RES09_A1_Executed_6.29.21.pdf

PDF 1 MB Posted

Attached to
Bayou Chico Sediment Remediation (Final and Post-Design) - RESTORE
Solicitation number
PD 26-27.013
Issued by
Escambia County, Florida

About this file

This is a Revised Grant Work Plan executed by the State of Florida Department of Environmental Protection under DEP Agreement No. RES09, involving the Bayou Chico Contaminated Sediment Remediation (Planning) project located in Escambia County, Florida. The project is funded through the Gulf Coast Restoration Trust Fund via the RESTORE Council's Spill Impact Component and aims to plan, design, and secure permits for future remediation and removal of contaminated sediments enriched with nutrients and hydrocarbons from approximately 125 acres of Bayou Chico, a tributary to Pensacola Bay. Escambia County serves as the grantee and will oversee a competitively procured contractor to complete four primary tasks: (1) Engineering and Design, including surveying, sediment analysis, hydrographic modeling, and development of 30%, 60%, and 100% remediation design plans with bid specifications; (2) Permitting, including development and submission of permit packages to federal and state agencies; (3) Project Administration, including project management and quality assurance/quality control; and (4) Public Engagement, funded entirely through non-federal cofunding. Task timelines range from the execution date through December 31, 2023, with interim deliverables for surveys and sediment analysis due August 31, 2022, and final design plans and permitting deliverables due October 31, 2023.

The project budget totals $335,510.00 in federal grant reimbursement for tasks one through three, with an additional $1,083,114.00 in non-federal RESTORE SEP Award funding designated as the state's required cofunding contribution. Task 1 (Engineering and Design) is budgeted at $286,564.00, subdivided as follows: surveys ($46,479.00), sediment analysis and modeling ($51,413.00), and design and specification packages ($188,672.00). Task 2 (Permitting) is budgeted at $21,870.00, Task 3 (Project Administration) at $27,076.00, and Task 4 (Public Engagement) is a no-cost reimbursement task. All work must be performed by professionals licensed in Florida, and the grantee must submit an executed subcontract prior to invoicing. The Department's Grant Manager will review and approve all interim deliverables before payment authorization, and the grantee may submit monthly reimbursement requests upon completion and departmental approval of corresponding deliverables.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEP Agreement No. RES09, Attachment 3-A, Page 1 of 7

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

REVISED GRANT WORK PLAN

DEP AGREEMENT NO.: RES09

ATTACHMENT 3-A

PROJECT TITLE: Bayou Chico Contaminated Sediment Remediation (Planning)

PROJECT LOCATION: Bayou Chico, a tributary to Pensacola Bay, has experienced severe environmental degradation due to historic impacts, including industrial and domestic wastewater discharges, shipyard-related pollution and long-term untreated stormwater runoff. Legacy pollutants remain in the Bayou. This project will provide funds to Escambia County for planning, design, and acquisition of all federal and state environmental compliance and permits for the remediation and removal of sediments enriched with nutrients and hydrocarbons from approximately 125 acres of Bayou Chico. See Figure 1, Project Site.

PROJECT BACKGROUND: The Gulf Coast Ecosystem Restoration Council (RESTORE Council) is comprised of eleven (11) state and federal members. Council members include the governors of Alabama, Florida, Louisiana, Mississippi, and Texas, the Administrator of the U.S. Environmental Protection Agency and the Secretaries of the U.S. Departments of the Interior, Commerce, Agriculture, Homeland Security, and the Army.

One of the RESTORE Council's primary responsibilities is to develop a comprehensive plan to restore the ecosystem and economy of the Gulf Coast region in the wake of the Deepwater Horizon oil spill. The RESTORE Council selects projects to be funded by the Gulf Coast Restoration Trust Fund and adds them to an approved Funded Priorities List. Projects listed on the approved Funded Priorities list must implement on or more of the seven (7) objectives set by the RESTORE Council:

(1) Restore, Enhance and Protect Habitats

(2) Restore, Improve, and Protect Water Resources

(3) Protect and Restore Living Coastal and Marine Resources

(4) Restore and Enhance Natural Processes and Shorelines

(5) Promote Community Resilience

(6) Promote Natural Resource Stewardship and Environmental Education

(7) Improve Science-Based Decision-Making Processes

PROJECT DESCRIPTION: This Project will allow Escambia County to plan, design and secure permits for future remediation and removal of contaminated sediments enriched with nutrients and hydrocarbons for approximately 125 acres - the majority of the bayou. Areas that were recently remediated, including the federally maintained navigational channel, will likely be excluded from the project. The remediation of contaminated sediment will occur during a future phase. The future removal of additional sediment will significantly improve water quality, benthic habitat and the ecology of Bayou Chico.

Bayou Chico, a tributary to Pensacola Bay, located in Escambia County, Florida, has experienced considerable environmental degradation due to historic impacts, including industrial and domestic wastewater discharges, shipyard related pollution, and long-term untreated stormwater runoff. Legacy pollutants remain in the Bayou Chico sediment, and significant restoration needs remain to be accomplished to allow the bayou to heal and regain its natural richness and productivity. Over many decades, Bayou Chico has been filling in with stormwater sediment from Jones Creek, Jackson Creek, and Maggie's Ditch. Fine grained sediment with a high

DEP Agreement No. RES09, Attachment 3-A, Page 2 of 7 silt and clay content has accumulated throughout the bayou smothering bottom habitat and degrading water quality and biological communities. The accumulated sediment is enriched with nutrients, heavy metals, and other pollutants typical of stormwater runoff and commercial activities in the basin. Commercial and recreational boating activities and periodic wave action from storms re-suspend the accumulated bottom sediment causing water quality and habitat impairment.

Maintenance dredging of the Bayou Chico navigation channel was successfully completed by the U.S. Army Corps of Engineers in 2008 to improve navigation and water circulation in the bayou. At that time, 54 samples were analyzed and showed elevated levels of total recoverable petroleum hydrocarbons, semi-volatile organic compounds, organochloride pesticides, metals, and total organic carbon (TOC). Removal of the sediment from the navigation channel resulted in improved water quality in the bayou.

Escambia County (Grantee) will oversee Project planning, design, and securing of permits for future remediation and removal of contaminated sediments enriched with nutrients and hydrocarbons for approximately 125 acres. Specific tasks associated with this Project include: survey activities, sediment analysis/modeling, development of 30%, 60% and 100% remediation design packages and remediation bid specification packages, preparation of draft and final application packages for all federal, state, and local permits, project administration, and public engagement (public engagement task will be paid for entirely with cofunding). The Grantee will use a competitively procured contractor to complete these activities.

The Bayou Chico Contaminated Sediment Remediation Project is cofunded through the RESTORE Council’s Spill Impact Component. The Council awarded $1,083,114.00 in State Expenditure Plan (SEP) Funds to the Gulf Consortium, which subawarded funding to Escambia County to fund planning, design, and permitting associated with the project. The RESTORE SEP Award, entitled 1-1: Bayou Chico Contaminated Sediment Remediation Project E&D, is considered Non-Federal share and is not a statutory requirement, but is required to complete the project. The Grantee will report the federal expenditures throughout the period of performance using Exhibit C, Payment Request Summary Form.

TASKS and DELIVERABLES:

Task 1: Engineering and Design (As amended through Amendment 1)

Task 1 Description: The Grantee will competitively procure a qualified contractor to provide architectural and engineering (A&E) services. Work requiring a professional license will be performed by professionals licensed in the State of Florida to provide the required services. Selection of the contractor will be completed in accordance with the Grantee's purchasing policies and procedures for A&E services. An electronic copy of the executed subcontract is required prior to submitting any invoices for subcontracted work.

The contractor will provide the required A&E services, including: surveying, sediment data analyses, development of 30%, 60%, and 100% remediation design plans and bid specification packages to accompany remediation design, as well as development of permit application packages and acquiring the necessary permit.

The contractor will submit the survey reports, sediment analysis reports and modeling results report, and sediment remediation design packages, final remediation design report, monitoring/data management plans, and Construction Bid specifications package to the Grantee for approval.

Payment Request Schedule: Grantee may submit a payment request for cost reimbursement upon completion and Department approval of each interim deliverable (1a, 1b, and 1c).

Deliverable 1a: The Grantee will provide to the Department’s Grant Manager electronic copies of the survey reports and verification of survey control points. Surveys are performed to: locate shorelines, aquatic growth, DEP Agreement No. RES09, Attachment 3-A, Page 3 of 7 docks, seawalls, etc., assess biological/habitat, survey aquatic vegetation, delineated wetlands, and locate cultural resources to support permitting. Survey types include: topographic, bathymetric, land rights, aquatic vegetation/wetlands, biological assessment and cultural resources.

Deliverable 1a Budget: Cost Reimbursement (Not to Exceed) $46,479.00

Performance Standard: The Department's Grant Manager will review each of the submitted interim deliverables to verify that they meet the specifications in the Grant Work Plan and this task description. Upon review and written acceptance by the Department's Grant Manager of the interim deliverable submitted, the Grantee may proceed with payment request submittal.

Deliverable 1b: The Grantee will provide to the Department’s Grant Manager electronic copies of the sediment analyses report and modeling results report. Collection and analysis of shallow sediment samples will determine risk management areas and where active remediation is needed, as well as evaluation of dewatering and disposal option for future implementation phases. The sediment analysis will result in a Sediment Quantity and Quality Report. The hydrologic modeling results will be provided in a Hydrographic Modeling Report.

Deliverable 1b Budget: Cost Reimbursement (Not to Exceed) $51,413.00

Performance Standard: The Department's Grant Manager will review each of the submitted interim deliverables to verify that they meet the specifications in the Grant Work Plan and this task description. Upon review and written acceptance by the Department's Grant Manager of the interim deliverable submitted, the Grantee may proceed with payment request submittal.

Deliverable 1c: The Grantee will provide to the Department’s Grant Manager electronic copies of Grantee-accepted 30%, 60%, and 100% sediment remediation design packages, final design report, monitoring/data management plans, and associated specification packages.

Deliverable 1c Budget: Cost Reimbursement (Not to Exceed) $188,672.00

Performance Standard: The Department's Grant Manager will review each of the submitted interim deliverables to verify that they meet the specifications in the Grant Work Plan and this task description. Upon review and written acceptance by the Department's Grant Manager of the interim deliverable submitted, the Grantee may proceed with payment request submittal.

Task 1 Total Budget: Cost Reimbursement (Not to exceed) $286,564.00 (reduced by $23,946.00)

Task 2: Permitting (As amended through Amendment 1)

Task 2 Description: The Grantee will oversee the contractor’s development of necessary permit packages, including all aspects and features of the project, and all data needed to complete environmental compliance documentation including identification of cultural resources and other sensitive areas. The contractor will submit permit applications and is responsible for ensuring all required permits are obtained.

The Grantee has already completed the RESTORE Council’s Categorical Exclusion Determination Form to comply with the NEPA as required. Documentation of NEPA Categorical Exclusion status is available on the RESTORE Council’s Environmental Compliance Library (https://www.restorethegulf.gov/funded-priorities-list).

https://www.restorethegulf.gov/funded-priorities-list https://www.restorethegulf.gov/funded-priorities-list https://www.restorethegulf.gov/funded-priorities-list https://www.restorethegulf.gov/funded-priorities-list

DEP Agreement No. RES09, Attachment 3-A, Page 4 of 7

Deliverables: The Grantee will provide to the Department’s Grant Manager the permit packages and all required permits.

Task 2 Total Budget: Cost Reimbursement (Not to Exceed) $21,870.00 (reduced by $3,130)

Performance Standard: The Department's Grant Manager will review the deliverables to ensure that they meet the specifications in the Grant Work Plan and this task description. Upon review and written acceptance by the Department's Grant Manager of all deliverables under this task, the Grantee may proceed with payment request submittal.

Payment Request Schedule: Grantee may submit a payment request for cost reimbursement upon completion of the task and Department approval of all associated task deliverables.

Task 3: Project Administration (As added through Amendment 1)

Task 3 Description: The Grantee will oversee the contractor’s project management, including bi-weekly conference calls, and monthly status reports, project schedule management and quality control. The contractor will review all tasks and undertake Quality Assurance/Quality Control for deliverables listed under Tasks 1, 2 and 4, under this task.

Deliverables: The Grantee will provide to the Department’s Grant Manager copies of meeting minutes or notes from the bi-weekly conference calls, copies of monthly status reports and written summaries of Quality Assurance/Quality Control activities undertaken by the contractor.

Performance Standard: The Department's Grant Manager will review each of the deliverables to verify they meet the specifications in the Grant Work Plan and this task description. Upon review and written acceptance by the Department's Grant Manager of the deliverable submitted, the Grantee may proceed with payment request submittal.

Payment Request Schedule: The Grantee may submit a payment request no more frequently than monthly for cost reimbursement and payment is subject to review by the Department’s Grant Manager for successful implementation of this task and/or approval of deliverables.

Cost of Task 3: Not to exceed $27,076 in Cost Reimbursement

Task 4: Public Engagement (As added through Amendment 1)

Task 4 Description: The Grantee will oversee the contractor’s development of a master mailer database and provide materials for a project website. The Grantee’s contractor will provide support, materials and technical staff for up to three public meetings.

Deliverables: The Grantee will provide to the Department’s Grant Manager meeting documentation and a link to the website that will be developed to engage the public concerning the Project.

Performance Standard: The Department's Grant Manager will review the deliverables to ensure that they meet the specifications in the Grant Work Plan and this task description.

Cost of Task 4: This is a no-cost reimbursement task. Reimbursement for work under this task will be paid for with the Non-Federal Share.

DEP Agreement No. RES09, Attachment 3-A, Page 5 of 7

PROJECT TIMELINE: The tasks must be completed by the corresponding task end date and all deliverables must be received by the designated due date.

Task or Deliverable

No.

Task or Deliverable Title Task Start

Date Task End

Date Deliverable Due Date

1a Surveys Upon Execution 8/31/2022 8/31/2022

1b Sediment Analysis Upon Execution 8/31/2022 8/31/2022

1c 30%, 60% and 100% Remediation Design Plans and Bid Specification, Packages 1/24/2022 8/31/2023

Upon Grantee-acceptance of 30%, 60% and 100%

Remediation Design Plans

2 Permitting 12/6/2021 10/31/2023 Upon Approval

3 Project Administration Upon Execution 12/31/2023

No more frequently than monthly

4 Public Engagement Upon Execution 10/31/2023

See 1-1:

Bayou Chico Contaminated

Sediment Remediation

Project Award Issued

5/12/2021

BUDGET DETAIL BY TASK:

Task or

Deliverable No.

Task or Deliverable Title Cost Reimbursement (Not to Exceed)

1a Contractual Services (Subcontractor) $46,479.00

1b Contractual Services (Subcontractor) $51,413.00

1c Contractual Services (Subcontractor) $188,672.00

Total for Task 1 $286,564.00

2 Contractual Services (Subcontractor) $21,870.00

Total for Task 2 $21,870.00

3 Contractual Services (Subcontractor) $27,076.00

Total for Task 3 $27, 076.00

4 Contractual Services (Subcontractor) $0.00 (Paid for with Non-Federal Share.)

DEP Agreement No. RES09, Attachment 3-A, Page 6 of 7

Grand Total $335,510.00 PROJECT BUDGET SUMMARY: Cost reimbursable grant funding must not exceed the category totals for the Project as indicated below.

Category Grant Funding (Not to Exceed)

Contractual Services (Subcontractor) $335,510.00

Total for Tasks 1, 2, 3 and 4 $335,510.00

Project Total: $335,510.00

- REMAINDER OF PAGE INTENTIONALLY LEFT BLANK -

DEP Agreement No. RES09, Attachment 3-A, Page 7 of 7

Division of Water Restoration Assistance RESTORE Projects Grant Work Plan Template for FY 20-21 (Revised 4/1/2021) Figure 1. Project Site

Exhibit C-1, DEP Agreement #: RES09

Rev. 6/14/2019

Exhibit C-1

REVISED PAYMENT REQUEST SUMMARY FORM

DEP Agreement No.: ___RES09___ Agreement Effective Dates: _______________________

Grantee: ________________________________ Grantee’s Grant Manager: __________________

Mailing Address: ___________________________________________________________________

Payment Request No. ______________________ Date of Payment Request: __________________

Performance Period (Start date – End date): _______________________________________________

Task/Deliverable No(s). _______________ Task/Deliverable Amount Requested: $______________

GRANT EXPENDITURES SUMMARY SECTION

CATEGORY OF EXPENDITURE

(As authorized)

AMOUNT OF

THIS REQUEST

TOTAL

CUMULATIVE

PAYMENT

REQUESTS

CO-FUNDING

AMOUNT FOR

THIS REQUEST

TOTAL

CUMULATIVE

CO-FUNDING

ORIGINAL GRANT AMOUNT $335,510.00 $1,083,114.00

Contractual (Subcontractors) $ $ $ $

TOTAL BUDGET AMOUNT

REMAINING $

TOTAL $ $

TOTAL AMOUNT REQUESTED $

GRANTEE CERTIFICATION

Complete Grantee’s Certification of Payment Request on Page 2 to certify that the amount being requested for reimbursement above was for items that were charged to and utilized only for the above cited grant activities.

Rev. 6/14/2019

Grantee’s Certification of Payment Request

I, ______________________________________________________________ , on behalf of

(Print name of Grantee’s Grant Manager designated in the Agreement)

_______________________________________________________________ , do hereby certify for

(Print name of Grantee/Recipient)

DEP Agreement No. and Payment Request No. that:

The disbursement amount requested is for allowable costs for the project as described in Attachment 3 of the Agreement.

All costs included in the amount requested have been satisfactorily purchased, performed, received, and applied toward completing the project; such costs are documented by invoices or other appropriate documentation as required in the Agreement.

The Grantee has paid such costs under the terms and provisions of contracts relating directly to the project;

and the Grantee is not in default of any terms or provisions of the contracts.

Check all that apply below:

All permits and approvals required for the construction, which is underway, have been obtained.

Construction up to the point of this disbursement is in compliance with the construction plans and permits.

The Grantee’s Grant Manager relied on certifications from the following professionals that provided services for this project during the time period covered by this Certification of Payment Request, and such certifications are included:

Professional Service Provider (Name / License No.) Period of Service (mm/dd/yy – mm/dd/yy)

Grantee's Grant Manager Signature Grantee's Fiscal Agent Signature

Print Name Print Name

Telephone Number Telephone Number

Rev. 6/14/2019

INSTRUCTIONS FOR COMPLETING

PAYMENT REQUEST SUMMARY FORM

DEP AGREEMENT NO.: This is the number on your grant agreement.

AGREEMENT EFFECTIVE DATES: Enter agreement execution date through end date.

GRANTEE: Enter the name of the grantee’s agency.

GRANTEE’S GRANT MANAGER: This should be the person identified as grant manager in the grant Agreement.

MAILING ADDRESS: Enter the address that you want the state warrant sent.

PAYMENT REQUEST NO.: This is the number of your payment request, not the quarter number.

DATE OF PAYMENT REQUEST: This is the date you are submitting the request.

PERFORMANCE PERIOD: This is the beginning and ending date of the performance period for the task/deliverable that the request is for (this must be within the timeline shown for the task/deliverable in the Agreement).

TASK/DELIVERABLE NO.: This is the number of the task/deliverable that you are requesting payment for and/or claiming match for (must agree with the current Grant Work Plan).

TASK/DELIVERABLE AMOUNT REQUESTED: This should match the amount on the “TOTAL TASK/DELIVERABLE BUDGET AMOUNT” line for the “AMOUNT OF THIS REQUEST” column.

GRANT EXPENDITURES SUMMARY SECTION:

“AMOUNT OF THIS REQUEST” COLUMN: Enter the amount that was expended for this task during the period for which you are requesting reimbursement for this task. This must agree with the currently approved budget in the current Grant Work Plan of your grant Agreement. Do not claim expenses in a budget category that does not have an approved budget. Do not claim items that are not specifically identified in the current Grant Work Plan. Enter the column total on the “TOTAL AMOUNT” line. Enter the amount of the task on the “TOTAL TASK BUDGET AMOUNT” line. Enter the total cumulative amount of this request and all previous payments on the “LESS TOTAL CUMULATIVE PAYMENT REQUESTS OF” line. Deduct the “LESS TOTAL CUMULATIVE PAYMENT REQUESTS OF” from the “TOTAL TASK BUDGET AMOUNT” for the amount to enter on the “TOTAL REMAINING IN TASK” line.

“TOTAL CUMULATIVE PAYMENT REQUESTS” COLUMN: Enter the cumulative amounts that have been requested to date for reimbursement by budget category. The final request should show the total of all requests; first through the final request (this amount cannot exceed the approved budget amount for that budget category for the task you are reporting on). Enter the column total on the “TOTALS” line. Do not enter anything in the shaded areas.

“MATCHING FUNDS” COLUMN: Enter the amount to be claimed as match for the performance period for the task you are reporting on. This needs to be shown under specific budget categories according to the currently approved Grant Work Plan. Enter the total on the “TOTAL AMOUNT” line for this column. Enter the match budget amount on the “TOTAL TASK BUDGET AMOUNT” line for this column. Enter the total cumulative amount of this and any previous match claimed on the “LESS TOTAL CUMULATIVE PAYMENTS OF” line for this column. Deduct the “LESS TOTAL CUMULATIVE PAYMENTS OF” from the “TOTAL TASK BUDGET AMOUNT” for the amount to enter on the “TOTAL REMAINING IN TASK” line.

“TOTAL CUMULATIVE MATCHING FUNDS” COLUMN: Enter the cumulative amount you have claimed to date for match by budget category for the task. Put the total of all on the line titled “TOTALS.” The final report should show the total of all claims, first claim through the final claim, etc. Do not enter anything in the shaded areas.

GRANTEE’S CERTIFICATION: Check all boxes that apply. Identify any licensed professional service providers that certified work or services completed during the period included in the request for payment. Must be signed by both the Grantee’s Grant Manager as identified in the grant agreement and the Grantee’s Fiscal Agent.

NOTES:

If claiming reimbursement for travel, you must include copies of receipts and a copy of the travel reimbursement form approved by the Department of Financial Services, Chief Financial Officer.

Documentation for match claims must meet the same requirements as those expenditures for reimbursement.

RES09 A1_Partially Executed 6_28_21.pdf
RES09 Amendment 1_Partially Executed 6_28_21.pdf
RES09 A1 Bayou Chico Contaminated Sediment Remediation (Planning)
GRANT EXPENDITURES SUMMARY SECTION
GRANT EXPENDITURES SUMMARY SECTION
GRANTEE CERTIFICATION
GRANTEE CERTIFICATION
Clerks Original:
1a:
Surveys:
8312022:
8312022_2:
1b:
Sediment Analysis:
8312022_3:
8312022_4:
2:
Permitting:
1262021:
10312023:
Contractual Services Subcontractor:
Contractual Services Subcontractor_2:
Contractual Services Subcontractor_3:
Contractual Services Subcontractor_4:
Contractual Services Subcontractor_5:
4:
Contractual Services Subcontractor_6:
undefined:
Agreement Effective Dates:
Grantee:
Grantees Grant Manager:
Mailing Address:
Payment Request No:
Date of Payment Request:
Performance Period Start date End date:
TaskDeliverable Nos:
TaskDeliverable Amount Requested:
33551000:
108311400:
fill_16:
fill_17:
fill_18:
fill_19:
TOTAL BUDGET AMOUNT:
fill_20:
undefined_2:
undefined_3:
fill_13:
fill_10:
fill_11:
Print name of Grantees Grant Manager designated in the Agreement:
Print name of GranteeRecipient:
and Payment Request No:
that:
All permits and approvals required for the construction which is underway have been obtained: Off
Construction up to the point of this disbursement is in compliance with the construction plans and permits: Off
The Grantees Grant Manager relied on certifications from the following professionals that provided: Off
Professional Service Provider Name License No 1:
Professional Service Provider Name License No 2:
Professional Service Provider Name License No 3:
Professional Service Provider Name License No 4:
Professional Service Provider Name License No 5:
Print Name:
Print Name_2:
Telephone Number:
Telephone Number_2:
2021-06-29T15:11:25-0400
Trina Vielhauer

File details come from the government source that posted it. Updated .