Report_USR_AC-829579.pdf
PDF 171 KB Posted
- Solicitation number
- 693C73-23-B-000009
About this file
This document provides details for four utility status reports and a related federal contract opportunity notice. The utility status reports were prepared by Jose A. Batlle y Asociados, CSP for the Puerto Rico Department of Transportation and Public Works. They identify existing utilities along sections of PR-124 and the work planned, including water and telephone lines to be relocated.
The related federal contract opportunity is a solicitation notice for Project PR ER DOT PRMNT RPR(20) to repair roadways damaged by landslides in Anasco, Puerto Rico. Work includes embankment stabilization, retaining walls, drainage installation, road reconstruction, guardrails, signage and traffic control. Bids are expected to range from $2-5 million. The solicitation number is 693C73-23-B-000009 and bids are due in April 2023 through the System for Award Management website. The contract will be awarded by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Utility Status Report
EFL-FM-UTL-01(07)Page 1 of 2
Project : Landslide and Road Damage Evaluation and Repair Recommendations/Group-B/site-B Date: Aug 5, 2022
Preparer : José A. Batlle y Asociados, CSP PM : Jessie Agosto, CSA Group HDM :
Review
Interval:
Preliminary (30%)
Plan In Hand (70%)
Internal (90%)
External (95%)
Final / Certification (100%)
Other :
Utilities EXIST within project limits NO utilities exist within project limits Presence of existing utilities UNKNOWN
Existing utilities [ are are not ] identified on the Plans
Utility locating requirements are included in the SCR Sections 107 and/or 645
NO utilities are proposed to be relocated✖
Utility relocation plans are described in detail below
# Location and Utility Information Design Information
Roadway Name:
PR-124
Station / Station Range:
2+00 to 3+10.71
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: W Size/Pole No. 2"φ
Utility Company Name:
A.A.A.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
Roadway Name:
PR-124
Station / Station Range:
2+00 to 3+10.71
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: T Size/Pole No.
Utility Company Name:
P.R.T.C.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
General Information :
Group-B / Site-B PR-124, km 2.4
EFL-FM-UTL-01(07)Page 2 of 2
**P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks
Project : Landslide and Road Damage Evaluation and Repair Recommendations/Group-B/site-C Date: Aug 5, 2022
Preparer : José A. Batlle y Asociados, CSP PM : Jessie Agosto, CSA Group HDM :
Review
Interval:
Preliminary (30%)
Plan In Hand (70%)
Internal (90%)
External (95%)
Final / Certification (100%)
Other :
Utilities EXIST within project limits NO utilities exist within project limits Presence of existing utilities UNKNOWN
Existing utilities [ are are not ] identified on the Plans
Utility locating requirements are included in the SCR Sections 107 and/or 645
NO utilities are proposed to be relocated✖
Utility relocation plans are described in detail below
# Location and Utility Information Design Information
Roadway Name:
PR-124
Station / Station Range:
22+00 to 23+00
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: W Size/Pole No. 4"φ
Utility Company Name:
A.A.A.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
Roadway Name:
PR-124
Station / Station Range:
22+00 to 23+00
Left of CL Right of CL● Both
Type and/or Size Facility (** See Legend)
Type: T Size/Pole No.
Utility Company Name:
P.R.T.C.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
# Location and Utility Information Design Information
Roadway Name:
PR-124
Station / Station Range:
22+00 to 23+00
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: P Size/Pole No.
Utility Company Name:
P.R.E.P.A.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
General Information :
Group-B / Site-C PR-124, km 21.9
**P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks
Project : Landslide and Road Damage Evaluation and Repair Recommendations/Group-B/site-D Date: Aug 5, 2022
Preparer : José A. Batlle y Asociados, CSP PM : Jessie Agosto, CSA Group HDM :
Review
Interval:
Preliminary (30%)
Plan In Hand (70%)
Internal (90%)
External (95%)
Final / Certification (100%)
Other :
Utilities EXIST within project limits NO utilities exist within project limits Presence of existing utilities UNKNOWN
Existing utilities [ are are not ] identified on the Plans
Utility locating requirements are included in the SCR Sections 107 and/or 645
NO utilities are proposed to be relocated✖
Utility relocation plans are described in detail below
# Location and Utility Information Design Information
Roadway Name:
PR-124
Station / Station Range:
23+40 to 24+00
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: W Size/Pole No. 2"φ
Utility Company Name:
A.A.A.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
Roadway Name:
PR-124
Station / Station Range:
23+40 to 24+00
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: T Size/Pole No.
Utility Company Name:
P.R.T.C.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
# Location and Utility Information Design Information
Roadway Name:
PR-124
Station / Station Range:
23+40 to 24+00
Left of CL Right of CL Both●
Type and/or Size Facility (** See Legend)
Type: P Size/Pole No.
Utility Company Name:
P.R.E.P.A.
Primary Contact - Name & Number:
Detailed listing of Utilities on Project Plans
Additional Contact Information
Utility to participate in PreCon Meeting
Design Responsibility:
Payment Responsibility:
Responsible Party:
Work Completed:
Cost Estimate:
Date of Contract or Agreement: N/A
Remarks / Description of Relocation:
N/A
General Information :
Group-B / Site-D PR-124, km 23.4
**P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks
| 06 Bb-EFL-FM-UTL-01_Utility-Status-Report |
| 06 Bc-EFL-FM-UTL-01_Utility-Status-Report |
| 06 Bd-EFL-FM-UTL-01_Utility-Status-Report |
File details come from the government source that posted it. Updated .