This document contains a Statement of Objectives (SOO) for the Avionics Intermediate Shop (AIS) Product Support Integration (PSI) services to be provided to the 416th Supply Chain Management Squadron (SCMS) at Hill Air Force Base.
The SOO outlines the services required, which include software and hardware sustaining engineering technical support as well as system integration software maintenance for the AIS systems used to test and repair F-16 avionics components. The contractor will provide on-site and off-site support at government and contractor facilities worldwide. Key tasks include technical troubleshooting, software installation and maintenance, DMSMS issue resolution, and AIS system integration. The Period of Performance is 12 months. The contractor must have ISO 9001:2015 quality certification and CMMI Level 3 certification. This SOO is related to Solicitation Number FA825124RB001 for the Avionics Intermediate Shop Product Support Integration, which is being issued by the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
416 SCMS SAMPLE TASK
26 September 2023
Avionics Intermediate Shop Product Support Integration
(AIS/PSI)
Statement of Objectives for:
416 SCMS Representative Task
Prepared By:
416 SCMS/GUMAA
6070 Gum Lane Bldg. 1213
Hill AFB, UT 84056-5825
1.0 Background
The Avionics Intermediate Shop (AIS) Systems Sustainment Program, located in the 416 Supply Chain Management Squadron (SCMS), utilizes a Product Support Integrator (PSI) to ensure operational capability of Advanced Computer Avionics Intermediate Shop (AdC AIS), Improved Avionics Intermediate Shop (IAIS), Versamodule Extensions for Instrumentation Improved Avionics Intermediate Shop (VXI-IAIS), and Rackmount Improved Avionics Intermediate Shop (R-IAIS) test systems worldwide by providing system-level support for systems engineering, integration, problem resolution, sustainment, and procurement activities. AIS Systems consist of Automatic Test Equipment (ATE), ATE components, Test Program Sets (TPSs), and ancillary Support Equipment (SE) hardware and software. These systems are used by the United States Air Force (USAF) and European Participating Air Force (EPAF) / Foreign Military Sales (FMS) customers throughout the world to perform fault diagnostic testing and repair of F-16 Line Replaceable Units (LRUs). These systems are critical in order to meet warfighter requirements and rapidly return faulty LRUs to operational condition. To ensure that requirements are fulfilled in the most cost-effective and timely manner possible, the 416 SCMS utilizes a PSI to develop, test, integrate, and provide logistics and engineering sustainment support.
2.0 Purpose
The purpose of this Statement of Objectives (SOO) is to solicit a proposal for the 416 SCMS that will result in a Firm Fixed Price (FFP) Performance Based Task Order for on-site and off-site contractor technical services in support of AIS System Sustainment Program activities, to include software and hardware sustaining engineering technical support as well as system integration software maintenance.
3.0 Scope
The Scope of this effort is to obtain AIS/PSI services for AIS system-level software integration maintenance and sustaining engineering technical support for system hardware and software sustainment requirements. Support shall be provided on-site and off-site at government and contractor locations, as well as F-16 field locations worldwide, on behalf of 416 SCMS requirements. The scope of this effort also includes providing programmatic technical support throughout the entire Period of Performance.
This Task Order shall:
• Obtain AIS/PSI technical services.
• Provide the proper skill-set mix, and number of on-site and off-site Full Time Equivalent
(FTE) personnel for this effort with knowledge, experience, and expertise in Automatic Test System (ATS) software and hardware, and system integration software maintenance.
o 9 FTE AIS/PSI personnel - Hill AFB o ½ FTE OEM TPS personnel – Ft. Worth, TX
• Provide all necessary supplies, spares, tools, test equipment, consumables, hardware, software, automatic data processing equipment, data/documentation, and other applicable services, in the most cost-effective/efficient manner, ensuring that the requirements for purchasing materials and other ODCs (to include travel and subcontracted labor) are in full compliance with the terms and conditions of the core Performance Work Statement (PWS).
• Provide Program Management (CDRL A001, DI-MGMT-80227/T).
• Obtain sufficient rights in technical data, both software and hardware, such that the
Government can maintain and modify the equipment using government personnel and third-party contractors as required now, and in the future, as applicable.
4.0 Period and Place of Performance
• The Period of Performance for this effort is 12 months.
• Work shall be performed at Hill AFB, UT; end user facilities, and contractor facilities.
5.0 Performance Objectives
Program Objectives/Description of Work
AIS Sustaining Engineering and Technical Services: Provides support for F-16 avionics LRUs/SRUs (Shop Replaceable Units), Units Under Test (UUTs), TPSs, and AIS System components managed by the 416 SCMS. Services provided shall include, but not be limited to the following:
• Technical troubleshooting to resolve field support problems relating to LRU, SRU, TPS, and system component hardware and software failures and discrepancies.
• Under the direction of the Government, prepare AIS ATS components and UUT/TPSs for technical operations prior to troubleshooting activities.
• Perform AIS system, component, and UUT/TPS operations in order to complete all investigative and corrective actions pertaining to troubleshooting activities.
• If required for use during troubleshooting of ATS hardware, identify replacements for non-functioning hardware (to include P/Ns and/or NSNs).
• Provide recommendations for satisfying AIS ATS lateral support actions necessary to ensure continued operation of ATS hardware.
• Perform and/or participate in software installation and kit-proofing and directed by the Government.
• Perform technical analysis to identify technical alternatives for government consideration in order to resolve Diminishing Manufacturing Sources and Material Shortage (DMSMS) issues.
• Under the direction of the Government, serve as the focal point for the Reliability Analysis and Corrective Action Team (RACAT) program.
• Identify LRU bad actors and overall Deficiency Report (DR) trends and patterns which are negatively impacting F-16 LRU performance.
• Perform statistical analysis, data collection, and analytical evaluations of F-16 A/B/C/D LRU and SRU cases.
• Provide information on LRU and SRU Cannot-Duplicate-Malfunctions (CNDs), repairs, and Not-Repairable-This Station (NRTS) data; Mission Capable (MICAP) Supply data for distribution to Supply Planners; Mean-Time-Between-Failure (MTBF) and base-level Re-Test Okay (RETOK) data for F-16 LRU Programs and MAJCOM distribution; and LRU configuration data for use by the Government.
• Provide technical support for the Informal Tech Data Exchange (ITDE) program to ensure software activities are not duplicated between contract and organic efforts.
• DIRECTED SOURCE? Review the established Memorandum of Agreement (MOA) between the Government and the Original Equipment Manufacturer (OEM) which identifies the roles and responsibilities of each party with regard to Operational Flight Program (OFP) and TPS software development, maintenance, and sustainment; to determine if any changes in policies, procedures, or workload are required (CDRL A009, DI-MISC-8058/B/T).
o If changes/additions are required, they will be incorporated into a revised MOA to be signed by the Government and the OEM respectively o If changes are not required, both parties will review and sign the MOA, indicating that the annual review has taken place
AIS Systems Integration Software Maintenance and Sustaining Engineering: Provides resolutions to discrepancies identified by the ATE OEM to ensure that system-level changes have minimal impacts to the testing, troubleshooting, and repair of F-16 LRUs. Services provided shall include, but not be limited to the following:
• Provide single-point solutions when Software DRs are identified by the ATE OEM.
• Identify resolutions to correct deficiencies when changes are made to ATE software and component firmware (to include AdC AIS, IAIS, VXI-IAIS, and R-IAIS systems) which impact LRU TPSs.
• Identify resolutions to correct deficiencies when changes are made to ATE hardware and tested components (to include AdC AIS, IAIS, VXI-IAIS, and R-IAIS systems) which impact LRU TPSs.
• Under the direction of the Government, organize, schedule, and/or participate in System Compatibility Tests (SCTs) and Validation and Verification activities.
• Perform coordination on resolutions of software problem reports and fixes to the ATE OEM for subsequent implementation in ATE Control and Support (C&S) software.
• When required, perform coordination on resolutions of software problem reports and fixes to the appropriate software maintenance organization, as specified by the ITDE program, for subsequent implementation in the applicable Computer Program Identification Number (CPIN) program(s).
• Ensure system-level changes to the ATE software have minimal impacts to the testing, troubleshooting, and subsequent repair of F-16 LRUs in order to ensure testing compatibility, integrity, and Configuration Management compliance.
• Ensure system-level changes to the ATE hardware have minimal impacts to the testing, troubleshooting, and subsequent repair of F-16 LRUs in order to ensure testing compatibility, integrity, and Configuration Management compliance.
AIS/PSI Sustaining Engineering Associated Tasks: Provides support in conjunction with and/or as a result of the tasks identified above. Services provided shall include, but not be limited to the following:
• Develop technical procedures and ensure procedures are incorporated into all applicable AIS ATS Technical Orders and engineering data packages.
• Analyze, classify, and develop technical alternatives to resolve data discrepancies and incorporate end-user data exchange recommendations.
• Under the direction of the Government, develop and maintain logistics plans.
• Prepare Time Compliance Technical Order (TCTO) data documentation for submission to the Government in support of AIS ATS requirements.
• As a result of the activities identified in this SOO, identify and update all affected data.
Examples of data to be updated include, but are not limited to the following:
o ATS Data (as appropriate) o ATS ATP updates o Reliability Calculation Reports o General Specification and Slash Sheets o Engineering data (to include drawings) o Spares calculation data o Reference material embedded in software o Affected Technical Order red-line/change pages o Provisioning/logistics data to support end-user operations o Calibration Measurement Requirements Summary
• Attend and/or participate in Technical Interchange Meetings, Program Management Reviews, and other meetings as directed by the Government.
• Establish and implement program management functions to mange all technical performance, including reliability, maintainability, schedules, and data delivery requirements for this task. The contractor shall provide a Monthly Status Report IAW
CDRL A001, DI-MGMT-80227/T.
• The contractor shall perform travel as necessary to support the requirements of this task.
Government authorization is required prior to travel. Whenever possible, the contractor shall submit a written travel request to the Contracting Officer Representative (COR) at least two (2) weeks prior to departure for authorization/approval. For planning purposes, the contractor shall plan for the following trips in support of this effort.
Number of Trips
Number of Travelers
Days for each Traveler
Destination
10 2 5 Fort Worth Texas 10 2 5 San Diego CA 2 1 10 Homestead AFB FL 1 1 10 Luke AFB AZ 2 1 12 Spangdahlem AB GE 2 1 5 Shaw AFB SC 1 1 12 Osan AB ROK
• After each travel event, the contractor shall submit a trip report that contains meeting minutes and tasks performed. Trip reports shall be submitted in the next Monthly Status Report following completion of the event (CDRL A009, DI-MISC-8058B/T).
6.0 Operating Constraints
• The contractor shall establish, document, and maintain a quality system such as International Organization for Standardization (ISO) 9001:2015 as a means of ensuring that the requisite quality assurance oversight is exercised in fulfilling the requirements of this effort.
• The contractor shall maintain Capability Maturity Model Integration (CMMI) Level 3 Certification (appraised and maintained at Level 3) throughout the duration of this effort.
• Security: The contractor shall comply with the security requirements detailed on the DD Form 254.
• Foreign Disclosure: Foreign Disclosure Restrictions apply.