About this file
This is a ResCheck energy compliance certification report for Building B of Project 23135-3, a multi-family residential construction project in Macedon, New York, submitted by Gerber Homes. The project involves the construction of three all-electric, wood-framed townhome buildings totaling fifteen residential units at 2 West Street (Lapham Estates). Building B, the subject of this report, comprises 4,638 square feet of conditioned floor area with a 10% glazing area ratio and is classified as new construction under the 2020 NYStretch - 2018 IECC energy code standards for Climate Zone 5a. The building is oriented 180 degrees from north and features multi-family residential construction with all-electric systems, including heat pump capability, though renewable energy systems, battery storage, and EV charging are not included in this unit.
The energy compliance assessment demonstrates that the proposed building design exceeds code requirements, achieving 1.2% better performance than the code maximum using a UA trade-off compliance path, with a proposed UA value of 505 compared to the maximum allowable of 511. The envelope assemblies include raised/energy truss ceilings with R-41 continuous insulation, wood-frame walls with R-21 cavity insulation, vinyl-frame windows and doors with SHGC ratings of 0.34, and basement masonry block walls with R-19 integral insulation. The inspection checklist addresses mandatory compliance requirements across pre-inspection/plan review, foundation, framing/rough-in, insulation, and final inspection provisions, with all high-impact Tier 1 requirements documented as compliant. The report confirms adherence to mechanical, ventilation, lighting, and hot water system requirements, including HRV/ERV ventilation systems and high-efficiency lighting fixtures meeting or exceeding 65 lumens/watt efficacy standards.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Report Title: PROJECT 23135-3 - BUILDING 'B' Report Date: 12/13/25, 3:32 AM
Compliance Certificate
Project Information
Project Title:
Energy Code:
Location:
Construction Type:
Project Type:
Project Sub Type:
Orientation:
Conditioned Floor Area:
Glazing Area:
Climate Zone:
Project No:
All Electric:
Is Renewable:
Has Battery:
Has Charger:
Has Heat Pump
PROJECT 23135-3 - BUILDING 'B'
2020 NYStretch - 2018 IECC
Macedon, New York
Multi-family
New Construction
None
Bldg. faces 180 deg. from North
4638 ft2
10%
5a (6672 HDD)
1802123 true false false false false
Construction Site: Owner/Agent: Designer/Contractor:
WEST ST
MACEDON
, NY
BUILDING 'A'
GERBER HOMES
Project Notes:
12/13/2025
Envelope Assemblies
Assembly Gross Area or Perimeter
Cavity
R-Value
Cont.
R-Value
Prop.
U-
Factor/
F-Factor
Req.
U-
Factor/
F-Factor
Prop.
UA
Req.
UA
over garage: Flat Ceiling or
Scissor Truss
670 30.0 0.0 0.035 0.026 23 17
Ceiling: Raised or Energy
Truss
2645 19.0 41.0 0.016 0.026 42 69
Floor: All-Wood Joist/Truss 112 30.0 0.0 0.033 0.033 4 4
Wall: Wood Frame, 24" o.c.
Orientation: Front
3997 21.0 0.0 0.056 0.045 190 153
Window 2: Vinyl Frame
SHGC: 0.34
360 0.300 0.270 108 97
Sliders: Solid Door (under
50% glazing)
122 0.300 0.270 37 33
Garage and front door: Solid
Door (under 50% glazing)
126 0.166 0.270 21 34
Basement Wall: Masonry
Block w/ Empty Cells
Wall height: 8.00
Insulation depth: 8.00'
Insulation position: Integral
Insulation
1868 0.0 19.0 0.036 0.050 66 91
Window: Vinyl Frame
SHGC: 0.34
48 0.300 0.270 14 13
Compliance: Passes using UA trade-off
Compliance: 1.2% Better Than Code Max UA:
Your UA: 505 Your SHGC: 0.34
The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES
NOT provide an estimate of energy use or cost relative to a minimum-code home.
Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements.
Compliance Statement
The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2020 NYStretch - 2018 IECC requirements in REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist.
Name - Title Signature Date
Inspection Checklist
Energy Code: 2020 NYStretch - 2018 IECC
Requirements: 85% were addressed directly in the REScheck software
Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Pre-Inspection/Plan Review
Section
& Req.ID Pre-Inspection/Plan Review
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
103.1, 103.2
[PR1]1
Construction drawings and documentation demonstrate energy code compliance for the building envelope. Thermal envelope represented on construction documents.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
103.1, 103.2, 403.7
[PR3]1
Construction drawings and documentation demonstrate energy code compliance for lighting and mechanical systems. Systems serving multiple dwelling units must demonstrate compliance with the IECC Commercial Provisions.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
302.1, 403.7
[PR2]2
Heating and cooling equipment is sized per ACCA Manual S based on loads calculated per
ACCA Manual J or other methods approved by the code official.
Heating:
Btu/hr
Cooling:
Heating:
Cooling:
Complies
Does Not
Comply
Not
Observable
Not
Applicable
Additional Comments/Assumptions:
1 High Impact (Tier 1) 2 Medium Impact (Tier 2) 3 Low Impact (Tier 3)
Foundation Inspection
Section
& Req.ID Foundation Inspection
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
303.2.1
[FO11]2
A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in. below grade.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.9
[FO12]2
Snow- and ice-melting system controls installed.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.1.1
[FO4]1
Conditioned basement wall insulation R-value. Where interior insulation is used, verification may need to occur during Insulation Inspection. Not required in warm-humid locations in Climate Zone 3.
R-
R-
R-
R-
Complies
Does Not
Comply
Not
Observable
Not
Applicable
See the Envelope
Assemblies table for values
303.2
[FO5]1
Conditioned basement wall insulation installed per manufacturer’s instructions.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.2.9
[FO6]1
Conditioned basement wall insulation depth of burial or distance from top of wall.
ft ft Complies
Does Not
Comply
Not
Observable
Not
Applicable
See the Envelope
Assemblies table for values
Framing / Rough-In Inspection
Section
& Req.ID
Framing / Rough-In
Inspection
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
402.1.1, 402.3.4
[FR1]1
Door U-factor.
U- U-
Complies
Does Not
Comply
Not
Observable
Not
Applicable
See the Envelope
Assemblies table for values
402.1.1, 402.3.1, 402.3.3, 402.5
[FR2]1
Glazing U-factor (area-weighted average).
U- U-
Complies
Does Not
Comply
Not
Observable
Not
Applicable
See the Envelope
Assemblies table for values
402.4.1.1
[FR23]1
Air barrier and thermal barrier installed per manufacturer’s instructions. An approved third-party will inspect all components and verify compliance. See section details and guidance from Table
R402.4.1.1.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.4.3
[FR20]1
Fenestration that is not site built is listed and labeled as meeting
AAMA /WDMA/CSA
101/I.S.2/A440 or has infiltration rates per NFRC 400 that do not exceed code limits.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.4.5
[FR16]2
IC-rated recessed lighting fixtures sealed at housing/interior finish and labeled to indicate ≤2.0 cfm leakage at 75 Pa.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.3.1
[FR12]1
Supply and return ducts in attics insulated >= R-8 where duct is
>= 3 inches in diameter and
>= R-6 where < 3 inches.
Supply and return ducts in other portions of the building insulated >= R-6 for diameter
>= 3 inches and R-4.2 for < 3 inches in diameter.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.3.2
[FR13]1
Ducts, air handlers and filter boxes are sealed with joints/seams compliant with
International Mechanical Code or International Residential
Code, as applicable.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.3
[FI32]1
Duct system in new buildings and additions are located in a conditioned space in accordance with Sections
R403.3.7 (1-2).
Complies
Does Not
Comply
Not
Observable
Not
Applicable
Section
& Req.ID
Framing / Rough-In
Inspection
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
403.3.8
[FI33]1
Ducts are sized in accordance with ACCA Manual D and sections R403.7-8.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.3.5
[FR15]3
Building cavities are not used as ducts or plenums.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.3.7
[FR28]3
Ducts declared to be within the conditioned space are either 1) completely within the continuous air barrier and within the building thermal envelope,
2) buried within ceiling insulation in accordance with
Section R403.3.6 and the air handler is located completely within the continuous air barrier and within the building thermal envelope and the duct leakage is <= 1.5 cfm / 100 square feet of conditioned floor area served by the duct system, or 3) the ceiling insulation R-value installed against and above the insulated duct >= to the proposed ceiling insulation R-value, less the R-value of the insulation on the duct.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.4
[FR17]2
HVAC piping conveying fluids above 105 ºF or chilled fluids below 55 ºF are insulated to ≥R-
3.
R- R- Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.4.1
[FR24]1
Protection of insulation on HVAC piping.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.5.3
[FR18]2
Hot water pipes are insulated to
≥R-3.
R- R-
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.5
[FR29]2
Energy conservation measures for SWH systems follow guidelines in section R403.5.1-
5.
R- R- Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.6
[FR19]2
Automatic or gravity dampers are installed on all outdoor air intakes and exhausts.
Complies
Does Not
Comply
Not
Observable
& Req.ID
Framing / Rough-In
Inspection
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
303.1.3
[FR4]1
U-factors of fenestration products are determined in accordance with the NFRC test procedure or taken from the default table.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
Insulation Inspection
Section
& Req.ID Insulation Inspection
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
303.1
[IN13]2
All installed insulation is labeled or the installed R-values provided.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.1.1, 402.2.6
[IN1]1
Floor insulation R-value.
R-
Wood
Steel
R-
Wood
Steel
Complies
Does Not
Comply
Not
Observable
Not
Applicable
See the Envelope
Assemblies table for values
303.2, 402.2.8
[IN2]1
Floor insulation installed per manufacturer’s instructions and in substantial contact with the underside of the subfloor, or floor framing cavity insulation is in contact with the top side of sheathing, or continuous insulation is installed on the underside of floor framing and extends from the bottom to the top of all perimeter floor framing members.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.1.1, 402.2.5, 402.2.6
[IN3]1
Wall insulation R-value. If this is a mass wall with at least ½ of the wall insulation on the wall exterior, the exterior insulation requirement applies (FR10).
R-
Wood
Mass
Steel
R-
Wood
Mass
Steel
Complies
Does Not
Comply
Not
Observable
Not
Applicable
See the Envelope
Assemblies table for values
303.2
[IN4]1
Wall insulation is installed per manufacturer’s instructions.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
Final Inspection Provisions
Section
& Req.ID Final Inspection Provisions
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
402.1.1, 402.2.1, 402.2.2, 402.2.6
[FI1]1
Ceiling insulation R-value.
R-
Wood
Steel
R-
Wood
Steel
Complies
Does Not
Comply
Not
Observable
Not
Applicable
See the Envelope
Assemblies table for values
303.1.1.1, 303.2
[FI2]1
Ceiling insulation installed per manufacturer’s instructions.
Blown insulation marked every
300 ft².
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.1.2
[FI10]2
Heat pump thermostat installed on heat pumps.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.5.1
[FI11]2
Circulating service hot water systems have automatic or accessible manual controls.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.6.1
[FI25]2
All mechanical ventilation system fans not part of tested and listed HVAC equipment meet efficacy and air flow limits per Table R403.6.1.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.6.2
[FI34]2
Every dwelling unit is served by a heat recovery ventilator (HRV) or energy recovery ventilator
(ERV) installed per manufacturer’s instructions. The
HRV/ERV is listed and sized adequately for the specific application, which will include the building’s conditioned area, and number of occupants.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.6.3
[FI35]2
Installed performance of the mechanical ventilation system is tested and verified by an approved agency and measured using a flow hood, flow grid, or other airflow measuring device.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.2
[FI26]2
Hot water boilers supplying heat through one- or two-pipe heating systems have outdoor setback control to lower boiler water temperature based on outdoor temperature.
Complies
Does Not
Comply
Not
Observable
& Req.ID Final Inspection Provisions
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
403.5.1.1
[FI28]2
Heated water circulation systems have a circulation pump. The system return pipe is a dedicated return pipe or a cold water supply pipe. Gravity and thermos-syphon circulation systems are not present.
Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy.
Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.5.1.2
[FI29]2
Electric heat trace systems comply with IEEE 515.1 or UL
515. Controls automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.5.2
[FI30]2
Demand recirculation water systems have controls that manage operation of the pump and limit the temperature of the water entering the cold water piping to <= 104ºF.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.5.4
[FI31]2
Drain water heat recovery units have >= 40 percent efficiency if installed for equal flow or >=52 percent efficiency if installed for unequal flow. Vertical drain water heat recovery units comply with CSA B55.2 and tested and labeled in accordance with CSA B55.1.
Potable water-side pressure loss of drain water heat recovery units are < 3 psi for individual units connected to one or two showers. Potable water-side pressure loss of drain water heat recovery units are < 2 psi for individual units connected to three or more showers.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.5.5(1-
4)
[FI33]2
Heated water supply piping is in acccordance with one of the following: 1) Maximum allowable pipe length method,
2) Maximum allowable pipe volume mehtod, 3) Drain water heat recovery units, or 4)
Recirculation Systems.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
404.1
[FI6]1
90% or more of permanent fixtures have lamps with an efficacy >= 65 lumans/watt or have a total luminaire efficacy
>= 45 lumens/watt.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
404.2
[FI35]1
Detached one and two-family dwellings and townhouses where the conditioned space is
> 1,400 sf comply with the requirements of Appendix RA.
Complies
Does Not
Comply
Not
Observable
& Req.ID Final Inspection Provisions
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
404.3
[FI36]1
One or two-family dwellings and townhouses with parking area provided on the building site shall have a 208/240V 40-amp outlet for each dwelling unit or panel capacity and conduit for the future installation of such an outlet. See section details.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
404.1.1
[FI23]3
Fuel gas lighting systems have no continuous pilot light.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
401.3
[FI7]2
Compliance certificate posted. Complies
Does Not
Comply
Not
Observable
Not
Applicable
303.3
[FI18]3
Manufacturer manuals for mechanical and water heating systems have been provided.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.2.3
[FI22]2
Vented attics with air permeable insulation include baffle adjacent to soffit and eave vents that extends over insulation.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.2.4
[FI3]1
Attic access hatch and door insulation ≥R-value of the adjacent assembly.
R- R- Complies
Does Not
Comply
Not
Observable
Not
Applicable
402.4.1.2
[FI17]1
Blower door test @ 50 Pa. <=5 ach in Climate Zones 1-2, and
<=3 ach in Climate Zones 3-8.
ACH 50 =
ACH 50 =
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.3.3
[FI27]1
Ducts are pressure tested to determine air leakage with either:
Rough-in test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the system including the manufacturer’s air handler enclosure if installed at time of test.
Postconstruction test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer’s air handler enclosure.
cfm/100 ft cfm/100 ft
Complies
Does Not
Comply
Not
Observable
& Req.ID Final Inspection Provisions
Plans
Verified
Value
Field
Verified
Value Complies? Comments/Assumptions
403.3.4
[FI4]1
Duct tightness test result of
<=4 cfm/100 ft2 across the system or <=3 cfm/100 ft2 without air handler @ 25 Pa. For rough-in tests, verification may need to occur during Framing
Inspection.
cfm/100 ft cfm/100 ft
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.3.2.1
[FI24]1
Air handler leakage designated by manufacturer at <=2% of design air flow.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
403.1.1
[FI9]2
Programmable thermostats installed for control of primary heating and cooling systems and initially set by manufacturer to code specifications.
Complies
Does Not
Comply
Not
Observable
Not
Applicable
2020 NYStretch -
2018 IECC Energy
Efficiency
Certificate
Insulation Rating R-Value
Above-Grade Wall 21.00
Below-Grade Wall 19.00
Floor 30.00
Ceiling / Roof 60.00
Ductwork (unconditioned spaces): _____
Glass & Door Rating U-Factor SHGC
Window 0.30 0.34
Door 0.17
Skylight 0.00
Heating & Cooling Equipment Efficiency
Heating System: ______________________ ______________________
Cooling System: ______________________ ______________________
Water Heater: ______________________ ______________________
Signature
Name: ______________________ Date: ______________________
Comments:
File details come from the government source that posted it. Updated .