Requirements.docx

DOCX document 23 KB Posted

Attached to
Trailer Decking lumber
Solicitation number
W912JM25QA013
Issued by

About this file

This document is a requirements specification for lumber procurement by the Georgia Army National Guard. The solicitation (W912JM25QA013) seeks 1,386 total white oak lumber boards in two specific dimensions: 660 boards measuring 1 1/2" X 5 1/2" X 16" and 726 boards measuring 1 1/2" X 6 1/2" X 16". Delivery options include local pickup within 150 miles of Ft. Eisenhower or delivery directly to the facility located at coordinates 33.426029, -82.158122 in Augusta, GA, with two potential delivery schedules: either 100% delivery on July 21st, 2025, or a phased delivery of 25% on July 21st, July 28th, August 4th, and August 11th, 2025. Packaging requirements specify that lumber must be strapped and forklift-movable, with the procurement targeting trailer re-decking purposes for the Department of the Army Georgia Army National Guard.

View the file

Other files

File Type Posted
Questions and Answers.docx DOCX document
Solicitation Amendment W912JM25QA0130001 SF 30.pdf PDF
Solicitation - W912JM25QA013.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements:

Lumber for Trailer Re-decking:

Lumber Type: White Oak
Lumber Dimensions: 660 Boards at 1 1/2'' X 5 1/2'' X 16' AND 726 Boards at 1 1/2'' X 6 1/2'' X 16'.

Lumber Standards:

Shipping Requirements

If within 150 Miles from Ft. Eisenhower local pickup by GAARNG DOL-M Technicians is acceptable. Lumber would be picked up with one of the two options listed below.

If outside of 150 miles, delivery to 33.426029, -82.158122, Fort Eisenhower, Augusta, GA (https://maps.app.goo.gl/4BFKz6jsyfEwgtuFA)
Required Delivery/ Local Pickup Option 1: 100% on July 21st 2025
Required Delivery/ Local Pickup Option 2:

25% on July 21st 2025 25% on July 28th 2025 25% on August 4th 2025 25% on August 11th 2025 Packaging Instructions: Lumber must be strapped and able to be moved by forklift.

File details come from the government source that posted it. Updated .