This is a U.S. Army Corps of Engineers Nationwide Permit Pre-Construction Notification (PCN) form (ENG Form 6082) submitted by Escambia County for the Bayou Chico Sediment Remediation Project in Pensacola, Florida. The applicant, J. Taylor Kirschenfeld, represents the Escambia County Board of County Commissioners and proposes to remove approximately 226,513 cubic yards of legacy-contaminated sediments from Bayou Chico using mechanical dredging equipment fitted with an environmental bucket. The project encompasses approximately 62.5 acres across multiple dredge management units (DMUs), with Phase 1 involving DMU 1 and DMU 2 and removing up to 90,200 cubic yards of sediment. Dredging depths range from 1 to 4 feet with 0.5-foot over-dredge, targeting contamination including dioxins, furans, mercury, polychlorinated biphenyls, and polycyclic aromatic hydrocarbons. The proposed work is authorized under Nationwide Permit 38 (Cleanup of Hazardous and Toxic Waste) and Section 10 of the Rivers and Harbors Act. The project timeline spans from September 1, 2028, through August 31, 2033, with an estimated duration of 1,825 days. Dewatered and stabilized sediment will be transported to the Escambia County Solid Waste Perdido Landfill at an estimated rate of 200–300 cubic yards per day, with offloading at the Port of Pensacola.
The project includes water quality monitoring with turbidity control utilizing double or triple floating turbidity barriers around dredging and barge processing areas. Overlying water will be treated via a barge-mounted water treatment system before discharge back to the bayou, with discharge in compliance with temporary permits. The applicant identified no compensatory mitigation requirements, as the project is designed to produce beneficial environmental effects on waters of the United States by improving sediment and water quality, restoring benthic invertebrate habitat, and enhancing ecological conditions. The PCN identified potential impacts to West Indian Manatee and Gulf Sturgeon critical habitat; however, work will comply with U.S. Department of Interior Fish and Wildlife Service Standard Manatee Conditions for In-Water Work. No wetland impacts or historic property impacts are anticipated, and no Section 408 permission from the Corps is required. Supporting documentation includes a Basis of Design Report, Conceptual Site Model/Risk Assessment, Engineering Design Drawings at 60-percent completion, Listed Species Report, and a letter of intent from the Port of Pensacola regarding sediment offloading and disposition.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 9
U.S. Army Corps of Engineers (USACE)
NATIONWIDE PERMIT PRE-CONSTRUCTION NOTIFICATION (PCN)
For use of this form, see 33 CFR 330; the proponent agency is CECW-CO-R.
Form Approved -
OMB No. 0710-
Expires: 2027-10-31
DATA REQUIRED BY THE PRIVACY ACT OF 1974
Authority Rivers and Harbors Act, Section 10, 33 USC 403; Clean Water Act, Section 404, 33 USC 1344; Regulatory Program of the Corps of Engineers (Corps); Final Rule 33 CFR 320-332.
Principal Purpose Information provided on this form will be used in evaluating the nationwide permit pre-construction notification.
Routine Uses This information may be shared with the Department of Justice and other federal, state, and local government agencies, and the public and may be made available as part of the agency coordination process.
Disclosure Submission of requested information is voluntary, however, if information is not provided the permit application cannot be evaluated nor can
The public reporting burden for this collection of information, 0710-0003, is estimated to average 11 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or burden reduction suggestions to the Department of Defense, Washington Headquarters Services, at whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR RESPONSE TO THE ABOVE EMAIL.
One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application
(see sample drawings and/or instructions) and be submitted to the district engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned.
(ITEMS 1 THRU 4 TO BE FILLED BY THE CORPS)
1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED 4. DATE APPLICATION COMPLETE
(ITEMS BELOW TO BE FILLED BY APPLICANT)
5. APPLICANT'S NAME
First – J. Taylor Middle – Last – Kirschenfeld
8. AUTHORIZED AGENT'S NAME AND TITLE (agent is not required)
First – Middle – Last –
Company – Escambia County Board of County Commissioners
Company Title –
Company –
E-mail Address –
E-mail Address – jtkirsche@myescambia.com
6. APPLICANT'S ADDRESS 9. AGENT'S ADDRESS
Address – 221 Palafox Place Address –
City – Pensacola State – FL ZIP – 32502 Country – US City – State – ZIP – Country –
7. APPLICANT'S PHONE NOs. with AREA CODE
a. Business b. c. Fax
+18505951630
10. AGENT'S PHONE NOs. with AREA CODE
a. b. c. Fax mailto:whs.mc-alex.esd.mbx.dd-dod-information-collections@mail.mil
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 2 of 9
STATEMENT OF AUTHORIZATION
11. I hereby authorize, to act in my behalf as my agent in the processing of this nationwide permit pre-construction notification and to furnish, upon request, supplemental information in support of this nationwide permit pre-construction notification.
SIGNATURE OF APPLICANT DATE
NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
12. PROJECT NAME or TITLE (see instructions)
Bayou Chico Sediment Remediation
NAME, LOCATION, AND DESCRIPTION OF PROJECT OR ACTIVITY
13. NAME OF WATERBODY, IF KNOWN (if applicable)
Bayou Chico
14. PROPOSED ACTIVITY STREET ADDRESS (if applicable)
Address:
City: Warrington State: FL Zip:
15. LOCATION OF PROPOSED ACTIVITY (see instructions)
Latitude: 30.4056282 °N Longitude: -87.2572638 °W
16. OTHER LOCATION DESCRIPTIONS, IF KNOWN (see instructions)
Section – Township – Range –
County – Escambia County Project Area – 235 Acres State Tax Parcel ID –
17. DIRECTIONS TO THE SITE
Bayou Chico is in West Pensacola (See Exhibit 1 of Attachment C - Regional Location Map). It is located in an urban area with development of industrial and residential land uses along the entire shoreline (See Exhibit 2 of Attachment C - Aerial Location Map).
Work will be performed within the bayou with offloading of sediment at the Pensacola Port located at 700 S Barracks Street (Sheet 01 - Cover Sheet) From Jefferson
Street and W. Garden, Travel East to Tarragona. Turn right onto S. Tarragona, Travel 0.4 miles. Turn left onto East Main Street, Travel 150 feet. Turn right onto S.
Barracks Street, Travel 0.3 miles to Port entrance. Specific location of offloading activity will be identified by the Port once permits are received and project work is scheduled.
Expected site for daily launch of personnel to work area will be at the County-owned Mahogany Mill Boat Ramp.
Directions to Mahogany Mill Boat Ramp at 1251 Mahogany Mill Road, Pensacola, FL 32507. From Jefferson Street and W. Garden, Travel West on Garden St. to
Barrancas Ave., Turn Left onto Barrancas; travel over the Bayou Chico Bridge.
Turn left on Weis Lane and left on Old Barrancas Ave. Turn left On Mahogany Mill Road and travel approximately 0.2 mile to County Sign for the Boat Ramp.
18. IDENTIFY THE SPECIFIC NATIONWIDE PERMIT(S) YOU PROPOSE TO USE
NWP 38 Cleanup of Hazardous and Toxic Waste
19. DESCRIPTION OF PROPOSED NATIONWIDE PERMIT ACTIVITY (see instructions)
The project will remove legacy contaminated sediments from Bayou Chico, a small embayment that flows to Pensacola Bay. The project was designed with the intent of producing beneficial environmental effects on the WOTUS.
Escambia County contracted AECOM for the engineering and design of the project. AECOM performed a two-phased investigation of the surficial and sub-surficial sediment and water quality within Bayou Chico in 2022 and 2023. They evaluated the efficacy of sediment management alternatives for full-scale design and
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 3 of 9 evaluated remediation strategy alternatives for completing a phased mitigation of sediment contaminated with dioxins and furans across the Bayou. See Attachment
D, Basis of Design Report (AECOM, 2026). Attachment E, Conceptual Site Model/Risk Assessment (AECOM, 2024) summarizes historical sources of contamination, investigations, and dredging activities.
The project involves dredging contaminated sediment from Bayou Chico using a barge-mounted excavator equipped with an environmental bucket. The sediment will be placed into a hopper barge and transported to barge processing area where overlying water will be pumped to barge-mounted water treatment system (WTS).
After completion of dewater and stabilization, sediment will be transferred to haul trucks for transport and disposal at Escambia County Landfill. After the water has been treated in the WTS and is in compliance with a temporary discharge permit, it will be discharged to the Bayou. Water quality will be monitored during construction to make sure activities do not impact waters outside of the turbidity curtains. Long-term water quality impacts will be positive due to removal of contamination.
The project will occur in multiple phases over time and will involve several areas of Bayou Chico called dredge management units (DMUs) as shown on Sheet 08 of the Attachment A, Engineering Design Drawing Set. Bayou Chico has a federally maintained navigation channel regulated by the USACE. The DMUs are outside of the navigation channel. All maritime safety protocols will be followed, and proper coordination with the USACE and the U.S. Coast Guard will take place once the project schedule is known. The total project area is approximately 62.5 acres and entails dredging of approximately 226,513 cubic yards of sediment. Dredge depth will be approximately 1 to 4 ft with 0.5 ft over dredge.
Phase 1 of the project includes dredging of DMU 1 and DMU2, covering approximately 18 surface acres and removing up to 90,200 cubic yards of sediment.
DMU 1 is located in the center of Bayou Chico, adjacent to the northern end of the navigation channel. The approximate acreage for DMU-1 is 12.5-acres with a 3-dimensional surface area of 55,900 square feet and a dredge neat volume plus 0.5 ft over burden of 64,396 cubic yards. Hydrographic survey results indicated that the top of soft sediment elevation ranges from -16.5-ft to -4.5-ft with an average of -8-ft. A subsequent geophysical survey of soft sediment elevation identified a range from -19-ft to -4.5-ft with an average of -9.5-ft. Based on the two aforementioned surveys, fine-grained sediment thickness ranges from 0-ft to 6-ft with an average of
1.5-ft.
DMU 2 is located immediately south of Spoils Island. The southern edge of the DMU2 is adjacent to commercial and residential boat docks. The approximate acreage for DMU-2 is 5.5-acres with a 3-dimensional surface area of 263,800 square feet and a dredge neat volume plus 0.5 ft over burden of 21,577 cubic yards. DMU2 encompasses sediment sloping at the southeast corner and northern edge up to the shoreline. Hydrographic and geophysical surveys indicated that the top of soft sediment elevation ranges from -7.5-ft to -3.5-ft with an average of -5-ft and the bottom of soft sediment elevation ranges from -17-ft to -4-ft with an average of -8.5-ft.
Sediment will be removed mechanically using a deck barge with mechanical dredging equipment fitted with an environmental bucket. Dredged sediment will be placed into sediment hopper barges or scows for transport to the processing areas where it will be dewatered and stabilized for transportation to the transloading area
(Pensacola Port - see Attachment B). Once loaded onto trucks, the stabilized material will be transported to the Escambia County Solid Waste Perdido Landfill (see
Attachment G). Depending on the timing of sediment removal from additional DMUs, restoration of the in-water areas will include removal of all barges, associated equipment and turbidity curtains (Sheets 12 and 13 in Attachment A). The onshore facilities at the Port of Pensacola will be restored to pre-use conditions. If dredging of additional DMUs is expected soon after completion of the Phase 1 work, some equipment may be left onsite at the Port.
20. DESCRIPTION OF PROPOSED MITIGATION MEASURES (see instructions)
Compensatory mitigation should not be required as the project will have a beneficial effect on waters of the United States. Project work will be coordinated with
USACE and the U.S. Coast Guard. No dredging is proposed in the navigational channel within Bayou Chico.
21. PURPOSE OF NATIONWIDE PERMIT ACTIVITY (Describe the reason or purpose of the project, see instructions)
The purpose is to remove contaminated sediments from the open waters of Bayou Chico, with no submerged aquatic vegetation (SAV) or wetland impacts. The project is anticipated to meet the following objectives: (1) improve sediment and water quality; (2) restore benthic invertebrate habitat and conditions for recovery of
SAV; and (3) enhance the economic and recreational opportunities along the working waterfront through improved water quality and habitat as well as improved navigation as an incidental effect of dredging.
Bayou Chico has experienced the lasting effects of more than a century of human activity associated with its role as a working waterfront, including early industrial development, extensive maritime operations, historical use as a receiving water for wastewater effluent, untreated stormwater runoff, and other legacy pollutant sources. Over time, these activities contributed to the accumulation of fine-grained, organic-rich sediments containing legacy contaminants and elevated nutrient levels. Numerous scientific investigations beginning in the 1970s documented degraded sediment conditions within Bayou Chico, including elevated concentrations of
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 4 of 9 metals, polycyclic aromatic hydrocarbons (PAHs), pentachlorophenol (PCP), dioxins and furans, polychlorinated biphenyls (PCBs), and other pollutants associated with historical industrial activities, wastewater discharges, and urban runoff. While state regulatory actions and nearly $100 million in restoration investments by
Escambia County and other partners have reduced or eliminated many ongoing sources of pollution within the watershed, these historically impacted sediments remain a persistent source of environmental stress that must be addressed to achieve long-term recovery of the bayou and support improved water quality and ecological conditions throughout the broader Pensacola Bay estuary.
22. QUANTITY OF WETLANDS, STREAMS, OR OTHER TYPES OF WATERS DIRECTLY AFFECTED BY PROPOSED NATIONWIDE PERMIT ACTIVITY
(see instructions)
See Appendix B
Each PCN must include a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project site.
25. List any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity. (see instructions)
26. If the proposed activity will result in the loss of greater than 1/10-acre of wetlands and/or the loss of greater than 3/100-acre of stream bed and requires pre-construction notification, explain how the compensatory mitigation requirement in paragraph (c) and/or paragraph (d) of general condition 23 will be satisfied, or explain why the adverse environmental effects are no more than minimal and why compensatory mitigation should not be required for the proposed activity.
27. Is any portion of the nationwide permit activity already complete?
If Yes, describe the completed work:
28. List the name(s) of any species listed as endangered or threatened under the Endangered Species Act that might be affected by the proposed NWP activity or utilize the designated critical habitat that might be affected by the proposed NWP activity. (see instructions)
West Indian Manatee,Gulf sturgeon
ADDITIONAL AFFECTED SPECIES:
The List Species Report (WRA, 2024) for Bayou Chico is included as Attachment C. No species impacts are expected. However, Pensacola Bay is a critical habitat for Gulf Sturgeon (Acipenser oxyrinchus desotoi), and the stabilized sediment will be transported by barge from Bayou Chico through Pensacola Bay to the Port of Pensacola for transloading onto trucks.
The main species searched for within and adjacent to the project in Bayou Chico were the Florida manatee (Trichechus manatus latirostris), bald eagle
(Haliaeetus leucocephalus), Eastern black rail (Laterallus jamaicensis jamaicensis), loggerhead sea turtle (Caretta caretta), green sea turtle (Chelonia mydas), leatherback sea turtle (Dermochelys coriacea), hawksbill sea turtle (Eretmochelys imbricata), Kemps Ridley sea turtle (Lepidochelys kempii), and gulf sturgeon (Acipenser oxyrinchus desotoi), though all appropriate species were considered.
Work will be conducted in accordance with the U.S. Department of Interior, Fish and Wildlife Service Standard Manatee Conditions For In-Water Work guidance (see Appendix 1 of Attachment C).
29. List any historic properties that have the potential to be affected by the proposed NWP activity or include a vicinity map indicating the location of the historic property or properties. (see instructions)
None. Activities will primarily take place over the open waters of Bayou Chico, a public waterway. Transport of sediment by barge will occur over the open waters of Pensacola Bay. Offloading of sediment will take place at the Port of Pensacola. Disposal will occur at the Escambia County Perdido Landfill.
30. For a proposed NWP activity that will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a
Yes No
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 5 of 9
“study river” for possible inclusion in the system while the river is in an official study status, identify the Wild and Scenic River or the “study river”:
31. If the proposed NWP activity also requires permission from the Corps pursuant to 33 U.S.C. 408 because it will alter or temporarily or permanently occupy or use a U.S. Army Corps of Engineers federally authorized civil works project, have you submitted a written request for section 408 permission from the Corps district having jurisdiction over that project?
If “yes”, please provide the date your request was submitted to the Corps district:
32. If the terms of the NWP(s) you want to use require additional information to be included in the PCN, please include that information in this space or provide it on an additional sheet of paper marked Block 30. (see instructions)
33. Pre-construction notification is hereby made for one or more nationwide permit(s) to authorize the work described in this notification. I certify that the information in this pre-construction notification is complete and accurate. I further certify that I possess the authority to undertake the work described herein or am acting as the duly authorized agent of the applicant.
J. Taylor Kirschenfeld
SIGNATURE OF APPLICANT DATE SIGNATURE OF AGENT DATE
The pre-construction notification must be signed by the person who desires to undertake the proposed activity (applicant) and, if the statement in Block 11 has been filled out and signed, the authorized agent.
18 U.S.C. Section 1001 provides that: Whoever, in any manner within the jurisdiction of any department or agency of the United States knowingly and willfully falsifies, conceals, or covers up any trick, scheme, or disguises a material fact or makes any false, fictitious or fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any false, fictitious or fraudulent statements or entry, shall be fined not more than $10,000 or imprisoned not more than five years or both.
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 6 of 9
Instructions for Preparing a
Department of the Army
Nationwide Permit (NWP) Pre Construction Notification (PCN)
Blocks 1 through 4. To be completed by the Corps of Engineers.
Block 5. Applicant’s Name. Enter the name and the e mail address of the responsible party or parties. If the responsible party is an agency, company, corporation, or other organization, indicate the name of the organization and responsible officer and title. If more than one party is associated with the preconstruction notification, please attach a sheet of paper with the necessary information marked Block 5.
Block 6. Address of Applicant. Please provide the full address of the party or parties responsible for the PCN. If more space is needed, attach an extra sheet of paper marked Block 6.
Block 7. Applicant's Telephone Number(s). Please provide the telephone number where you can usually be reached during normal business hours.
Blocks 8 through 11. To be completed, if you choose to have an agent.
Block 8. Authorized Agent’s Name and Title. Indicate name of individual or agency, designated by you, to represent you in this process. An agent can be an attorney, builder, contractor, engineer, consultant, or any other person or organization. Note: An agent is not required.
Blocks 9 and 10. Agent’s Address and Telephone Number. Please provide the complete mailing address of the agent, along with the telephone number where he / she can be reached during normal business hours.
Block 11. Statement of Authorization. To be completed by the applicant, if an agent is to be employed.
Block 12. Proposed Nationwide Permit Activity Name or Title. Please provide a name identifying the proposed NWP activity, e.g., Windward Marina, Rolling
Hills Subdivision, or Smith Commercial Center.
Block 13. Name of Waterbody. Please provide the name (if it has a name) of any stream, lake, marsh, or other waterway to be directly impacted by the NWP activity. If it is a minor (no name) stream, identify the waterbody the minor stream enters.
Block 14. Proposed Activity Street Address. If the proposed NWP activity is located at a site having a street address (not a box number), please enter it in
Block 14.
Block 15. Location of Proposed Activity. Enter the latitude and longitude of where the proposed NWP activity is located. Indicate whether the project location provided is the center of the project or whether the project location is provided as the latitude and longitude for each of the “corners” of the project area requiring evaluation. If there are multiple sites, please list the latitude and longitude of each site (center or corners) on a separate sheet of paper and mark as Block 15.
Block 16. Other Location Descriptions. If available, provide the Tax Parcel Identification number of the site, Section, Township, and Range of the site (if known), and / or local Municipality where the site is located.
Block 17. Directions to the Site. Provide directions to the site from a known location or landmark. Include highway and street numbers as well as names. Also provide distances from known locations and any other information that would assist in locating the site. You may also provide a description of the location of the proposed NWP activity, such as lot numbers, tract numbers, or you may choose to locate the proposed NWP activity site from a known point (such as the right descending bank of Smith Creek, one mile downstream from the Highway 14 bridge). If a large river or stream, include the river mile of the proposed NWP activity site if known. If there are multiple locations, please indicate directions to each location on a separate sheet of paper and mark as Block 17.
Block 18. Identify the Specific Nationwide Permit(s) You Propose to Use. List the number(s) of the Nationwide Permit(s) you want to use to authorize the proposed activity (e.g., NWP 29).
Block 19. Description of the Proposed Nationwide Permit Activity. Describe the proposed NWP activity, including the direct and indirect adverse environmental effects the activity would cause. The description of the proposed activity should be sufficiently detailed to allow the district engineer to determine that the adverse environmental effects of the activity will be no more than minimal. Identify the materials to be used in construction, as well as the methods by which the work is to be done.
Provide sketches when necessary to show that the proposed NWP activity complies with the terms of the applicable NWP(s). Sketches usually clarify the activity and result in a quicker decision. Sketches should contain sufficient detail to provide an illustrative description of the proposed NWP activity (e.g.,a conceptual plan), but do not need to be detailed engineering plans.
The written descriptions and illustrations are an important part of the application. Please describe, in detail, what you wish to do. If more space is needed, attach an extra sheet of paper marked Block 19.
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 7 of 9
Block 20. Description of Proposed Mitigation Measures. Describe any proposed mitigation measures intended to reduce the adverse environmental effects caused by the proposed NWP activity. The description of any proposed mitigation measures should be sufficiently detailed to allow the district engineer to determine that the adverse environmental effects of the activity will be no more than minimal and to determine the need for compensatory mitigation or additional mitigation measures.
Block 21. Purpose of Nationwide Permit Activity. Describe the purpose and need for the proposed NWP activity. What will it be used for and why? Also include a brief description of any related activities associated with the proposed project. Provide the approximate dates you plan to begin and complete all work.
Block 22. Quantity of Wetlands, Streams, or Other Types of Waters Directly Affected by the Proposed Nationwide Permit Activity. For discharges of dredged or fill material into waters of the United States, provide the amount of wetlands, streams, or other types of waters filled, flooded, excavated, or drained by the proposed NWP activity. For structures or work in navigable waters of the United States subject to Section 10 of the Rivers and Harbors Act of 1899, provide the amount of navigable waters filled, dredged, or occupied by one or more structures (e.g., aids to navigation, mooring buoys) by the proposed
NWP activity.
For multiple NWPs, or for separate and distant crossings of waters of the United States authorized by NWPs 12 or 14, attach an extra sheet of paper marked
Block 21 to provide the quantities of wetlands, streams, or other types of waters filled, flooded, excavated, or drained (or dredged or occupied by structures, if in waters subject to Section 10 of the Rivers and Harbors Act of 1899) for each NWP. For NWPs 12 and 14, include the amount of wetlands, streams, or other types of waters filled, flooded, excavated, or drained for each separate and distant crossing of waters or wetlands. If more space is needed, attach an extra sheet of paper marked Block 22.
Block 23. Identify Any Other Nationwide Permit(s), Regional General Permit(s), or Individual Permit(s) Used to Authorize Any Part of Proposed
Activity or Any Related Activity. List any other NWP(s), regional general permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity. For linear projects, list other separate and distant crossings of waters and wetlands authorized by NWPs 12 or 14 that do not require PCNs. If more space is needed, attach an extra sheet of paper marked Block 23.
Block 24. Compensatory Mitigation Statement for Losses of Greater Than 1/10-Acre of Wetlands and/or of Greater Than 3/100-Acre of Stream Bed
When Pre-Construction Notification is Required. Paragraphs (c) and (d) of NWP general condition 23 require compensatory mitigation at a minimum one-for-one replacement ratio for all wetland losses that exceed 1/10-acre and/or for all losses of stream bed that exceed 3/100-acre, unless the district engineer determines in writing that either some other form of mitigation is more environmentally appropriate or the adverse environmental effects of the proposed NWP activity are no more than minimal without compensatory mitigation, and provides an activity-specific waiver of this requirement. Describe the proposed compensatory mitigation for wetland losses greater than 1/10 acre and/or for losses of stream bed that exceed 3/100-acre, or provide an explanation of why the district engineer should not require wetland and/or stream compensatory mitigation for the proposed NWP activity. If more space is needed, attach an extra sheet of paper marked Block 24.
Block 25. Is Any Portion of the Nationwide Permit Activity Already Complete? Describe any work that has already been completed for the NWP activity.
Block 26. List the Name(s) of Any Species Listed As Endangered or Threatened under the Endangered Species Act that Might be Affected by the
Nationwide Permit Activity. If you are not a federal agency, and if any listed species or designated critical habitat might be affected or is in the vicinity of the proposed NWP activity, or if the proposed NWP activity is located in designated critical habitat, list the name(s) of those endangered or threatened species that might be affected by the proposed NWP activity or utilize the designated critical habitat that might be affected by the proposed NWP activity. If you are a Federal agency, and the proposed NWP activity requires a PCN, you must provide documentation demonstrating compliance with Section 7 of the Endangered Species
Act.
Block 27. List Any Historic Properties that Have the Potential to be Affected by the Nationwide Permit Activity. If you are not a Federal agency, and if any historic properties have the potential to be affected by the proposed NWP activity, list the name(s) of those historic properties that have the potential to be affected by the proposed NWP activity. If you are a Federal agency, and the proposed NWP activity requires a PCN, you must provide documentation demonstrating compliance with Section 106 of the National Historic Preservation Act.
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 8 of 9
Block 28. List the Wild and Scenic River or Congressionally Designated Study River if the Nationwide Permit Activity Would Occur in such a River. If the proposed NWP activity will occur in a river in the National Wild and Scenic River System or in a river officially designated by Congress as a “study river” under the Wild and Scenic Rivers Act, provide the name of the river. For a list of Wild and Scenic Rivers and study rivers, please visit http://www.rivers.gov/.
Block 29. Nationwide Permit Activities that also Require Permission from the Corps Under 33 U.S.C. 408. If the proposed NWP activity also requires permission from the Corps under 33 U.S.C. 408 because it will temporarily or permanently alter, occupy, or use a Corps federal authorized civil works project, indicate whether you have submitted a written request for section 408 permission from the Corps district having jurisdiction over that project.
Block 30. Other Information Required For Nationwide Permit Pre Construction Notifications. The terms of some of the Nationwide Permits include additional information requirements for preconstruction notifications:
* NWP 3, Maintenance –information regarding the original design capacities and configurations of the outfalls, intakes, small impoundments, and canals.
* NWP 31, Maintenance of Existing Flood Control Facilities –a description of the maintenance baseline and the dredged material disposal site.
* NWP 33, Temporary Construction, Access, and Dewatering –a restoration plan showing how all temporary fills and structures will be removed and the area restored to pre project conditions.
* NWP 44, Mining Activities –if reclamation is required by other statutes, then a copy of the final reclamation plan must be submitted with the pre construction notification.
* NWP 45, Repair of Uplands Damaged by Discrete Events –documentation, such as a recent topographic survey or photographs, to justify the extent of the proposed restoration.
* NWP 48, Commercial Shellfish Aquaculture Activities –(1) a map showing the boundaries of the project area, with latitude and longitude coordinates for each corner of the project area; (2) the name(s) of the species that will be cultivated during the period this NWP is in effect; (3) whether canopy predator nets will be used; (4) whether suspended cultivation techniques will be used; and (5) general water depths in the project area (a detailed survey is not required).
* NWP 49, Coal Remining Activities –a document describing how the overall mining plan will result in a net increase in aquatic resource functions must be submitted to the district engineer and receive written authorization prior to commencing the activity.
* NWP 50, Underground Coal Mining Activities –if reclamation is required by other statutes, then a copy of the reclamation plan must be submitted with the pre construction notification.
If more space is needed, attach an extra sheet of paper marked Block 30.
Block 31. Signature of Applicant or Agent. The PCN must be signed by the person proposing to undertake the NWP activity, and if applicable, the authorized party (agent) that prepared the PCN. The signature of the person proposing to undertake the NWP activity shall be an affirmation that the party submitting the
PCN possesses the requisite property rights to undertake the NWP activity (including compliance with special conditions, mitigation, etc.).
DELINEATION OF WETLANDS, OTHER SPECIAL AQUATIC SITES, AND OTHER WATERS
Each PCN must include a delineation of wetlands, other special aquatic sites, and other waters, such as lakes and ponds, and perennial, intermittent, and ephemeral streams, on the project site. Wetland delineations must be prepared in accordance with the current wetland delineation manual and regional supplement published by the Corps. The permittee may ask the Corps to delineate the special aquatic sites and other waters on the project site, but there may be a delay if the Corps does the delineation, especially if the project site is large or contains many wetlands, other special aquatic sites, and other waters. The 45 day PCN review period will not start until the delineation is submitted or has been completed by the Corps.
DRAWINGS AND ILLUSTRATIONS
General Information.
Three types of illustrations are needed to properly depict the work to be undertaken. These illustrations or drawings are identified as a Vicinity Map, a Plan View or a Typical Cross Section Map. Identify each illustration with a figure or attachment number. For linear projects (e.g. roads, subsurface utility lines, etc.) gradient http://www.rivers.gov/
ENG FORM 6082, OCT 2024 PREVIOUS EDITIONS ARE OBSOLETE. Page 9 of 9 drawings should also be included. Please submit one original, or good quality copy, of all drawings on 8½x11 inch plain white paper (electronic media may be substituted). Use the fewest number of sheets necessary for your drawings or illustrations. Each illustration should identify the project, the applicant, and the type of illustration (vicinity map, plan view, or cross section). While illustrations need not be professional (many small, private project illustrations are prepared by hand), they should be clear, accurate, and contain all necessary information.
ADDITIONAL INFORMATION AND REQUIREMENTS
For proposed NWP activities that involve discharges into waters of the United States, water quality certification from the State, Tribe, or EPA must be obtained or waived (see NWP general condition 25). Some States, Tribes, or EPA have issued water quality certification for one or more NWPs. Please check the appropriate Corps district web site to see if water quality certification has already been issued for the NWP(s) you wish to use. For proposed NWP activities in coastal states, state Coastal Zone Management Act consistency concurrence must be obtained, or a presumption of concurrence must occur (see NWP general condition 26). Some States have issued Coastal Zone Management Act consistency concurrences for one or more NWPs. Please check the appropriate Corps district web site to see if Coastal Zone Management Act consistency concurrence has already been issued for the NWP(s) you wish to use.
Appendix B. Aquatic Resource Inventory:
Aquatic Resource
Name State
Cowardin
System
Cowardin
Class
HGM
Class
Local
Waterway
Name
Measurement
Type
Measurement
Amount
Measurement
Units Waters Type Latitude Longitude
Bayou Chico Florida Area 235 ACRE 30.405628
-87.2572638
Pensacola Bay Florida Linear 19084.6 FOOT 30.397790
-87.2236506
Appendix C. Impact Inventory:
Water Name Impact Name Activity
Type of
Material Being
Discharged
Resource Type Permanent
Loss (Y/N)
Impact
Duration
Amount
Type
Proposed
Length
Proposed
Width
Proposed
Amount
Amount
Units
Bayou Chico Dredging Dredging
(Section 10) Harbor/Ocean No Permanent
Removal
Volume 226513 Cubic Yards
Provide any additional information you may have about the proposed quantity of wetlands, streams, or other types of waters directly affected by the proposed activity. This level of detail is helpful to better understand the type of impacts that are proposed for your project.
The project will be conducted in open waters with no wetland impacts. BMPs will be utilized as shown in Attachment A to minimize impacts to surface waters. Water quality will be monitored during construction to make sure activities do not impact waters outside of the turbidity curtains. Long-term water quality impacts will be positive due to removal of contamination.
The project will remove sediment-associated contaminants and reducing the potential for continued contaminant resuspension, redistribution, and exposure within the aquatic environment. By addressing legacy contamination that has persisted despite substantial progress in controlling ongoing pollution sources, the project will improve sediment quality, reduce contaminant-related stressors affecting benthic and aquatic communities, and support the long-term restoration of water quality and ecological function within Bayou Chico and the broader Pensacola Bay estuary.
Definitions and help text
Water Name: The name of the wetland, stream, or other type of water that would be impacted.
Impact Name: Useful if entering more than one impact for the same or multiple waters (e.g., linear projects) and name accordingly. This may be different than the
Water Name; keep it short and simple. For example, if Stream-1 is the water, the impact name could be “Crossing-1,” “Crossing-2,” “Crossing-3.” A short name helps describe the impact and is useful when looking at a list of impacts.
Activity: Options are:
• Conversion of waters type (forested wetland to emergent wetland, stream to lake)
• Discharge of dredged material
• Discharge of fill material
• Dredging (Section 10)
• Ecological restoration
• Other (Aquaculture, Work, Aerial or Submarine cable crossings)
• Removal (Sec 10 structures)
• Structure (Sec 10 only)
• Transport of dredged material (Sec 103)
Type of Material Being Discharged: Describe the material to be discharged within USACE jurisdiction. Make sure this description is consistent with your illustrations.
Discharge material includes: rock, sand, clay, concrete, etc.
Resource Type: Options are Harbor/Ocean, Lake, Non-Tidal wetland, Other, Pond, River/Stream, and Tidal wetland.
Permanent Loss (Y/N): Only enter “YES” when the ‘discharge of dredged or fill material’ activity types are chosen. A permanent loss means the conversion of an aquatic resource to dry land.
Impact Duration: Options are Permanent or Temporary. An example of a temporary impact is the discharge of fill for temporary access roads that are later removed and returned to pre-construction contours.
Amount Type: Options are Area or Volume.
Amount Units: Options are Acre or Square Feet if Amount Type=Area, Cubic Yards if Amount Type=Volume.
Proposed Length and Proposed Width: Unit is linear feet.
Proposed Amount: Unit is square feet.
DREDGING PROJECT INFORMATION SHEET
1. APPLICATION NO. 2. FIELD OFFICE CODE 3. DATE RECEIVED
PROJECTS INVOLVING DREDGING IN SECTION 10 WATERS
4. DESCRIBE THE TYPE AND COMPOSITION OF THE MATERIAL TO BE DREDGED
Relevant information is included in Attachment D: Basis of Design Report (AECOM, 2026) and Attachment E: Conceptual Site Model/Risk Assessment (AECOM, 2024). Sediment in Bayou Chico was characterized as unconsolidated fines with greater than 50% moisture content and a range of total organic carbon (TOC) between 7% and 12%. Sediment cores, surface grabs, and historical samples taken from the bayou revealed contaminants such as dioxins and furans, mercury, polychlorinated biphenyls (PCB), and polycyclic aromatic hydrocarbons (PAH).
The highest levels of dioxins and furans were found in the central part of the Bayou to the north and west of Spoils Island, where fine-grained sediment is the deepest, and along the navigational channel, which periodically acts as a sediment trap after maintenance dredging. Data indicated that remediation would be most effective at reducing overall toxicity equivalent (TEQ) (fish and mammal) concentrations of dioxins and furans across Bayou Chico by prioritizing soft sediments in the top 2 feet in the central portion of the Bayou and near Spoils Island.
5. DESCRIBE THE METHOD OF DREDGING (mechanical, suction, clamshell, hydraulic, etc.)
Sediment will be removed mechanically using a deck barge with mechanical dredging equipment fitted with an environmental bucket.
The Dredging and Dewatering Alternatives Analysis (AECOM, 2024) describes evaluation of the following remedial action alternatives: Alternative 1- No Action;
Alternative 2A- Mechanical Dredging with Amended Gravity Stacking; Alternative 2B-Mechanical Dredging with Mechanical Dewatering; Alternative 2C- Mechanical
Dredging with Passive Dewatering; Alternative 3A- Hydraulic Dredging with Geotextile Tube Dewatering; and Alternative 3B- Hydraulic Dredging with Mechanical
Dewatering. Additional alternatives for ex situ dredge material disposition (e.g., confined disposal facilities, confined aquatic disposal facilities, beneficial reuse in littoral zone or wetland applications) were eliminated from consideration due to permitting, logistic and/or perception challenges associated with placement of contaminated material within the watershed.
Based on a comparative analysis of the retained alternatives using implementability, effectiveness, community acceptance, regulatory acceptance and cost as comparison criteria, Alternative 2A: Mechanical Dredging with Amended Gravity Stacking was selected as the recommended alternative.
6. CONSTRUCTION METHOD (working from uplands or a barge, turbidity curtains, cofferdams, etc.)
Water Quality (turbidity) will be controlled by using double (or triple) floating turbidity barriers. These barriers will be used around the dredge location and the
Barge Processing Area (Sheets 9 and 15-17 in Attachment A). Dredged sediment will be placed into sediment hopper barges or scows for transport to the processing areas where it will be dewatered and stabilized for transportation to the transloading area (Pensacola Port). Overlying water will be pumped to barge-mounted water treatment system (WTS). Normal dewatering will be supplemented with mixture of lime kiln ash and Portland cement to remove excess water and help to solidify the dredge material. Supernatant will be discharged back to the Bayou. Specific means and methods of the pump (e.g., fuel) and WTS will be determined by the construction contractor, while Escambia County and/or its agent will monitor the discharge as required by federal and state permits.
Once loaded onto trucks, the stabilized material will be transported to the Escambia County Solid Waste Perdido Landfill. Depending on the timing of sediment removal from additional DMUs, restoration of the in-water areas will include removal of all barges, associated equipment and turbidity curtains (Sheets 12 and 13 in
Attachment A). The onshore facilities at the Port of Pensacola will be restored to pre-use conditions. If dredging of additional DMUs is expected soon after completion of the Phase 1 work, some equipment may be left onsite at the Port.
7. ESTIMATED THE NUMBER OF DREDGE EVENTS TO OCCUR UNDER THE AUTHORIZATION
8. TIME OF YEAR/DATE WINDOW FOR THE WORK
Start Date: 09/01/2028 End Date: 08/31/2033
9. DURATION OF DREDGING WORK (hours or days)
1825 Days
10. WATER DEPTH OF THE AREA TO BE DREDGED (in feet)
11. DREDGE TYPE
MAINTENANCE DREDGING
12. DATE OF LAST DREDGE CYCLE 13. AUTHORIZED DIMENSION OF THE CHANNEL AND/OR DEPTHS TO
BE RESTORED (length, width, depth in feet)
1650 x 1650 x 19
DREDGE DISPOSAL
14. DESCRIBE THE PLAN FOR DISPOSAL OF THE DREDGED MATERIAL
Once loaded onto trucks, the stabilized material will be transported to the Escambia County Solid Waste Perdido Landfill. An estimated 200-300 cubic yards per of material per day will be disposed at the landfill over liner.
15. ESTIMATED THE FREQUENCY OF DISPOSAL AND THE ESTIMATED NUMBER OF DISPOSAL TRIPS TO OCCUR UNDER THE AUTHORIZATON
16. DISPOSAL LOCATION (in decimal degrees)
Latitude: 30.5743074◦N Longitude: -87.3983013◦W
Maintenance
New
Appendix H. Supporting Information:
Document Type Document Created Date
(YYYY-MM-DD)
Document Label Information Source/Citation Uploaded file name
Other Information 2024-05-15 Attachment E - CSM_RA AECOM 2024-05-15_Bayou Chico_CSM_Risk
Assessment-FINAL.pdf
Other Information 2025-10-02 Attachment F - Preapp meeting WRA 2025 1002 USACE Preapplication Meeting
Summary Final.pdf
Project Plans 2026-08-27 Attachment A - 60 percent plan drawings AECOM BAYOU CHICO 60 Percent_08272026.pdf
Other Information 2026-01-15 Attachment D - BODR AECOM Bayou Chico-Sed Rem-BODR_REV
2_FINAL_01152026.pdf
Other Information 2026-09-04 Attachment B - LOI from Port Port of Pensacola LOI for BCSR_Port of Pensacola_signed 4 Sep
26.pdf
Threatened Endangered Species Report 2024-05-13 Attachment C - Listed Species Report WRA Listed Species Report - WRA.pdf
Other Information 2026-04-30 Attachment G - Memo to Landfill AECOM MEMO to Perdido Landfill on Bayou Chico sediment disposal.pdf
PERMIT INFORMATION SHEET
PERMIT FORM TYPE
ENG 6082
DATE RECEIVED
TYPE OF PERMIT YOU’RE REQUESTING
APPLICABLE STATUTORY AUTHORITY
DO YOU PROPOSE COMPENSATORY MITIGATIONS?
No
COASTAL DISTRICT
WOULD THE PROJECT OCCUR IN THE TERRITORIAL SEAS OR OCEAN WATERS?
No
DESCRIBE THE ACTIVITY’S RELATIONSHIP TO THE BASELINE FROM WHICH THE TERRITORIAL SEA IS MEASURED
SECTION 408 USACE CIVIL WORKS PROJECTS
WILL THE PROPOSED ACTIVITY REQUIRES PERMISSION FROM THE USACE PURSUANT TO 33 U.S.C. 408 BECAUSE
IT WILL ALTER OR TEMPORARILY OR PERMANENTLY OCCUPY OR USE A U.S. ARMY CORPS OF ENGINEERS
FEDERALLY AUTHORIZED CIVIL WORKS PROJECT?
IF YES, HAVE YOU SUBMITTED A WRITTEN REQUEST FOR SECTION 408 PERMISSION FROM THE USACE DISTRICT
HAVING JURISDICTION OVER THAT PROJECT?
GENERAL PERMIT INFORMATION
WILL THE PROPOSED ACTIVITY RESULT IN A LOSS TO WETLANDS OR WATERS THAT EXCEEDS NATIONAL OR
DISTRICT THRESHOLDS?
No
Standard Letter Of Permission General Permit
Section 404 Clean Water Act Section 10 Rivers and Harbors Act
Section 103 of the Marine Protection, Research, and Sanctuaries Act
Yes No I'm not sure
| IsWorkComplete: Off |
| IsNoWorkComplete: Yes |
| HasPermission: Off |
| HasNoPermission: Yes |
| IsMaintenance: Off |
| IsNew: Yes |
| IsStandardPermit: Off |
| IsLetterOfPermission: Off |
| IsGeneralPermit: Yes |
| IsSection404: Yes |
| IsSection10: Yes |
| IsSection103: Off |
| Is408Required: Off |
| Is408NotRequired: Yes |
| Is408Unsure: Off |
| Is408SubmittedChecked: Off |
| Is408SubmittedNotChecked: Yes |