This is a technical specification document (Section 26 12 19) for pad-mounted, liquid-filled, medium-voltage transformers required for VA Ancillary facilities only. The specification mandates that transformers be outdoor-type, continuous-duty, integral assemblies with liquid-immersed windings, complete factory fabrication with only external cable connections required on-site, and weatherproof compartmentalized construction per IEEE C57.12.28 standards. The document establishes minimum requirements including 5 kV class equipment with 60 kV BIL rating, transformer impedance not less than 4.5% for units 150 kVA and larger, temperature rises not exceeding 65°C by resistance per NEMA TR 1, and mineral oil insulation per ASTM D3487. Primary equipment specifications include externally replaceable Bay-O-Net liquid-immersed fuse assemblies rated for 10 load makes and breaks, oil-immersed load-interrupter disconnect switches, and 600 A deadbreak premolded rubber elbow connectors for medium-voltage terminations compliant with IEEE 386.

Transformer accessories must include no-load tap changers, lifting/jacking facilities, pressure relief valves, liquid level gauges, dial-type thermometers, and grounding pads in both compartments. Factory testing requires insulation-resistance tests and turns-ratio tests at all tap positions per IEEE standards with certified results. Submittals must include comprehensive shop drawings, complete maintenance and operating manuals with wiring diagrams and replacement parts lists, and pre-final inspection certifications from both manufacturer and contractor. Installation requires outdoor placement per NEC standards with rustproof anchorment bolts no less than 12mm diameter and grounding systems maintaining maximum 5-ohm resistance to ground. Acceptance procedures include visual inspections, thermographic surveys of bolted connections post-energization, and manufacturer-required field tests, with spare parts delivery required two weeks prior to final inspection including six protective caps, one spare fuse set per fuse type and size, and three cable fault indicators.

View the file

Other files

File Type Posted
RFI Responses.pdf PDF
36C24226B0043 0002.docx DOCX document
36C24226B0043 0001.docx DOCX document
630A4-26-412 Photos Bldg89 Transformers.docx DOCX document
P07 Wage Determination Replace Outdated Transformer.pdf PDF
NY Tax Exempt Form.pdf PDF
52.225-2 Buy American Certificate.pdf PDF
Bldg 176 E2.pdf PDF
173 E-1.pdf PDF
ReplaceOT_Spec010000.docx DOCX document
36C24226B0043_1.docx DOCX document
St Albans VA One line diagram.pdf PDF
ReplaceOT_Spec260511.docx DOCX document
LIMITATIONS ON SUBCONTRACTING .pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11-01-25

SECTION 26 12 19

PAD-MOUNTED, LIQUID-FILLED, MEDIUM-VOLTAGE TRANSFORMERS

PART 1 - GENERAL

1.1 DESCRIPTION

A.This section can only be used for VA Ancillary facilities. This section shall not be used for VA Critical, or Essential facilities.
B.This section specifies the furnishing, installation, connection, and testing of the pad-mounted, liquid-filled, medium-voltage transformers, indicated as transformers in this section.

1.2 RELATED WORK

A.Section 09 06 00, SCHEDULE FOR FINISHES: Finishes for electrical equipment.
B.Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: Requirements that apply to all sections of Division 26.
C.Section 26 05 13, MEDIUM-VOLTAGE CABLES: Medium-voltage cables.
D.Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS: Requirements for personnel safety and to provide a low impedance path to ground for possible ground currents.
E.Section 26 05 41, UNDERGROUND ELECTRICAL CONSTRUCTION: Manholes, pull-boxes, and ducts for underground raceway systems.
F.Section 26 05 73, OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY: Short circuit and coordination study, and requirements for a coordinated electrical system.

1.3 qualITY ASSURANCE A. Quality Assurance shall be in accordance with Paragraph, QUALIFICATIONS (PRODUCTS AND SERVICES) in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.

1.4 FACTORY TESTs

A.Factory Tests shall be required.
B.Factory Tests shall be in accordance with Paragraph, MANUFACTURED PRODUCTS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirement:
1.Transformers shall be thoroughly tested at the factory to ensure that there are no electrical or mechanical defects. Tests shall be conducted as per IEEE Standards. Factory tests shall be certified. The following tests shall be performed:
a.Perform insulation-resistance tests, winding-to-winding and each winding-to-ground.
b.Perform turns-ratio tests at all tap positions.

1.5 SUBMITTALS

A.Submit in accordance with Paragraph, SUBMITTALS in Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, and the following requirements:
1.Shop Drawings:
a.Submit sufficient information to demonstrate compliance with drawings and specifications.
b.Include electrical ratings, nameplate data, impedance, outline drawing with dimensions and front, top, and side views, weight, mounting details, decibel rating, termination information, temperature rise, no-load and full-load losses, regulation, overcurrent protection, connection diagrams, and accessories.
c.Complete nameplate data, including manufacturer’s name and catalog number.
2.Manuals:
a.When submitting the shop drawings, submit companion copies of complete maintenance and operating manuals, including technical data sheets, wiring diagrams, and information for ordering replacement parts.
1)Identify terminals on wiring diagrams to facilitate installation, maintenance, and operation.
2)Indicate on wiring diagrams the internal wiring for each piece of equipment and interconnections between the pieces of equipment.
3)Approvals will be based on complete submissions of manuals, together with shop drawings.
b.If changes have been made to the maintenance and operating manuals originally submitted, submit updated maintenance and operating manuals two weeks prior to the final inspection.
1)Update the manual to include any information necessitated by shop drawing approval.
2)Show all terminal identification.
3)Include information for testing, repair, troubleshooting, assembly, disassembly, and recommended maintenance intervals.
4)Provide a replacement parts list with current prices. Include a list of recommended spare parts, tools, and instruments for testing and maintenance purposes.
B.Certifications:
1.Two weeks prior to the final inspection, submit the following certifications.
a.Certification by the manufacturer that the transformers conform to the requirements of the drawings and specifications.
b.Certification by the Contractor that the transformers have been properly installed, connected, and tested.

1.6 APPLICABLE PUBLICATIONS

A.Publications listed below (including amendments, addenda, revisions, supplements, and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B.American Society for Testing and Materials (ASTM):
D3487-25Standard Specification for Mineral Insulating Oil Used in Electrical Apparatus
C.Institute of Electrical and Electronic Engineers (IEEE):
48-20Test Procedures and Requirements for Alternating-Current Cable Terminations Used on Shielded Cables Having Laminated Insulation Rated 2.5kV Through 765kV or Extruded Insulation Rated 2.5kV Through 500kV
386-16Separable Insulated Connector Systems for Power Distribution Systems Above 600 V
592-18Insulation Shields on Medium-Voltage (15 kV - 35 kV) Cable Joints and Separable Connectors
C2-23National Electrical Safety Code
C37.42-16Specifications for High-Voltage (>1000 V) Fuses and Accessories
C57.12.00-21Liquid-Immersed Distribution, Power and Regulating Transformers
C57.12.10-17Liquid-Immersed Power Transformers
C57.12.25-90Pad‑Mounted, Compartmental-Type, Self-Cooled, Single-Phase Distribution-Transformers with Separable Insulated High Voltage Connectors; High Voltage, 34500 Grd Y/19920 Volts and Below; Low-Voltage 240/120 Volts; 167 kVA and Smaller Requirements
C57.12.28-23Pad-Mounted Equipment - Enclosure Integrity
C57.12.29-23Pad-Mounted Equipment – Enclosure Integrity for Coastal Environments
C57.12.34-22Pad‑Mounted, Compartmental-Type, Self-Cooled, Three-Phase Distribution Transformers, 5 MVA and Smaller; High Voltage, 34.5 kV Nominal System Voltage and Below; Low Voltage, 15kV Nominal System Voltage and Below
C57.12.90-21Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
C62.11-20Metal-Oxide Surge Arresters for AC Power Circuits
D.International Code Council (ICC):
IBC-24International Building Code
E.National Electrical Manufacturers Association (NEMA):
TR 1-2013(R2019)Transformers, Step Voltage Regulators, and Reactors
F.National Fire Protection Association (NFPA):
70-26National Electrical Code (NEC)
G.Underwriters Laboratories Inc. (UL):
467-22Safety Grounding and Bonding Equipment
H.United States Department of Energy (DOE):
10 CFR Part 431Energy Efficiency Program for Certain Commercial and Industrial Equipment

PART 2 - PRODUCTS

2.1 general requirements

A.Transformers shall be in accordance with ASTM, IEEE, NFPA, UL, as shown on the drawings, and as specified herein. Each transformer shall be assembled as an integral unit by a single manufacturer.
B.Transformers shall be complete, outdoor type, continuous duty, integral assembly, grounded, tamper‑resistant, and with liquid‑immersed windings.
C.Ratings shall not be less than shown on the drawings.
D.Completely fabricate transformers at the factory so that only the external cable connections are required at the project site.
E.Thoroughly clean, phosphatize, and finish all the metal surfaces at the factory with a rust‑resistant primer and dark green enamel finish coat, except where a different color is specified in Section 09 06 00, SCHEDULE FOR FINISHES. All surfaces of the transformer that will be in contact with the concrete pad shall be treated with corrosion‑resistant compounds and epoxy resin or a rubberized sealing compound.

2.2 COMPARTMENTS

A.Construction:
1.Enclosures shall be weatherproof and in accordance with IEEE C57.12.28.
2.The medium- and low-voltage compartments shall be separated with a steel barrier that extends the full height and depth of the compartments.
3.The compartments shall be constructed of sheet steel (gauge to meet ANSI requirements) with bracing and with reinforcing gussets using jig welds to assure rectangular rigidity.
4.All bolts, nuts, and washers shall be zinc-plated or cadmium-plated steel.
5.Sufficient space shall be provided for equipment, cabling, and terminations within the compartments.
6.Affix transformer nameplate permanently within the low-voltage compartment. Voltage and kVA rating, connection configuration, impedance, date of manufacture, and serial number shall be shown on the nameplate.
B.Doors:
1.Provide a separate door for each compartment with provisions for a single padlock to secure all doors. Provide each compartment door with open‑position doorstops and corrosion-resistant tamperproof hinges welded in place. The medium-voltage compartment door shall be mechanically prevented from opening unless the low-voltage compartment door is open.
2.The secondary compartment door shall have a one-piece steel handle and incorporate three‑point locking mechanisms.

2.3 BIL RATING

A. 5 kV class equipment shall have a minimum 60 kV BIL rating.

2.4 TRANSFORMER FUSE ASSEMBLY

A.The primary fuse assembly shall be a combination of externally replaceable Bay-O-Net liquid-immersed fuses in series with liquid-immersed current-limiting fuses.
B.The primary fuse assembly shall be load-break combination fuse and dry‑well fuse holder rated for system voltage, rated for 10 load makes and 10 load breaks, with rated 200 amp load current at 75% power factor, 10,000 symmetrical A close‑in on fault duty, and 95 kV BIL. The entire fuse assembly shall be removable through the use of hot stick.
1.The fuses shall be concealed, hot stick removable, 50,000 A symmetrical interrupting, non‑expulsion, current‑limiting primary distribution type, of the size and voltage class as shown on the drawings. The fuses shall operate within the fuse holder as a unit disconnecting means. Fuses shall be in accordance with ANSI C37.47.
2.Transformers shall not have internal "weak link" fuses that require transformer tank cover removal for replacement.
3.For units above 500 kVA using fusing above the 50 A 15 kV and 100 A 5 kV application, a clip-mounted arrangement of the current limiting fuses (i.e., live-front configuration) is required.

2.5 primary connections A. Primary connections shall match existing transformers.

2.6 medium-voLtage switch

A.The transformer primary disconnect switch shall be an oil-immersed, internal, gang-operated, load-interrupter type, rated at ampacity and system voltage as shown on the drawings, with a minimum momentary withstand rating of not less than the calculated available fault current shown on the drawings.
B.Switch type shall match existing transformers.

2.7 MEDIUM-VOLTAGE TERMINATIONS

A.Terminate the medium-voltage cables in the primary compartment with 600 A deadbreak premolded rubber elbow connectors, suitable for submersible applications. Elbow connectors shall have a semi‑conductive shield material covering the housing. The separable connector system shall include the loadbreak elbow, the bushing insert, and the bushing well. Separable connectors shall comply with the requirements of IEEE 386, and shall be interchangeable between suppliers. Allow sufficient slack in medium-voltage cable, ground, and drain wires to permit elbow connectors to be moved to their respective parking stands.
B.Ground metallic cable shield with a cable shield grounding adapter, consisting of a solderless connector enclosed in watertight rubber housing covering the entire assembly, bleeder wire, and ground braid.

2.8 LOW-VOLTAGE EQUIPMENT

A.Mount the low-voltage bushings, and hot stick in the low-voltage compartment.
B.The low-voltage leads shall be brought out of the tank by epoxy pressure tight bushings and shall be standard arrangement.
C.Tin-plate the low-voltage neutral terminal and isolate from the transformer tank. Provide a removable ground strap sized in accordance with the NEC and connect between the secondary neutral and ground pad.
D.Mount the main breaker off of the transformer tank to allow sufficient ventilation and ensure that the heat from the transformer tank will not be transmitted through conduction. Circuit breakers shall be of the ambient compensating-type, with interrupting ratings for the available fault current.

2.9 TRANSFORMERS

A.Transformer ratings shall be as shown on drawings. kVA ratings shown on the drawings are for continuous duty without the use of cooling fans.
B.Temperature rises shall not exceed the NEMA TR 1 of 65˚ C (149˚ F) by resistance.

C. Transformer insulating material shall be mineral oil in accordance with ASTM D 3487.

D.Transformer impedance shall be not less than 4-1/2% for sizes 150 kVA and larger. Impedance shall be as shown on the drawings.
E.Sound levels shall conform to NEMA TR 1 standards.
F.Primary and Secondary Windings for Three‑Phase Transformers:
1.Primary windings shall be delta-connected.
2.Secondary windings shall be wye-connected, except where otherwise indicated on the drawings. Provide isolated neutral bushings for secondary wye-connected transformers.
3.Secondary leads shall be brought out through pressure‑tight epoxy bushings.
G.Primary windings shall have four 2-1/2% full-capacity voltage taps; two taps above and two taps below rated voltage.
H.Core and Coil Assemblies:
1.Cores shall be grain‑oriented, non‑aging, silicon steel to minimize losses.
2.Core and coil assemblies shall be rigidly braced to withstand the stresses caused by rough handling during shipment, and stresses caused by any possible short-circuit currents.
3.Coils shall be continuous-winding type without splices except for taps. Material shall be copper.
4.Coil and core losses shall be optimum for efficient operation.
5.Primary, secondary, and tap connections shall be brazed or pressure type.
6.Provide end fillers or tie-downs for coil windings.
I.The transformer tank, cover, and radiator gauge thickness shall not be less than that required by ANSI.
J.Accessories:
1.Provide standard NEMA features, accessories, and the following:
a.No‑load tap changer. Provide warning sign.
b.Lifting, pulling, and jacking facilities.
c.Globe-type valve for oil filtering and draining, including sampling device.
d.Pressure relief valve.
e.Liquid level gauge and filling plug.
f.A grounding pad in the medium- and low-voltage compartments.
g.A diagrammatic nameplate.
h.Dial-type liquid thermometer with a maximum reading pointer and an external reset.
i.Hot stick. Securely fasten hot stick within low-voltage compartment.
2.The accessories shall be made accessible within the compartments without disassembling trims and covers.
K.Transformers shall meet the energy conservation standards for transformers per the United States Department of Energy 10 CFR Part 431.

PART 3 - EXECUTION

3.1 INSTALLATION

A.Install transformers outdoors, as shown on the drawings, in accordance with the NEC, and as recommended by the manufacturer.
B.Anchor transformers with rustproof bolts, nuts, and washers not less than 12 mm (1/2 inch) diameter, in accordance with manufacturer’s instructions, and as shown on drawings.
C.Grounding:
1.Ground each transformer in accordance with the requirements of the NEC. Install ground rods per the requirements of Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS, to maintain a maximum resistance of 5 ohms to ground.
2.Connect the ground rod to the ground pads in the medium- and low-voltage compartments.
3.Install and connect the cable shield grounding adapter per the manufacturer’s instructions. Connect the bleeder wire of the cable shield grounding adapter to the loadbreak or deadbreak elbow grounding point with minimum No. 14 AWG wire, and connect the ground braid to the grounding system with minimum No. 6 AWG bare copper wire. Use soldered or mechanical grounding connectors listed for this purpose.

3.2 Acceptance Checks and Tests

A.Perform manufacturer’s required field tests in accordance with the manufacturer's recommendations. In addition, include the following:
1.Visual Inspection and Tests:
a.Compare equipment nameplate data with specifications and approved shop drawings.
b.Inspect physical and mechanical condition. Check for damaged or cracked bushings and liquid leaks.
c.Verify that control and alarm settings on temperature indicators are as specified.
d.Inspect all field-installed bolted electrical connections, using the calibrated torque-wrench method to verify tightness of accessible bolted electrical connections, and perform thermographic survey after energization under load.
e.Vacuum-clean transformer interior. Clean transformer enclosure exterior.
f.Verify correct liquid level in transformer tank.
g.Verify correct equipment grounding per the requirements of Section 26 05 26, GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS.
h.Verify the presence and connection of transformer surge arresters, if provided.
i.Verify that the tap-changer is set at rated system voltage.

3.3 Follow-Up Verification

A. Upon completion of acceptance checks, settings, and tests, the Contractor shall demonstrate that the transformers are in good operating condition and properly performing the intended function.

3.4 SPARE PARTS

A.Deliver the following spare parts for the project to the Resident Engineer two weeks prior to final inspection:
1.Six insulated protective caps.
2.One spare set of medium-voltage fuses for each size and type of fuse used in the project.
3.One spare set of three cable fault indicators.

3.5 INSTRUCTION

A. The Contractor shall instruct maintenance personnel, for not less than one 2‑hour period, on the maintenance and operation of the equipment on the date requested by the COR.

---END---