Report_SWPPP.pdf

PDF 425 KB Posted

Attached to
El Yunque National Forest Federal contract opportunity
Solicitation number
693C73-21-R-000021
Issued by
Department of Transportation Federal Highway Administration

About this file

This federal contract opportunity announcement solicits proposals from certified Small Business Concerns for repair work on multiple storm damaged sites within El Yunque National Forest in Puerto Rico. The project consists of constructing retaining walls, a reinforced soil slope, a rock buttress, roadway shoring systems, asphalt pavement reconstruction, shoulder and ditch reconditioning, and culvert replacements. The work will be split into multiple schedules with an estimated total cost over $10 million. Bid documents will be issued on June 8, 2021, with proposals due on a date specified in Block 13a of the solicitation. A virtual pre-bid meeting will be held approximately 7 days later. Offerors must submit qualifications demonstrating experience on similar projects. The solicitation will provide further requirements and will be available at www.beta.sam.gov by searching for "693C73". Firms must complete representations and certifications at www.beta.sam.gov and www.dol.gov/vets/vets4212.htm. Questions should be sent to eflhd.contracts@dot.gov. Prospective contractors must register in SAM for payment purposes. This is a request for proposal with no public bid opening.

View the file

Other files for this federal contract opportunity

Other files attached to El Yunque National Forest, newest first.
File Type Posted
Amendment 0003 - PR ERFO FS 2017-1(3).pdf PDF
Amendment 0002 - PR ERFO FS 2017-1(3).pdf PDF
Amendment 0001 - PR ERFO FS 2017-1(3).pdf PDF
Report_Geotechnical.pdf PDF
Plans - PR ERFO FS 2017 1(3) Part1.pdf PDF
Report_As-Built_PR-9966_Power Line.pdf PDF
VETS-4212 - Form - 2021.pdf PDF
Plans - PR ERFO FS 2017 1(3) Part2.pdf PDF
RFP Solicitation - PR ERFO FS 2017 1(3).pdf PDF
Report_As-Built_PR-191 Water Line Replacement.pdf PDF
Categorical Exlusion Form (NEPA).PDF PDF
FP14_Eng.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stormwater Pollution Prevention Plan (SWPPP)

PR ERFO FS 2017-1(3)

PR ERFO FS 2017-1(3) SWPPP i

For Construction Activities At:

EL YUNQUE NATIONAL FOREST

RIO GRANDE AND LUQUILLO MUNICIPALITIES, PUERTO RICOO

SWPPP Prepared By:

Federal Highway Administration Eastern Federal Lands Highway Division

22001 Loudoun County Parkway Building E-2, Suite 200

Ashburn, VA 20147 702-404-6201

Efl.fhwa@dot.gov

SWPPP Preparation Date:

06/02/2020

Estimated Project Dates:

Project Start Date: 04/26/2021

Project Completion Date: 07/15/2024

PR ERFO FS 2017-1(3) SWPPP ii

Contents

SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES

1.1 Operator(s) / Subcontractor(s)

1.2 Stormwater Team

SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING

2.1 Project/Site Information

2.2 Discharge Information

2.3 Nature of the Construction Activities

2.4 Sequence and Estimated Dates of Construction Activities

2.5 Authorized Non-Stormwater Discharges

SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL

REQUIREMENTS

3.1 Endangered Species Protection

3.2 Historic Preservation

3.3 Safe Drinking Water Act Underground Injection Control Requirements ...10

SECTION 4: EROSION AND SEDIMENT CONTROLS

4.1 Natural Buffers or Equivalent Sediment Controls

4.2 Perimeter Controls

4.3 Sediment Track-Out

4.4 Stockpiled Sediment or Soil

4.5 Minimize Dust

4.6 Minimize Steep Slope Disturbances

4.7 Topsoil

4.9 Storm Drain Inlets

4.13 Dewatering Practices

4.15 Site Stabilization

SECTION 5: POLLUTION PREVENTION STANDARDS

5.1 Spill Prevention and Response

5.2 Minimize the Discharge of Pollutants

SECTION 6: INSPECTION, MAINTENANCE, AND CORRECTIVE ACTION

6.1 Inspection Personnel and Procedures

6.2 Corrective Action

6.3 Delegation of Authority

SECTION 7: TRAINING

SECTION 8: CERTIFICATION AND NOTIFICATION

SWPPP APPENDICES

PR ERFO FS 2017-1(3) SWPPP 1

SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES

1.1 Operator(s) / Subcontractor(s)

Operator(s):

Federal Highway Administration Eastern Federal Lands Highway Division 22001 Loudoun County Parkway Building E-2, Suite 200 Ashburn, VA 20147

Contractor(s):

Insert Company or Organization Name Insert Name Insert Address Insert City, State, Zip Code Insert Telephone Number Insert Fax/Email Insert area of control (if more than one operator at site)

[Repeat as necessary.]

Emergency 24-Hour Contact:

TBD

PR ERFO FS 2017-1(3) SWPPP 2

1.2 Stormwater Team

Stormwater Team

Name and/or position, and contact Responsibilities I Have Read the CGP and Understand the Applicable

Requirements Lisa Landers

FHWA-EFLHD

Environmental Protection Specialist Lisa.Landers@dot.gov

Responsible for preparation of the

SWPPP

☒ Yes Date: 6/11/2020

Romany Towfek

FHWA-EFLHD –

Environmental Intern Romany.Towfek@dot.gov

Responsible for preparation of the

SWPPP

☒ Yes Date: 6/11/2020

Kevin Rose

FHWA-EFLHD

Environmental Team Leader Kevin.Rose@dot.gov

Responsible for approving the SWPPP

☒ Yes Date: 10/22/2020

Construction Contractor - TBD Responsible for updating, maintaining, and implementing the

SWPPP.

☒ Yes Date: Click here to enter a date.

PR ERFO FS 2017-1(3) SWPPP 3

SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING

2.1 Project/Site Information

Project Name and Address

Project/Site Name: PR ERFO FS 2017-1(3) Project Street/Location: PR-9938, PR-988, PR-9966, PR-930, AND PR-186 City: RIO GRANDE AND LUIQUILLO MUNICIPALITIES State: PUERTO RICO ZIP Code: N/A County or Similar Subdivision: Rio Grande, Luquillo

Business days and hours for the project: Work is anticipated to occur during the daytime until 5 pm on weekdays only. Nighttime operations are not permitted. No work will be permitted on Saturdays, Sundays, Puerto Rican holidays or National legal holidays.

Project Latitude/Longitude PR-191

Start

Latitude: 18º19’57.18” N

Longitude: 65º45’54.12” W

End

Latitude: 18º17’44.07” N

Longitude: 65º47’25.98” W

Project Latitude/Longitude PR-186

Start

Latitude: 18º19’24.68” N

Longitude: 65º49’11.78” W

End

Latitude: 18º17’32.03” N

Longitude: 65º52’9.04” W

Latitude/longitude data source:

☐ Map ☐ GPS ☒ Other (please specify): ___ground survey and mapping______

Horizontal Reference Datum:

☐ NAD 27 ☒ NAD 83 ☐ WGS 84

Additional Project Information

PR ERFO FS 2017-1(3) SWPPP 4

Are you requesting permit coverage as a “federal operator” as defined in Appendix A of the 2017 CGP?

☒ Yes ☐ No

Is the project/site located on Indian country lands, or located on a property of religious or cultural significance to an Indian tribe?

☐ Yes ☒ No

2.2 Discharge Information

Does your project/site discharge stormwater into a Municipal Separate Storm Sewer System (MS4)?

Are there any waters of the U.S. within 50 feet of your project’s earth disturbances?

☒ Yes ☐ No

Description of Stormwater Runoff Characteristics:

The project contains multiple distinct sites. Stormwater runoff consists of sheet flow and in some cases, runoff is conveyed through ditches and discharged through drainage pipes. A list of sites with discharges is provided in Sheet D01 of the project plans in Appendix A.

https://www.epa.gov/sites/production/files/2017-02/documents/2017_cgp_final_appendix_a_-_definitions_508.pdf

PR ERFO FS 2017-1(3) SWPPP 5

2.3 Nature of the Construction Activities

General Description of Project Provide a general description of the nature of your construction activities, including the age dates of past renovations for structures that are undergoing demolition:

The FHWA-EFLHD, in cooperation with the United States Forest Service, proposes to repair several roads in El Yunque National Forest (EYNF) that were damaged by Hurricane Maria in September of 2017. The repair work would reconstruct asphalt concrete pavement, reconstruct road embankment, recondition shoulders and ditches, replace culverts, repair slides, construct gabion gravity walls, and would also include the completion of other minor miscellaneous repairs. The repairs are located on PR 191, PR 9938, PR 930, PR 988, PR 9966, and PR 186 in the Luquillo and Río Grande municipalities.

Size of Construction Site

Size of Property EYNF is approximately 28,516 acres in size.

Total Area Expected to be Disturbed by Construction Activities

3.75 acres

Maximum Area Expected to be Disturbed at Any One Time

3.75 acres

Type of Construction Site (check all that apply):

☐ Single-Family Residential ☐ Multi-Family Residential ☐ Commercial ☐ Industrial

☐ Institutional ☒ Highway or Road ☐ Utility ☐ Other ____________________________

Will there be demolition of any structure built or renovated before January 1, 1980? ☐ Yes ☒ No

If yes, do any of the structures being demolished have at least 10,000 square feet of floor space?

☐ Yes ☒ No ☐ N/A

Was the pre-development land use used for agriculture (see Appendix A for definition of “agricultural land”)?

https://www.epa.gov/sites/production/files/2017-02/documents/2017_cgp_final_appendix_a_-_definitions_508.pdf

PR ERFO FS 2017-1(3) SWPPP 6

Pollutant-Generating Activities

Pollutant-Generating Activi Pollutants or Pollutant Constituents Asphalt Oil, petroleum distillates Concrete Work Limestone, sand, pH, chromium Hydraulic oil/flluids Mineral oil Gasoline Benzene, ethyl benzene, toluene, xylene, MTBE

Diesel Fuel Petroleum distillate, oil & grease, naphthalene, xylenes Antifreeze/coolant Ethylene glycol, propylene glycol, heavy metals Fertilizer Nitrogen, phosphorous

Construction Support Activities The following locations may be used for equipment staging and material storage:

PR-186 KM 15.85 (Closed parking area) PR-191 KM 8.1 (Parking Area) PR-191 KM 8.3 (Parking Area) PR-191 KM 8.4 (Parking Area) PR-191 KM 11.8 (Parking Area) PR-191 KM 12.3 (Parking Area)

Woody vegetation must be disposed of within EYNF. Salvageable trees will be taken to PR- 9966, to the road clearing after the Iguaca Aviary. Not salvageable vegetation will be disposed of in an area also located on PR-9966 right after the intersection with PR-191.

Contact information for construction support activity: To Be Completed by Construction Contractor.

INSERT NAME

INSERT TELEPHONE NO.

INSERT EMAIL

INSERT ADDRESS AND/OR LATITUDE/LONGITUDE

PR ERFO FS 2017-1(3) SWPPP 7

2.4 Sequence and Estimated Dates of Construction Activities

Estimated Timeframe Construction Activity/BMPs

Phase I – Establish Perimeter Controls

Construct perimeter controls to ensure that disturbed sediment does not leave the project site. Perimeter controls include fiber roll and other specified measures

Phase II – Intermediate Controls

Apply intermediate controls during rough grading operations. Install fiber roll in ditches along roadway. Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 calendar days within 7 days. Apply permanent turf establishment to the finished slopes. At the end of each day’s grading operations, shape earthwork to minimize and control erosion from storm runoff. Install inlet protection prior to diverting water through inlets. Upon completion of culverts, ensure that culvert entrances, outlets, and outlet channels are at final grade and are stabilized (with vegetation, riprap, or pavement) before routing drainage through completed culverts. Provide fiber roll around all stockpiled excavated roadway material. Apply temporary turf establishment to stockpiles remaining in place longer than 14 days within 7 days of stockpiling. Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.

Phase III – Final Construction / Stabilization

After completion of roadway construction: finish grading, place riprap, rolled erosion control product, topsoil, and apply permanent turf establishment to any remaining disturbed areas. Where necessary, replace eroded topsoil and reapply permanent turf establishment to disturbed areas where vegetation has not established. Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels. Remove all devices used for dewatering.

Remove the fiber roll only after all upslope areas are stabilized and vegetation is well established.

PR ERFO FS 2017-1(3) SWPPP 8

2.5 Authorized Non-Stormwater Discharges

List of Authorized Non-Stormwater Discharges Present at the Site

Type of Authorized Non-Stormwater Discharge Likely to be Present at Your Site?

Discharges from emergency fire-fighting activities ☐ Yes ☒ No Fire hydrant flushings ☐ Yes ☒ No Landscape irrigation ☒ Yes ☐ No Waters used to wash vehicles and equipment ☒ Yes ☐ No Water used to control dust ☒ Yes ☐ No Potable water including uncontaminated water line flushings ☐ Yes ☒ No External building washdown (soaps/solvents are not used and external surfaces do not contain hazardous substances)

☐ Yes ☒ No

Pavement wash waters ☒ Yes ☐ No Uncontaminated air conditioning or compressor condensate ☐ Yes ☒ No Uncontaminated, non-turbid discharges of ground water or spring water ☐ Yes ☒ No Foundation or footing drains ☐ Yes ☒ No Construction dewatering water ☒ Yes ☐ No

PR ERFO FS 2017-1(3) SWPPP 9

SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS

3.1 Endangered Species Protection

A Biological Assessment (BA) was prepared to analyze the impacts to Federally-listed species that are potentially present in the project area, which included: Elfin-woods Warbler (Setophaga angelae), Puerto Rican Broad-Winged Hawk (Buteo platypterus brunnescens); Puerto Rican Parrot (Amazona vittata);

Puerto Rican Sharp-Shinned Hawk (Accipiter striatus venator); Puerto Rican Boa (Epicrates inornatus);

Callicarpa ampla; Ilex sintenisii; Ternstroemia luquillensis; Styrax portoricensis; Ternstroemia subsessilis;

Eugenia haematocarpa; and, Elfin-Woods Warbler (Setophaga angelae) critical habitat. In a letter dated July 17, 2020, FHWA submitted the BA to the FWS, and requested concurrence with their determination that the project implemented with the mitigation measures and Best Management Practices outlined in the BA may affect, but is not likely to adversely affect Federally-listed species or their critical habitat.

In a letter dated August 5, 2020, the FWS concurred with FHWA’s determination that the proposed action may affect, but is not likely to adversely affect the above referenced species, and is not likely to adversely modify designated critical habitat. The FWS also indicated that certain areas along PR- 186, are considered as “hot spots” for listed plants such as Eugenia haematocarpa, Styrax portoricensis, and Callicarpa ampla. Work proposed in this area will occur within the existing roadway prism; however, care should be taken to avoid any side casting of material down slope.

This project is eligible for criteria E in Appendix D of this permit.

3.2 Historic Preservation

A Cultural Resource Survey was conducted to identify archeological sites and components of historic reads that could be impacted by the proposed undertaking. No archeological sites were discovered as a result of the combination of pedestrian reconnaissance and controlled interval and judgmental subsurface testing. The built resources survey identified all resources 50 years or older in the APE, and assessed their significance and integrity by applying the National Register of Historic Places Criteria for Evaluation (36 CFR 60.4). PR 191, also referred to as Mameyes-Rio Blanco Road, was constructed by the CCC. This road is eligible for the National Register of Historic Places (NRHP). In addition to PR 191, PR 186 is also considered a contributing property based on NRHP criteria. PR 191 is the road most used by visitors to EYNF since the road was built in the mid-1930s. PR 186 was originally built to provide access to timber stands and planting units, and to connect Cabuy and Canóvanas. After its initial construction, PR 186 now also provides access to picnic and recreational areas. PR 9966 was built to connect PR 191 and PR 966. PR 988 was built to provide access to timber plots, a sawmill, the Sabana Work Camp, and as a transportation route within EYNF. PR 9938, also known as the Mount Britton Loop Road, provides access to the popular Mount Britton trailhead. PR 930, also known as Molindero/East Peak Road provided access to many recreational areas that used to exist, but now leads to U.S. Navy facilities on East Peak.

A total of 52 built resources exceeding 50 years of age were identified on four of these roads. Most of the resources were found on PR 191 and PR 196 (37 and 13 respectively) while PR 988 and PR 9938 only had one resource each. Forty-two (42) of these 52 resources constitute contributing resources to “Multiple Property Documentation Form-New Deal Era Constructions in the Forest Reserves in Puerto Rico, 1933- 1942.” Repair or replacement will occur on or near five of the 42 resources because they were damaged by the storm and are currently failing.

In a letter dated March 13, 2020, FHWA submitted the Cultural Resource Survey to the Puerto Rico State Historic Preservation Officer and requested concurrence with their determination that the proposed

PR ERFO FS 2017-1(3) SWPPP 10

undertaking would have no adverse effect on historic resources. However, after further evaluation, FHWA reconsidered its posture in regards to the effects on the retaining wall on PR 191 north, KM 7.9. Road PR- 191 is eligible for inclusion in the National Register of Historic Places as a contributing resource to the “Multiple Property Documentation Form-New Deal Era Constructions in the Forest Reserves in Puerto Rico, 1933-1942.”. In consultation with the FS, FHWA found that demolition and reconstruction of the CCC era retaining wall at PR 191 north KM 7.9 (191-E-02) to Secretary of Interior (SOI) standards was not possible.

The existing wall is severely compromised and will need to be demolished and replaced. The demolition of the wall would constitute an adverse effect to a contributing feature of the CCC era road. An MOA was developed and executed on September 15, 2020 to resolve the adverse effect on this contributing feature to PR-191 north, a CCC era road. Mitigation measures outlined in the MOA are summarized in the section above. The MOA also documented that the FHWA determined and the SHPO concurred that the remaining forty-one (41) contributing built features would not be adversely affected by the project.

3.3 Safe Drinking Water Act Underground Injection Control Requirements

Not Applicable

PR ERFO FS 2017-1(3) SWPPP 11

SECTION 4: EROSION AND SEDIMENT CONTROLS

4.1 Natural Buffers or Equivalent Sediment Controls

The project will make repairs to existing linear features; therefore, the project is unable to maintain a 50-foot undisturbed natural buffer. In two locations (PR-988 KM 1.1, and PR-186, KM 15.3), the project will require work within waters of the U.S. FHWA has received verification of authorization from the U.S. Army Corps of Engineers that the repairs can be completed under the Nationwide Permit program.

4.2 Perimeter Controls

General Fiber roll will be installed as a perimeter control.

Specific Perimeter Controls

Fiber roll Description: Prior to any cleaning, grubbing, or excavation, construct perimeter controls to ensure that sediment does not leave project site.

Installation TBD Maintenance Requirements

Remove sediment before it has accumulated to one-half of the above-ground height of any perimeter control. (

Design Specifications

See Detail E157-04

4.3 Sediment Track-Out

Stabilized Construction Exit will help eliminate sediments from work trucks when leaving the work site.

Specific Track-Out Controls

Stabilized Construction Exits Description: The Contractor is required to maintain stabilized construction exists to minimize tracking of soils onto existing roads Installation TBD Maintenance Requirements

Inspect roads adjacent to the site daily. Remove visible accumulated sediment. If exist is clogged with sediment, remove aggregate, separate, and dispose of sediment.

Design

FP-14

4.4 Stockpiled Sediment or Soil

Fiber rolls will be installed around all stockpiled excavated roadway material.

Specific Stockpile Controls

PR ERFO FS 2017-1(3) SWPPP 12

Fiber rolls Description: Fiber roll will be installed around all stockpiled excavated roadway material.

Installation TBD Maintenance Requirements

Fiber roll will be installed around all stockpiled excavated roadway material.

Design

See Detail E157-04

4.5 Minimize Dust

General

Watering for dust will be provided within construction limits, on active haul roads, and in pits and staging areas.

Specific Dust Controls

Watering for dust control Description: Provide watering for dust control within the construction limits, on active haul roads, and in pits and staging areas.

Installation TBD Maintenance Requirements n/a

Design Specifications

FP-14, Section 158

4.6 Minimize Steep Slope Disturbances

Rolled erosion control matting will be installed to minimize erosion on steep slopes.

Specific Steep Slope Controls

Rolled Erosion Control / Shape Earth Work Description: Rolled Erosion Control Product, Type 4 Installation TBD Maintenance Requirements

Inspect matting after every significant (0.5 inch or greater) rainfall event for damage and erosion beneath the matting. Replacement of matting may be necessary if damaged by equipment. Check staples and stakes to make sure they are securely in the ground.

Design Specifications

See Detail E629-01

4.7 Topsoil

General Conserve topsoil from roadway excavation areas and place conserved topsoil on completed slopes.

PR ERFO FS 2017-1(3) SWPPP 13

4.9 Storm Drain Inlets

Inlet protection will be installed to prior to diverting water through inlets.

Specific Storm Drain Inlet Controls

Temporary Inlet Protection Description: Temporary Inlet Protection Installation TBD Maintenance Requirements

Inspect to ensure that inlet protection remains firmly in place and is not damaged or clogged. Clean clogged inlet protection or replace clogged or damaged inlet protection as necessary.

Design Specifications

See Detail ET 157-2

4.13 Dewatering Practices

A temporary flexible pipe diversion will be installed to dewater the work area.

Specific Dewatering Practices

Temporary Diversion Berm Bypass Pumping Description: Temporary Diversion Berm Bypass Pumping Installation TBD Maintenance Requirements

Inspect weekly and after each event. Remove any debris from the diversion and repair any damage immediately.

Design

See Detail E157-A

4.15 Site Stabilization

Total Amount of Land Disturbance Occurring at Any One Time ☒ Five Acres or less ☐ More than Five Acres

Seeding of turf grass is not permitted in EYNF. Peat moss mulch will be applied, after which biodegradable coconut fiber rolled erosion control matting will be installed. Permanent stabilization will be achieved by planting native plants, shrubs and trees.

PR ERFO FS 2017-1(3) SWPPP 14

SECTION 5: POLLUTION PREVENTION STANDARDS

5.1 Spill Prevention and Response

The contractor must develop and implement a Spill Prevention Control and Countermeasures Plan (SPCC) following the requirements under 40 CFR 112. Report sill large enough to discharge to surface waters to the National Response Center at 1-800-424-8802.

5.2 Minimize the Discharge of Pollutants

The Contractor will provide specific practices to minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, concrete wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge.

The contractor will identify designated areas for equipment maintenance and repair, provide waste receptacles and regular collection of waste, provide adequately maintained sanitary facilities, provide protected storage areas for chemicals, paints, solvents, fertilizers, etc.

PR ERFO FS 2017-1(3) SWPPP 15

SECTION 6: INSPECTION, MAINTENANCE, AND CORRECTIVE ACTION

6.1 Inspection Personnel and Procedures

Personnel Responsible for Inspections Contractor to INSERT NAMES OF PERSONNEL OR TYPES OF PERSONNEL WHO WILL BE

CONDUCTING SITE INSPECTIONS HERE

Inspection Schedule Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of 0.25 inches or more, and daily during wet weather.

Rain Gauge Location (if applicable) Contractor to SPECIFY LOCATION(S) OF RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED (only applies to inspections conducted for Part 4.2.2, 4.3, or 4.4.2)

Inspection Report Forms See Appendix D

6.2 Corrective Action

Personnel Responsible for Corrective Actions Contractor to INSERT NAMES OF PERSONNEL OR TYPES OF PERSONNEL RESPONSIBLE FOR

CORRECTIVE ACTIONS

Corrective Action Forms See Appendix E

6.3 Delegation of Authority

Duly Authorized Representative(s) or Position(s):

Insert Company or Organization Name Insert Name Insert Position Insert Address Insert City, State, Zip Code Insert Telephone Number Insert Fax/Email

PR ERFO FS 2017-1(3) SWPPP 16

SECTION 7: TRAINING

Table 7-1: Documentation for Completion of Training

Name Describe Training Date Training Completed

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

INSERT NAME OF PERSONNEL INSERT COMPLETION DATE

PR ERFO FS 2017-1(3) SWPPP 17

SECTION 8: CERTIFICATION AND NOTIFICATION

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Name: Title:

Signature: Date:

PR ERFO FS 2017-1(3) SWPPP 18

SWPPP APPENDICES

Appendix A – Construction Drawings (Project Plans) Appendix B – 2017 Construction General Permit Appendix C – NOI Appendix D – Inspection Form Appendix E – Corrective Action Form Appendix F – SWPPP Amendment Log Appendix G – Subcontractor Certifications/Agreements Appendix H – Grading and Stabilization Activities Log Appendix I – Training Log Appendix J – Delegation of Authority Appendix K – Environmental Compliance Documentation Appendix L – Rainfall Gauge Recordings

PR ERFO FS 2017-1(3) SWPPP

Appendix A – Project Plans

Appendix B – 2017 Construction General Permit

Appendix C – Copy of NOI and EPA Authorization email

Appendix D – Copy of Inspection Form

Appendix E – Copy of Corrective Action Form

Appendix F – SWPPP Amendment Log

No. Description of the Amendment Date of Amendment

Amendment Prepared by [Name(s) and Title]

INSERT DATE

INSERT DATE

INSERT DATE

INSERT DATE

INSERT DATE

INSERT DATE

INSERT DATE

Appendix G – Subcontractor Certifications/Agreements

SUBCONTRACTOR CERTIFICATION

STORMWATER POLLUTION PREVENTION PLAN

Project Number:

Project Title:

Operator(s):

As a subcontractor, you are required to comply with the Stormwater Pollution Prevention Plan (SWPPP) for any work that you perform on-site. Any person or group who violates any condition of the SWPPP may be subject to substantial penalties or loss of contract. You are encouraged to advise each of your employees working on this project of the requirements of the SWPPP. A copy of the SWPPP is available for your review at the office trailer.

Each subcontractor engaged in activities at the construction site that could impact stormwater must be identified and sign the following certification statement:

I certify under the penalty of law that I have read and understand the terms and conditions of the SWPPP for the above designated project and agree to follow the practices described in the

SWPPP.

This certification is hereby signed in reference to the above named project:

Company:

Address:

Telephone Number:

Type of construction service to be provided:

Signature:

Title:

Date:

Appendix H – Grading and Stabilization Activities Log

Date Grading Activity Initiated

Description of Grading Activity Description of Stabilization Measure and Location

Date Grading Activity Ceased (Indicate Temporary or Permanent)

Date When Stabilization Measures Initiated

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

INSERT DATE

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

INSERT DATE

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

INSERT DATE

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

INSERT DATE

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

INSERT DATE

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

INSERT DATE

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

INSERT DATE

INSERT DATE INSERT DATE

☐ Temporary ☐ Permanent

Appendix I – SWPPP Training Log

Stormwater Pollution Prevention Training Log

Project Name:

Project Location:

Instructor’s Name(s):

Instructor’s Title(s):

Course Location: Date:

Course Length (hours):

Stormwater Training Topic: (check as appropriate)

☐ Sediment and Erosion Controls ☐ Emergency Procedures ☐ Stabilization Controls ☐ Inspections/Corrective Actions ☐ Pollution Prevention Measures

Specific Training Objective:

Attendee Roster: (attach additional pages as necessary)

No. Name of Attendee Company

Appendix J – Delegation of Authority Form

Delegation of Authority

I, _______________________ (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit (CGP), at the ____________________________________ construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit.

________________________________________ (name of person or position) ________________________________________ (company) ________________________________________ (address) ________________________________________ (city, state, zip) ________________________________________ (phone)

By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in Appendix I of EPA’s CGP, and that the designee above meets the definition of a “duly authorized representative” as set forth in Appendix I.

I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I have no personal knowledge that the information submitted is other than true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.

Name:

Company:

Title:

Signature:

Date:

Appendix K – Environmental Compliance Documentation

Appendix L – Rainfall Gauge Recording

Use the table below to record the rainfall gauge readings at the beginning and end of each work day. An example table follows.

Month/Year Month/Year Month/Year Day Start time End time Day Start time End time Day Start time End time 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 6 6 6 7 7 7 8 8 8 9 9 9 10 10 10

11 11 11 12 12 12 13 13 13 14 14 14 15 15 15 16 16 16 17 17 17 18 18 18 19 19 19 20 20 20 21 21 21 22 22 22 23 23 23 24 24 24 25 25 25 26 26 26 27 27 27 28 28 28 29 29 29 30 30 30 31 31 31

Example Rainfall Gauge Recording

April 2017 May 2017 June 2017 Day 7:00 am 4:400 pm Day 7:00 am 4:00 pm Day 7:00 am 4:00 pm 1 -- -- 1 0.2 0 1 0 0.4 2 -- -- 2 0 0 2 0 0 3 0 0 3 0.1 0.3 3 -- -- 4 0 0.3 4 0 0 4 -- -- 5 0 0 5 0 0 5 0 0

In this example (for only partial months), 0.25-inch rainfall inspections would have been conducted on April 4 and June 1.

SECTION 1: CONTACT INFORMATION/RESPONSIBLE PARTIES
1.1 Operator(s) / Subcontractor(s)
1.2 Stormwater Team
SECTION 2: SITE EVALUATION, ASSESSMENT, AND PLANNING
2.1 Project/Site Information
2.2 Discharge Information
2.3 Nature of the Construction Activities
2.4 Sequence and Estimated Dates of Construction Activities
2.5 Authorized Non-Stormwater Discharges
SECTION 3: DOCUMENTATION OF COMPLIANCE WITH OTHER FEDERAL REQUIREMENTS
3.1 Endangered Species Protection
3.2 Historic Preservation
3.3 Safe Drinking Water Act Underground Injection Control Requirements
SECTION 4: EROSION AND SEDIMENT CONTROLS
4.1 Natural Buffers or Equivalent Sediment Controls
4.2 Perimeter Controls
4.3 Sediment Track-Out
4.4 Stockpiled Sediment or Soil
4.5 Minimize Dust
4.6 Minimize Steep Slope Disturbances
4.7 Topsoil
4.9 Storm Drain Inlets
4.13 Dewatering Practices
4.15 Site Stabilization
SECTION 5: POLLUTION PREVENTION STANDARDS
5.1 Spill Prevention and Response
5.2 Minimize the Discharge of Pollutants
SECTION 6: INSPECTION, MAINTENANCE, AND CORRECTIVE ACTION
6.1 Inspection Personnel and Procedures
6.3 Delegation of Authority
SECTION 7: TRAINING
SECTION 8: CERTIFICATION AND NOTIFICATION
SWPPP APPENDICES