3. 25LLNV-0002 Repair K Spans RFI_Final.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Repair LSA K Spans
Solicitation number
Not on record
Issued by

About this file

This document is a Request for Information (RFI) for the repair of LSA K Spans located on Nevatim Air Base in Israel. The U.S. Air Force is seeking a contractor to perform comprehensive renovation work across multiple facility areas, including K-Span buildings (A, B, C, D), dormitory rooms, restrooms, and support spaces totaling approximately 2,593 square meters. Specific renovation requirements include replacing carpentry doors and door frames, updating lighting fixtures, applying gray epoxy floor coating, supplementing HVAC grilles, clearing existing spaces, and performing fire detection system repairs.

Key logistical details include a site visit scheduled for 15-16 July 2025, with contractor questions due by 20 July 2025 and RFI answers to be posted by 22 July 2025. Contractors must submit proposals via email to michael.roybal.1@us.af.mil, with pricing to be submitted in U.S. Dollars. U.S.-based contractors will be exempt from Value Added Tax under the Status of Forces Agreement (SOFA). The project requires compliance with Israeli Air Force and U.S. safety codes, and contractors will be responsible for managing all aspects of the renovation, including equipment, personnel, tools, and administrative services.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

25LLNV-0002 Repair K Spans Request for Information (RFI)
#Contractor Questions
1Are offerors required to submit any performance bonds or payment guarantees as part of this solicitation?
Please reference SF 1442.
2Should the pricing proposal be submitted in Israeli Shekels (NIS) or in U.S. Dollars (USD)?
Pricing should be submitted in U.S. Dollars (USD).
3Is there any guidance regarding Value Added Tax (VAT)? Specifically, will a U.S.-based company be eligible for reimbursement or exemption of VAT in the event it is incurred during contract execution in Israel?
U.S. contractors are exempt from VAT based off of the SOFA.
4Could you please confirm the official method for bid submission? Should proposals be submitted via SAM.gov, through an electronic platform such as PIEE, or directly by email to the designated U.S. Air Force point of contact?
Please submit proposals to the Contracting Officer via e mail to michael.roybal.1@us.af.mil.
5Please provide the surface area (in square meters) of all renovation zones in the facility, including floor area, rooms, restrooms, and showers.
K-Span A, B, C, D: 566 SM each

K-Span Latrine, Shower, Shave: 423 SM Small Dorm Rooms: 108 SM Large Dorm Rooms: 272 SM MWR/Mayor Cell: 324 SM Female Restroom: 33 SM Men Restroom: 117 SM

6Regarding replacement of carpentry doors – is the replacement of the door frames also required?
Yes
7Lighting Fixtures – Is it required to replace all lighting fixtures in the rooms and corridors? If so, can you please provide the quantity of fixtures to be replaced? Is it 2 lamps in a room? How many in the corridors?
2 Lights Per Room: 96 Total

10 Lights Per Cooridor: 80 Total

8Please clarify the required treatment of the existing floor. Specifically, is painting required? If so, please provide the paint specifications.
A gray epoxy paint would be ideal for the K-Spans. Coating must be durable, forms a hard protective layer, waterproof, chemical and abrasion-resistant, and easy to clean.
9Is it required to supplement or replace HVAC grilles in the rooms?
Yes
10Will the existing furniture be removed from the facility prior to work, or is the contractor responsible for clearing the space?
The contractor will be responsible for clearing the space.
11Fire Protection Systems

a. Are there any requirements to perform work to comply with fire safety codes? What fire safety systems are required? Since no sprinklers are currently installed, is a new sprinkler system required, or is it sufficient to repair the existing fire detection system? If a new system is required, please provide a Bill of Quantities and specifications for each item.

b. Existing fire detection panel (Simplex by Afcon) – is it required to repair or replace the panel due to its outdated condition?

a. Yes, all work will comply with IAF and US safety codes. As of now, a fire alarm system is the only requirement. We would like to repair the existing fire detection system.

b. A full repair of the current model that is installed will be sufficient at this time.

12 Showers and Restrooms

a. Is work required in the women's showers? If so, please specify the scope of work, as access to this area was not permitted during the site visit.

b. Men's restrooms – please provide the technical specifications of the trough, sinks, and faucets. Is it possible to receive a model/sample reference?

a. Yes, the only work required in the womens restroom would be the replacement of the shower heads (Quantity 4). Additionally, the female countertops will also have to be replaced.

Technical specifications of the female restroom countertops: L 350 mm x W 63 mm, 4 sinks

b. No make and model of countertops can be provided at this time. 23 showerheads total in the mens restroom Techincal specifications of the male restroom countertops (Quantity 2): L 640 mm x W 582 mm, 12 sinks

13Will the contractor be provided with an on-site office for the duration of the work?
No