Replace AHU COVID Wards 6J-6k Bid Set Narrative update 1-19-22.pdf
PDF 570 KB Posted
- Solicitation number
- 36C25722B0029
About this file
This document is a 100% bid set narrative for a construction project to replace air handling units (AHUs) serving COVID wards 6J and 6K at the Olin E. Teague VA Medical Center in Temple, Texas. The project involves removing the existing variable air volume AHUs in mechanical room 6K112 and installing new constant volume AHUs with 100% outdoor air, chilled water cooling coils, and steam heating coils to serve the two wards. Key aspects of the project include installing new supply, exhaust, and control ductwork; replacing variable air volume boxes with new units including hot water reheat coils; modifying the existing fire sprinkler and electrical systems; and phasing the work over two periods to minimize disruption. The estimated construction cost is $1,974,120. The solicitation for the project is number 36C25722B0029.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 Pre Bid Site Visit Sign in Sheet.pdf | ||
| Asbestos Report Copy of Bldg 204 Temple.xls | XLS spreadsheet | |
| 36C25722B0029 0001.docx | DOCX document | |
| Asbestos Report Copy of Bldg 205 Temple.xls | XLS spreadsheet | |
| Asbstos Report Copy of Bldg 163 Temple.xls | XLS spreadsheet | |
| 36C25722B0029_2.docx | DOCX document | |
| Replace AHU COVID Wards 6J-6K Bid Set Specifications update 1-19-22.pdf | ||
| Replace AHU COVID Wards 6J-6K Bid Set Drawings updated 1-19-22.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Design Narrative
A/E DESIGN SERVICES TO REPLACE AHUs BUILDING
204 (COVID UNIT, WARDS 6J-6K)
Prepared for
Department of Veterans Affairs
VISN 17
Olin E. Teague VA Medical Center
Temple, TX
Project No. 674-20-01
Submittal Date: DECEMBER 20, 2021
100% BID SET NARRATIVE SUBMISSION
DEPARTMENT OF VETERANS AFFAIRS VA PROJECT NO. 674-20-01
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
100% BID SET SUBMISSION DECEMBER 20, 2021
TABLE OF CONTENTS
GENERAL INFORMATION 1.0
Project Description 1.1
Design General Scope 1.2
BUILDING CODE & LIFE SAFETY REVIEW 2.0
Primary Applicable Codes & Standards 2.1
NFPA 101 Building Code Design Criteria 2.2
SITE DEVELOPMENT 3.0
Site Development Evaluation 3.1
ARCHITECTURAL 4.0
Building Exterior Evaluation 4.1
Building Interior Evaluation 4.2
INTERIOR DESIGN 5.0
Interior Design Development 5.1
STRUCTURAL 6.0
Overview 6.1
Codes and Standard 6.2
MECHANICAL 7.0
Overview 7.1
Codes and Standard 7.2
Mechanical Approach 7.3
PLUMBING 8.0
Codes and Standards 8.1
Existing Plumbing System 8.2
Design Approach 8.3
Water Usage 8.4
Proposed Plumbing Fixtures 8.5
ELECTRICAL 9.0
Overview 9.1
Codes and Standards 9.2
Electrical Design Approach (Power) 9.3
Electrical Design Approach (Lighting) 9.4
FIRE PROTECTION 10.0
Codes and Standards 10.1
Existing Conditions 10.2
Design Approach 10.3
Existing Egress Path
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
ASBESTOS ABATEMENT REPORT 11.0
Scope 11.1
CRITICAL PATH METHOD (CPM) 12.0
Phasing Narrative 12.1
COST ESTIMATE 13.0
Base Project 13.1
APPENDIX A1: QUALITY ASSURANCE / QUALITY CONTROL PLAN A1.0
Quality Assurance / Quality Control Overview A1.1
APPENDIX A2: SCHEDULE A2.0
Updated Project Design Schedule A2.1
APPENDIX A3: SPECIFICATION TOC A3.0
Project Specifications Table of Contents A3.1
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 1.0
GENERAL INFORMATION
1.1 PROJECT DESCRIPTION
A. CB Design Group, in collaboration with its consulting engineers, is providing professional services and documentation for schematic design, design development and construction documents for the
A/E DESIGN-REPLACE BUILDING 204 AHU’S;WARD 6J-6K (674-20-01) project at the VA Olin
E. Teague Temple (Temple, TX). This project will replace two air handling units feeding the existing patient wards 6J through 6K in Building #204.
B. Replacement of these units will provide the Hospital with a better means to maintain the temperature in these spaces and to isolate these spaces from other portions of the hospital.
C. Submissions shall comply with the AE submission instruction for Minor and NRM Construction programs Program Guide PG-18-15, volume C, with respect to Schematic Design, Design
Development and Construction Documents.
[END OF SECTION]
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 2.0
BUILDING CODE & LIFE SAFETY REVIEW
2.1 PRIMARY APPLICABLE CODES AND STANDARDS
A. The Department of Veterans Affairs has adopted the latest edition of the following codes and standards as a minimum for all projects performed in the modernization, alteration, addition, or improvement of its real property and the construction of new structures. VA design Manuals and
Master Specifications specify other codes and standards that VA follows on its projects:
1. VA Directives, Design Manuals, Master Specifications, VA National CAD Standard
Application Guide, and other Guidance on the Technical Information Library (TIL)
(http://www.cfm.va.gov/til/) including but not limited to:
a. VA PG-18-01, Master Construction Specifications
b. VA PG-18-03, VA Design and Construction Procedures
c. VA PG-18-04, Standard Details
d. VA PG-18-05, Equipment Guide List
e. VA PG-18-09, Planning Criteria for Medical Facilities
f. VA PG-18-13, Barrier Free Design Handbook (2017)
g. VA PG-18-14, Room Finishes, Door & Hardware Schedule (2017)
h. VA PG-18-15, Minimum Requirements for A/E Submissions
2. International Building Code (IBC) (Only when specifically referenced in VA Design
Documents, see notes below).
3. NFPA 101 Life Safety Code, 2018 Edition (see notes below).
4. NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900.
5. Occupational, Safety and Health Administration (OSHA) Standards.
6. VA Seismic Design Requirements, H-18-8.
7. National Electrical Code (NEC).
8. International Plumbing Code (IPC).
9. Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13).
10. Energy policy Act of 2005 (EP Act).
11. DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.
12. Federal Leadership in High Performance and Sustainable Buildings: Memorandum of
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Understanding (MOU).
13. Executive Order 13423: Strengthening Federal Environmental, Energy, and
Transportation Management.
14. The Provisions for Construction and Safety Signs. Stated in the General Requirements
Section 01010 of the VA Master Construction Specification.
15. Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2004.
16. Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.
B. Local Codes: As an agency of the federal government, VA is not subject to local imposition of code enforcement procedures (drawing reviews, building permits, inspections, fees, etc.). VA must function as the Authority Having Jurisdiction (AHJ) and thus has the responsibility to guard public health and safety through enforcing its adopted codes. However, local authorities should be notified about planned projects and given opportunity to review drawings provided that VA does not pay for review or inspection fees.
C. Notes:
1. NFPA 101 primarily addresses life safety and fire protection features while the IBC addresses a wide range of considerations, including, but not limited to, structural strength, seismic stability, sanitation, adequate light and ventilation, and energy conservation. VA buildings must meet the requirements of NFPA 101, and documents referenced by NFPA
101 in order to comply with the accreditation requirements of The Joint Commission.
Therefore, designs shall comply with the requirements of the latest edition of NFPA 101 and documents referenced therein.
Design features not addressed by NFPA 101 or documents referenced therein shall comply with the requirements of the latest edition of the IBC or as otherwise addressed in the VA Program Guide. For design features that are addressed by both the IBC as well as
NFPA 101 or a document referenced by NFPA 101, the requirements of NFPA 101 or the document referenced by NFPA 101 shall be used exclusively (this applies even if the IBC requirements are different).
2. Should a conflict exist between VA requirements and VA adopted nationally recognized codes and standards, the conflict shall be brought to the attention of VA. The resolution of the conflict shall be made by the authority having jurisdiction for VA to ensure a consistency system wide.
D. Construction Type Classification: Type II (222). The minimum fire rating for all load bearing structural elements is 2 hrs.
2.2 NFPA 101 BUILDING CODE DESIGN CRITERIA
A. Healthcare:
1. 6.1.5 Health Care Occupancy
2. Shall comply with Chapter 19 “Existing Health Care Occupancies”
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
a. (19.1.1.1.1) The requirements of this chapter shall apply to existing buildings or portions thereof used as health care occupancies.
b. (19.1.1.1.5) The health care facilities regulated by this chapter shall be those that provide sleeping accommodations for their occupants and are occupied by persons who are mostly incapable of self-preservation because of age, because of physical or mental disability, or because of security measures not under the occupants’ control.
c. (19.1.1.1.9) The requirements of this chapter shall apply based on the assumption that staff is available in all patient-occupied areas to perform certain emergency control functions as required in other paragraphs of this chapter.
d. (19.1.1.4.3.1) For purposes of the provisions of this chapter, the following shall apply:
1) A minor rehabilitation shall involve the modification of not more than 50 percent, and not more than 4,500 sf, of the area of the smoke compartment.
B. Fire Suppression:
1. The entire building is protected throughout by an approved, supervised automatic sprinkler system in accordance with Section 9.7.
C. Means of Egress (Sections 7 and 18)
1. Means of egress will be minimally affected by this project. GC will need to implement an interim life safety plan.
D. Interior Finishes (Sections 18 and 10.2)
1. Interior finished will be minimally affected by this project and limited to required overhead demolition to access mechanical and electrical systems.
E. Extinguishing Requirements
1. (19.3.5.1)The existing fire sprinkler system will remain. Minor modifications to the system may be required to remove the existing AHUs and install the new AHUs and make changes to ductwork systems.
2. (19.3.5.12) the locations of existing portable fire extinguishers shall not be affected by this project.
F. Smoke Barriers
a. (19.3.7.3) No modifications to existing smoke barriers shall be required as part of this project. Any new penetrations of existing smoke barrier will be constructed to maintain the fire and smoke rating of the barrier using a listed assembly.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 3.0
SITE DEVELOPMENT
3.1 SITE DEVELOPMENT EVALUATION
A. Analysis of Site:
1. The building site is not affected by this renovation project.
B. Circulation Study:
1. The number of users and staff will not change as a result of this project. Work area will be vacated prior to start of construction. Therefore, a circulation study was not conducted.
C. Parking Analysis:
1. The number of users and staff will not change as a result of this project. Therefore, a parking analysis was not conducted.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 4.0
ARCHITECTURAL
4.1 BUILDING EXTERIOR EVALUATION
A. General Description:
1. Modifications to the building exterior are not anticipated as part of this project.
4.2 BUILDING INTERIOR EVALUATION
A. General Description:
1. Modifications to the building interior are minimum and limited to restoring ceiling post demolition to match their original construction.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 5.0
INTERIOR DESIGN
5.1 INTERIOR DESIGN DEVELOPMENT
A. General Description:
1. Modifications to existing interior finished are limited to restoring the existing to their original design post construction.
2. Any damages or changes to finishes will be refinished to match existing finishes.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 6.0
STRUCTURAL
6.1 SCOPE
It is not currently anticipated that any structural services will be required as part of this project.
1. Occupancy Category IV.
2. Seismic Design Category D.
3. Site Class D, Ss = 0.361g, S1 = 0.07g, Bbs = 0.364g, SD1 = 0.112g.
4. IP = 1.5.
[End of Chapter]
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 7.0
MECHANICAL
MECHANICAL
7.1 OVERVIEW
This project will replace the existing air handling units serving the sixth floor wards, 6J and 6K.
Previous projects have modified the existing air handling units and wards 6J and 6K are experiencing temperature and humidity issues. The hospital is reclassifying wards 6J and 6K as
“COVID” wings, and require the patient rooms to be negative pressure relative to adjacent corridors. The SOW has directions that the units shall be 100% outdoor air units.
7.2 CODES AND STANDARDS
The following is a list of VA and other design and construction criteria that shall be utilized by the
A/E for the development of the design of this project:
a. PG-18-1, Master Construction Specification Index
b. PG-18-3, Design and Construction Procedures
c. PG-18-4, Standard Details and CAD Standards
d. PG-18-10, HVAC Design Manual – 2017
e. ASHRAE Standard 62.1 – 2016
f. ASHRAE Standard 170 – 2013
7.3 MECHANICAL DESIGN APPROACH
Each area will be analyzed to meet the design approach requirements in the DVA, “HVAC Design
Manual” dated November 2017.
EXISTING CONDITIONS:
The existing variable air volume air handling units serving 6J and 6K will be removed from
Mechanical Room, 6K112. Existing supply, outdoor and exhaust air ducts within the mechanical room which are attached to the existing air handling units will be removed. Existing duct-mounted and roof-mounted exhaust air fans serving wings 6J and 6K will be removed and their corresponding roof openings will be reused by new exhaust air ducts. The existing 4” chilled water pipe will be removed and replaced with a 6” chilled water pipe inside the mechanical room. New chilled water isolation gate valves will be provided. Existing 2” steam piping and corresponding steam condensate pipe riser shall remain and be reused. Existing outdoor air louver located in the mechanical room will be reused. Existing hot water risers and associated piping will remain and serve the VAV boxes located throughout wings 6J and 6K.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
PROPOSED SYSTEM:
New constant volume air-handling units with 100% outdoor air, chilled water cooling coils, steam heating coils will be provided to serve wings 6J and 6K. New AHU-6J will be capable of providing
22,000 cfm of supply air to wing 6J and new AHU-6K will be capable of providing 18,000 cfm of supply air to wing 6K. Outdoor air will be ducted from the existing outdoor air louver on the east wall of mechanical room 6K112. Exhaust air from the sixth floor will be ducted to the mechanical room and exhausted up through the roof through existing roof openings. HEPA filters will be provided in the air handling units and in the exhaust air duct system upstream of the exhaust fans in the mechanical room. Chilled water coils will have new insulated piping that connects to existing chilled water risers. Steam preheat coils will have new insulated piping that connects to existing steam risers. Supply and exhaust fan sections will be comprised of fan arrays to reduce air handling unit footprint size. Supply and exhaust fans will utilize variable frequency drives. New air handling units shall be provided with freeze protection. The new air-handling unit DDC controllers shall be compatible with the existing building EMCS (Johnson Controls Metasys System).
AHU OPTIONS:
Several air-handling unit types were evaluated; AHUs without energy recovery, AHUs with flat plate heat exchangers, and air-handling units with a run-around coils.
Air handling units without energy recovery do not have the capability to mix air streams and are small enough to fit in the existing mechanical room. However, cooling coil and heating coil capacities increased because of the lack of preconditioning the outdoor air.
Air handling units with flat plate heat exchangers reduce the possibility of mixing air streams, but the size of the units makes it prohibitive to use inside the existing mechanical room.
Air handling units with run-around coils can fit within the existing mechanical room, but only affect sensible loads. The size of the coils that would be proposed in the outdoor air intake and exhaust air stream are physically too large to be installed in the existing mechanical room. Smaller coils would not transfer an adequate amount of heat to be feasible.
The existing mechanical room size, availability of chilled water capacity, and water flow influenced our decision to choose air-handling units without energy recovery. The units will be providing air to areas with airborne infectious diseases, therefore any energy recovery that introduced the potential for air leakage was prohibited. The VA Design Guide also prohibited Energy Recovery
Wheels for isolation or airborne infectious rooms.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
The existing air-handling units were VAV type units. The new design for the patient rooms will provide a constant 12 air changes to those rooms. The amount of variable airflow will be limited to approximately 20-30% of the designed supply air flow. Varying the amount of supply airflow could also impact the amount of exhaust air in other parts of wings 6J and 6K, which could put the negative pressure conditions for the patient rooms in jeopardy. After discussing these issues with the VA, it was decided that a constant volume air system would be a better fit to achieve the negative pressure requirements for the patient rooms.
AIR DISTRIBUTION:
A test and balance of air handling units and associated supply, return, and exhaust air ducts serving wings 6J and JK shall be performed prior to any construction. The air distribution system will be balanced in accordance with original construction airflow rates. There is a concern that the previous renovation to the air handling units may restrict airflow to all the rooms, and balancing them to those airflow rates will lead to heating/cooling issues after this renovation.
PATIENT ROOMS:
Patient rooms will be provided with a minimum of 12 air changes per hour of conditioned outdoor air. Exhaust air will be pulled from the patient rooms to maintain a negative pressure to the adjacent corridor. Exhaust air duct above some of the one-bedroom and two-bedroom patient rooms shall be removed and replaced with appropriately sized ductwork and accessories. Ceilings in those areas will need to be removed and replaced to accomplish the work. Existing VAV boxes serving the patient rooms will be replaced with new appropriately sized VAV boxes. New VAV boxes shall have hot water reheat coils. Existing ceiling diffusers and grilles will be evaluated if they can be reused. Each VAV box shall be controlled by an existing corresponding wall-mounted temperature sensor.
PROPOSED COST DEDUCTIONS:
1. Only install new controls, valves, and accessories for new VAV terminal units.
2. Select less efficient roof-mounted exhaust fans that does not incorporate plume discharge heights in the design. Use different type of exhaust fan, provide new stack and support accessories.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Section 8.0
PLUMBING
8.1 CODES AND STANDARDS
The following is a list of VA and other design and construction criteria that shall be utilized by the
A/E for the development of the design of this project:
a. PG-18-1, Master Construction Specification Index
b. PG-18-3, Design and Construction
c. VA Plumbing Design Manual
d. International Codes
e. NFPA 99
8.2 EXISTING PLUMBING SYSTEM
The existing plumbing system will remain without modifications.
8.3 DESIGN APPROCH
Not used.
8.4 WATER USAGE
Not used.
8.5 PROPOSED PLUMBING FIXTURES
Not used.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
CHAPTER 9.0
ELECTRICAL
9.1 OVERVIEW
The project Scope of Work is to renovate existing air handling systems. The electrical scope of work includes demolition of existing and replacement of electrical connections to air handling equipment including, but not be limited to, power and power distribution. Design will be in accordance with VA-adopted codes and standards including VA Directives, Design Manuals, Master Construction Specifications, Design Criteria and other Guidance on the Technical
Information Library.
9.2 CODES AND STANDARDS
The following is a list of VA and other design and construction criteria that shall be utilized by the
A/E for the development of the design of this project:
• PG-18-1, Master Construction Specification Index
• PG-18-3, Design and Construction Procedures
• PG-18-10, VA Design Manuals
• ANSI C2, National Electrical Safety Code
• IEEE 141, Recommended Practice for Electrical Power and Distribution for Industrial
Plants
• IEEE 142, Recommended Practice for Grounding of Industrial and Commercial Power
Systems
• NFPA 70, National Electrical Code
• IES Handbook, Illuminating Engineering Society Handbook
• ANSI/TIA/EIA-568-B, Commercial Building Telecom Cabling Standard
• ANSI/TIA/EIA-569-B, Commercial Building Standard for Telecom Pathways and Space
9.3 ELECTRICAL DESIGN APPROACH (POWER)
Electrical evaluation and design will be provided to support
All power wiring will be copper with type with THHN/THWN insulation. Conductors #10 and smaller will be solid, conductors #8 and larger will be stranded. Minimum size conductor will be #12 AWG for power circuits and #14 AWG for control wiring. An insulated equipment grounding conductor will be provided for all circuits.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
Existing circuits serving replaced air handling equipment on the 6th floor will be replaced.
1. New disconnect switches, combination starters, variable frequency controllers will be designed.
2. Removed devices will be turned over to the Owner.
3. New 480 Volt, 3-phase circuits will be designed.
4. The existing electrical equipment in the mechanical room is fed from an existing branch panel “6KM” and taps off of a circuit in a wireway. The panel and wireway circuit are each fed from separate 200/3 fused plug-in disconnects on a 480/277V, 600A bus duct in the electrical room. The existing bus duct supplies the hospital equipment branch essential systems and is backed up by generators at the Central Plant Building 203.
5. The existing branch panel serving the mechanical space does not have capacity to support the new equipment. A new branch panel will be designed. A new feeder to the new panel will be designed. The feeder will extend to the existing source.
6. The capacity of the existing equipment branch bus duct is insufficient to accommodate the new loads. By observing the existing meters in the first floor main electrical room, the peak load on the equipment branch circuit is 420KVA. According to NEC 220.87, before adding new load to the circuit we need to take 1.25% of the peak load and subtract that amount from the busway capacity. The remaining capacity is available for use in new circuits. For this busway, 420 x 1.25 = 525 KVA, 525 / 0.831 = 632 Amps.
The existing equipment branch busway is only rated for 600 Amps. Therefore, there is no available capacity for the additional loads on this busway. Adding load to this busway is not allowed by code.
7. The equipment branch busway is fed from a 600 Amp circuit breaker in the first floor main electrical room. This circuit breaker will be replaced with a 1000 Amp circuit breaker. The existing busway will be disconnected and a new feeder from the new circuit breaker will be routed to a new 1200 Amp distribution panelboard with two 600 Amp circuit breakers. One of the new 600 Amp circuit breakers will feed the existing 600 Amp equipment branch busway. The other 600 Amp circuit breaker will feed the new panel “6KM”.
8. The existing equipment branch feeder from the Central Plant Building 203 is indicated to be 3 sets of 500 KCMIL conductors. These conductors are capable of providing 1140 Amps and were oversized to accommodate voltage drop. The estimated new loads on the circuit is 593 KVA. The length of the circuit is approximately 500 lf. The voltage drop on the circuit at full load is 1.9%.
9. The Equipment Branch ATS #3 in the Central Plant Building 203 is rated at 1000 Amps.
10. The equipment branch circuit breaker for the hospital building is only rated at 600 Amps. This circuit breaker will be replaced with a 1000 Amp breaker.
11. Space appears to be available in the existing electrical equipment to accommodate the new circuit breakers. However, where circuit breakers in existing switchboards are being replaced, the Contractor still need to field verify the available space in the existing equipment.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
9.4 ELECTRICAL DESIGN APPROACH (LIGHTING)
Lighting design will consist or relocation of existing lighting to accommodate removal and replacement of mechanical systems.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
CHAPTER 10.0
FIRE PROTECTION
10.1 CODES AND STANDARDS
The following is a list of VA and other design and construction criteria that shall be utilized by the
A/E for the development of the design of this project:
• PG-18-1, Master Construction Specification Index
• PG-18-3, Design and Construction
• VA Fire Protection Design Manual
• International Codes
• NFPA 13, 72 101
10.2 EXISTING CONDITIONS
The existing Building 1 and 2 areas proposed for the renovation are fully sprinklered in accordance with the requirements of NFPA 13. The existing fire suppression system and fire alarm system will be impaired in the work area. All existing sprinkler heads within the work area will be protected while work is performed. If necessary, temporary protection will be provided in the work area to mitigate outages that exceed a work shift.
10.3 DESIGN APPROACH
Existing sprinkler heads will remain in place and be protected while work is completed.
Modification of the existing sprinkler system on level 6 in Mechanical Room 6K112 included but not limited to relocating sprinkler heads and branch piping as necessary for changes to existing ductwork and air handling equipment. Modifications include coordinated shutdown and drainage of the sprinkler system serving level 6.
10.4 EXISTING EGRESS PATHS
Existing egress path will not be disrupted during this project.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
CHAPTER 11.0
ASBESTOS
11.1 SCOPE
The A/E design team has requested but not yet received any HazMat survey information from the VAMC and does not anticipate this to be within its scope of work.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
CHAPTER 12.0
CRITICAL PATH METHOD (CPM)
12.1 PHASING NARRATIVE
1. It is currently anticipated that the work will proceed with a minimum of two phases, one for each ward.
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
CHAPTER 13.0
COST ESTIMATE
13.1 BASE PROJECT
GENERAL DESCRIPTION: VA estimated construction contract cost to be $1.3M. Latest cost estimation performed per OCMI and dated 13 October 2021 $1,974,120:
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
APPENDIX A1
QUALITY ASSURANCE / QUALITY CONTROL
PLAN
A1.1 QUALITY ASSURANCE / QUALITY CONTROL
OVERVIEW
The Construction Specifications Institute (CSI) defines quality assurance (QA) during design as “the procedures for guarding against defects before and during the execution of the work.” Quality Control
(QC) during design is defined by CSI as “the procedures for evaluating completed activities and elements of the design for conformance with requirements.” CB Design follows basic principles we have developed over many years of practicing architecture.
Do It Right the First Time
• Quality is achieved not by merely finding mistakes and correcting them, but by refining the process over time to prevent mistakes from happening in the first place. Our Quality Control committee meets regularly to discuss issues, procedures and guidelines to improve our process.
Never Make the Same Mistake Twice
• Before drawings are released, we use checklists composed of issues that have been addressed and resolved on similar projects. At the project kick off we gather your lessons learned and integrate them into our QA/QC checklist, so we don’t repeat mistakes of pervious teams.
Two Heads Are Better Than One
• At the completion of each phase of the work, the drawings and specifications are reviewed by our Design Review Committee. A fresh set of eye can uncover issues which need further clarification.
Execution
• All team members do internal QA/QC checks before sending their drawings and specifications to CBDG for overall coordination and final QC check.
• CBDG maintains and adds to a QC Manual that is shared between team members. This has been developed over our many years of experience.
QUALITY ASSURANCE
QA starts with hiring qualified staff and continually training staff to be current with the latest design and construction technologies. For project specific QA, the first step is to review and understand the owner’s program and seek clarification on any ambiguities.
Other QA processes include:
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
• Assigning a Project Manager/Architect throughout the lifecycle of the project
• Reviewing codes
• Reviewing regulatory agency regulations, ordinances, standards
• Reviewing owner’s design guidelines
• Participating in regular coordination and progress meetings
• Reviewing owner provided information
• Reviewing consultant provided information
• Teaming with qualified consultants
QUALITY CONTROL
CB Design implements several quality processes at each phase of the design that fall within the area of
QC, including:
• Principal level involvement throughout each phase of the project
• Reviewing cost estimates to ensure project design aligns with budget
• Internal reviews of design and design documents
• Code plan reviews by each discipline lead
• Using AIA Document D200 – Project Checklist
• Using project specific checklist based on owner’s requirements (Supplement B to SF 252)
[End of Appendix A1]
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
APPENDIX A2
SCHEDULE
A2.1 UPDATED PROJECT DESIGN SCHEDULE
[End of Appendix A2]
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
APPENDIX A3
SPECIFICATION TOC
A3.1 PROJECT SPECIFICATIONS TABLE OF CONTENTS
The following is a list of anticipated specification sections that our team will use for this project.
Specifications will be obtained from the VA Technical Information Library (TIL) and will be tailored for the requirements of the Manhattan VAMC bathroom / door hardware / signage renovation.
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01 33 23 Shop Drawings, Product Data, and Samples
01 35 26 Safety Requirements 01 42 19 Reference Standards 01 45.00.10 .20 Quality Control 01 45 29 Testing Laboratory Services 01 45 35 Special Inspections 01 58 16 Temporary Interior Signage 01 17 19 Construction Waste Management 01 91 00 General Commissioning Requirements
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition
02 82 11 Traditional Asbestos Abatement 02 83 33.13 Lead-Based Paint Removal and Disposal
DIVISION 03 – CONCRETE:
03 30 53 (Short-Form) Cast-in-Place Concrete
DIVISION 04 – MASONRY: NOT USED
DIVISION 05 – METALS: NOT USED
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES: NOT USED
DIVISION 07 - THERMAL AND MOISTURE PROTECTION:
07 84 00 Firestopping 07 92 00 Joint Sealants
DIVISION 09 – FINISHES: NOT USED
OLIN E. TEAGUE VAMC: A/E Design Services to Replace AHUs BLDG. 204; Ward 6J-6K
DIVISION 10 – SPECIALTIES: NOT USED
DIVISION 11 – EQUIPMENT: NOT USED
DIVISION 12 – FURNISHINGS: NOT USED
DIVISION 13 - SPECIAL CONSTRUCTION: NOT USED
DIVISION 21 – FIRE PROTECTION: NOT USED
DIVISION 22 – PLUMBING: NOT USED
DIVISION 23 – HVAC
23 05 11 Common Work Results for HVAC 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 08 00 Commissioning of HVAC Systems
23 09 23 Direct-Digital Control System for HVAC 23 21 13 Hydronic Piping 23 21 23 Hydronic Pumps 23 22 13 Steam and Condensate Heating Piping 23 31 00 HVAC Ducts and Casings 23 36 00 Air Terminal Units 23 37 00 Air Outlets and Inlets 23 72 00 Air-to-Air Energy Recovery Equipment 23 73 00 Indoor Central-Station Air-Handling Units
DIVISION 26 - ELECTRICAL
26 05 11 Requirements for Electrical Installations 26 05 19 Low-Voltage Electrical Power Conductors and Cables
26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceways and Boxes for Electrical Systems 26 29 21 Enclosed Switches and Circuit Breakers
DIVISION 27 – COMMUNICATIONS: NOT USED
DIVISION 32 – SITEWORK: NOT USED
[End of Appendix A3]