Request_for_Information_009.pdf
PDF 4 MB Posted
- Attached to
- FPCM-CAL-I001055-M063-KM, Addendum 03 State and local contract opportunity
- Solicitation number
- 0000036585
- Issued by
- Imperial County, California
About this file
This document is a Request for Information (RFI) from the California State Fire Marshal's Inmate/Ward Labor (IWL) program, specifically focused on a roof replacement project. The RFI, numbered 009 and submitted by Eduardo Gomez, a Construction Supervisor II, concerns modifications to guard railing specifications for roof areas across multiple buildings. The request, dated 3/24/2023 and needed by 3/31/2023, pertains to project I-001055 and A/E project 18-044, seeking approval to use 2" schedule 40 galvanized pipe for posts and railing instead of the originally specified 1-1/2" schedule 160 pipe. The Design Service Section responded on 4/10/2023, accepting the proposed pipe specification change.
The RFI includes detailed plan sheets (AA2.1, BA2.1, CA2.1, DA2.1, EA2.1, FA2.1, and FA2.2) and references the approved plan FA4.2 detail 10, which originally specified the pipe dimensions. The document indicates this RFI supersedes a previous RFI-006 answer and covers roof work for multiple buildings (420, 423, 433, 440, 450, and 462) in Phase-1 of the project. No specific cost information, funding sources, or additional contract terms are provided in this technical documentation, which appears to be focused solely on a specific technical specification modification for the roof and railing installation.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 12_-_FPCM-CAL-I001055-M063-KM,_Addendum_03.pdf | ||
| Request_for_Information_007.pdf | ||
| Construction_Bulletin_001.pdf | ||
| Construction_Bulletin_003.pdf | ||
| Construction_Bulletin_005.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information
RFI Description – Inmate/Ward Labor
(IWL)
Attachments
Response To RFI – Design Service Section (A/E)
Attachments
Submitted By: Eduardo Gomez
Title: Construction Supervisor II
Region: III
Institution: CAL
Project Name: Replace Roof - Program
RFI#: 009
Date: 3/24/2023
Needed By: 3/31/2023
I/WL Proj. # I-001055
A/E Proj. # 18-044
Title: I-001055 - 18-044 - 009 - I-001055, 18044, 009 Posts and Railing
Plan sheets AA2.1, BA2.1, CA2.1, DA2.1, EA2.1, FA2.1 and FA2.2 show to install guard railing at different roof areas. Approved plan
FA4.2 detail 10 shows to utilize 1-1/2" sch. 160 galvanized pipe for posts and railing. Requesting to utilize 2" sch. 40 galvanized pipe for posts and 2" sch. 40 for railing or 1 1/2" sch. 40 for railing if required to meet code requirements. RFI-009 answer supersedes
RFI-006 answer.
Request to utilize 2" dia. sch. 40 galvanized pipe for posts and railing is acceptable.
Plan(s) Sht/Detail: AA2.1, BA2.1, CA2.1, DA2.1, EA2.1, FA2.1, FA2.2, FA4.2/D10
Specification: N/A
Submittals: N/A
Shop Drawings: N/A
Plan(s) Sht/Detail: N/A
Specification: N/A
Submittals: N/A
Shop Drawings: N/A
Product Data: N/A
Memo / Letter: N/A
Images: N/A
Other: Cut sheets
Product Data: N/A
Memo / Letter: N/A
Images: N/A
Other: N/A
Date: 4/10/2023 Response By: Beirong Li, Senior Architect
A/E Stamp Not Required
Access Compliance Review for Attachment: Not Required
SFM Approval for Attachment: Not Required
File details come from the government source that posted it. Updated .