RestorationCompetencyAdminGuide.docx
DOCX document 81 KB Posted
- Attached to
- Request For Information (RFI)- USDA Jamie L. Whitten Building Masonry Cleaning Restoration
- Solicitation number
- 123144
- Issued by
-
Department of Agriculture
About this file
The document is a comprehensive Restoration Contractor Competency Administrative Guide for GSA construction contracts involving historic building materials. The guide provides detailed instructions for ensuring technical competence of contractors working on historic preservation projects, focusing on establishing and evaluating specialized skills required for restoration work across various material types such as masonry, metals, wood, windows, roofing, and other architectural elements.
The guide outlines a rigorous process for contractors to demonstrate competency, including submitting detailed documentation of past projects, showcasing specific technical skills, and providing evidence of successful restoration work within the past 3-10 years depending on the specialty. Contractors must prove proficiency through project examples that demonstrate ability to clean, repair, replicate, and restore historic materials without causing damage, matching original visual characteristics, and adhering to preservation standards. The evaluation process involves review by qualified preservation professionals who assess technical qualifications based on detailed checklists and qualification standards for each restoration specialty.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Restoration Contractor Competency Requirements
GSA Administrative Guide for Placing Restoration Competency Requirements in Construction Contracts
Competency requirements must be included in all GSA construction contracts for work involving historic building materials. Such work includes replication as well as cleaning, repair, refinishing, conservation and stabilization of historic building materials or finishes. The intent of these requirements is to ensure compliance with federal preservation laws and standards and quality of performance in competitive projects.
Competency requirements are included in Solicitation Evaluation Criteria and applicable contract specifications. The goal is to ensure that projects requiring specialized skills in the repair, replication, cleaning, restoration, or alteration of historic materials are awarded to the technically competent offeror providing the lowest price or best value, to minimize change orders, ensure project completion within established budgets and time frames, and to avoid costly damage to ornamental finishes, fixtures, and assemblies. These skill and past performance requirements apply to construction services procured by design-build as well as design-bid-build contracts.
Competency evaluations may be performed only by individuals meeting the Secretary of the Interior’s Qualification Standards for Preservation Professionals, such as the Regional Historic Preservation Officer, GSA preservation program staff or contract preservation specialists approved by the RHPO.
STEPS FOR PLACING RESTORATION COMPETENCY REQUIREMENTS
IN CONSTRUCTION CONTRACTS:
1. Determine if the building is historic by checking the Historic Building Database. If the building is on the list, contact your GSA Regional Historic Preservation Officer early in project development to incorporate competency requirements into solicitation packages for design and construction services. Consult your RHPO to determine the status of buildings not listed in the database.
2. Include technical competency submission requirements and Evaluation Criteria in the Solicitation for Key Personnel, including individuals performing preservation construction management services and each restoration specialist.
3. Insert competency requirements for each specialist into Division 1 Historic Preservation, Quality Assurance and Historic Treatment Specialist Qualifications.
4. For each type of work requiring specialized preservation skills, insert into the technical specifications applicable standards from the Restoration Contractor Competency Guide.
RESTORATION CONTRACTOR COMPETENCY
CONTRACT REQUIREMENTS GUIDE
TABLE OF CONTENTS
PAGE
PART I. GENERAL INSTRUCTIONS ……………………………………………………………………………………….1
PART II. PROOF OF COMPETENCY
Solicitation………………………………………………………………………………………………………………………..5 Source Selection………………………………………………………………………………………………………………...5
| Contract Specifications | …7 |
| Proof of Competency Technical Qualification Forms | 9 |
PART III. REVIEWING PROOF OF COMPETENCY SUBMISSIONS
| Review Checklists | 10 |
| Sample Review Memorandum | 13 |
PART IV. QUALIFICATION STANDARDS FOR SPECIALTY WORK
| Restoration Specialties List (Alphabetical) | 16 |
| Restoration Specialties List (CSI Indexed) | 17 |
| Qualification Standards | 18 |
PART I - GENERAL INSTRUCTIONS
1) This Desk Guide tells how to:
a. Create competency specifications for projects involving historic properties
b. Review offerors’ proof of competency submissions
2) Successful construction projects:
a. Include Restoration Contractor Competency requirements in solicitation and contract specifications for projects affecting historic materials.
b. Identify restoration specialties and long-lead material/fabrication needs early in design development.
c. Relate proof of competency requirements directly to specified work as described below.
d. Integrate competency requirements in Source Selection Plan and Evaluation Factors
e. Validate competency project data with reference checks confirming that projects met preservation standards.
f. Allow no substitution for approved firms and technicians without proof of competency as required in contract.
3) There are three parts to every contract's Restoration Competency package:
a. Solicitation: Preservation Construction Specialist Competency documentation & Evaluation Criteria
b. Division 1 Historic Building Treatment Quality Assurance – Specialist Qualifications
c. Historic Building Materials Treatment Specifications
Edit each part as follows:
Solicitation: Solicitation submission requirements and Evaluation Criteria alert offerors to preservation construction specialist work categories requiring competency documentation.
Specifications: Project submission requirements for each specialty are referenced in Division 1, Historic Treatment Procedures and detailed in the corresponding Technical Specifications.
a. Division 01 – 013510 Historic Treatment Procedures - Competency of Restoration Specialist:
1. Identify each Historic Treatment Specialist, based on the scope of work materials, tasks and required skills.
2. Common restoration specialties are listed in this Desk Guide. Each skill required for the specialty has its own qualification standards. However, all specialties and all skills are not listed. Unusual jobs may require creating additional specialties, skills and qualification standard or adjustments to submitted project time frames.
Example:
| 04500 Stone Restoration - | Specialty skills: | Repointing | |
| Patching |
Dutchmen installation
b. Technical Specifications
a. List the restoration skills requiring proof of competency in applicable material specifications. Using the Desk Guide, insert the corresponding qualification standards for each skill. For skills not listed in the Desk Guide, create qualification standards modeled on those listed for similar skills. Tailor quantitative submission requirements (number of projects, project completion year).
Example:
04500 Stone Restoration - Selected specialty skill: Repointing
Qualification Standards:
· 3 projects in 4 years
· Raked mortar without damaging stone
· Matched existing/historic mortar joints in color, texture, profile, and other visual characteristics
· Maintained original joint width
PART II PROOF OF COMPETENCY
Solicitation Basic of Award, Source Selection
Base Contract Proof of Competency Contract Requirements Technical Specifications
Solicitation
A. Basis of Awardl
1. Definitions
a. Technically Qualified (or competent) Offeror
A technically qualified offeror is an offeror who meets all of the technical qualifications for the categories stipulated in this contract.
b. Non-Responsible Offeror
A non-responsible offeror is an offeror who has failed to complete the forms provided as directed, including submission of photographs, or whose work does not meet the standards for competency as created by the competency clause requirements. GSA reserves the right to reject the bid of any offeror determined to be non-responsible.
Source Selection
B. Evaluation of Offers
Lowest technically acceptable offer:
The award may be made without negotiations of proposals. Therefore, offerors are requested to initially submit proposals to the Government on the most favorable terms from a technical and price standpoint.
The lowest price technically acceptable source selection process will be used to obtain the best value. The task order will be awarded to the responsible contractor that provides the lowest priced technically acceptable proposal after evaluation. Contractors shall submit the following non-cost/price factors for evaluation of acceptability only.
Historic Building Project Experience and Past Performance
Description: This factor considers the Offeror’s experience in pre-planning and execution of similar projects, identifying potential risks (risks they do not control on a project that is being competed), how they minimize such risks, how efficiently they plan the work, how efficiently they execute the work (scheduling), did they meet their completion date, did they remain within their budget and overall client satisfaction.
Standard for Evaluation: Using Form 1, included in The Solicitation, offerors shall submit one form for each project to include the following items, presented in a non-technical as possible manner:
1. The Offeror shall submit, not exceeding two (2) pages per project, detailed descriptions of two (2) completed projects for evaluation, with a contact/reference for each project. All projects shall have been completed within the [last five (5) years]. Projects shall be identified by the Offeror as being “Similar” (as defined below) in size, scope, and complexity to the requirements provided in the specifications. Projects shall be identified as being completed in a “Quality” (as defined below) manner. The Offeror is responsible for demonstrating how projects they deem “Similar” are in-fact comparable in size, scope, and complexity. The Offeror is responsible for demonstrating how projects they deem “Quality” were in-fact delivered in a timely manner, within established budgets, and to the customer’s satisfaction.
a. [Two (2) projects] submitted as “Similar” shall be defined for evaluation purposes as an interior or exterior repair or alteration project on or in a the historic” portion of a fully occupied commercial/government office building with an original construction dated between the [years of 1900 – 1940] and listed in or eligible for the National Register of Historic Places. Each project submitted must have a construction value [no less than $150,000.00]. Projects must have been carried out in a manner consistent with the Secretary of the Interior’s Standard for Treatment of Historic Properties.
The term “Quality” for evaluation purposes is defined as meeting or exceeding the customer’s requirements as set forth in the construction contract documents, (i.e., drawings and specifications) in a timely manner, within established budgets and with a minimum of disruptions to building operations and occupants. It is also evidenced by receiving satisfactory references, in which those interviewed are willing to contract with the Offeror again.
2. Offeror shall be evaluated on the completeness of Form 1 providing General Project Data, Specific Project Data, Photographs and a detailed Project Narrative and Project References.
3. The offeror or the subcontractor whom the offeror will use for the performance of this work shall meet the competency qualifications defined in SECTION 01350 Historic Preservation
4. Standard for evaluation: The standard is “met” when:
1. Submitted projects were “Similar” and completed in a “Quality” manner within the [last five (5) years] as evidenced by the Offeror’s written response and references contacted.
Procedure for evaluation:
1. Offeror’s projects will be evaluated for “Similarity” and “Quality” performance of the contract requirements. The Offerors shall provide project data and references for the project submitted. References provided by the Offeror may be contacted by the Government. Additional references, beyond those provided by the Offeror, may also be contacted. This evaluation will consist of evaluating the offeror’s written response to the RFP and any references contacted.
The General Services Administration, Public Buildings Service, is using the Contractor Performance Assessment Reporting System (CPARS) modules as the secure, confidential, information management tool to facilitate the performance evaluation process. CPARS enables a comprehensive evaluation by capturing comments from both GSA and the contractor. If needed the CPARS may be used to evaluate past performance on additional projects that the contractor has completed.
A. Base Contract Proof of Competency Division 013510 Historic Treatment Procedures Technical Specifications
Base Contract
Proof of Competency
1. The Proof of Competency Technical Qualifications Package shall be sufficiently complete and organized to insure that evaluation can: be made on the basis of its content. Organize Proof of Competency Technical Qualifications as specified in SECTION 01350. Specialty work requiring a determination of competency for this project includes:
EXAMPLE:
A. 04405 - Dimension Stone: Fabrication and installation of stone masonry.
Stone Patching
B. 07315 - Slate Shingles: Fabrication and installation of Slate Roofing.
C. 07600 - Flashing and Sheet Metal: Fabrication and installation of sheet metal ornament.
Division 013510 Historic Treatment Procedures
Quality Assurance - Submittal Requirements – Restoration Specialists
A. The requirements specified in this section relate to the determination of competency for the General Contractor and Subcontractors performing specialty work on or adjoining historic building materials as listed below:
1. [LIST APPLICABLE MATERIALS SPECIFICATION SECTIONS]
B. Include technical competency documentation for all firms and personnel identified in this section.
C. Provide required information to the Contracting Officer as part of the formal bid.
D. The offeror and each restoration specialist (firm and individual technicians) must provide the technical competency documentation as described below.
1. Firm capabilities and experience: Provide the firm name, address, telephone number, date, authorized official, title, and corresponding telephone number. Provide information regarding the firm’s facilities and equipment that pertains to your ability to perform the restoration or repair work. Describe your firm's experience - include number of years in restoration construction and specific accomplishments of the firm. Describe in your own words how you will proceed through the contract requirements to perform work applicable to your firm.
a) General Contractors: describe your experience managing historic building projects, including coordination of restoration specialists and partnerships in which your firm played a substantive role in projects that met preservation requirements. [Minimum requirement: must have an individual assigned to the project who has had five years of project management experience on historic building rehabilitation or restoration projects.]
2. Project documentation: Select [three] historic building projects that your firm has completed commendably in the past seven years which are similar in size and complexity to your work in this contract. For each project, include the project name, completed date, location, participating technicians, client reference details and captioned photographs describing how you used your restoration skills to accomplish the work in a manner consistent with the technical specifications and technical competency criteria for this project. Include the client's name, address, and contact person’s name title, and telephone number. Explain the materials and methods in sufficient detail for GSA to determine that the project is similar in complexity to the proposed project. Photographs must be of sufficient quality and detail to illustrate the technicians’ competency.
E. Individual technicians: Provide names, training (include academic and on-the-job training), preservation experience (special commendations, unusual projects), total years performing this specialty work, and work performed on projects of similar size and complexity to this project, if different than projects submitted to establish the firm's competency. List all individuals who might be employed under this contract. Only individuals reviewed and approved under this competency clause may perform work on historic materials under this contract. If additional individuals are added after award of the contract, their credentials must be approved by the Contracting Officer prior to their starting work. Include documentation for construction supervisors or project managers who will be overseeing the restoration specialists or facilitating their coordination with other contractors. [At least one project must include interior or exterior work, as applicable to this project.]
Method of evaluation of technical qualifications:
A. Purpose: To determine the technical competence of the offeror to perform work specified in this contract at the lowest price or best value for the Government.
B. Competency evaluations will be performed by individuals meeting the Secretary of the Interior’s Qualification Standards for Preservation Professionals, either as part of an evaluation panel convened by the Government to review all technical data requested of the offerors, or as the qualified subject matter specialist on the contract team.
Technical Specifications [INSERT SPECIFICATION NUMBER AND NAME]
A. Quality Assurance
1. Required technical competency documentation related to this competency clause shall be included with bid package submittals as described in Division 01-3510 Historic Preservation for all technicians who will be performing the following work:
[INSERT APPLICABLE SKILLS E.G. REPOINTING, PATCHING]
2. Project photographs and descriptions shall demonstrate that work was completed in accordance with the Secretary of the Interior’s Standards for Rehabilitation and met the following technical requirements:
[INSERT APPLICABLE SKILL REQUIREMENTS FOR EACH SKILL E.G.,
REPOINTING:
· RAKED MORTAR WITHOUT DAMAGING STONE
· MATCHED HISTORIC MORTAR JOINTS IN COLOR, TEXTURE AND PROFILE
· MAINTAINED ORIGINAL JOINT WIDTH]
INSTALLATION OF NEW MATCHING STONE:
· NO DAMAGE TO SOUND STONE
· NEW UNITS ALIGN WITH EXISTING, MATCHING EXISTING JOINT PATTERN AND CHARACTERISTICS
· VEINING OR WEATHERING RUNS IN SAME DIRECTION AS THAT OF EXISTING STONE]
PART II – PROOF OF COMPETENCY TECHNICAL QUALIFICATION FORMS
FORM 1: COMPLETED PROJECTS
TECHNICAL QUALIFICATIONS DATA
SUBMIT A SEPARATE FORM FOR EACH COMPLETED PROJECT.
Minimum requirements:
1. Select [Two (2) - REQUIRE THREE FOR COMPLEX PROJECTS] projects that your firm has completed commendably in past [5 years] which have included restoration or rehabilitation work on [INSERT ONE OR BOTH: BUILDING INTERIORS, BUILDING EXTERIORS performed on similar historic properties and comparable in size and complexity to the proposed project.
2. Complete each area of this form in sufficient detail to allow a determination that the projects submitted are comparable in size and complexity to the proposed project.
3. The client's contact person must provide a satisfactory rating with regard to quality, schedule and cost of project.
FIRM NAME:_________________________________________________________________________
PROJECT NAME:______________________________________________________________________
PROJECT ADDRESS:___________________________________________________________________
DATE COMPLETED:___________________________________________________________________
WHAT RESTORATION/REHABILITATION ISSUES WERE INVOLVED WITH THIS PROJECT?
EXPLAIN:
HOW DID THIS PROJECT BENEFIT FROM YOUR [PROJECT MANAGEMENT] SKILLS? EXPLAIN:
Minimum requirement: Project management skills must have been used on the project.
DESCRIPTION OF MATERIALS AND METHODS USED TO PERFORM THE RESTORATION/REHABILITATION WORK:
(Provide photos (overall and close up) that show quality of work. Include building identification and view)
DESCRIPTION OF PHOTO VIEW #1:______________________________________________________
DESCRIPTION OF PHOTO VIEW #2:______________________________________________________
DESCRIPTION OF PHOTO VIEW #3:______________________________________________________
FORM B: EXAMPLES OF OFFEROR'S COMPLETED PROJECTS (Page 3 of 3)
DESCRIPTION OF PHOTO VIEW #4:_______________________________________________________
DESCRIPTION OF PHOTO VIEW #5:_______________________________________________________
CLIENT NAME:________________________________________________________________________
CLIENT ADDRESS:_____________________________________________________________________
CONTACT PERSON and TITLE:____ ______________________________________________________
TELEPHONE NUMBER AND EMAIL:_______________________________________________________
REVIEWING PROOF OF COMPETENCY SUBMISSIONS
REVIEW CHECKLISTS
TECHNICAL COMPETENCY REVIEW – GENERAL CONTRACTOR
Bldg.____________________________ Project____________________________ Review No._______
Facilities: ___Adequate ___Not adequate Submit:_________________________________________
Project Mgmt.: ___Adequate ___Not adequate Submit:____________________________________
Proposed Approach: ___Approved _____Not approved because________________________________
TECHNICAL COMPETENCY REVIEW – RESTORATION SPECIALISTS
Bldg.____________________________ Project Review___________________________ No.________
Project: ___Approved ___Not approved Completion date met? ___Yes ___No
Comparable work? ___Yes ___No, because_______________________________________________
Successful? ___Yes ___No, because_____________________________________________________
Photos provided? ___Yes ___No Illustrative? ___Yes ___No
Approved Technicians:
TECHNICAL EVALUATION SUMMARY
Bldg.______________________ Project______________________ Contract______________________
SUBMISSION NO.:__________ ___COMPLETE-Specialist approved ___INCOMPLETE-Resubmit ___REJECTED-Project submission indicates not competent in this specialty
Firm info. Complete? ___Yes ___No Submit__________________________________
Project info. Complete? ___Yes ___No
Provide missing data for:
Project 1______________________________________________________________________________
Project 2______________________________________________________________________________
Project 3______________________________________________________________________________
Submit photos for: ___Project 1 ___Project 2 ___Project 3
Submit both forms & photos for _____ more projects
Enough technicians competent? ___Yes ___No Submit__________________________
Other information required_______________________________________________________________
REVIEW MEMORANDUM FORMAT (SAMPLE)
| MEMORANDUM FOR | JESSE BOWEN | |
| CONTRACTING OFFICER | ||
| CONSTRUCTION CONTRACTS BRANCH) |
| FROM: | GONZALO CESPEDES |
| PROJECT OFFICER (WPOC) |
| THROUGH: | JOHN SMITH | |
| HISTORIC PRESERVATION ARCHITECT | ||
| FOR JANE DOE & ASSOCIATES, ARCHITECTS |
SUBJECT: Offeror Competency Evaluation - Second Submission Pension Building - Galleries Rehabilitation
GS11P93MKCOO40"U"
The Competency of Offeror submission by Marlowe Heating and Air Conditioning on behalf of the restoration specialists listed below is complete. No further submissions are required.
| 04500 | Unit Masonry Repair Specialist: Marlowe Heating and Air approved |
| Approved technicians: |
Gary W. Marlowe Marvin Murphy
| 09200 | Specialist: D. L. Boyd Plastering, Inc. approved |
| Approved technicians: |
Leonard Groomes Michael Santoro
Only approved technicians may perform work on this project.
A detailed review of the submission is provided on the attached forms. If you have any questions, please call John Smith at 202-222-2222.
| cc: | Richard Judson, North Construction District (WPCON) |
| Andrea Mones-O'Hara, Regional Historic Preservation Officer (WPT) |
PART IV - QUALIFICATION STANDARDS FOR SPECIALTY WORK
RESTORATION SPECIALTIES (listed alphabetically): PAGE
| Bird Deterrent System | 18 |
| Demolition | 18 |
| Excavation | 18 |
| Flashing and Gutters | 18 |
Flooring, Ceramic (See Tile)
| Flooring, Resilient | 19 |
| Flooring, Wood | 19 |
| Glass | 20 |
| Hardware | 20 |
| Leather | 21 |
| Masonry Cleaning and Coating - Clay, Stone, Concrete | 21 |
| Masonry Repair/Repointing - Brick, Terra Cotta, Cast Stone | 22 |
| Masonry Repair/Repointing - Stone | 23 |
| Masonry Repair - Concrete | 24 |
| Metals | 25 |
| Painting | 26 |
| Painting, Ornamental | 26 |
| Plaster, Ornamental | 27 |
| Roofing - Clay Tile | 27 |
| Roofing - Slate | 27 |
| Roofing - Metal | 27 |
Selective Demolition (See specific specialty trade)
| Stucco | 28 |
| Terrazzo | 28 |
| Tile | 28 |
| Windows, Aluminum, Steel and Bronze | 29 |
| Windows, Wood | 30 |
| Wood, Architectural | 31 |
Wood Doors (See Wood, Architectural) Wood, Structural 32 Restoration Contractor Competency Requirements
PART IV QUALIFICATION STANDARDS FOR SPECIALTY WORK
Restoration Contractor Competency Requirements
RESTORATION SPECIALTIES (CSI indexed): PAGE
02400 Demolition (Building Demolition) 18 31000 Selective Demolition - Do not use*
| 02200 Earthwork (Excavation) | 18 |
| 03330 Architectural Cast in Place Concrete | 18 |
| 03450 Architectural Precast | 22 |
| 04210 Clay Masonry | 21 |
| 04400 Stone Masonry Restoration and Cleaning | 21 |
| 04900 Cast Stone | 22 |
| 04700 Sheet Metal Fabrications | 25 |
| 05700 Ornamental Metalwork | 25 |
| 06100 Rough Carpentry | 32 |
| 06400 Architectural Woodwork | 30 |
| 073126 Slate Shingle Roofing | 27 |
| 07320 Roofing Tile | 27 |
| 07620 Flashing and Sheet Metal (Flashing, Gutters) | 18 |
| 07610 Sheet Metal Roofing | 27 |
| 08140 Wood Doors | 30 |
| 08510 Steel/Bronze Windows | 29 |
| 08510 Aluminum Windows | 29 |
| 08520 Wood Windows | 30 |
| 08710 Door Hardware | 20 |
| 08800 Glazing | 20 |
| 09220 Lath and Plaster (Ornamental) | 27 |
| 092423 Portland Cement Plaster (Stucco) | 28 |
| 09300 Ceramic Tile | 28 |
| 09660 Terrazzo | 28 |
| 09640 Wood Flooring | 19 |
| 09650 Resilient Tile Flooring | 19 |
| 09900 Painting (Plain, Ornamental) | 26 |
| 108113 Pest Control (Bird Deterrent Systems) | 18 |
| 120513 Fabrics (Leather) | 21 |
*Use appropriate material specification sections
PART IV. QUALIFICATION STANDARDS FOR SPECIALTY WORK
MINIMUM STANDARDS REQUIRED FOR MEETING COMPETENCY IN THE FOLLOWING AREAS OF SPECIALTY WORK: The following list is organized alphabetically by the area of specialty work, particular skills required within the area of specialty work, and the minimum standard for qualitative experience to be applied to that skill:
BIRD DETERRENT SYSTEMS -108113PEST CONTROL
Anchoring into masonry joints:
· 3 projects in 3 years
· no damage/no drilling into masonry units
Installing netting on ornamental surfaces:
· 3 projects in 3 years
· netting was installed inconspicuously: taut, with clean edges (no sagging or bunching), conforming to architectural lines
Spot cleaning (water, poultice, or chemical):
· 2 projects in 3 years, using method specified for this project
· no damage to masonry by cleaning products, tools, or equipment
· no soiling of adjoining masonry by cleaning products or rinse water
DEMOLITION -02400BUILDING DEMOLITION
Documentation - measured drawings, photography:
· 3 projects in 4 years
· documentation met HABS standards
EXCAVATION - 02200 EARTHWORK
Archeological monitoring:
· 2 projects in 10 years
Archeological research:
· Phase I: 3 projects in 3 years
· Phase II: 3 projects in 5 years
· Phase III: 2 projects in 8 years
FLASHING AND GUTTERS - 07620 FLASHING AND SHEET METAL
Custom fabrication/replication:
· 3 projects in 4 years
· at least two projects involved replicating configurations similar to those required for this project (e.g., complex curves)
Installation:
· 3 projects in 4 years
Patching/repair:
· 3 projects in 4 years
· no damage to sound metal
· other than material weathering differences, patches/repairs were neatly-executed and inconspicuous
· watertight
FLOORING, CERAMIC - (See TILE)
FLOORING, RESILIENT - 09650 RESILIENT TILE FLOORING: Includes historic cork flooring, linoleum, rubber tile, and other resilient materials
Cleaning/Refinishing:
· 2 projects in 10 years, involving either cork, linoleum, or rubber tile more than 50 years old
· no damage to flooring by cleaning products, tools, or equipment
· no damage to adjoining finishes
· preserved sound original finishes
· accurately replicated historic finishes, when non-extant or deteriorated
Custom fabrication/replication:
· 2 projects in 10 years, involving either cork, linoleum, or rubber tile
· accurately replicated historic flooring in color, texture, pattern, and other visual characteristics
Installation:
· 3 projects in 4 years, involving any type of resilient flooring
Patching/repair.
· 2 projects in 10 years, involving either cork, linoleum, or rubber tile
· no damage to sound flooring
· repair was inconspicuous
· patches blended with historic flooring in color, texture, pattern, and other visual characteristics
· patches adhered a minimum of one year
FLOORING, WOOD - 09640 WOOD FLOORING
Cleaning/refinishing:
· 3 projects in 4 years, involving application techniques similar to those specified for this project
· no damage to/discoloration of wood substrate by cleaning products, tools, or equipment
· no damage to adjoining finishes
· sanding: created no gouges or ridges, secured loose pieces in advance to avoid damage during sanding
· cleaning- preserved existing historic finishes
· refinishing: matched original finish appearance, including color, gloss, and other surface characteristics
In kind replacement/replication:
· 3 projects in 4 years
· wood parquet flooring: at least one project must have involved wood parquet repair/replacement of similar complexity
· accurately replicated historic flooring in color, wood grain character, sizes and configuration of wood pieces, finish and visual qualities
Patching/repair
· 3 projects in 4 years
· wood parquet flooring: at least one project must have involved wood parquet repair of similar complexity
· no damage to sound flooring
· repair was inconspicuous
· patches blended with historic flooring in color, wood grain character, finish, and other visual qualities
Treating unusual conditions (e.g. sun damage, fire damage, water damage):
· illustrate training or experience involving similar problem(s) which enables you to solve this project's problem(s)
GLASS - 08800 GLAZING
Custom fabrication/replication:
· 1 project in 20 years, involving similar glass to that required for this project (e.g., structural. figured, stained)
· replicas must have accurately recreated the original glass' color, transparency, polish, and other visual characteristics
· obsolete materials: substitutions for glass products no longer manufactured must have resembled the original glass in color, transparency, polish, figuring and visual characteristics and blended visually with originals
Structural glass patching:
· 2 projects in 10 years, involving either polished stone or structural glass
· patches must have reproduced the original glass' color and surface character sufficiently that patches are inconspicuous and blend with original glass
Structural glass repair/readhesion:
· 2 projects in 10 years, involving either polished stone or structural glass, using similar repair procedures to those required for this project
· repairs were inconspicuous
· no damage to existing sound material
Regrouting structural glass
· 2 projects in 10 years, involving either polished stone or structural glass
· removed unsound grout without damaging stone/glass
· matched existing/historic grout in color, texture, profile, and other visual characteristics
Sealant Installation:
· 3 projects in 4 years, involving structural glass or any stone
· removed old grout/sealant cleanly, without damaging glass/stone
· sealant matched existing grout or glass/stone color
· sealant applied neatly, not spreading onto glass/stone surface
· sealant adhered to both sides of joint
· uniform sealant beds
· watertight installation
HARDWARE - 08710 DOOR HARDWARE/ 05700 ORNAMENTAL METALWORK
Cleaning/Refinishing:
· 3 projects in 6 years, involving same type of metal and using techniques specified for this project
· Nickel alloys: 2 projects in 10 years
· no damage to hardware by cleaning products, tools, or equipment
· no damage to adjoining finishes by cleaning products, tools, or equipment
· accurate replication of historic finishes
Replating
· 3 projects in 4 years
· accurately recreated original finishes
· uniform surface appearance
· no damage to hardware
Custom fabrication/replication:
· 2 projects in 10 years
· accurate replication of original hardware in form, material, and finish
Installation:
· 3 projects in 8 years
· no damage to hardware
· no damage to adjoining finishes
· hardware adjusted as necessary to function properly
Repair - soldering, welding, removing dents, replacement of parts, etc.
· 2 projects in 10 years
· no damage to hardware
· no loss of hardware function as a result of repair
· repair was inconspicuous
LEATHER - 120513 FABRICS
Cleaning/spot removal:
· 1 project in 20 years
· no damage to leather by cleaning products, tools, or equipment
· no damage to adjoining finishes by cleaning products, tools, or equipment
Custom fabrication/replication:
· 1 project in 20 years
· accurate replication of original leather in color, texture, and other visual characteristics
Repair:
· 1 project in 20 years
· no damage to sound leather
· no damage to adjoining finishes
· repair was inconspicuous
MASONRY CLEANING AND COATING - 04210 CLAY MASONRY AND 04400 STONE MASONRY RESTORATION AND CLEANING/ 04900 CAST STONE/ 03300 ARCHITECTURAL CAST IN PLACE CONCRETE/ 03450 ARCHITECTURAL PRECAST: includes Terra Cotta, Brick, Cast Stone, Stone, and Concrete
General exterior cleaning:
· 3 projects in 4 years, using techniques specified for this project
· no damage or discoloration of masonry by cleaning products or equipment
Marble, limestone, polished stone cleaning:
· 3 projects in 4 years, involving the same type(s) of masonry, using techniques specified for this project
· no damage or discoloration of masonry by cleaning products or equipment
Stain removal:
· 3 projects in 4 years, showing use of similar procedures on similar masonry
· no damage or discoloration of masonry by cleaning products or equipment
General Interior Cleaning:
· 3 projects in 4 years, using techniques specified for this project
· no damage or discoloration of masonry by cleaning products or equipment
Interior Cleaning of Polished Stone or Mosaic Tile:
· 3 projects in 4 years, using method specified for this project
· no damage or discoloration of masonry by cleaning products or equipment
Application of Repellent Coatings:
· 2 projects in 5 years
· no damage or discoloration of masonry by coating products or equipment
MASONRY REPAIR/REPOINTING - BRICK, TERRA COTTA, CAST STONE - 04210 CLAY
MASONRY RESTORATION AND CLEANING/ 04900 CAST STONE
Repointing:
· 3 projects in 4 years, involving either " of masonry listed above, or cast stone (more difficult)
· raked mortar without damaging masonry
· matched existing/historic mortar joints in color, texture, profile, and other visual characteristics
· maintained original joint width
· projects must involve building more than 50 years old (experience with historic materials required)
· no mortar left on face of masonry
Sealant Installation:
· 3 projects in 4 years, involving either type of masonry listed above, or cast stone
· removed old mortar/sealant cleanly, without damaging masonry
· sealant matched existing masonry color
· sealant applied neatly, not spreading onto masonry surface
· sealant applied properly (as directed), including backer rod and weep holes or other means specified for vapor transmission
· uniform sealant beds
· watertight installation
Dismantling and resetting:
· 3 projects in 4 years, involving either type of masonry listed above, or cast stone
· careful removal to salvage existing masonry
· no damage to sound adjoining masonry
· reinstalled masonry aligned with existing units
Matching/replication:
· 3 projects in 5 years, involving either type of masonry listed above
· matched masonry color, texture, size, and other visual characteristics
· For terra cotta projects, at least one project must have involved terra cotta replication
Installation of new (replicate) terra cotta or cast stone:
· 3 projects in 5 years, involving either terra cotta. cast stone, or natural stone
· new units align with existing, following existing joint pattern and pointing characteristics.
Installation of new (replicate) brick:
· 3 projects in 5 years, involving either brick, terra cotta, cast stone, or natural stone
· new units align with existing, following existing joint pattern and pointing characteristics.
Patching:
· 3 projects in 4 years, involving either brick, terra cotta, cast stone, or natural stone
· used similar materials and procedures to those specified for this project
· no damage to sound masonry
· matched color, texture, and other visual characteristics of existing masonry
· maintained original joint locations; patches did not bridge joints
Surface replication of glazed terra cotta, glazed brick, or polished/figured stone:
· 2 projects in 10 years, at least one completed within past 5 years
· projects involved either type of masonry listed above
· matched color, texture, gloss, and other visual characteristics of existing masonry
Crack Repair:
· 3 projects in 5 years, involving terra cotta, brick, cast stone, or natural stone
· no damage to sound masonry
· surface of crack repair matched existing masonry in color, texture, and other visual characteristics
· hairline cracks: grout color matched to masonry or crack raked and pointed/patched with matching mortar
MASONRY REPAIR/REPOINTING - STONE - 04400 STONE MASONRY RESTORATION AND
COATING
Repointing:
· 3 projects in 4 years
· raked mortar without damaging stone
· matched existing/historic mortar joints in color, texture, profile, and other visual characteristics
· maintained original joint width
· no mortar left on face of stone
Sealant Installation:
· 3 projects in 4 years
· removed old mortar/sealant cleanly, without damaging stone
· sealant matched stone/mortar color
· sealant applied neatly, not spreading onto stone surface
· sealant adhered to both sides of joint
· sealant applied properly (as directed), including backer rod and weep holes or other specified vapor transmission
· uniform sealant beds
· watertight installation
Dismantling and resetting:
· 3 projects in 4 years
· careful removal to salvage existing stone
· no damage to sound adjoining stone
· reset stones aligned with existing units
Cutting:
· 3 projects in 4 years
· careful removal to salvage existing stone
· no damage to sound adjoining stone
· straight and uniform cuts with no irregularities
Matching/Replication:
· 3 projects in 5 years
· matched color, texture, size, surface pattern (if present), and other visual characteristics
Installation of new matching stone:
· 3 projects in 5 years
· new units align with existing, following existing joint pattern and pointing characteristics
· veining or weathering (salvage stone) runs in same direction as that of existing stone
Dutchman installation:
· 2 projects in 10 years
· no damage to sound stone
· matched color, texture, and other visual characteristics of existing stone
· new pieces aligned with existing stone, following existing joint pattern and pointing characteristics
· veining or weathering (salvage stone) runs in same direction as that of existing stone
· joints between dutchman and remaining (partial) stone units are inconspicuous (pieces appear as one on cursory view)
Crack Repair:
· 3 projects in 5 years
· no damage to sound stone
· surface of crack repair matched existing masonry in color, texture, and other visual characteristics
· hairline cracks: grout color matched to masonry or crack raked and pointed/patched with matching mortar
Patching:
· 3 projects in 4 years
· used similar materials and procedures to those specified for this project
· no damage to sound stone
· matched color, texture, and other visual characteristics of existing stone
· matched masonry vapor transmission characteristics
· maintained original joint locations; patches did not bridge joints
Surface replication of polished/figured stone:
· 2 projects in 10 years, at least one completed within past 5 years
· projects involved either type of polished/figured stone, or glazed brick/terra cotta.
· matched color, texture, gloss, and other visual characteristics of existing masonry
MASONRY REPAIR - CONCRETE - 03120 ARCHITECTURAL CAST IN PLACE/ 03300 CAST IN PLACE/ 03450 ARCHITECTURAL PRECAST
Sealant Installation:
· 3 projects in 4 years, involving any type of masonry
· removed old mortar/sealant cleanly, without damaging masonry
· sealant matched existing masonry color
· sealant applied neatly, not spreading onto masonry surface
· sealant adhered to both sides of joint
· sealant applied properly (as directed), including backer rod and weep holes or other means specified for vapor transmission
· uniform sealant beds
· watertight installation
Patching:
· 3 projects in 4 years, involving patching of any type of masonry
· used similar materials and procedures to those specified for this project
· no damage to sound masonry
· matched color, texture, and other visual characteristics of existing masonry
· matched concrete vapor transmission characteristics
· maintained original joint locations; patches did not bridge joints
· painted concrete: matched surface texture of existing masonry
Crack Repair:
· 3 projects in 5 years, involving any type of masonry
· no damage to sound masonry
· surface of crack repair matched existing masonry in color, texture, and other visual characteristics
· hairline cracks: grout color matched to concrete or raked and pointed with matching mortar
METALS - 04700 SHEET METAL FABRICATIONS/ 05700 ORNAMENTAL METALWORK
Cleaning/refinishing/polishing:
· 3 projects in 4 years, involving same type of metal and using cleaning/refinishing/polishing techniques specified for this project
· Nickel alloys: 2 projects in 10 years
· no damage to metal by cleaning/polishing products, tools, or equipment
· no damage to adjoining finishes
· accurate replication of historic finishes
· cleaning/polishing followed metal grain
· protective lacquer application: smooth, uniform, with no drips or sags
· polishing: matched original polish gloss characteristics
Replating:
· 3 projects in 4 years
· accurately recreated original finishes
· uniform surface appearance
· no damage to metal
Paint stripping:
· 3 projects in 4 years, involving similar techniques to those specified for project
· removed corrosion products completely
· achieved uniform, smooth surface without loss of detail or damage to metal substrate
· no damage to adjoining finishes
Custom fabrication/replication:
· 2 projects in 10 years
· accurate replication of original metal in form, material, and finish
Removal/installation:
· 3 projects in 8 years
· no damage to metals being removed and salvaged
· no damage to new or salvaged metals being (re)installed
· no damage to adjoining finishes
Repair - replacement of parts, cutting, welding, soldering filling dents, patching, etc.
· 3 projects in 7 years, involving similar types of repairs
· no damage to sound metal
· repair was inconspicuous: follows original design, contours, detailing, finish
· left no sharp edges or other safety hazards
· watertight connections between new and existing materials
· repair blended visually with existing sound metal
Painting:
· 3 projects in 4 years
· surface preparation: loose paint removed, surface smoothed/cleaned as necessary to assure adhesion and neat finished appearance
· application: smooth and uniform, with no drips or sags
Sealant Installation:
· 3 projects in 4 years
· removed sealant cleanly, without damaging metal or adjoining materials
· sealant matched existing metal/wall color, as required
· sealant was applied neatly, not spreading onto adjoining surfaces
· sealant adhered to both sides of joint
· uniform sealant beds
· watertight installation
PAINTING - 09900 INTERIOR AND EXTERIOR
General:
· 3 projects in 4 years
· surface preparation: loose paint removed, surface smoothed/cleaned as necessary to assure adhesion and neat finished appearance
· application: smooth and uniform, with no drips or sags
PAINTING, ORNAMENTAL - 09900 INTERIOR AND EXTERIOR
Replication: Faux finishes/multiple-coat ornamental paint systems:
· 3 projects in 4 years
· accurate replication of ornamental paint system's color, texture, pattern, luminosity, and other visual characteristic
· faux finishes: projects replicated either an existing faux finish, a historic faux finish (based on visual documentation), or an existing natural material in the building
· ornamental paint systems other than faux finishes: as least one project must involve replication of an ornamental paint system similar to that specified for this project (e.g., glazed paint system)
Leaf:
· 3 projects in 4 years
· accurate replication of existing/historic leaf material, color, and other visual qualities
Metallic paints:
· 3 projects in 4 years
· accurate replication of existing or historic metallic paint's color and other visual qualities
· infill/patching: selected paint with similar weathering characteristics to existing, to assure long term match
Stencilling:
· 3 projects in 4 years
· accurate replication of existing or historic stencilling color, pattern, placement, and other visual qualities
Acrylic lacquer application:
· 3 projects in 4 years
· coats applied smoothly and uniformly, with no drips or sags.
Ornamental paint cleaning/conservation:
· 3 projects in 5 years, using techniques specified for the project
· no damage to/discoloration of sound paint by cleaning/conservation materials or equipment
PLASTER, ORNAMENTAL - 09220 LATH AND PLASTER
Paint removal:
· 3 projects in 6 years
· restored plaster ornament detailing without damaging substrate
Consolidation: see Ornamental Paint cleaning/conservation
Repair/replication:
· 3 projects in 4 years
· accurate replication of plaster castings or moldings by casting or in place modeling
· new work replicated existing form and surface texture
· replications were comparable in complexity to those in this project
· repairs were inconspicuous
· new work aligned with existing ornament
ROOFING - 073126 SLATE SHINGLES
Repair:
· 3 projects in 5 years, involving techniques similar to those specified for this project
· replacement slates matched originals in color, size, and other visual characteristics
· repairs were inconspicuous
Replacement in kind:
· 3 projects in 5 years
· matched original slates in color, size, and other visual characteristics
ROOFING - 07320 ROOFING TILE - CLAY
Repair:
· 3 projects in 10 years, involving techniques similar to those specified for this project
· replacement tiles matched original materials in color (including color range, if variegated) and other visual characteristics
· repairs were inconspicuous: new work blended in and aligned with existing
Replacement:
· 3 projects in 10 years
· matched original materials in color, texture, and other visual characteristics
ROOFING - 07620 SHEET METAL ROOFING: Standing or flat seam, tin shingle
Repair:
· 3 projects in 5 years, using techniques specified for this project
· matched original metal in color, texture, and other visual characteristics
· matched roof configuration, including contours and ornamental details
· repairs were inconspicuous
Replacement:
· 3 projects in 5 years, at least one project involving the particular roof system specified for project
· matched original materials in color, texture, and other visual characteristics
· matched roof configuration, including contours and ornamental details
SELECTIVE DEMOLITION - see specific specialty trade
STUCCO - 092423 PORTLAND CEMENT PLASTER (INTERIOR AND EXTERIOR)
Repair/replacement:
· 2 projects in 5 years
· removed unsound stucco without damaging wood/masonry substrate
· new stucco (patches/replaced areas) matched original in color, texture, and other visual characteristics
TERRAZZO -09660TERRAZZO
Resurfacing:
· 3 projects in 8 years
Replication (replacement in kind):
· 2 projects in 8 years
· matched color, texture, chip size, and other visual characteristics
Patching:
· 2 projects in 8 years
· matched color, texture, chip size, and other visual characteristics
· no damage to sound terrazzo
Crack Repair:
· 2 projects in 8 years
· no damage to sound terrazzo
· repair not conspicuous: blended with color and texture of adjoining terrazzo
TILE - 09300 TILE: CERAMIC, MOSAIC, GLAZED WALL, QUARRY, PAVERS 09385
DIMENSION STONE - TILE: MARBLE, GRANITE, LIMESTONE, SLATE
Deep cleaning/stain removal:
· 2 projects in 15 years
· no damage to tile by cleaning products, tools, or equipment
Replication (replacement in kind):
· 2 projects in 8 years
· matched tile color, finish, texture, size, shape, grout color and texture, tile layout, and other visual characteristics
· no damage to sound tile
Crack Repair:
· 2 projects in 8 years
· no damage to sound tile
· repair not conspicuous: blended with color and texture of adjoining tile
Interior Cleaning of Polished Stone or Mosaic Tile:
· 3 projects in 4 years, using method specified for this project
· no damage of masonry by cleaning products or equipment
Application of Repellent Coatings:
· 2 projects in 5 years
· no damage to/discoloration of masonry by mating products or equipment
WINDOWS - 08510 ALUMINUM/ 08510 STEEL/ BRONZE
Custom fabrication/replication:
· 2 projects in 8 years
· accurate replication of historic aluminum, steel, or bronze windows in size, and detailing, including muntin profile and configuration
Window removal and installation:
· 2 projects in 8 years, involving removal of existing windows and installation of new or repaired/salvaged windows
· no damage to window frame
· no damage to adjoining finishes
· newly installed windows align with existing frames, operate properly, conform to existing opening sizes
Repair - replacement of parts, soldering, welding, filling dents, etc.
· 3 projects in 7 years
· no loss of window function as a result of repair
· repair was inconspicuous; conformed to existing window detailing
· watertight
Repair - aligning, straightening, restoring operability, repairing weather-stripping
· 3 projects in 7 years
· repair was inconspicuous, no alteration of original window appearance
· watertight
Installing new weather-stripping
· 2 projects in 5 years
· no damage to windows or adjoining finishes
· window operability maintained
Glazing:
· 3 projects in 4 years
· no damage to windows
· replicated historic glazing appearance
Painting:
· 3 projects in 4 years
· surface preparation: loose paint removed, surface smoothed/cleaned as necessary to assure adhesion and neat finished appearance
· application: smooth and uniform, with no drips or sags
· window operability maintained, no openings painted shut
Sealant Installation:
· 3 projects in 4 years
· removed sealant cleanly, without damaging windows or adjoining materials
· sealant matched existing window/wall color, as required
· sealant applied neatly, not spreading onto window or wall surface
· sealant adhered to both sides of joint
· uniform sealant beds
· watertight installation
WINDOWS - 08520 WOOD WINDOWS
Custom fabrication/replication:
· 3 projects in 4 years
· accurate replication of historic wood windows in size, and detailing, including muntin profile and configuration
Window removal and installation:
· 3 projects in 6 years, involving removal of existing windows and installation of new or repaired/salvaged windows
· no damage to window frame or building during removal
· no damage to adjoining finishes
· newly installed windows align with existing frames, operate…