 2022
QF-6.1 SPECIAL CONDITIONS September 9, 2022 September 9, 2022
QF-7.1 DETAILS September 9, 2022 September 9, 2022
# DATE DESCRIPTION
1 07.31.202
Revision 1
DUMPSTER
BAKING PREP DISHWASHING
RESTROOM
POT
WASHING
P R
E P
SLICING
VESTIBULELOADING DOCK
EMERGENCY EXIT
PACKAGING / PRODUCTION AREA
CEILING MOUNT
CORD REEL (TYP.)
BY EC
OFFICE
23B
23A
23B
5 5 5 5 5 5
46 47
17 17 17
18 18A
21B
13121212
33A
5 542
FUTURE EQUIPMENT
32A
1A
1B1D
1C
LOCATION TBD
6B
6A
6A
6B
6A
6B
11 11A
15 15.115A 15A
25.1
25A
38 38
41 41 41 41 41 41
4848.1 48A 48A
38 38
34G
34F34D 35B34E 35C
35A
34C
33 32
DRY STORAGE
34B
44 45
45A
45B
ELECTRICAL PANELS
8A
8A
8A
21A
34A
36 36
RAMP
85 SF
WALK-IN
COOLER
53 SF
WALK-IN
FREEZER
21C
25B
49A
5049B
20.1
1. EQUIPMENT SHOWN IS BASED ON PRIMARY MANUFACTURER AS
LISTED IN ITEMIZED SPECIFICATION. THE KITCHEN EQUIPMENT
CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY
DIMENSIONAL AND UTILITY CHANGES WHICH MAY BE REQUIRED
AS A RESULT OF USING A MANUFACTURER AND MODEL NUMBER
OTHER THAN THE ONE ORIGINALLY SPECIFIED.
2. KITCHEN EQUIPMENT CONTRACTOR IS RESPONSIBLE FOR
VERIFYING ACCESS INTO THE BUILDING AND INTO THE FOOD
SERVICE AREAS FOR ALL EQUIPMENT WHETHER NEW OR
EXISTING.
3. KITCHEN EQUIPMENT CONTRACTOR IS RESPONSIBLE FOR FIELD
VERIFYING THE SPACE IN THE FOOD SERVICE AREA TO INSURE
THAT ALL EQUIPMENT INTERFACES PROPERLY WITH WALLS,
COLUMNS, CHASES, WINDOWS AND OTHER EQUIPMENT AND
ADJUST EQUIPMENT ACCORDINGLY, AS NEEDED.
4. KITCHEN EQUIPMENT CONTRACTOR SHALL RECOMMEND AND
SUBMIT FOR APPROVAL ON ANY MAJOR DESIGN OR LAYOUT
CHANGES TO EQUIPMENT BASED ON FIELD CONDITION CHANGE.
5. ALL FOOD SERVICE EQUIPMENT TO MEET OR EXCEED LOCAL
CODE FOR CLEARANCES REGARDING CROSS CONTAMINATION
AND CLEANABILITY. EQUIPMENT TO BE A MINIMUM OF 3" FROM
ADJOINING WALLS/EQUIPMENT, MOBILE, 6" FROM FLOOR TO
UNDERSIDE OR SEALED IN PLACE BY KITCHEN EQUIPMENT
CONTRACTOR.
6. ACID BASED CLEANING SUBSTANCES WILL CAUSE ANY
STAINLESS STEEL OR ALUMINUM SURFACES TO BECOME PITTED
& DISCOLOR. DO NOT USE ACID BASED SUBSTANCES TO CLEAN
THESE SURFACES. PROTECT THESE SURFACES ANYTIME AS
THEY MAY BE SUBJECT TO CONTACT WITH ACID BASED
CLEANING PRODUCTS.
7. DO NOT SLOPE FLOORS TO DRAINS NEAR SERVING COUNTERS.
WHEN COUNTERS ARE SPECIFIED ON CASTERS THEY CANNOT
BE LEVELED AND TOPS &TRAY SLIDES WILL BY OUT OF LEVEL IF
FLOORS ARE NOT LEVEL.
8. Not used.
9. Not used.
GENERAL NOTES
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-1.1
September 9, 2022
T. SHUE, CFSP
M. HUHN
KITCHEN FLOOR
PLAN
B e n H il l
In n o v a ti o n
C e n te r
1/4" = 1'-0"
Equipment Plan
Equipment Schedule
ITEM # QTY ITEM DESCRIPTION KEY
1 1 Walk-In Cooler/Freezer Combo NEW
1A 1 Evaporator, Cooler NEW
1B 1 Condensing Unit, Cooler NEW
1C 1 Evaporator, Freezer NEW
1D 1 Condensing Unit, Freezer NEW
2 5 Mobile Transport Carts NEW
3 2 Shelving, Wire, Mobile, 5-Tier, 18x60 NEW
4 1 Spare Number SPARE
5 13 Pan Rack NEW
6 3 Hand Sink NEW
6A 3 Towel Dispenser BY VENDOR
6B 3 Soap Dispenser BY VENDOR
7 3 Slim Jim Trash Can NEW
8 3 Hose Reel NEW
8A 3 Service Faucet NEW
9 1 40 QT Mixer NEW
10 1 Spare Number SPARE
11 1 S/S Worktable NEW
11A 2 Shelving, Wall Mounted, Stacked NEW
12 3 Ingredient Bins NEW
13 1 Refrigerator, Reach-In NEW
14 1 Blast Chiller NEW
15 1 S/S Worktable W/ Sink NEW
15.1 1 S/S Worktable W/ Undershelf NEW
15A 3 Shelving, Wall Mounted, Stacked NEW
16 1 Slicer, Electric NEW
17 6 44 Gallon Trash Can NEW
18 1 Clean Dishtable NEW
18A 1 Wall Shelf with Pot Racks NEW
19 1 Dishmachine NEW
20 1 Condensate Hood NEW
20.1 1 Condensate Fan NEW
21 1 Soiled Dishtable NEW
21A 1 Pre-Rinse Faucet NEW
21B 1 Disposer NEW
21C 1 Tubular Design Rack Shelves NEW
22 1 Shelving, Drop Mat, Mobile, 4-Tier, 24x24 NEW
23 1 Three-Compartment Sink NEW
23A 1 Pre-Rinse w/ Add-On Faucet NEW
23B 2 Wall Shelf with Pot Racks NEW
24 2 Shelving, Drop Mat, Mobile, 4-Tier, 24x72 NEW
25 1 S/S Worktable W/ Sink NEW
25.1 1 S/S Worktable W/ Undershelf NEW
25A 3 Shelving, Wall Mounted, Stacked NEW
25B 1 Buffalo Chopper NEW
26 1 Food Processor NEW
27 1 Dicing Food Processor NEW
28 1 Refrigerator, Reach-In NEW
29 1 Convection Oven, Gas FUTURE
30 1 Spare Number SPARE
31 1 Convection Oven, Gas NEW
32 1 Combi Oven, Stacked FUTURE
32A 1 Water Filter, Combi Oven FUTURE
33 1 Combi Oven, Stacked NEW
33A 1 Water Filter, Combi Oven NEW
34 1 Exhaust Hood NEW
34A 1 Hood Controls NEW
34B 1 Fire Supression System NEW
34C 5 S/S Panels NEW
34D 1 Exhaust Fan NEW
34E 1 Exhaust Fan NEW
34F 1 MUA Unit NEW
34G 1 Fire Pull NEW
35 1 Exhaust Hood NEW
35A 5 S/S Panels NEW
35B 1 Exhaust Fan NEW
35C 1 Exhaust Fan NEW
36 2 Tilt Skillet NEW
37 1 Range, Gas NEW
38 4 S/S Worktable W/ Undershelf NEW
39 2 Service Cart NEW
40 1 Spare Number SPARE
41 6 S/S Worktable W/ Undershelf NEW
42 8 Shelving, Wire, Mobile, 5-Tier, 24x60 NEW
44 1 Service Sink Faucet NEW
45 1 Mop Sink NEW
45A 1 Mop Holder NEW
45B 1 Shelving, Wire, Mobile, 5-Tier, 24x60 NEW
46 1 Freezer, Reach-In NEW
47 1 Refrigerator, Reach-In NEW
48 1 S/S Worktable W/ Sink NEW
48.1 1 S/S Worktable W/ Undershelf NEW
48A 4 Shelving, Wall Mounted, Stacked NEW
49 1 S/S Worktable W/ Undershelf NEW
49A 1 Liquid Paste Filling Machine NEW
49B 1 Compressor, Paste Filling Machine BY OWNER
50 1 Vacuum Sealer NEW
# DATE DESCRIPTION
1 07.31.202
Revision 1
H O
O D
H E
IG
H
T
36 36
FUTURE EQUIPMENT
33 32
32A33A
34A
H O
O D
H E
IG
H
T
15A 15A
15.1 15
11A
11A
12 12 12
15A
6A
6B
8A
26 27
25A
25A25A
25.1
6A
6B
23B 23B
18A
23A
21B
21A
8A
6A
6B
46 47
48A 48A
48A48A
48.1 48
5 5 5
8A
45A 45B
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-2.1
September 9, 2022
K. RILEY
M. HUHN
ELEVATIONS
B e n H il l
In n o v a ti o n
C e n te r
1/2" = 1'-0"
Front Cook Line Elevation 1/2" = 1'-0"
Back Cook Line Elevation
1/2" = 1'-0"
Slicing/Baking Area Elevation 1/2" = 1'-0"
Prep Area Elevation
1/2" = 1'-0"
Dish Room Elevation 1/2" = 1'-0"
Production Area Elevation
1/2" = 1'-0"
Mop Sink Closet Elevation
# DATE DESCRIPTION
1 07.31.202
Revision 1
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-3.1
September 9, 2022
T. SHUE, CFSP
M. HUHN
ISOMETRICS
B e n H il l
In n o v a ti o n
C e n te r
# DATE DESCRIPTION
CL
CL
36.1 37
293133A
6 8A 15
21A
23A
8A
488A6
1A
1C
36.1
SEE GAS MANIFOLD DETAIL 'A'
34F
3232.132.132A33.133.1
36 36
LOCATION:TBD
SEE GAS MANIFOLD DETAIL 'B'
21B
Not In Kitchen Equipment Contract
Verify
Above Finished Floor
Above Finished Floor
Food Service Equipment Contractor
Branch To Connection
Down From CeilingDFC
BTC
NIC
KEC
AFF
VFY
British Thermal UnitBTU
Indirect Waste
Floor Drain Flat Top
Funnel Floor Drain
Direct Connected Waste
Floor Sink
Gas Supply
FFD
G
FD
FS
DW
IW
PLUMBING/GAS KEY
Hot Water
Cold Water
HW
CW
Stub Up Water ConnectionSUW
Down From Above Water ConnectionDFAW
Down From Above Gas SupplyDFAG
Stub Up Gas SupplySUG
Cooling Water Supply
Cooling Water Return
* See Utility Schedule Remarks
CS
CR
PLUMBING/ GAS NOTES
P1. Dimensions shown are from finished floor, walls, or column centers.
P2. Mechanical/Plumbing Contractor to determine (per applicable codes) size & location of grease interceptors.
P3. Final connections are by the Plumbing Contractor (PC).
This includes connections to equipment from Utility Distribution Systems (UDS) if applicable.
P4. Equipment is existing, future, or supplied by others than the KEC. Verify requirements and supply utilities as required per manufacturer spec.
P5. Faucets are supplied by the Kitchen Equipment Contractor (KEC) and installed by the PC.
P6. Cold water connections are always on the RIGHT.
P7. Drain lines are by the PC. PC to manifold multiple waste connections and extend safe waste or direct connections as required. It is HIGHLY RECOMMENDED that the first 20 feet of all drains are made of cast iron. Hight temp drain water can damage PVC pipes and dissolve joint adhesive.
P8. PC shall provide and install pressure reducing valves where water pressure is in excess of 50psi unless otherwise indicated.
P9. Not used.
P10. Not used.
P11. Water filters are supplied by the KEC, installed by the PC.
Piping from rough-in to filter inlet is by the PC. Piping from the filter outlet to equipment is by the PC.
P12. Each water line is have a separate shut-off installed.
P13. The KEC will not be responsible for furnishing plumbing components such as mixing valves, couplings or fittings other than those furnished as standard with the equipment, except as specified.
P14. All cooking equipment must shut off automatically per NFPA codes. Gas shut-off valve is supplied by the KEC, and installed by the PC in an accessible area.
P15. Do not run gas line inside hood envelope. Pipe gas line after exhaust hood is hung or coordinate with KEC prior to rough-in. Incoming gas pressure to kitchen MUST NOT exceed
14" WC!
P16. Condensate drain line from evap coils to walk-in box is by the PC, and should be installed with a slope of 1" per linear foot of piping. Heat Trace in the freezer compartment is by the PC.
Insulation of drain line is by the PC.
P17. Plumbing components for the disposer are supplied by the KEC and installed by the PC.
P18. Stubbed up water lines to be cut at 4" AFF so equipment can be set in place.
P19. Plumbing connection locations to be determined in coordination with contract plumbing drawings.
P20. Floor troughs are furnished by the KEC, and installed by the PC.
P21. Quick disconnect gas & water hoses (when specified) are provided by the KEC and installed by the PC.
P22. PC to install all wall mounted provisions after S/S wall panels have been installed.
P23. See manufacturer shop drawings for exact plumbing requirements.
P24. Water quality to be tested by others. Refer to manufacturer spec sheet for acceptable later hardness levels.
24"
36 3637
2'-8"3'-8"
GAS MANIFOLD DETAIL 'B'
SCALE: NTS
FINISHED FLOOR
8'11"
24"
GAS MANIFOLD DETAIL 'A'
SCALE: NTS
FINISHED FLOOR
SHUT-OFF VALVE
(BY PLUMBING
CONTRACTOR)
TYPICAL ALL
MANIFOLD
OUTLETS
FIRE SYSTEM FUEL
SHUT-OFF VALVE
SUPPLIED BY KEC,
INSTALLED BY PC
IN ACCESSIBLE
AREA
FIRE SYSTEM FUEL
SHUT-OFF VALVE
SUPPLIED BY KEC,
INSTALLED BY PC
IN ACCESSIBLE
AREA
SHUT-OFF VALVE
(BY PLUMBING
CONTRACTOR)
TYPICAL ALL
MANIFOLD
OUTLETS
GAS MANIFOLD ELEVATION
3'-7" 3'-5" 3'-11"4'-0"
31 2932.1 32.133.133.1
GAS MANIFOLD ELEVATION
INCOMING GAS SUPPLY:
PIPE GAS LINE AFTER
EXHAUST HOOD & S/S
WALL PANELS ARE
INSTALLED
INCOMING GAS SUPPLY:
PIPE GAS LINE AFTER
EXHAUST HOOD & S/S
WALL PANELS ARE
INSTALLED
INCOMING GAS
PRESSURE MUST
NOT EXCEED 14"
WC!
INCOMING GAS
PRESSURE MUST
NOT EXCEED 14"
WC!
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-4.1
September 9, 2022
T. SHUE, CFSP
M. HUHN
PLUMBING
ROUGH-INS
B e n H il l
In n o v a ti o n
C e n te r
1/4" = 1'-0"
Plumbing Plan
Plumbing Schedule
ITEM
# QTY ITEM DESCRIPTION KEY
CW
SIZE
CW
AFF HW SIZE
HW
AFF DRAIN
GAS
SIZE
GAS
BTU PLUMBING REMARKS & NOTES
1A 1 Evaporator, Cooler NEW 1" IW TO FD NOTE P16, P23
1C 1 Evaporator, Freezer NEW 1" IW TO FD NOTE P16, P23
6 3 Hand Sink NEW 1/2" 21" 1/2" 21" 1 1/2" DW + 18" 4" O.C., NOTE P24
8A 3 Service Faucet NEW 1/2" 36" 1/2" 36" 8" O.C., HOSE FROM FAUCET TO HOSE REEL BY PC, NOTE P5, P24
14 1 Blast Chiller NEW 1" IW TO FS
15 1 S/S Worktable W/ Sink NEW 1/2" 15" 1/2" 15" 2" IW TO FS 4" O.C., NOTE P24
19 1 Door Type Dishmachine NEW 3/4" 15" 1 1/2" IW TO FS 155 DEGREE MIN. FOR HW, NOTE P24
20 1 Condensate Hood NEW IW TO FS PLUMBING REQUIREMENTS TBV
21A 1 Pre-Rinse Faucet NEW 1/2" 15" 1/2" 15" 8" O.C., NOTE P5, P24
21B 1 Disposer NEW 1/2" 15" 2" DW
23 1 Three-Compartment Sink NEW (3) 1 1/2" IW TO FS 8" O.C., NOTE P5, P24
23A 1 Pre-Rinse w/ Add-On Faucet NEW 1/2" 15" 1/2" 15" 8" O.C., NOTE P5, P24
25 1 S/S Worktable W/ Sink NEW 1/2" 15" 1/2" 15" 2" IW TO FS 4" O.C., NOTE P24
29 1 Convection Oven, Gas FUTURE 1" 120000 SEE GAS MANIFOLD DETAIL 'A' NOTE P4, P14, P21
31 1 Convection Oven, Gas NEW 1" 120000 SEE GAS MANIFOLD DETAIL 'A' NOTE P14, P21
32 1 Combi Oven, Drain FUTURE NOTE P4
32.1 2 Combi Oven, Gas Connection FUTURE 0" 0 SEE GAS MANIFOLD DETAIL 'A', NOTE P4
32A 1 Combi Oven Water Filter FUTURE CW TO WATER FILTER THEN BRANCH TO COMBI OVEN, NOTE P4, P11, P22
33 1 Combi Oven, Drain NEW NOTE P4
33.1 2 Combi Oven, Gas Connection NEW 3/4" 106500 SEE GAS MANIFOLD DETAIL 'A'
33A 1 Combi Oven, Water Filter NEW 3/4" 60" CW TO WATER FILTER ON COMBI OVEN, NOTE P11, P22
34F 1 MUA Fan NEW 3/4" 0 NOTE P23
36 2 Tilt Skillet NEW 3/4" 91000 SEE GAS MANIFOLD DETAIL 'B'
36.1 2 Tilt Skillet, Water Connection NEW 1/2" 36" 1/2" 36" 1 1/4" IW TO FS DRAIN DRAWER ACCESSORY
37 1 Range, Gas NEW 3/4" 210000 SEE GAS MANIFOLD DETAIL 'B'
44 1 Service Sink Faucet NEW 1/2" 36" 1/2" 36" 8" O.C., NOTE P5, P24
45 1 Mop Sink NEW 4" DW +4"
48 1 S/S Worktable W/ Sink NEW 1/2" 15" 1/2" 15" 2" IW TO FS 4" O.C., NOTE P24
# DATE DESCRIPTION
1 07.31.202
Revision 1
9 13 14 16
21B
2929313132323333
34B
34A
34F 35C35B34E34D
1D 1B
1A
1E
1F
1C
LOCATION: TBD
DCR-1
DCR-1
DCR-2
DCR-2
+48"
+48"
+18"
+18"
FIRE PULL
25B
JB-NIC JB-NIC JB-NIC
JB-NICJB-NIC
5049A49B
20.1
ELECTRICAL KEY
JB Junction Box
V
KW
HP
A
Voltage
Horsepower
Amperage
Kilowatts
SR
DCR
DR PED
SR PED
SCR
Single Receptacle
TOW
KEC
VFY Verify
Top of Walk-In Box
Duplex Receptacle Pedestal
Single Receptacle Pedestal
Kitchen Equipment Contractor
Duplex Convenience Receptacle
Single Convenience Receptacle
AFF
BTC
CLG
Above Finished Floor
At Ceiling
Branch To Connection
Above Finished Floor
NIC Not In Kitchen Equipment Contract
TOH Top of Hood
DR Duplex Receptacle
AFC Above Finished Ceiling
DA Data Connection
DFA Down From Above
ESU Electrical Stub Up
DFA JB Down From Above
* See Utility Schedule Remarks
DRDFA Duplex Receptacle Down From Above
DCRDFA Duplex Convenience Receptacle Down From Above
SRDFA Single Receptacle Down From Above
E1. Dimensions are above finished floor to center line of junction boxes and receptacles.
E2. Final Connections to the kitchen equipment are by the Electrical Contractor (EC). This includes connections between equipment and Utility Distribution Systems (UDS) if applicable.
E3. Electrical requirements are indicated to accommodate kitchen equipment. Refer to contract electrical drawings for all other requirements.
E4. Equipment is existing, future, or supplied by other than the Kitchen Equipment Contractor (KEC). Verify requirements and supply utilities as required per manufacturer spec.
E5. Not used.
E6. EC to interconnect vent fan control in dish machine control panel to exhaust fan or supply a fan switch for the dish machine condensate exhaust hood & interconnect with exhaust fan as needed. Verify switch location & coordinate with KEC as needed.
E7. EC to provide light switch for dish machine condensate exhaust hood & interconnect with the light junction box on top of the hood. Verify switch location.
E8. Drain temp kit for dish machine supplied & installed by KEC, wired by
EC.
E9. Exhaust hood control panel is supplied by the KEC and {factory installed inside the Utility Distribution System (UDS) tower}{factory installed on the exhaust hood}{wall mounted in the kitchen by the KEC}. Circuit for hood controls MUST be fed by emergency power. See exhaust hood manufacturer shop drawings for more details and exact wiring diagrams.
E10. EC to interconnect from light switch in exhaust hood control panel to the light on top of the hood.
E11. EC to interconnect from fan switch in the exhaust hood control panel to the exhaust (and supply if required) fans. See hood manufacturer shop drawings for more details. If VFD controls are provided, EC must bring power from the breaker to control panel and then from control panel to roof.
E12. Temp sensor for exhaust fan is factory installed inside exhaust collar.
EC to interconnect from temp sensor to control panel. Cable wire is provided by the exhaust hood manufacturer.
E13. All cooking equipment must shut off automatically per NFPA codes utilizing shunt-trip breakers or contactors, as furnished and installed by the
EC.
E14. EC to interconnect from fire suppression system contacts to building alarm, shunt-trip breakers or contactors, as furnished and installed by the
EC.
E15. EC to supply & install disconnects if required for code purposes.
Disconnects, if required, should be installed after equipment is set in place or coordinated with KEC as to location of placement if installed prior to kitchen equipment.
E16. Max height of floor receptacles is 5-1/4" AFF.
E17. Verify data requirements for all equipment with owner. EC to run data conduit and cable as needed.
E18. Control wiring from freezer condensing unit to freezer evap coil is by the EC. Pull 8 wires plus ground, 12awg stranded wire.
E19. Extra light fixtures in the walk-in box are supplied by the KEC and installed by the EC. EC to interconnect light fixtures to light switch. EC to caulk penetrations inside and out with sealtight to prevent warm air from entering the walk-in box.
E20. Heat trace is to be applied to condensate drain line in the walk-in freezer by EC. Power for heat trace is pulled from 120V receptacle in the freezer, provided & installed by EC.
E21. EC to interconnect rough-in to disposer control panel. EC to interconnect from disposer control panel to disposer.
E22. The KEC will not be responsible to furnish electrical components such as line or disconnect switches, safety cut-outs, control panels, fuse boxes, fittings, or wiring other than those furnished as standard with the equipment or except as specified.
E23. See manufacturer shop drawings for exact electrical requirements.
E24. EC to provide empty pull box sized and shaped as specified by fire suppression system, at a height above finished floor in compliance with local code in wall with empty conduit running to above finished ceiling for fire suppression pull station cable. Final location to be verified by EC/Fire Safety subcontractor.
E25. EC to install receptacles/faceplates & other wall mounted provisions after S/S wall panels have been installed
CLARK FOOD SERVICE INC. RECOMMENDS THAT ALL FOOD SERVICE
EQUIPMENT BE POWERED BY GFI BREAKERS, NOT GFI OUTLETS.
ELECTRICAL NOTES
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-5.1
September 9, 2022
T. SHUE, CFSP
M. HUHN
ELECTRICAL
ROUGH-INS
B e n H il l
In n o v a ti o n
C e n te r
1/4" = 1'-0"
Electrical Plan
Electrical Schedule
ITEM# QTY. ITEM DESCRIPTION KEY VOLTAGE PHASE AMPS
CONNECTION
TYPE AFF ELECTRICAL REMARKS & NOTES
1A 1 Evaporator, Cooler NEW 208 V-230 V 1 1.4 A JB 108" NOTE E15, E23
1B 1 Condensing Unit, Cooler NEW 208 V-230 V 3 7.6 A JB 4" NOTE E23
1C 1 Evaporator, Freezer NEW 208 V-230 V 1 10.3 A JB 108" NOTE E15, E20 E23
1D 1 Condensing Unit, Freezer NEW 208 V-230 V 3 11.8 A JB 4" NOTE E23
1E 1 Cooler, Lights NEW 120 V 1 15.0 A JB DFA NOTE E23
1F 1 Freezer, Lights NEW 120 V 1 15.0 A JB DFA NOTE E23
9 1 40 QT Mixer NEW 240 V 1 6.8 A NEMA 6-15P 48"
13 1 Refrigerator, Reach-In NEW 120 V 1 2.6 A NEMA 5-15P 90"
14 1 Blast Chiller NEW 120 V/208-230 V 1 24.0 A JB 90"
16 1 Slicer, Electric NEW 120 V 1 4.6 A NEMA 5-15P 48"
19 1 Dishmachine NEW 208 V 3 51.8 A JB 60" NOTE E7, E8, E15
20 1 Condensate Hood NEW 120 V 1 20.0 A JB * NOTE E6, E7, E15, E23
20.1 1 Condensate Fan NEW 0 V 0 0.0 A 0" ELECTRICAL REQUIREMENTS TBV. NOTE E23
21B 1 Disposer NEW 208 V 3 4.9 A JB 20" NOTE E15, E21
25B 1 Buffalo Chopper NEW 120 V 1 15.0 A NEMA 5-15P 48"
26 1 Food Processor NEW 120 V 1 4.6 A NEMA 5-15P 48"
27 1 Dicing Food Processor NEW 120 V 1 6.1 A NEMA 5-15P 48"
28 1 Refrigerator, Roll-In NEW 120 V 1 6.5 A NEMA 5-15P 90"
29 2 Convection Oven, Gas FUTURE NOTE E4
31 2 Convection Oven, Gas NEW 120 V 1 9.8 A NEMA 5-15P 48"
32 2 Combi Oven, Stacked FUTURE NOTE E4
33 2 Combi Oven, Stacked NEW 208 V-240V 1 15.0 A SR 48"
34 1 Exhaust Hood NEW JB DFA BRANCH FROM ITEM 34A, NOTE E9-E15, E23
34A 1 Hood Controls NEW 120 V 1 15.0 A JB DFA NOTE E9-E15, E23
34B 1 Fire Supression System NEW JB DFA BRANCH FROM ITEM 34A, NOTE E9-E15, E23
34D 1 Exhaust Fan NEW 208 V 3 2.6 A JB 4" NOTE E23
34E 1 Exhaust Fan NEW 208 V 3 2.6 A JB 4" NOTE E23
34F 1 MUA Unit NEW 460 V 3 9.6 A JB 4" NOTE E23
35 1 Exhaust Hood NEW JB DFA BRANCH FROM ITEM 34A, NOTE E9-E15, E23
35B 1 Exhaust Fan NEW 208 V 3 2.6 A JB 4" NOTE E23
35C 1 Exhaust Fan NEW 208 V 3 2.6 A JB 4" NOTE E23
36 2 Tilt Skillet NEW 120 V 1 1.8 A NEMA 5-15P 18" NOTE E25
46 1 Freezer, Reach-In NEW 120 V 1 10.7 A NEMA 5-15P 90"
47 1 Refrigerator, Reach-In NEW 120 V 1 3.8 A NEMA 5-15P 90"
49A 1 Liquid Paste Filler NEW 120 V 1 0.6 A NEMA 5-15P DFA
49B 1 Compressor, Paste Filler BY OWNER NOTE E4
50 1 Vacuum Sealer NEW 120 V 1 9.8 A NEMA 5-15P DFA
DCR-1 2 DCR BY EC 120 V 1 15.0 A DCR 18" SEE DWG FOR AFF DIMS
DCR-2 2 DCR BY EC 120 V 1 15.0 A DCR 48" SEE DWG FOR AFF DIMS
JB 5 Cord Reel BY EC 120 V 1 15.0 A JB DFA
# DATE DESCRIPTION
1 07.31.202
Revision 1
WALL BLOCKING KEY
1. Wall blocking is supplied & installed by GC.
2. Wall blocking is not needed if walls are constructed of CMU.
3. Wall blocking is shown in order to provide a safe & secure point for wall mounted equipment to fasten too.
4. All heights are above finished floor.
5. Lengths of wall blocking are nominal. Always extend to the next stud over in each direction.
6. GC shall review plans in their entirety so as to determine other wall blocking requirements not indicated on these plans.
7. Typical backing is 3/4" solid plywood.
WALL BLOCKING NOTES:
ABOVE FINISH FLOOR 2'-0"
WITH A HEIGHT OF 48"
TYPE A
B L O
C K
IN
G
B L O
C K
IN
G
ABOVE FINISH FLOOR 3'-6"
WITH A HEIGHT OF 30"
TYPE B
ABOVE FINISH FLOOR 3'-6"
WITH A HEIGHT OF 24"
TYPE D
B L O
C K
IN
G
"4
TYPE E
ABOVE FINISH FLOOR 6"
WITH A HEIGHT OF 60"
B L O
C K
IN
G
ABOVE FINISH FLOOR 5'-6"
WITH A HEIGHT OF 24"
TYPE F
B L O
C K
IN
G
B L O
C K
IN
G
ABOVE FINISH FLOOR 4'-0"
WITH A HEIGHT OF 24"
TYPE C
ABOVE FINISH FLOOR 4'-6"
WITH A HEIGHT OF 24"
TYPE G
B L O
C K
IN
G
ABOVE FINISH FLOOR 4'-6"
WITH A HEIGHT OF 12"
TYPE H
B L O
C K
IN
G
SEE WALK-IN PIT
DETAIL 08 ON QF-7.1
MIN. CLEARANCE
8' - 4"
M
IN
C
L E
A R
A N
C E
TYPE A
2' - 0"
TYPE F
2' - 0"
TYPE B
7' - 0"
TYPE B
5' - 0"
TYPE C
4' - 0"
TYPE C
5' - 0"
6 8 11A 15A 15A
18A
T Y
P E
C
T Y
P E
C
T Y
P E
D
T Y
P E
A
T Y
P E
F
B
A
B
T Y
P E
C
T Y
P E
B
TYPE G
4' - 0"
TYPE G
4' - 0"
33A 32A
A
A
TYPE E
2' - 0"
T Y
P E
H
A
TYPE B
5' - 0"
TYPE B
5' - 0"
48A48A
TYPE A
1' - 6"
TYPE F
1' - 6"
6 8
LOCATION: TBD
S3. Refer to manufacturer shop drawings and/or equipment cutsheets for all HVAC & hood information.
S4. Beverage conduits are by PC, lines are by PC. Verify requirements. Beer system is by PC. Conduits for beverage lines to be run as indicated on these plans and approved shop submittals. CFSE recommends 6" accessible pull boxes on runs exceeding 75', or runs exceeding 180° bends. Pull boxes to be installed in floor or other concealed space. Conduits to terminate 2" above finished floor or concrete pad and be sealed water tight after installation of lines. All installations must meet or exceed all applicable local code requirements.
S5. Walls directly behind, and extending at least 18" above and beyond edge of cooking lines/type 1 hoods MUST be constructed using nonflammable materials and framing. Constructions standards must meet or exceed all local codes and ordinances.
SPECIAL CONDITIONS NOTES
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-6.1
September 9, 2022
T. SHUE, CFSP
M. HUHN
SPECIAL
CONDITIONS
B e n H il l
In n o v a ti o n
C e n te r
1/4" = 1'-0"
Special Conditions Plan
OUTLET DETAIL DETAIL FOR
REFERENCE PURPOSE
ONLY.
NOTE:
ELECTRICIAN SHALL
VFY SIZE AND TYPE
WITH PROJECT
ENGINEER
FINISHED FLOOR
A B
O V
E F
IN
IS
H E
D F
L O
O R
01 WALK-IN LIGHT
DETAIL
DETAIL FOR
REFERENCE PURPOSE
ONLY.
J BOX BY E.C.
E.C. TO SEAL
BETWEEN FIXTURE
BASE AND CEILING
LIGHT FIXTURE(S)
PROVIDED BY KEC
E.C. TO CUT HOLES
AS DIRECTED BY
K.E.C.
VINYL SLEEVE AND
GROMMETS BY E.C.
PENETRATIONS
THRU WALK-IN
PANEL TO BE
THOROUGHLY
SEALED BTY E.C.
CONDUIT BY E.C.
SEALING HUB BY E.C.
WALK-IN CEILING PANEL
02 FIRE PULL DETAIL DETAIL FOR
REFERENCE PURPOSE
ONLY.
FINISHED FLOOR
A
F F
PULLEY AND CONDUIT
FROM THIS POINT BY
FIRE PROTECTION
SYSTEM INSTALLER
CABLE
PROVIDE 6" SQUARE OPEN
AREA IN WALL AT TOP OF
CONDUIT FOR INSTALL OF
THE PULLEY
FINISHED CEILING
1/2" CONDUIT
CONCEALED IN WALL
BY E.C.
REMOTE FIRE PULL
COVER BY FIRE
PROTECTION SYSTEM
INSTALLER
EMPTY BOX SIZED
AND SHAPED, AS PER
FIRE SYSTEM
INSTALLER, AT
HEIGHT ABOVE
FINISHED FLOOR AS
REQUIRED BY LOCAL
CODE. RECESSED IN
WALL BY E.C.
03 HOOD CONTROL
DETAIL
DETAIL FOR
REFERENCE PURPOSE
ONLY.
FINISHED FLOOR
A
F F
FINISHED CEILING
ALARM INDICATING LCD SCREEN
MOUNTS IN STANDARD
DOUBLE GANG
JUNCTION BOX
1/2" CONDUIT WITH CAT
5 CABLE CONNECTED TO
HOOD CONTROL PANEL
CONCEALED IN WALL BY
E.C.
HOOD CLEARANCE
DETAIL
DETAIL FOR
REFERENCE PURPOSE
ONLY.
FINISHED FLOOR
FINISHED CEILING
A
B O
V E
F
IN
IS
H
E D
F L
O O
R
BAR JOIST
V E
R
IF
Y C
E
IL
IN
G
H E
IG
H
T
S P
A C
E P
E R
F E
R E
D
O F
O P
E N
*SEE SPEC OR
SHOP DRAWINGS
FOR ALL
ACCESSORIES ON
EXHAUST HOOD*
KEEP
DIRECTIONAL
AIR DISFUSSERS
AT LEAST 10'-0"
FROM
VENTILATOR
KEEP VELOCITY
BELOW 150 CFM
VERIFY
HEIGHT AND
WIDTH WITH
SHOP
DRAWINGS
1'-0" CLEARANCE
MINIMUM OF
05 FLOOR SINK
DETAIL
DETAIL FOR
REFERENCE PURPOSE
ONLY.
FINISHED FLOOR
DRAIN LINE
FLOOR SINK TO
BE RAISED WITH
FINISHED FLOOR
UNLESS
OTHERWISE
REQUIRED BY
LOCAL CODE.
FLOOR SINK GRATE
06 WATER FILTER
DETAIL
DETAIL FOR
REFERENCE PURPOSE
ONLY.
INCOMING COLD WATER
INLET BY PC. VFY SIZE
WITH UTILITY SCHEDULE
SHUT OFF VALVE SUPPLIED BY PC
COLD WATER OUTLET - SEE
UTILITY SCHEDULE FOR
ITEM(S) WATER FILTER
SERVES
LEAVE A MINIMUM OF 3"
BELOW TO ALLOW ROOM TO
CHANGE FILTERS
WATER FILTER SUPPLIED BY KEC
(S
E E
E L
E V
A T
IO
N
S
V F
Y M
O U
N T
IN
G
H E
IG
H
T
FINISHED FLOOR
SECTION VIEW
ISO VIEW
GROUT FILL
OUTSIDE WALK-IN WALL PANEL
SUPPLIED AND INSTALLED BY KEC
NEW OR EXISTING CONCRETE FLOOR
WALK-IN 4"
DEPRESSION
DETAIL FOR
REFERENCE PURPOSE
ONLY.
WALK-IN DOOR PANEL SUPPLIED
AND INSTALLED BY KEC
4" PIT DEPRESSION BY G.C.
SHEET NUMBER:
DATE:
CHECKED BY:
DRAWN BY:
SHEET TITLE:
NOT FOR CONSTRUCTION
CONTRACT DOCUMENTS
QF-7.1
September 9, 2022
T. SHUE, CFSP
M. HUHN
DETAILS
B e n H il l
In n o v a ti o n
C e n te r
| Sheets |
| QF-0.0 - COVER SHEET |
| QF-1.1 - KITCHEN FLOOR PLAN |
| QF-2.1 - ELEVATIONS |
| QF-3.1 - ISOMETRICS |
| QF-4.1 - PLUMBING ROUGH-INS |
| QF-5.1 - ELECTRICAL ROUGH-INS |
| QF-6.1 - SPECIAL CONDITIONS |
| QF-7.1 - DETAILS |