Replace AHU COVID Wards 6J-6K Bid Set Drawings updated 1-19-22.pdf
PDF 12 MB Posted
- Solicitation number
- 36C25722B0029
About this file
This document outlines a federal contract opportunity to replace air handling units in two COVID wards at a Veterans Affairs medical center. The solicitation number is 36C25722B0029 and seeks to replace the air handling units in Wards 6J and 6K at the Veterans Affairs medical center in Temple, Texas, under project number 674-20-019. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 17. Offerors should provide design and construction services to replace the existing air handling units with new energy efficient units and ensure proper ventilation is maintained in the wards housing COVID-19 patients. The response due date is not specified but the work is expected to be completed by the end of 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S04 Pre Bid Site Visit Sign in Sheet.pdf | ||
| Asbestos Report Copy of Bldg 204 Temple.xls | XLS spreadsheet | |
| 36C25722B0029 0001.docx | DOCX document | |
| Asbestos Report Copy of Bldg 205 Temple.xls | XLS spreadsheet | |
| Asbstos Report Copy of Bldg 163 Temple.xls | XLS spreadsheet | |
| 36C25722B0029_2.docx | DOCX document | |
| Replace AHU COVID Wards 6J-6K Bid Set Specifications update 1-19-22.pdf | ||
| Replace AHU COVID Wards 6J-6k Bid Set Narrative update 1-19-22.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
Olin E. Teague VA Medical Center 1901 Veterans Memorial Drive Temple, TX 76504
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
12/20/2021
674-20-01
JSAL
A/E DESIGN SERVICES TO
REPLACE AHUs BLDG. 204
(COVID UNIT, WARDS 6J-6K)
100% BID SET SUBMISSION
COVER SHEET
GI100
-2
-0
G I1
.p d f
Department of Veterans Affairs
A/E DESIGN SERVICES TO REPLACE AHUs BLDG 204
(COVID UNIT, WARDS 6J-6K)
OLIN E. TEAGUE VA MEDICAL CENTER
1901 VETERANS MEMORIAL DRIVE
TEMPLE, TX 76504
LOCATION MAP DRAWING LIST
Medical Center Director
Director of Facility Management Service
Medical Director
Project COR
Project CO
Infection Control
Safety Officer
APPROVALS
GENERAL INFORMATION
GI100 COVER SHEET
GI200 SYMBOLS, ABBREVIATIONS & NOTES
GI300 GENERAL NOTES
GENERAL CONTRACT
GC301 ICRA PLAN - AREA J
GC302 ICRA PLAN - AREA K
GC401 LIFE SAFETY PLAN & CODE STUDY
ARCHITECTURAL
AD701 6TH FLOOR REFLECTED CEILING DEMOLITION PLAN - AREA J
AD702 6TH FLOOR REFLECTED CEILING DEMOLITION PLAN - AREA K
AE701 6TH FLOOR REFLECTED CEILING RENOVATION PLAN - AREA J
AE702 6TH FLOOR REFLECTED CEILING RENOVATION PLAN - AREA K
MECHANICAL
M-001 HVAC GENERAL NOTES AND DESIGN DATA
M-002 HVAC ABBREVIATIONS AND SYMBOLS
MD-101 SIXTH FLOOR HVAC PLAN - DEMOLITION PLAN - WING 6J
MD-102 SIXTH FLOOR HVAC PLAN - DEMOLITION PLAN - WING 6K
MD-103 SIXTH FLOOR HVAC PLAN - DEMOLITION PLAN - MECHANICAL ROOM 6K112
MD-104 HVAC PLAN - DEMOLITION PLAN- ROOF
M-101 SIXTH FLOOR HVAC PLAN - WING 6J
M-102 SIXTH FLOOR HVAC PLAN - WING 6K
M-103 SIXTH FLOOR HVAC PLAN - MECHANICAL ROOM 6K112
M-104 HVAC PLAN - ROOF
M-310 HVAC SECTIONS
M-501 HVAC DETAILS
M-502 HVAC DETAILS
M-601 HVAC SCHEDULES
M-602 HVAC SCHEDULES
M-603 HVAC SCHEDULES
M-701 CONTROL DIAGRAMS
ELECTRICAL
E-001 ELECTRICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES
E-101 6TH FLOOR ELECTRICAL PLAN - AREA J
E-102 6TH FLOOR ELECTRICAL PLAN - AREA K
E-200 ENLARGED ELECTRICAL PLANS
PROJECT DIRECTORY
CONTRACTING OFFICER REPRESENTATIVE (COR)
Nelson Gonzalez
Olin E. Teague VAMC 1901 Veterans Memorial Dr.
Temple, TX 76504
PHONE: (254) 743-7971
Nelson.gonzalez3@va.gov
ARCHITECT
CB DESIGN GROUP
421 King Street Suite 301
PHONE: (703) 772-4213
Wes Bridges wbridges@cbdg-ae.com
MEP/FP/STRUCTURAL ENGINEER
HUITT-ZOLLARS INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102
PHONE: (817) 335-3000
Joel Colwell jcolwell@Huitt-Zollars.com
CONTRACTING OFFICER (CO)
Lynn Pettit
Department of Veterans Affairs | Contracting
VISN 17 NCO
2002 Scott Blvd.
Temple, TX 76504
PHONE: (254) 899-6001
Lynn.Pettit@va.gov
N.T.S.
100% BID SET SUBMISSION
ALongeau Text Box
WOOD
ALUMINUM
STEEL
EARTH
CONCRETE MASONRY UNITS
RIGID INSULATION
CONCRETE
EXISTING CONSTRUCTION TO REMAIN
EXISTING CONSTRUCTION TO BE REMOVED
BRICK
WOOD-FINISHED
WOOD ROUGH
PLYWOOD
GYPSUM - PLASTER
ACOUSTIC TILE
CAST STONE
ALL METALS - SMALL SCALE
GLASS - LARGE SCALE
BATT INSULATION
CERAMIC TILE
CARPET
GRAVEL
CENTER LINE
DETAIL INDICATOR
DETAIL INDICATIOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DIMENSION LINE
NEW DOOR OPENING / BORROWED LIGHT
INDENTIFIER
DRAWING BLOCK TITLE, TYPICAL
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
ELEVATION INDICATOR, INTERIOR, SINGLE VIEW
SECTION INDICATOR
TYPICAL DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
COLUMN GRID
KEYNOTE
WALL OR PARTITION TYPE
FIRE EXTINGUISHER CABINET
NORTH ARROW
FEC
A
DETAIL NUMBER
SHEET WHERE
DRAWN
XXxxx
XXxxx
X
DRAWING TITLE
SCALE: 1 1/2" = 1'-0"
1 3/16"
D2
XX-XX
XXxxx
XXxxx
CL
XXxxx x'-x" VERTICAL HEIGHT INDICATOR
REVISION
REVISION CLOUD
NORTH
BREAK LINE
X
DEMOLITION KEYNOTE
NEW ROOM NAME AND NUMBERCORRIDOR
C2
XX
A
XXxxx
D
BC
COLUMN NUMBER
COLUMN LETTER
XXxxx
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
ELEVATION NUMBER
SHEET WHERE
DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL NUMBER
SHEET WHERE DRAWN
WALL MOUNTED FIRE EXTINGUISHERFE
XX
SHEET WHERE
DRAWN
ELEVATION NUMBER
& AND
@ AT
C CENTERLINE
# NUMBER
AB ANCHOR BOLT
ABV ABOVE
ACT ACOUSTIC CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH
DISABILITIES ACT
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALUM ALUMINUM
ALT ALTERNATE
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AUTO AUTOMATIC
AVG AVERAGE
BD BOARD
BLDG BUILDING
BLK BLOCK
BM BEAM
BOT BOTTOM
BRG BEARING
BEL BELOW
BR BUMPER RAIL
BRK BRICK
CAB CABINET
CB CATCH BASIN
CEM CEMENT
CCT CUBICLE CURTAIN TRACK
CG CORNER GUARD
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CT CERAMIC TILE
CLG CEILING
CL CLOSET
COL COLUMN
CONC CONCRETE
CONF CONFERENCE
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CU CUBIC
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DOOR OPENING
DOZ DOZEN
DP DAMPPROOFING
DR DOOR
DWG DRAWING
DWGS DRAWINGS
DWR DRAWER
E EAST
EA EXHAUST AIR, EACH
EL ELEVATION
ELEV ELEVATION
ELEC ELECTRICAL
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
EP ELECTRICAL PANELBOARD
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXP EXPANSION
EJ EXPANSION JOINT
EXIST EXISTING
EXT EXTERIOR
FA FIRE ALARM
FB FACE BRICK
FD FLOOR DRAIN
FDC FIRE DEPARTMENT
CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FACE
FHC FIRE HOSE CABINET
FIN FINISH
FLR FLOOR
FLUOR FLUORESCENT
FO __ FACE OF __
FOC FACE OF CONCRETE
FOS FACE OF STUD
FOW FACE OF WALL
FPRF FIREPROOF(ING)
FR FIRE RATING, FRAME
FRMG FRAMING
FS FULL SIZE
FT FOOT OR FEET
FTG FOOTING
FUR FURRING
FUT FUTURE
GC GENERAL CONTRACTOR
GA GAUGE
GAL GALLON
GALV GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GL GLASS
GND GROUND
GR GRADE
GWB GYPSUM WALLBOARD
GYP BD GYPSUM WALLBOARD
HB HOSE BIBB
HC HOLLOW CORE
HD HEAD
HDWR HARDWARE
HDWD HARDWOOD
HT HEIGHT
HNDRL HANDRAIL
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HMF HOLLOW METAL FRAME
HR HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HP HIGH POINT
HR HOUR
HVAC HEATING, VENTILATION, AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE
DIAMETER / DIMENSION
IN INCH
INCL INDLUDE(D)
INSUL INSULATION
INT INTERIOR
INV INVERT
JAN JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAM LAMINATE
LAV LAVATORY
LBS POUND
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LIQ LIQUID
LKR LOCKER
LG LONG
LL LEAD LINED
LLV LONG LEG VERTICAL
LP LOW POINT
LRG LARGE
LT LIGHT
LT WT LIGHTWEIGHT
LVR LOUVER
MATL MATERIAL
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MTL METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MP MOP PLATE
MTD MOUNTED
N NORTH
NA NOT APPLICABLE
NEC NATIONAL ELECTRICAL CODE
NEG NEGATIVE
NFC NATIONAL FIRE CODE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER / DIMENSION
OFF OFFICE
OH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OH OVERHEAD
OZ OUNCE
PAV PAVING
PC PRECAST CONCRETE
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PLBG PLUMBING
PMF PREMOLDED FILLER
PR PAIR
PT POINT
PTN PARTITION
QT QUARRY TILE
R RADIUS, RISER
RA RETURN AIR
RAD RADIUS
RB RESILIENT BASE, RUBBER
BASE
RD ROOF DRAIN
RL ROOF LEADER
REF REFERENCE
REFR REFRIGERATOR
REQ'D REQUIRED
REV REVISION
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SA SUPPLY AIR
SAN SANITARY
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SH SPRINKLER HEAD
SHT SHEET
SIM SIMILAR
SM SMOKE
SPEC SPECIFICATION
SPKR SPEAKER
SQ SQUARE
STA STATION
STD STANDARD
STO STORAGE
STL STEEL
SS STAINLESS STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TEL TELEPHONE
TEMP TEMPERED
T&G TONGUE AND GROOVE
THK THICK
TOC TOP OF CONCRETE
TOP TOP OF PAVEMENT
TOS TOP OF STEEL
TOW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
VB BAPOR BARRIER
VERT VERTICAL
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VTR VET THRU ROOF
W WEST
W/ WITH
WD WOOD
W/O WITHOUT
WP WATERPROOF
WT WEIGHT
WWF WELDED WIRE FRAME
NOTE: ALL ABBREVIATIONS SHOWN
MAY NOT BE USED ON THIS PROJECT.
CERTAIN COMMON ABBREVIATIONS
MAY NOT BE SHOWN.
L
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
Olin E. Teague VA Medical Center 1901 Veterans Memorial Drive Temple, TX 76504
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
12/20/2021
674-20-01
JSAL
A/E DESIGN SERVICES TO
REPLACE AHUs BLDG. 204
(COVID UNIT, WARDS 6J-6K)
100% BID SET SUBMISSION
SYMBOLS, ABBREVIATIONS & NOTES
GI200
-2
-0
G I2
.p d f
SYMBOLS OF MATERIALS DRAWING KEY ARCHITECTURAL ABBREVIATIONS
ALongeau
G1 ITEMS AND CONDITIONS NOTED, DETAILED, OR OTHERWISE IDENTIFIED ON DRAWINGS ARE APPLICABLE AND BINDING TO SIMILAR CONDITIONS ON ALL DRAWINGS. FOR CONDITIONS NOT NOTED OR NOT DETAILED, PROVIDE MATERIALS OF EQUAL QUALITY AND PERFORMANCE TO OTHER SIMILAR
CONDITIONS ON THE JOB.
G2 SECTIONS SHOWN ARE INTENDED TO SHOW THE SPECIFIC CONSTRUCTION WHERE INDEXED AS WELL AS ESTABLISH THE GENERAL CONSTRUCTION DETAILS FOR SECTIONS THROUGHOUT THE PROJECT WHICH DO NOT HAVE SPECIFIC SECTIONS DRAWN. THE MOST SIMILAR SECTION SHALL BE ADAPTED TO ANY SECTION NOT DETAILED. ANY SPECIFIC QUESTIONS CONCERNING CONSTRUCTION NOT ADEQUATELY COVERED BY THE ABOVE
SHOULD BE DIRECTED TO THE ARCHITECT DURING THE BID PERIOD.
G3 ALL CONSTRUCTION IS TO BE ASSUMED NEW AND FURNISHED AND INSTALLED BY THE CONTRACTOR, UNLESS NOTED OTHERWISE.
G4 REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR NOTED PERTAINING TO THEIR PARTICULAR TRAFES. COORDINATE THE WORK OF ALL TRADES AND REPORT TO THE ARCHITECT ANY PERCEIVED DISCREPENCIES. CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING SEQUENCES OF CONSTRUCTION AND MEANS AND METHODS FOR HOW TO PERFORM THE WORK REQUIRED IN THE CONTRACT DOCUMENTS. ALL CONTRACTORS SHALL CAREFULLY REVIEW ALL EXISTING CONDITIONS AND DETERMINE THE MOST FEASIBLE SEQUENCE FOR PERFORMING THE NEW WORK SO AS TO AVOID
CONFLICTS IN THE FIELD.
G5 ANY AREAS OR SPACES NOT CLEARLY DEFINED OR INDICATED BY NOTED SHALL BE OF SAME MATERIAL AND FINISH AS AREAS OF SIMILAR USE OR
FUNCTION ELSEWHERE IN THE BUILDING.
G6 WALL AND CEILING FINISHES SHALL INCLUDE PROJECTIONS, BEAM ENCLOSURES, RECESSES, BULKHEADS, PILASTERS AND
G7 ALL APPURTENANCES BUILT INTO OR THROUGH WALLS, INCLUDING DOORS, WINDOWS, DUCTS, FRAMES, LOUVRES, GRILLES, MECHANICAL WORK, ETC., SHALL FIT SNUGLY AND BE THOROUGHLY SEALED AROUND PERIMETERS. INSTALL FIRE SEALANT AROUND ALL PENETRATIONS THROUGH FLOORS, FIRE RATED WALLS AND SMOKE PARTITIONS. WORK AT EXTERIOR WALLS SHALL BE FLASHED OR OTHERWISE WATERPROOF SEALED.
G8 FIELD CHECK ROUGH AND/OR FINISHED DIMENSIONS FOR ACCURATE FITTING OF CABINETS, COUNTERS, STOREFRONT, DOORS, FRAMES, FIXTURES, MILLWORK, AND ALL OTHER INSTALLATIONS PRIOR TO SHOP OR FACTORY FABRICATION. PROVIDE AND INSTALL NECESSARY FILLER STRIPS, SCRIBE STRIPS, BASES, CLOSURES, FINISHES AND TRIM TO COMPLETE SUCH INSTALLATIONS. DIMENSIONS OF SUCH INSTALLATIONS SHALL BE CONSIDERED "NOMINAL." CONTRACOTRS SHALL ACCOUNT FOR ALL MANUFACTURER'S REQUIRED TOLERANCES, CLEARANCES AND SHIM SPACE TO ENSURE PROPER
INSTALLATION OF THE NEW WORK.
G9 SEE EQUIPMENT PLANS AND FLOOR PLANS FOR CASEWORK, CABINETS, MILLWORK AND OTHER BUILT-IN ITEMS. COORDINATE WITH MEP DRAWINGS FOR
SINKS, OUTLETS, AND OTHER ITEMS TO BE BUILT INTO SUCH ITEMS.
G10 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS OF DIFFERENT SCALES, CONSULT ARCHITECT FOR CLARIFICATION.
G11 IF A DISCREPANCY APPEARS TO EXIST BETWEEN DRAWINGS AND/OR SPECIFICATIONS, THE MORE STRINGENT (TYPICALLY THE MORE COSTLY) REQUIREMENT SHALL APPLY. ITEMS DESCRIBED ON DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED. CONTRACTOR SHALL BE RESPONSIBLE TO SUBMIT AN RFI TO SEEK CLARIFICATION OF ANY PERCEIVED DISCREPENCY DURING BID PHASE.
G12 WRITTEN INFORMATION ON DRAWINGS TAKES PRECEDENT OVER DRAWING LINES.
G13 IN THE ABSENCE OF A WRITTEN DIMENSION, OR IN CASE OF DOUBT AS TO THE PROPER MEASUREMENT, CONSULT ARCHITECT. DO NOT SCALE DRAWINGS. ASSUMPTIONS MADE, OR ACTIONS TAKEN, BASED ON SCALED DIMENSIONS SHALL BE AT THE CONTRACTOR'S RISK AND ANY RESULTING CORRECTIONS SHALL BE PERFOMRED BY CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G14 EACH CONTRACTOR OR SUB-CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH THE WORK OF OTHER TRADES SHOWN THROUGHOUT THE COMPLETE SET OF CONTRACT DOCUMENTS. CHANGES RESULTING FROM A CONTRACTOR OR SUB-CONTRACTOR'S FAILURE TO OPTAIN AND REVIEW A COMPLETE SET OF CONTRACT DOCUMENTS SHALL BE CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
G15 AT ALL CHANGES IN FLOOR FINISHES, PROVIDE AND INSTALL AN APPROPRIATE TRANSITION STRIP AS SHOWN ON THE DRAWINGS.
G16 CONSULT HVAC AND ELECTRICAL DRAWINGS FOR LOCATIONS AND DESCRIPTIONS OF ACCESS PANELS, LOUVER OPENINGS, VENTILATORS, GRILLES, VALVE CABINETS, FIRE DAMPERS OR OTHER APPURTENANCES AFFECTING WALLS, CEILINGS OR FLOORS AND PROVIDE NECESSARY LINTELS, SUPPORT
OR ANCHORING
G17 ELECTRIC SWITCHES, OUTLETS, THERMOSTATS, CONTROLS, CLOCKS, SPEAKERS, OR OTHER WALL-MOUNTED ACCESSORIES SHALL BE INSTALLED IN LOCATIONS WHICH ARE UNOBSTRUCTED BY CABINETS, COUNTERS, RACKS, MARKER AND TACKBOARDS, FIXTURES, SHELVING OR OTHER FURNISHING OR EQUIPMENT DESIGNATED FOR SPACES SHOWN ON DRAWINGS. ITEMS FOR WALL-MOUNTING ARE NOT TO BE INSTALLED ON, THROUGH, OR INTO, ANY
EQUIPMENT OTHER THAN WALLS, UNLESS SPECIFICALLY NOTED OTHERWISE.
G18 ELECTRICAL OUTLETS, CLOCKS, P.A. SPEAKERS, PULL STATIONS, EXIT SIGNS, OR OTHER DEVICES SHOWN DIAGRAMMATICALLY ON THE ARCHITECTURAL DRAWINGS SERVE TO ALERT CONTRACTORS OF THE PRESENCE OF SUCH DEVICES. CONSULT THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION AND ADVISE ARCHITECT OF ANY PERCEIVED DISCREPENCY BETWEEN ARCHITECTURAL AND ELECTRICAL DRAWINGS REGARDING LOCATION OR TYPE OF
DEVICES SHOWN PRIOR TO PREPARING SUBMITTALS.
G19 ELECTRIC SWITCHES, THERMOSTATS OR OTHER ELECTRONIC CONTROLS IN THE SAME VICINITY SHALL BE MOUNTED AT THE SAME HEIGHT FROM FLOOR
(UNLESS NOTED OTHERWISE) IN A UNIFORM, ORDERLY FASHION.
G20 SUBMITTAL REVIEW - THE CONTRACT DOCUMENTS PROVIDE SIZES, DIMENSIONS, PRODUCT REQUIREMENTS, ETC. CONTRACTOR SHALL VERIFY THAT SUBMITTALS ARE COORDINATED WITH THE REQUIREMENT OF THE CONTRACT DOCUMENTS PRIOR TO SUBMISSION. A/E REVIEW OF SUBMITTALS IS NOT FOR THE PURPOSE OF DETERMINING THAT SIZES, DIMENSIONS, ETC MATCH WHAT HAS ALREADY BEEN PROVIDED IN THE CONTRACT DOCUMENTS. ALL DEVIATIONS FROM WHAT IS SHOWN ON THE CONTRACT DOCUMENTS SHALL BE CLOUDED ON THE SUBMITTAL OR OTHERWISE CLEARLY BROUGHT TO THE ATTENTION OF THE REVIEWER. FAILURE TO CLEARLY BRING ANY DEVIATION(S) TO THE ATTENTION OF THE REVIEWER SHALL BE UNDERSTOOD BY ALL PARTIES THAT WHAT IS SHOWN IN THE SUBMITTAL COMPLIES WITH THE CONTRACT DOCUMENTS REGARDLESS OF WHETHER OR NOT THE REVIEWER DISCOVERS THE DEVIATION. CHANGES RESULTING FROM THE CONTRACTOR'S FAILURE TO CLEARLY IDENTIFY DEVIATIONS IN SUBMITTALS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY AND SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
G21 CONTRACTORS SHALL CAREFULLY REVIEW EXISTING FIELD CONDITIONS AND COORDINATE ALL QUANTITIES, DIMENSIONS, AND TOLERANCES REQUIRED TO PERFORM THE WORK SHOWN ON THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFORMATION THAT PERTAINS SOLELY TO FABRICATION PROCESSES, INSTALLATION TECHNIQUES (MEANS AND METHODS), AND SEQUENCING OF THE WORK TO MEET THE REQUIREMENTS OF THE PROJECT SCHEUDLE. EACH SUBCONTRACTOR SHALL COORDINATE WITH OTHER TRADES PRIOR TO BEGINNING THEIR PORTION
OF THE WORK.
G22 PUBLIC EXITS SHALL REMAIN CLEAR AT ALL TIMES WHILE THE BUILDING IS OCCUPIED. NO STORAGE SHALL BE PERMITTED IN THE EXIT ACCESS.
G23 PATCH ALL HOLES IN FLOORS, WALLS, AND CEILINGS WITHIN THE PROJECT LIMITS AFTER DEMOLITION AND NEW WORK IS COMPLETE.
G24 UNLESS SPECIFIC DIMENSIONS ARE PROVIDED, MEP DRAWINGS ARE CONSIDERED "DIAGRAMMATIC." IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR(S) TO FIELD COORDINATE LOCATIONS, SEQUENCES, ETC FOR UNOBSTRUCTURED INSTALLATION OF ITEMS THAT ARE SHOWN ON MEP DRAWINGS IN DIAGRAMMITIC FORM. COORDINATE ABOVE-CEILING WORK OF MEP TRADES TO THAT EACH TRADE LOCATES THEIR WORK AS TIGHT TO THE STRUCTURE/DECK ABOVE AS IS FEASIBLE. EACH SUCCESSIVE TRADE SHALL LOCATE THEIR WORK AS TIGHT TO THE TRADE BEFORE.
G25 THE DRAWINGS AND SPECIFICATIONS ARE COMPLIMENTARY AND NEITHER SHALL TAKE PRECEDENT OVER THE OTHER. WHAT IS REQUIRED BY EITHER THE DRAWINGS OR SPECIFICATIONS SHALL BE INTERPRETED AS BEING REQUIRED AS PART OF THE SCOPE OF WORK FOR THIS PROJECT. ITEMS SPECIFIED, BUT NOT INDICATED ON THE DRAWINGS, SHALL BE PROVIDED. ITEMS SHOWN ON THE DRAWINGS, BUT NOT SPECIFIED, SHALL BE PROVIDED.
IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO SEEK CLARIFICATION OF AN APPARENT DISCREPENCY BETWEEN DRAWINGS AND/OR SPECIFICATIONS DURING THE BIDDING PHASE. OTHERWISE, THE CONTRACTOR SHALL ASSUME THE MOST STRINGENT (TYPICALLY THE MOST
EXPENSIVE) REQUIREMENT SHALL APPLY
1. HOSPITAL STAFF SHALL ENSURE THE REMOVAL OF ANY MEDICAL WASTE, INCLUDING SHARPS CONTAINERS, FROM AREAS TO BE RENOVATED, PRIOR
TO THE START OF THE PROJECT.
2. INFECTION CONTROL SHALL BE NOTIFIED BY FACILITIES MANAGEMENT STAFF IMMEDIATELY IF UNEXPECTED MEDICAL WASTE IS ENCOUNTERED.
IN STRIVING TO PROVIDE A HEALTHY AND SAFE ENVIRONMENT AT VA FACILITIES, VHA IS IMPLEMENTING A SMOKE-FREE POLICY FOR ALL VHA HEALTH CARE FACILITIES AND PROPERTY ASSIGNED TO VHA THAT IS UNDER THE CHARGE AND CONTROL OF VA. THE POLICY APPLIES TO CIGARETTES, CIGARS, PIPES OR ANY OTHER COMBUSTION OF TOBACCO, INCLUDING BUT NOT LIMITED TO ELECTRONIC OR E-CIGARRETES, VAPE PENS OR E-CIGARS.
UNDER VHA DIRECTIVE 1085, ALL VHA HEALTH CARE FACILITIES WILL BE SMOKE-FREE FOR PATIENTS, VISITORS, CONTRACTORS, VOLUNTEERS AND
VENDORS EFFECTIVE OCTOBER 1, 2019.
1. ISOLATE HVAC SYSTEM IN AREA WERE WORK IS TO BE DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM.
2. MAINTAIN NEGATIVE AIR PRESSURE AT ALL TIMES WITH NO DISRUPTION OF THE AIR SYSTEMS OF THE ADJACENT AREAS. INSTALL HEPA (HIGH EFFICIENCY PARTICULATE ACCUMULATOR) FILTER VACUUM SYSTEM RATED AT 95% CAPTURE OF 0.3 MICRONS INCLUDING
EFFECTIVE FOR POLLEN, MOLD SPORES
1. VA DESIGN MANUAL (PG-18-0)
2. VA DESIGN, QUALITY, AND STANDARD ALERTS
3. VA DESIGN GUIDES (PG-18-12)
4. VA DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)
5. PHYSICAL SECURITY DESIGN MANUAL FOR VA FACILITIES
6. VA FIRE PROTECTION DESIGN MANUAL
7. VA BARRIER FREE DESIGN GUIDE (PG-18-3)
8. VA SIGNAGE DESIGN GUIDE
9. VA MASTER SPECIFICATIONS
10. VA SUSTAINABLE DESIGN MANUAL
1. THESE PLANS DEPICT AREAS WHERE MATERIAL SAMPLES SHOWED THE PRESENCE OF ASBESTOS CONTAINING MATERIALS AND / OR LEAD- BASED PAINT. THESE PLANS ARE ONLY REPRESENTATIVE OF A LIMITED NUMBER OF SAMPLES AND SHALL NOT BE ASSUMED TO BE THE ONLY
LOCATIONS OF THESE MATERIALS.
2. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT CONTAIN LEAD-BASED PAINT (LBP):
2.1. OFF-WHITE PLASTER WALLS
2.2. WHITE METAL RADIATOR COVERS
2.3. CERAMIC TILE WALLS AND FLOORS
2.4. OFF-WHITE METAL DOOR FRAMES
2.5. BROWN PLASTER BASEBOARD
2.6. RED PLASTER FIRE CABINETS
2.7. OFF-WHITE METAL / PLASTER PIPE COLUMNS
2.8. OFF-WHITE BRICK / DRYWALL / PLASTER WALLS
3. TESTING SHOWS THAT THE FOLLOWING ITEMS / MATERIALS PRESENT THROUGHOUT THIS PROJECT ARE ASBESTOS CONTAINING MATERIALS
(ACM):
3.1. AIRCELL TSI INSULATION - WHITE AND GRAY
3.2. WHITE TSI
3.3. RAISED FLOOR FOOT MASTIC - BLACK
3.4. TAN VINYL FLOOR TILE (VFT)
3.5. BLACK MASTIC ASSOCIATED WITH BEIGE VFT
3.6. OFF-WHITE FIBERGLASS BRIDGING PAINT
3.7. MIXED CARPET MASTIC - BLACK / YELLOW
4. CONTRACTOR SHALL ASSUME THAT ACM'S ARE PRESENT WITHIN CONCEALED SPACES SUCH AS PIPE CHASES AND THE CRAWL SPACE AND
SHALL REMOVE AND DISPOSE OF ALL SUCH MATERIALS ENCOUNTERED.
5. MATERIALS INDICATED ON THIS PLAN SERVE ONLY TO ALERT THE CONTRACTOR TO THEIR PRESENCE ON THIS PROJECT. EPA REGULATIONS STIPULATE THAT IF ONE SAMPLE OF A MATERIAL IS FOUND TO CONTAIN ASBESTOS THEN THE ENTIRE QUANTITY OF THAT MATERIAL CONTAINS ASBESTOS, REGARDLESS OF ADDITIONAL ANALYSIS. CONTRACTOR SHALL REMOVE ALL SIMILAR MATERIALS WITHIN THE ENTIRE PROJECT
SCOPE.
6. THIS PLAN IS BASED ON THE "HAZARDOUS MATERIALS SURVEY REPORT DATED OCTOBER 25, 2019 BY ECS, LTD." AND SERVES ONLY AS A SUMMARY OF SOME INFORMATION FOUND IN THAT DOCUMENT. REFER TO SECTION 02 82 11 TRADITIONAL ASBESTOS ABATEMENT, 02 83 33.13 LEAD-BASED PAINT REMOVAL & DISPOSAL AND THE "HAZARDOUS MATERIALS SURVEY", INCLUDED IN THE PROJECT SPECIFICATION MANUAL, FOR ADDITIONAL INFORMATION AND REQUIREMENTS.
1. CONTRACTOR SHALL PROVIDE EVERYTHING NEEDED FOR INFECTION
CONTAINMENT/CONTROL SYSTEM. SOME ITEMS MAY INCLUDE, BUT ARE NOT LIMITED TO;
CONSTRUCTION ZONE SIGNS, HEPA FILTERS, AIR SCRUBBERS, ETC. CONTACT RESIDENT
ENGINEER, FACILITY INFECTION CONTROL RISKS ASSESSMENT TEAM (ICRA) FOR FULL
PROCEDURE REQUIREMENTS.
2. IT IS RECOMMENDED THAT THE CONTRACTOR UTILIZES MOVEABLE CONTAINMENT SYSTEM,
CONSTRUCTED OF A MINIMUM 6ML POLY OR PREFABRICATED ZIP WALL THAT CAN BE
SEALED TO WORK AREAS. THE INTEGRITY OF THE BARRIER WALLS MUST ASSURE A
COMPLETE SEAL OF THE CONSTRUCTION AREA FROM ADJACENT AREAS. REFER TO THE
TWO ICRA SHEETS - GC301 AND GC302.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT CONTAINMENT/CONTROL
SYSTEM PLAN TO COR FOR APPROVAL, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT
TO THE VA RESIDENT ENGINEER AND FACILITY ICRA TEAM FOR REVIEW FOR COMPLIANCE
WITH CONTRACT REQUIREMENTS. ALL PERSONNEL INVOLVED IN THE CONSTRUCTION SHALL
BE EDUCATED AND TRAINED IN INFECTION PREVENTION MEASURES ESTABLISHED BY THE
MEDICAL CENTER AND SHALL FOLLOW INFECTION CONTROL PROCEDURES.
4. IN EACH CONSTRUCTION AREA, THE CONTRACTOR SHALL UTILIZE A 120V HEPA FILTER
EQUIPPED AIR SCRUBBER MACHINE.
5. DO NOT REMOVE CONSTRUCTION BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS SIGNED OFF BY COR AND VA'S INFECTION CONTROL DEPARTMENT.
6. PROVIDE DUST “STICKY” MAT AT EACH ENTRANCE/EXIT OF CONSTRUCTION AREA AND
REPLACE OR CLEAN WHEN NO LONGER EFFECTIVE.
7. ALL FURNITURE AND EQUIPMENT (IF APPLICABLE) SHALL BE PROTECTED DURING
DEMOLITION AND CONSTRUCTION.
GENERAL NOTES
1. DEPICTION OF EXISTING CONDITIONS BASED ON ORIGINAL CONSTRUCTION DOCUMENTS AND
LIMTED FIELD OBSERVATIONS. EXISTING ELEMENTS AND CONDITIONS CONCEALED BY IN-
PLACE EQUIPMENT AND FINISHES WERE NOT OBSERVED OR INVESTIGATED. ONCE CUTTING
AND SELECTIVE DEMOLITION WORK IS COMPLETE, REPORT ANY CONFLICTS TO COR/RE.
2. VAMC EQUIPMENT SUPPLIER TO REMOVE EXISTING UNMOUNTED AND MOUNTED EQUIPMENT
PRIOR TO CONSTRUCTION. ONCE OWNER & EQUIPMENT SUPPLIER HAS REMOVED
EQUIPMENT, PHOTOGRAPHICALLY DOCUMENT ENTIRE AREA OF NEW WORK. TAKE NOTE OF
ANY DAMAGED SURFACES OR ELEMENTS. PREPARE WRITTEN AND PHOTOGRAPHIC REPORT
OF SURVEY AND SUBMIT TO OWNER AND DESIGNER.
3. PROTECT ALL EXISTING FINISHES AND ELEMENTS TO REMAIN. REPAIR OR REPLACE
DAMAGED SURFACES TO MATCH ADJACENT FINISHES.
REMOVAL OF IN-PLACE CONSTRUCTION NECESSARY TO PERMIT INSTALLATION OR
PERFORMANCE OF OTHER WORK.
FITTING AND REPAIR WORK REQUIRED TO RESTORE SURFACES TO ORIGINAL
CONDITIONS AFTER INSTALLATION OF OTHER WORK.
DETACH ITEMS FROM EXISTING CONSTRUCTION AND LEGALLY DISPOSE OF THEM OFF-
SITE, UNLESS INDICATED TO BE SALVAGED OR REMOVED AND REINSTALLED.
DETACH ITEMS FROM EXISTING CONSTRUCTION AND DELIVER THEM TO OWNER
READY FOR REUSE.
DETACH ITEMS FROM EXISTING CONSTRUCTION, PREPARE THEM FOR REUSE, AND
REINSTALL THEM WHERE INDICATED.
EXISTING ITEMS OF CONSTRUCTION THAT ARE NOT TO BE REMOVED AND THAT ARE
NOT OTHERWISE INDICATED TO BE REMOVED, REMOVED AND SALVAGED, OR
REMOVED AND REINSTALLED.
DEFINITIONS
CUTTING:
PATCHING:
REMOVE:
SALVAGE:
REMOVE AND
REINSTALL:
EXISTING TO
REMAIN:
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
Olin E. Teague VA Medical Center 1901 Veterans Memorial Drive Temple, TX 76504
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
12/20/2021
674-20-01
JSAL
A/E DESIGN SERVICES TO
REPLACE AHUs BLDG. 204
(COVID UNIT, WARDS 6J-6K)
100% BID SET SUBMISSION
GENERAL NOTES
GI300
-2
-0
G I3
.p d f
GENERAL NOTESHAZARDOUS MATERIALS NOTES
REFERENCES
SMOKING POLICY
ENVIRONMENTAL CONTROL NOTES
MEDICAL WASTE NOTES
(THESE NOTES APPLY TO THE COMPLETE SET OF CONSTRUCTION DOCUMENTS)
NOTE: SEE LIFE SAFETY DRAWINGS FOR SPECIFIC EDITIONS OF APPLICABLE CODES
INFECTION CONTROL NOTES
DEMOLITION NOTES
ALongeau
UP
EFGJ.5IKLMNPQ.5RsUVWY
AREA J
AREA K
7' - 0"
IK1
IK2
IK2
IK2
IK1
IK3
IK3
STAIR 10
6S-10
STORAGE
6J07
PATIENT
6J8
TOILET
6J6A
PATIENT
6J9
TOILET
6J8A
PATIENT
6J6
PATIENT
6J10
WAITING
6J5 TOILET
6J09A
PATIENT
6J11
CORRIDOR
C6-3
PATIENT
6J4
PATIENT
6J12
TOILET
6J12A
TOILET
6J1A
PATIENT
6J3
TOILET
6J03A
MED
6J2
WAITING
6J13
COPY
6J1
LOUNGE
6J40
UNIT MANAGER
6J39
OFFICE
6J38
W.C.
6J32
DICT.
6J33
CONFERENCE
6G32
C&P CHECK-IN
C6-4
SOILED UTILITY
6J28
STORAGE
6J27
PATIENT
6J26
TOILET
6J26A
BREAK
6G30
OEF/ OIF OFFICE
6J29
TOILET
6J25A
VEST.
6J25B
PATIENT
6J25
PATIENT
6J24
TOILET
6J24A
VEST.
6J23B
STORAGE
6J22
ELECTRICAL
6K11
STORAGE
6J22A
TOILET
6J23A
TOILET
6K09A
PATIENT
6K10
TOILET
6K13A
PATIENT
6K14
PATIENT
6K13
MECHANICAL ROOM
6K12
PATIENT
6J21
TOILET
6J20A
TOILET
6J18A
TOILET
6J16A
PATIENT
6J16
PATIENT
6J17
PATIENT
6J18
PATIENT
6J19
PATIENT
6J20
CORRIDOR
C6-5
6J
6J
6K
A6
GC301
XC6-4AT
XC6-4BT
4'
6"
A6
GC301
IK3
MIN.
6' - 0"
SECTION EXISTING FLOOR FINISH/ BASE
UNDERSIDE OF STRUCTURE
EXISTING FINISHED CEILING
SYSTEM
METAL "C-H" STUDS (20 GA.) @ 24" O.C. W/
1" GYP. BD. SHAFTLINER (UPPER SIDE) &
5/8" TYPE "X" GYP. BD. OPPOSITE SIDE.
FIRE RATED PARTITION U.L. DES. NO. U415
RUNNER CHANNEL SET IN TWO CONT. BEADS
OF SEALANT AND FASTENED TO STUDS
SOUND ATTENUATION BLANKET INSUL.
METAL STUDS W/ 5/8" TYPE "X" GYP.
BD., EACH SIDE. FIRE RATED PARTITION
UL DES. NO 465
OUTLINE OF EXISTING WALL
RUNNER CHANNEL MECHANICALLY
FASTENED TO FLOOR, APPLY TWO CONT.
BEADS OF FIRE/ ACOUSTICAL SEALANT AT
EACH SIDE
HEAVY WEIGHT RESIN PAPER EXTEND 8"
EACH SIDE MIN. OF TEMPORARY PARTITION.
NOTE: IF NOT PHYSICALLY FEASIBLE TO EXTEND THE TEMPORARY
PARTITION FULL HEIGHT TO UNDERSIDE OF STRUCTURE ABOVE RETURN
PARTITION PERPENDICULAR TO WALL/ SOFFIT TO ENCLOSE WORK AREA
KEY PLAN
NOT TO SCALE
PLAN
NORTH
TRUE
NORTH
AREA J
AREA K
AREA G
ICRA KEY NOTES
IK1 AIRTIGHT ANTEROOM
IK2 TEMPORARY WALK-OFF MAT
IK3 HEPA FILTER EXHAUST FAN SYSTEM VENTED THROUGH OPERABLE WINDOW.
COORDINATE LOCATION OF HEPA FILTER WITHIN CONSTRUCTION ZONE WITH
VA COR.
IK4 DOOR TO BE SEALED OFF FOR DURATION OF CONSTRUCTION
ICRA CONSTRUCTION NOTES
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, & PLASTIC) TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE
WALL IS NOT ACCEPTABLE FOR MONITORING.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS
REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE
OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED
BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION
CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SEVERIVCES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630.
CONSTRUCTION WASTE / RUBBISH MUST BE TRANSPORTED IN TIGHTLY COVERED
CONTAINERS AT ALL TIMES.
9. CONTRACTOR TO USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR
TRANSPORT OF CONTAINERS THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA REMOVAL NOTES
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA GENERAL NOTES
1. PROVIDE TEMPORARY/ PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY
INDICATED ON PLANS. CONTRACTOR SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE
COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM
FUNCTION LOCKS, AND ALARMS. DOORS SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY"
SIGN ON THE PUBLIC SIDE OF ALL ICRA DOORS.
4. CONTRACTOR TO COMPLY WITH ALL OSHA REQUIREMENTS PERTAINING TO SILICA AND
DUST CONTAINMENT/ REMEDIATION.
#ICRA MATRIX
UNDER
CONSTRUCTION
NOT IN SCOPE
AREA TO REMAIN
IN USE
ICRA BARRIER
ICRA PLAN KEY
CONSTRUCTION PROJECT
TYPE
A B C D
LOW I II II III/IV
MEDIUM I II III IV
HIGH I II III/IV IV
HIGHEST II III/IV III/IV IV
PATIENT
RISK GROUP
GC ICRA PATH
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING
DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED
FOR VISUAL INSPECTION.
DURING CONSTRUCTION
PROJECT
UPON COMPLETION OF
PROJECT
1. CLEAN ANY DUST/DEBRIS GENERATED BY PROJECT.
C
LA
S
I
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST
FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
2. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA.
3. REMOVE ISOLATION OF HVAC SYSTEM WHEN JOB IS
COMPLETED.
4. CLEAN TRACKED DUST/DEBRIS IN COMMON AREAS AS
NEEDED; CLEAN AREA AT THE END IF THE WORK DAY.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL SERVICES PRIOR TO USE.
C
LA
II
1. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION
TO WORK SITE WITH HEPA VACUUM OR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS).
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS; OR
HEPA AIR SCRUBBER IF UNABLE TO ACHIEVE NEGATIVE
PRESSURE; FILTER CHANGED AS NEEDED.
4. MAINTAIN STICKY MATS AT ENTRANCE. AVOID
TRACKING DUST/DEBRIS OUTSIDE OF WORK AREA,
CLEAN AREA AS NEEDED.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED AND DIRT AND DEBRIS HAS
BEEN REMOVED.
2. WET MOP AND/OR VACUUM WORK AREA WITH HEPA
FILTERED VACUUM.
3. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL MANAGEMENT SERVICES
DEPARTMENT PRIOR TO USE
C
LA
III
WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION
TO WORK SITE WITH HEPA VACUUM OR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM SO THEY
CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED
EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE AREA
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED PROJECT AND INSPECTED.
8. AREA SHOULD BE TERMINALLY CLEANED BY THE
OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT
PRIOR TO USE.
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
C
LA
IV
ICRA REFERENCE NOTES
1. BARRIER WALLS:
A. THE CONSTRUCTION AREAS MUST BE KEPT SEPARATED FROM PATIENT CARE AREAS
BY BARRIERS THAT KEEP THE DUST AND DIRT INSIDE THE WORKSITE.
B. THE WALLS MUST PROVIDE A COMPLETE SEAL OF THE CONSTRUCTION AREA FROM
ADJACENT AREAS (WALLS MAY BE RIGID OR 4 OR 6 MIL THICKNESS PLASTIC).
2. ENVIRONMENTAL CONTROL:
A. NEGATIVE AIR PRESSURE MUST BE MAINTAINED WITHIN THE CONSTRUCTION AREA
WHEN POSSIBLE. IF UNABLE TO MAINTAIN NEGATIVE PRESSURE A HEPA AIR-
SCRUBBER MUST BE USED AND LEFT ON FOR THE DURATION OF THE PROJECT (24/7).
B. DEMOLITION DEBRIS IS REMOVED IN TIGHTLY FITTED COVERED CARTS – USE
SPECIFIED TRAFFIC PATTERNS.
C. STICKY OR WALK-OFF MATS ARE PLACED IMMEDIATELY OUTSIDE THE CONSTRUCTION
ZONE AND CHANGED WHENEVER NECESSARY TO CONTROL THE SPREAD OF DUST
AND DIRT.
D. EXTERIOR WINDOW SEALS ARE TO BE USED TO REDUCE THE AMOUNT OF OUTSIDE
EXCAVATION DEBRIS COMING INTO THE BUILDING.
E. IF DEMOLITION CHUTES ARE USED, THEY MUST BE SEALED WHEN NOT IN USE; THE
CHUTE AND DAMPER SHOULD BE SPRAYED WITH WATER, AS NECESSARY TO
MAINTAIN DUST CONTROL
F. CONTROL, COLLECTION AND DISPOSAL MUST BE PROVIDED FOR ANY DRAIN LIQUID OR
SLUDGE FOUND WHEN DEMOLISHING PLUMBING.
3. TRAFFIC CONTROL:
A. USE DESIGNATED ENTRY AND EXIT PROCEDURES.
B. KEEP ALL EGRESS PATHWAYS FREE OF DEBRIS.
C. NO UNAUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER CONSTRUCTION
AREAS.
D. USE DESIGNATED ELEVATORS ONLY.
4. CLEANING:
A. KEEP THE CONSTRUCTION AREA CLEAN ON A DAILY BASIS.
B. DUST AND DIRT MUST BE KEPT TO A MINIMUM.
5. WORKERS:
A. CLOTHING MUST BE FREE OF LOOSE SOIL AND DEBRIS WHEN EXITING THE
CONSTRUCTION AREA.
B. USE PERSONAL PROTECTIVE EQUIPMENT (MASKS, FACE SHIELDS, ETC.) AS INDICATED
FOR THE TASK AT HAND.
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
Olin E. Teague VA Medical Center 1901 Veterans Memorial Drive Temple, TX 76504
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
12/20/2021
674-20-01
JSAL
A/E DESIGN SERVICES TO
REPLACE AHUs BLDG. 204
(COVID UNIT, WARDS 6J-6K)
100% BID SET SUBMISSION
ICRA PLAN - AREA J
GC301
-2
-0
G C
/2
/2
.p d f
1/8" = 1'-0"A15
6TH FLOOR ICRA PLAN - AREA J
1 1/2" = 1'-0"A6
ICRA BARRIER ( 1HR FR )
ALongeau
BCDEFGJ.5IKLM
AREA J
AREA K
AREA J
AREA K
IK2
IK1
IK2
IK3
IK3
IK1
IK2
IK4
VEST.
6J23B
STORAGE
6J22
ELECTRICAL
6K11
STORAGE
6J22A
TOILET
6J23A
TOILET
6K09A
PATIENT
6K10
TOILET
6K13A
PATIENT
6K14
PATIENT
6K13
6K
6K
6K
PATIENT
6K15
PATIENT
6K16
PATIENT
6K17
PATIENT
6K18
PATIENT
6K09
PATIENT
6K08
PATIENT
6K07
PATIENT
6K06B
TOILET
6K07A
TOILET
6K08A
TOILET
6K15A
TOILET
6K17A
CLEAN UTILITY
6K19
RESERCH LAB
6K06
OFFICE
6K3
CLASSROOM
6K4
CORRIDOR
C6-2
ICE
6K43
STORAGE
6K42
S. UTILITY
6K44
C. UTILITY
6K45
MED.
6K00A
NURSE STATION
6K00
WOMEN'S HEALTH
CHIEF
6K38
OFFICE
6K41HAC
6K39
IDF
6K40
CORRIDOR
C6-11
STAFF LOUNGE
6K34
W.C.
6K35
OFFICE
6K36
OFFICE
6K37
LINEN
6G04
TRASH
6G05
WAITING
6K23
PATIENT
6K24
PATIENT
6K25
PATIENT
6K26
PATIENT
6K27
STAIR 9
6S-9
TOILET
6K28A
PATIENT
6K28
PATIENT
6K29
PATIENT
6K30
PATIENT
6K31
PATIENT
6K32
TOILET
6K31A
TOILET
6K29A
TOILET
6K26A
TOILET
6K25A
CORRIDOR
C6-10
CORRIDOR
C6-10
PATIENT
6K33
ANTE
6K33A
TOILET
6533B
TOILET
6K32B
ANTE
6K32A
A6
GC301
M
IN
6'
0"
MIN.
6' - 0"
ALIGN
8'
A6
GC301
IK3
6K00AT
6K00BT
KEY PLAN
NOT TO SCALE
PLAN
NORTH
TRUE
NORTH
AREA J
AREA K
AREA G
ICRA MATRIX
UNDER
CONSTRUCTION
NOT IN SCOPE
AREA TO REMAIN
IN USE
ICRA BARRIER
ICRA PLAN KEY
CONSTRUCTION PROJECT
TYPE
A B C D
LOW I II II III/IV
MEDIUM I II III IV
HIGH I II III/IV IV
HIGHEST II III/IV III/IV IV
PATIENT
RISK GROUP
GC ICRA PATH
ICRA KEY NOTES
IK1 AIRTIGHT ANTEROOM
IK2 TEMPORARY WALK-OFF MAT
IK3 HEPA FILTER EXHAUST FAN SYSTEM VENTED THROUGH OPERABLE WINDOW.
COORDINATE LOCATION OF HEPA FILTER WITHIN CONSTRUCTION ZONE WITH
VA COR.
IK4 DOOR TO BE SEALED OFF FOR DURATION OF CONSTRUCTION
ICRA CONSTRUCTION NOTES
1. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT
CONTAMINATION OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, & PLASTIC) TO SEAL AREA
FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC
COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR
VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR
FILTRATION UNITS. AIR PRESSURE SHALL BE CONTINUOUSLY MONITORED. BALL IN THE
WALL IS NOT ACCEPTABLE FOR MONITORING.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES AIRTIGHT AND/OR FIRE SEAL AS
REQUIRED.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO
THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE
OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY
LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE
COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS APPROVED
BY THE COR, INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION
CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL
SEVERIVCES DEPARTMENT.
8. REMOVE CONSTRUCTION WASTE DAILY DURING THE HOURS OUTSIDE OF 0800-1630.
CONSTRUCTION WASTE / RUBBISH MUST BE TRANSPORTED IN TIGHTLY COVERED
CONTAINERS AT ALL TIMES.
9. CONTRACTOR TO USE ROUTE AGREED UPON BY THE ICRA TEAM AND COR FOR
TRANSPORT OF CONTAINERS THROUGH THE FACILITY.
10. PLACE DUST MATS AT ENTRANCE AND EXIT OF WORK AREA.
ICRA REMOVAL NOTES
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS
ASSOCIATED WITH CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
ICRA GENERAL NOTES
1. PROVIDE TEMPORARY/ PERMANENT RATED ICRA PARTITIONS AS CONCEPTUALLY
INDICATED ON PLANS. CONTRACTOR SHALL SUBMIT AN ICRA PLAN FOR APPROVAL OF THE
COR PRIOR TO BEGINNING ANY WORK.
2. DOORS IN ICRA PARTITIONS SHALL HAVE CLOSERS, PANIC DEVICES, STOREROOM
FUNCTION LOCKS, AND ALARMS. DOORS SHALL AUTOMATICALLY LOCK UPON CLOSURE.
3. CONTRACTOR SHALL INSTALL "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL ONLY"
SIGN ON THE PUBLIC SIDE OF ALL ICRA DOORS.
4. CONTRACTOR TO COMPLY WITH ALL OSHA REQUIREMENTS PERTAINING TO SILICA AND
DUST CONTAINMENT/ REMEDIATION.
1. EXECUTE WORK BY METHODS TO MINIMIZE RAISING
DUST FROM CONSTRUCTION OPERATIONS.
2. IMMEDIATELY REPLACE A CEILING TILE DISPLACED
FOR VISUAL INSPECTION.
DURING CONSTRUCTION
PROJECT
UPON COMPLETION OF
PROJECT
1. CLEAN ANY DUST/DEBRIS GENERATED BY PROJECT.
C
LA
I
1. PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE DUST
FROM DISPERSING INTO ATMOSPHERE.
2. WATER MIST WORK SURFACES TO CONTROL DUST
WHILE CUTTING.
3. SEAL UNUSED DOORS WITH DUCT TAPE.
4. BLOCK OFF AND SEAL AIR VENTS.
5. PLACE DUST MAT AT ENTRANCE AND EXIT OF WORK
AREA.
6. REMOVE OR ISOLATE HVAC SYSTEM IN AREAS WHERE
WORK IS BEING PERFORMED.
1. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
2. WET MOP AND/OR VACUUM WITH HEPA FILTERED
VACUUM BEFORE LEAVING WORK AREA.
3. REMOVE ISOLATION OF HVAC SYSTEM WHEN JOB IS
COMPLETED.
4. CLEAN TRACKED DUST/DEBRIS IN COMMON AREAS AS
NEEDED; CLEAN AREA AT THE END IF THE WORK DAY.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL SERVICES PRIOR TO USE.
C
LA
II
WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION
TO WORK SITE WITH HEPA VACUUM OR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS).
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS; OR
HEPA AIR SCRUBBER IF UNABLE TO ACHIEVE NEGATIVE
PRESSURE; FILTER CHANGED AS NEEDED.
4. MAINTAIN STICKY MATS AT ENTRANCE. AVOID
TRACKING DUST/DEBRIS OUTSIDE OF WORK AREA,
CLEAN AREA AS NEEDED.
5. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
1. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED AND DIRT AND DEBRIS HAS
BEEN REMOVED.
2. WET MOP AND/OR VACUUM WORK AREA WITH HEPA
FILTERED VACUUM.
3. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
4. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
5. AREA SHOULD BE TERMINALLY CLEANED BY
ENVIRONMENTAL MANAGEMENT SERVICES
DEPARTMENT PRIOR TO USE
C
LA
III
WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK,
PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK
AREA OR IMPLEMENT CONTROL CUBE METHOD (CART
WITH PLASTIC COVERING AND SEALED CONNECTION
TO WORK SITE WITH HEPA VACUUM OR VACUUMING
PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE
UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES
APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL
PERSONNEL TO PASS THROUGH THIS ROOM SO THEY
CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR
CLOTH OR PAPER COVERALLS THAT ARE REMOVED
EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE AREA
REQUIRED TO WEAR SHOE COVERS. SHOE COVERS
MUST BE CHANGED EACH TIME THE WORKER EXITS
THE WORK AREA.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL
PROJECT IS COMPLETED PROJECT AND INSPECTED.
8. AREA SHOULD BE TERMINALLY CLEANED BY THE
OWNER’S ENVIRONMENTAL SERVICES DEPARTMENT
PRIOR TO USE.
1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE
SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT
IN TIGHTLY COVERED CONTAINERS.
3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE
COVERING UNLESS SOLID LID.
4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
5. WET MOP AREA WITH DISINFECTANT.
6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
C
LA
IV
ICRA REFERENCE NOTES
1. BARRIER WALLS:
A. THE CONSTRUCTION AREAS MUST BE KEPT SEPARATED FROM PATIENT CARE AREAS
BY BARRIERS THAT KEEP THE DUST AND DIRT INSIDE THE WORKSITE.
B. THE WALLS MUST PROVIDE A COMPLETE SEAL OF THE CONSTRUCTION AREA FROM
ADJACENT AREAS (WALLS MAY BE RIGID OR 4 OR 6 MIL THICKNESS PLASTIC).
2. ENVIRONMENTAL CONTROL:
A. NEGATIVE AIR PRESSURE MUST BE MAINTAINED WITHIN THE CONSTRUCTION AREA
WHEN POSSIBLE. IF UNABLE TO MAINTAIN NEGATIVE PRESSURE A HEPA AIR-
SCRUBBER MUST BE USED AND LEFT ON FOR THE DURATION OF THE PROJECT (24/7).
B. DEMOLITION DEBRIS IS REMOVED IN TIGHTLY FITTED COVERED CARTS – USE
SPECIFIED TRAFFIC PATTERNS.
C. STICKY OR WALK-OFF MATS ARE PLACED IMMEDIATELY OUTSIDE THE CONSTRUCTION
ZONE AND CHANGED WHENEVER NECESSARY TO CONTROL THE SPREAD OF DUST
AND DIRT.
D. EXTERIOR WINDOW SEALS ARE TO BE USED TO REDUCE THE AMOUNT OF OUTSIDE
EXCAVATION DEBRIS COMING INTO THE BUILDING.
E. IF DEMOLITION CHUTES ARE USED, THEY MUST BE SEALED WHEN NOT IN USE; THE
CHUTE AND DAMPER SHOULD BE SPRAYED WITH WATER, AS NECESSARY TO
MAINTAIN DUST CONTROL
F. CONTROL, COLLECTION AND DISPOSAL MUST BE PROVIDED FOR ANY DRAIN LIQUID OR
SLUDGE FOUND WHEN DEMOLISHING PLUMBING.
3. TRAFFIC CONTROL:
A. USE DESIGNATED ENTRY AND EXIT PROCEDURES.
B. KEEP ALL EGRESS PATHWAYS FREE OF DEBRIS.
C. NO UNAUTHORIZED PERSONNEL SHOULD BE ALLOWED TO ENTER CONSTRUCTION
AREAS.
D. USE DESIGNATED ELEVATORS ONLY.
4. CLEANING:
A. KEEP THE CONSTRUCTION AREA CLEAN ON A DAILY BASIS.
B. DUST AND DIRT MUST BE KEPT TO A MINIMUM.
5. WORKERS:
A. CLOTHING MUST BE FREE OF LOOSE SOIL AND DEBRIS WHEN EXITING THE
CONSTRUCTION AREA.
B. USE PERSONAL PROTECTIVE EQUIPMENT (MASKS, FACE SHIELDS, ETC.) AS INDICATED
FOR THE TASK AT HAND.
W A
LL
T
H
IC
K N
E S
S
C O
O R
D W
9/
9/
" UON
4"
2" 5/8"
/1 6"
/1 6"
WALL WHERE SHOWN IN
PLAN
DOOR
JAMB ANCHOR
SEALANT TYP. BOTH SIDES,
FULL PERIMETER
5/8" GWB EA. SIDE
H.M. DOOR FRAME
WALL THICKNESS
COORD W/
9/16" 9/16"
2" 5/
8"
1 15/16"1 15/16"
DOOR
JAMB ANCHOR
METAL TRACK
SEALANT TYP. BOTH SIDES,
FULL PERIMITER
5/8" GWB EA. SIDE
METAL STUD BOX HEADER
H.M. DOOR FRAME
F
FLUSH
D O
O R
H E
IG
H
T
AS SCHEDULE
DOOR WIDTH
TYPE 1
(HM - DOOR)
DOOR WIDTH
2" T
Y P
D O
O R
H E
IG
H
T
6" D
O O
R S
TO
P
DOOR TYPE DOOR FRAME TYPE LEGEND
EPY EPOXY FLOORING
EX EXISTING
HW HARDWARE SET (FINISH OR BUILDER'S HARDWARE)
P PAINT (EXTERIOR AND INTERIOR; TRANSPARENT,
SEMI-TRANSPARENT, AND OPAQUE FINISHES)
RB RESILIENT BASE (RUBBER OR VINYL WITH FACTORY
FORMED INSIDE AND OUTSIDE CORNERS)
HM HOLLOW METAL
VA Project Number:
Building:
Drawing Number:
Project Title:
Project Location:
Issue Date:
Checked By: Drawn By:
Drawing Title:
FULLY
SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
Submission:
ARCHITECT / ENGINEER OF RECORD:
Revisions: Date:
CONSULTANTS:
/8
/4
/8
/2
/4
-1
/2
MEP ENGINEER:
HUITT-ZOLLARS, INC.
500 W. 7th St. Ste. 300 Fort Worth, Texas 76102 817-335-3000 POC: Joel Colwell jcolwell@Huitt-Zollars.com
ARCHITECT:
CB DESIGN GROUP
421 KING STREET
SUITE 301
ALEXANDRIA, VA 22314
703-772-4213
POC: PAUL W. BRIDGES
PROFESSIONAL SEAL:
Olin E. Teague VA Medical Center 1901 Veterans Memorial Drive Temple, TX 76504
2345678910111213141516
B
C
D
E
F
G
H
I
J
12345678910111213141516
12/20/2021
674-20-01
JSAL
A/E DESIGN SERVICES TO
REPLACE AHUs BLDG. 204
(COVID UNIT, WARDS 6J-6K)
100% BID SET SUBMISSION
ICRA PLAN - AREA K
GC302
-2
-0
G C
/2
/2
.p d f
1/8" = 1'-0"A15
6TH FLOOR ICRA PLAN - AREA K
DOOR NO.
ROOM
NAME
DOOR FRAME DOOR
LABEL FIRE
RATING
HARD
WARE
SET REMARKS
NOMINAL SIZE
TYPE MATL MATL TYPE
SECTIONS
WIDTH HEIGHT THK. JAMB HEAD SILL
6K00AT 3' - 6" 7' - 0" 1 3/4" F HM HM 1 A7 / GC302 A5 / GC302 DR: 45 HW-5 TEMP. ICRA DOOR
6K00BT 3' - 6" 7' - 0" 1 3/4" F HM HM 1 A7 / GC302 A5 / GC302 DR: 45 HW-5 TEMP. ICRA DOOR
XC6-4AT 3' - 0" 7' - 0" 1 3/4" F HM HM 1 A7 / GC302 A5 / GC302 DR: 45 HW-5 TEMP. ICRA DOOR
XC6-4BT 3' - 0" 7' - 0" 1 3/4" F HM HM 1 A7 / GC302 A5 / GC302 CR: 45 HW-5 TEMP. ICRA DOOR
DOOR SCHEDULE
M: HM F: P M: HM F: P
M: HM F: P M: HM F: P
M: HM F: P M: HM F: P
M: HM F: P M: HM F: P
1 1/2" = 1'-0"A7
TYP. DOOR JAMB DTL.
1 1/2" = 1'-0"A5
TYP. DOOR HEAD DTL.
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
ALongeau
UP
A
B
C
DN
DN
DN
STORAGE
6J07
STAIR 10
6S-10
PATIENT
6J8
OUTSIDE COURT
TOILET
6J8A
PATIENT
6J9
TOILET
6J6A
PATIENT
6J6
PATIENT
6J10
TOILET
6J09A
WAITING
6J5
PATIENT
6J11
PATIENT
6J12PATIENT
6J4
CORRIDOR
C6-3
TOILET
6J12A
TOILET
6J1A
PATIENT
6J3
MED
6J2
TOILET
6J03A
WAITING
6J13
C&P CHECK-IN
C6-4
COPY
6J1LOUNGE
6J40
UNIT MANAGER
6J39
OFFICE
6J38
STORAGE
6G21A
EMPLOYEE EDU.
CLASSROOM
6G19
OUTDOOR COURT
6G18
STORAGE
6G19A
EQUIP.
6G23
HAC
6G22
COMM
6G21
CONFERENCE
6G32 OEF/ OIF OFFICE
6J29
BREAK
6G30
DICT.
6J33
W.C.
6J32
OEF/ OIF OFFICE
6J31
OEF/ OIF OFFICE
6G24
OEF/ OIF OFFICE
6G25
OEF/ OIF OFFICE
6G26
OEF/ OIF OFFICE
6G27
EED OFFICE
6G28
EED OFFICE
6G29
VISITORS' LOUNGE
6G01
IDC OFFICE
6J16A
IDC OFFICE
6J16B
OFFICE/EXAM
6G16C
OFFICE
6G16D
OFFICE
6G16E
OFFICE
6G16F
OFFICE/EXAM
6G16G
OFFICE
6G16H
INFECTIOUS
DISEASE CLINIC
6G15
INFECTIOUS
DISEASE CLINIC
6G14
ELECTRICAL ROOM
6G13
COMM.
6G20
ELEVATOR LOBBY,
SERVICE
6G12
ELEVATOR LOBBY
6G00
CORRIDOR
C6-1
MENS
6G02
WOMENS
6G03
LOCKERS, WOMEN
6G08
LOCKERS, MEN
6G07
STORAGE
6K42
ICE
6K43
RETHERM
6G11
EMS STORAGE
6G10
EQUIP. STA.
6G06
MECHANICAL
6G09
TRASH
6G05
LINEN
6G04
OFFICE
6K37
OFFICE
6K36
STAFF LOUNGE
6K34
W.C.
6K35
CORRIDOR
C6-11
IDF
6K40
HAC
6K39
OFFICE
6K41
WOMEN'S HEALTH
CHIEF
6K38
S. UTILITY
6K44
C. UTILITY
6K45
MED.
6K00A
NURSE STATION
6K00
CORRIDOR
C6-2
OFFICE
6K3
CLASSROOM
6K4
CLEAN UTILITY
6K19
WAITING
6K23
PATIENT
6K18
PATIENT
6K06B RESERCH LAB
6K06
TOILET
6K17A
TOILET
6K15A
TOILET
6K13A
PATIENT
6K10 PATIENT
6K14
PATIENT
6K15
PATIENT
6K16
PATIENT
6K17
TOILET
6K07A
TOILET
6K08A
PATIENT
6K09
PATIENT
6K08
PATIENT
6K07
MECHANICAL ROOM
6K12
ELECTRICAL
6K11
STORAGE
6J22A
TOILET
6J23A
STORAGE
6J22
VEST.
6J23B
PATIENT
6J23
PATIENT
6J24
PATIENT
6J25
PATIENT
6J26
STORAGE
6J27SOILED UTILITY
6J28
TOILET
6J26A
TOILET
6J25A
VEST.
6J25B
TOILET
6J24A
PATIENT
6J16
PATIENT
6J17
PATIENT
6J18
PATIENT
6J19
PATIENT
6J20
PATIENT
6J21
TOILET
6J20A
TOILET
6J18A
TOILET
6J16A
STAIR 8
5S-8
STAIR 9
6S-9
TOILET
6K28A
PATIENT
6K28
PATIENT
6K29
PATIENT
6K30
PATIENT
6K31
PATIENT
6K32
PATIENT
6K33
TOILET
6533B
TOILET
6K32B
ANTE
6K32A
TOILET
6K31A
TOILET
6K29A
CORRIDOR
C6-10
PATIENT
6K24
PATIENT
6K25
PATIENT
6K26
PATIENT
6K27
TOILET
6K26A
TOILET
6K25A
ANTE
6K33A
6J
6J
6K
6K 6G
PATIENT
6K13
TOILET
6K09A
LIFE SAFETY CODE ANALYSIS
7.1.10 MEANS OF EGRESS RELIABILITY
7.1.10.1 MEANS OF EGRESS SHALL BE CONTINUOUSLY MAINTAINED FREE OF ALL OBSTRUCTIONS OR IMPEDIMENTS TO FULL INSTANT
USE IN THE CASE OF FIRE OR OTHER EMERGENCY.
9.2.1 AIR CONDITIONING, HEATING, VENTILATION DUCTWORK, AND RELATED EQUIPMENT. AIR CONDITIONING, HEATING, VENTILATION
DUCTWORK, AND RELATED EQUIPMENT SHALL BE IN ACCORDANCE WITH NFPA 90A.
18.1.1.1.1 ALTERATION OF EXISTING HEALTH CARE OCCUPANCIES
18.1.1.4.3 REHABILITATION
18.1.1.4.3 (2) MINOR RENOVATION: A MINOR…
This is the start of the file's text. The full file is on GovTribe.